CN108343054A - Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction - Google Patents

Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction Download PDF

Info

Publication number
CN108343054A
CN108343054A CN201810165693.8A CN201810165693A CN108343054A CN 108343054 A CN108343054 A CN 108343054A CN 201810165693 A CN201810165693 A CN 201810165693A CN 108343054 A CN108343054 A CN 108343054A
Authority
CN
China
Prior art keywords
construction
pile
mixing
foundation pit
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810165693.8A
Other languages
Chinese (zh)
Inventor
王贵祥
徐亮
寿凡
胡鑫军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Original Assignee
ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QINYE JIANGONG GROUP CO Ltd filed Critical ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Priority to CN201810165693.8A priority Critical patent/CN108343054A/en
Publication of CN108343054A publication Critical patent/CN108343054A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to building fields, construction reinforced concrete filling pile foundation pit enclosure construction is beaten more particularly to a kind of three axes agitating pile set, include the following steps, the axis stake machine of construction lofting → excavation groove → tri- debugging → mixing cement grout in place, unlatching air compressor machine send slurry to drill bit of pile machine → drill bit whitewashing, gas and cutting soil to sink to design stake bottom absolute altitude → drill bit whitewashing, gas and promotion and plays construction to design stake top absolute altitude → same method construction second row mixing pile → maintenance one week → drill-pouring pile protection.The present invention solves the problems, such as two axis stirring pile water stopping curtain maximum effective depth deficiency and building enclosure construction site critical constraints.

