CN108328362A - A kind of layering material pulling device of clinker brick - Google Patents

A kind of layering material pulling device of clinker brick Download PDF

Info

Publication number
CN108328362A
CN108328362A CN201810371940.XA CN201810371940A CN108328362A CN 108328362 A CN108328362 A CN 108328362A CN 201810371940 A CN201810371940 A CN 201810371940A CN 108328362 A CN108328362 A CN 108328362A
Authority
CN
China
Prior art keywords
push rod
pulling device
support arm
oil cylinder
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810371940.XA
Other languages
Chinese (zh)
Other versions
CN108328362B (en
Inventor
毕长禄
李有奇
赵继增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Lier Refractory Materials Co Ltd
Original Assignee
Luoyang Lier Zhongjing Photovoltaic Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Lier Zhongjing Photovoltaic Material Co Ltd filed Critical Luoyang Lier Zhongjing Photovoltaic Material Co Ltd
Priority to CN201810371940.XA priority Critical patent/CN108328362B/en
Publication of CN108328362A publication Critical patent/CN108328362A/en
Application granted granted Critical
Publication of CN108328362B publication Critical patent/CN108328362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/24Unloading land vehicles
    • B65G67/30Unloading land vehicles using transportable tipping apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/82Rotary or reciprocating members for direct action on articles or materials, e.g. pushers, rakes, shovels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

The present invention relates to a kind of layering material pulling devices of clinker brick, including:Material-pulling device, material pulling device and track;The material-pulling device includes:Scraping wings, blanking plate, push rod, oil cylinder, push rod support arm and oil cylinder support arm;It is connected with push rod in the middle part of the scraping wings both ends, the push rod other end is fixedly connected with oil cylinder;The both ends of the every push rod are mounted on by pilot hole on push rod support arm, and described each oil cylinder one end is fixed with ground, and one end is installed in the pilot hole of oil cylinder support arm.The material pulling device includes:Take off rack, car body, lifting cylinder, raising board and push cylinder;The rack of taking off includes:Bottom frame, hopper, top frame, pull rod and clump weight.On ground between material-pulling device, material pulling device is orbited the track laying by car body.The present invention carries out layering to the clinker brick being fired into and takes off material, to distinguish product, not only saves the time, but also reduces artificial.

Description

A kind of layering material pulling