Description

Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction
Technical field
The invention belongs to building fields, and in particular to a kind of three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure and constructs Engineering method.
Background technology
In recent years, with the extensive use of skyscraper, building enclosure Normal practice is to fill in soft layer deep basal pit Note stake earth-retaining adds double two axis mixing pile sealing, but in narrow field, especially in City Building compact district building enclosure place When cannot meet bored concrete pile and adding double two axis mixing pile requirement, there are two axis stirring pile water stopping curtain maximum effective depth it is insufficient and The problem of building enclosure construction site critical constraints.And it beats construction reinforced concrete filling pile foundation pit in a kind of three axes agitating pile set of this proposition and encloses Construction is protected, thus this case generates.
Invention content
In view of the above technical problems, the purpose of the present invention is to provide a kind of three axes agitating pile sets to beat construction reinforced concrete filling pile base Pit enclosure construction, specific technical solution are:A kind of three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction, Include the following steps, the axis stake machine of construction lofting → excavation groove → tri- debugging → mixing cement grout in place is opened air compressor machine, sent Slurry to the whitewashing of drill bit of pile machine → drill bit, gas and cutting soil sinks to design stake bottom absolute altitude → drill bit whitewashing, gas and is promoted to setting Meter stake top absolute altitude → same method construction second row mixing pile → maintenance one week → drill-pouring pile protection plays construction.
Further, the excavation groove, according to foundation pit enclosure inner edge control line, using 0.4m3Excavator excavates groove, and Underground obstacle is removed, groove width is general single in 1.2m, and depth is 1 m.
Further, mixing speed and cement injection hydraulic control system:Three axis cement mixing piles should all in sinking and lifting process Inject cement grout, while stringent sinking control and promotion speed;Subsidence velocity of whitewashing is not more than 1m/min, and it is little to promote speed In 1.5 m/min;Grouting amount is generally the 70%~80% of specified slurry amount when drilling, and it is specified slurry amount to promote mixing-filling amount 20%~30%, suitably continue mixing-filling in stake bottom point.
Further, cement grout and cement grout injection are prepared:It builds at the construction field (site) and mixes slurry operation platform, near platform Bulk cement silo is built, slurries should be carried out before booting stirs system;Using 32.5 grades of Portland cements, cement grout Ratio of mud control mixes slurry and grouting amount for 1.5~2.0 and measures conversion with the soil mass consolidation side of every brill, and grouting pressure is 1.5~ 2.5MPa is controlled with slurries conveying capacity;Mixing pile soil body 28d compression strength >=1.2Mpa.When cement-soil stirring pile construction, no Must wash by water sinking, and adjacent two pile driving construction gap must not exceed 12h.
Further, mixing pile is installed:One row's mixing pile use strike-on, when mixing pile be two rows when outside mining strike-on, it is interior Arrange not strike-on;Dash area is to repeat set to bore, and ensures the continuity of fender body and the construction quality of connector, three axis cement mixing piles And the verticality of construction equipment, which is remedied, to be ensured by set brill is repeated, to have the function that curtain water stop.
The principle of the invention:In the surrounding of deep-foundation pit engineering, first according to positioning datum point, quasi- trench line is put, is opened after review Deep-mixed pile groove is dug, after three axes agitating pile frame and stirring system are completed, carries out tri-axial deep stirring pile construction, it is deep The number of rows of layer mixing pile construction is routinely an exclusive plus bored concrete pile, and two rows stirring pile protection can be used when narrow field and play perfusion Stake, when every section of deep-mixed pile pile body reaches certain intensity, the general maintenance phase is 7d, should carry out drilled pile construction immediately, Inner support beam must cut set and beat part hole inside mixing pile when constructing, be directly connected to convenient for internal support of foundation pit and bored concrete pile, it is ensured that The safety of foundation pit.
Advantageous effect of the present invention:Water seal curtain sealing is formed using tri-axial deep stirring pile, when deep-mixed pile reaches one After determining intensity, drilling pile protection is carried out immediately and plays construction, using bored concrete pile as foundation pit supporting pile, can be effectively protected neighbouring existing building Object and underground utilities reach safe and reliable purpose.
Tri-axial deep stirring pile water-stop curtain effective depth is up to 30m, and two axis stirring pile water stopping curtain is maximum effectively deep Degree is only 15m or so, when foundation pit digging depth is in 10~15m, replaces two axis mixing piles using tri-axial deep stirring pile, can have Effect solves the problems, such as the pit curtain sealing of this digging depth.
Three axes agitating pile set, which beats construction reinforced concrete filling pile, can effectively solve building enclosure construction site critical constraints, water-stop curtain The normal construction size of stake cannot be met the requirements and the special measure taken.
Specific implementation mode
A kind of three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction, includes the following steps, construction lofting → the axis stake machine of groove → tri- debugging → mixing cement grout in place is excavated, air compressor machine is opened, send slurry to drill bit of pile machine → drill bit spray Slurry, gas and cutting soil sink to design stake bottom absolute altitude → drill bit whitewashing, gas and are promoted to design stake top absolute altitude → same method Construction second row mixing pile → maintenance one week → drill-pouring pile protection plays construction.
Groove is excavated, according to foundation pit enclosure inner edge control line, using 0.4m3Excavator excavates groove, and lower barrier with clearing Hinder object, groove width is general single in 1.2m, and depth is 1 m.Native timely processing more than excavation groove, to ensure deep-mixed pile just Often construction, and reach civilized construction requirement.
Stake machine is in place:One, it is assumed unified command of by squad leader on duty, stake machine is in place, sees the feelings in terms of upper and lower, left and right before mobile clearly Condition finds that barrier should shut down removing in time.After stake machine movement, conscientiously checks situation and correct in time.Two, stake machine should be put down Surely, straight and even.It is used in combination theodolite to be observed correction pile frame, then loads onto sash weight control verticality.Three axis cement mixing pile positions are fixed Behind position, then positioning review is carried out, deviation should be less than 1cm.
Mixing speed and grout injection control:Three axis cement mixing piles are sinking and should all inject cement grout in lifting process, Stringent sinking control and promotion speed simultaneously.According to design or correlation technique data regulation, whitewashing subsidence velocity is not more than 1m/ Min promotes speed and is not more than 1.5 m/min.Grouting amount is generally the 70%~80% of specified slurry amount when drilling, promotes stirring note Slurry amount is the 20%~30% of specified slurry amount, suitably continues mixing-filling in stake bottom point.Carry out the original record of each pile.
Prepare cement grout and slurries injection:It builds at the construction field (site) and mixes slurry operation platform, platform nearby builds bulk water Mud silo, slurries should be carried out before booting stirs system.Using 32.5 grades of Portland cements, the ratio of mud of cement grout controls Slurry and grouting amount being mixed for 1.5~2.0, conversion being measured with the soil mass consolidation side of every brill, grouting pressure is 1.5~2.5MPa, defeated with slurries Send capability control.When mixing pile soil body 28d compression strength >=1.2Mpa cement-soil stirring pile constructions, must not wash by water sinking, adjacent Two pile driving construction gaps must not exceed 12h.
Mixing pile construction:One row's mixing pile uses strike-on;Mining strike-on outside when mixing pile is two row, interior row be not multiple It beats.Dash area is to repeat set to bore, and ensures the continuity of fender body and the construction quality of connector, three axis cement mixing piles and is applied The verticality of construction equipment, which is remedied, to be ensured by set brill is repeated, to have the function that curtain water stop.
Hole pouring pile of drilling is added using row's three axes agitating pile under general site condition, a row is limited for site condition When three axes agitating pile adds hole pouring pile planar dimension of drilling that cannot meet the requirements, using the set drilling perfusion of two row's three axes agitating piles Stake can reduce the spaces 300mm, and can remove after excavation and go along with sb. to guard him mixing pile on the inside of hole, can be further added by construction operation space 275mm, total space that can save is 575mm (for three axes agitating pile diameter with D850, cast-in-situ bored pile diameter is by taking D950 as an example);Especially Its depth, shallow foundation hole close to and place it is narrow, because certain special requirement first construct shallow foundation hole then construction deep basal pit must go along with sb. to guard him knot It is quite bigger than the space of conventional method saving using this engineering method in the case of the sealing problem of structure two sides, and be not required to additionally increase any Expense.Cast-in-situ bored pile should play construction by 7d or so sets after the completion of every section of mixing pile, can not must not delay in advance, drill-pouring Piece one jump in interval of stake is beaten, for avoid it is expanding after be difficult to be inserted into central pile, should be carried out after grout pile concrete pours for 24 hours Intermediate pile driving construction.
Stake top effective height is enclosure ring bottom elevation, should reach when perfusion that collar tie beam top mark is high, and chisel removes laitance after-pouring Collar tie beam, pile body main reinforcement stretches at least 500mm in collar tie beam, expanding to prevent, and should adjust mud balance, and natural mud domestic demand addition is swollen Profit soil or chemical paste, increase mud viscosity.
Monitoring technology and analysis:In Deep foundation Pit excavation, reinforce the information-based monitoring to deep pit monitor, it can be timely Understand the variation of construction stage foundation pit and surrounding enviroment, grasp monitoring data, is the control of working procedure, the layout of construction process Decision-making foundation is provided.Reason should be analyzed in time when significant change occur in foundation pit or surrounding enviroment monitoring data, taken and accordingly arranged It applies and is handled.

Claims (5)

1. a kind of three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction, it is characterised in that:Include the following steps, The axis stake machine of construction lofting → excavation groove → tri- debugging → mixing cement grout in place, opens air compressor machine, send slurry to drill bit of pile machine The whitewashing of → drill bit, gas and cutting soil sink to design stake bottom absolute altitude → drill bit whitewashing, gas and promoted to design stake top absolute altitude → Same method construction second row mixing pile → maintenance one week → drill-pouring pile protection plays construction.
2. three axes agitating pile set according to claim 1 beats construction reinforced concrete filling pile foundation pit enclosure construction, feature exists In:The excavation groove, according to foundation pit enclosure inner edge control line, using 0.4m3Excavator excavates groove, and descends obstacle with clearing Object, groove width is general single in 1.2m, and depth is 1 m.
3. three axes agitating pile set according to claim 1 beats construction reinforced concrete filling pile foundation pit enclosure construction, feature exists In:Mixing speed and cement injection hydraulic control system:Three axis cement mixing piles are sinking and should all inject cement grout in lifting process, Stringent sinking control and promotion speed simultaneously;Subsidence velocity of whitewashing is not more than 1m/min, promotes speed and is not more than 1.5 m/min; Grouting amount is generally the 70%~80% of specified slurry amount when drilling, promotes 20%~30% that mixing-filling amount is specified slurry amount, Suitably continue mixing-filling in stake bottom point.
4. three axes agitating pile set according to claim 1 beats construction reinforced concrete filling pile foundation pit enclosure construction, feature exists In:Prepare cement grout and cement grout injection:It builds at the construction field (site) and mixes slurry operation platform, platform nearby builds bulk cement Silo, slurries should be carried out before booting stirs system;Using 32.5 grades of Portland cements, the ratio of mud control of cement grout is 1.5~2.0 mix slurry and grouting amount measures conversion with the soil mass consolidation side of every brill, and grouting pressure is 1.5~2.5MPa, is conveyed with slurries Capability control;Mixing pile soil body 28d compression strength >=1.2Mpa;When cement-soil stirring pile construction, must not wash by water sinking, and adjacent two Pile driving construction gap must not exceed 12h.
5. three axes agitating pile set according to claim 1 beats construction reinforced concrete filling pile foundation pit enclosure construction, feature exists In:Mixing pile is installed:One row's mixing pile uses strike-on, when mixing pile is two row outside mining strike-on, interior row not strike-on;Shade Part is bored to repeat set, ensures the continuity of fender body and the construction quality of connector, three axis cement mixing piles and construction equipment Verticality to remedy be by repeating set and bore to ensure, to have the function that curtain water stop.
CN201810165693.8A 2018-02-28 2018-02-28 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction Pending CN108343054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810165693.8A CN108343054A (en) 2018-02-28 2018-02-28 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810165693.8A CN108343054A (en) 2018-02-28 2018-02-28 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction

Publications (1)

Publication Number Publication Date
CN108343054A true CN108343054A (en) 2018-07-31

Family

ID=62959116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810165693.8A Pending CN108343054A (en) 2018-02-28 2018-02-28 Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction

Country Status (1)

Country Link
CN (1) CN108343054A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155934A (en) * 2020-01-16 2020-05-15 龙元建设集团股份有限公司 Gravel layer three-shaft stirrer drill bit and construction method
CN112282767A (en) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology
CN114703881A (en) * 2022-04-18 2022-07-05 山西建筑工程集团有限公司 Construction method of waterproof curtain containing confined water hard stratum and triaxial mixing pile device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592605A (en) * 2017-01-17 2017-04-26 浙江勤业建工集团有限公司 Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven
CN106759379A (en) * 2017-01-25 2017-05-31 北京市政建设集团有限责任公司 A kind of construction method of the asymmetric water-stop curtain of foundation ditch
CN106894430A (en) * 2017-01-25 2017-06-27 北京市政建设集团有限责任公司 A kind of three axes agitating pile waterproof curtain construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592605A (en) * 2017-01-17 2017-04-26 浙江勤业建工集团有限公司 Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven
CN106759379A (en) * 2017-01-25 2017-05-31 北京市政建设集团有限责任公司 A kind of construction method of the asymmetric water-stop curtain of foundation ditch
CN106894430A (en) * 2017-01-25 2017-06-27 北京市政建设集团有限责任公司 A kind of three axes agitating pile waterproof curtain construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155934A (en) * 2020-01-16 2020-05-15 龙元建设集团股份有限公司 Gravel layer three-shaft stirrer drill bit and construction method
CN112282767A (en) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 Ultra-deep reinforcement construction method for shield end soil body under water-rich silty-fine sand geology
CN114703881A (en) * 2022-04-18 2022-07-05 山西建筑工程集团有限公司 Construction method of waterproof curtain containing confined water hard stratum and triaxial mixing pile device

Similar Documents

Publication Publication Date Title
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN104532821A (en) Extra-large karst cave bottom treatment construction method
CN101768961A (en) Construction method of section-steel triaxial soil-cement mixing pile
CN104631470A (en) Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel
CN106592605A (en) Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven
CN104674798A (en) Construction method for non-replacement and up-and-down convertible spouting five-shaft cement mixing pile
CN108343054A (en) Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction
CN102966110A (en) Vertically-combined type impermeable waterproof curtain structure and construction method thereof
CN109403333A (en) A kind of soft lower hard water rich strata deep basal pit reversed construction method
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN104695458A (en) Construction method of deep stirring and jet grouting compound pile waterproof curtain
CN107339122A (en) A kind of steel pipe column handles goaf engineering method
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN107035389B (en) A kind of construction method for grouting reinforcement and earth's surface construction method
CN103850261A (en) In-rock deep foundation pit rock-socketed water-stop curtain construction method
CN105221157A (en) WSS grouting and reinforcing assist gas pressure cutter replacing method in shield tunnel
CN110439011A (en) A kind of side slope antiskid supporting construction and its construction method
CN218060412U (en) Utility tunnel enclosure wall construction structures
CN216664152U (en) Water sealing structure for anchorage support
CN110344394A (en) A kind of surrounding deep foundation pit shallow embedding structure base ruggedized construction and construction method
CN110258588A (en) The branch mark structure and its construction method of ground double-decked slope
CN210857242U (en) Side slope anti-skidding supporting construction
JP3948655B2 (en) Construction method of retaining wall and underground structure
CN109488333B (en) Construction method for inserting pipe shed piles in horizontal stirring and spraying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731

RJ01 Rejection of invention patent application after publication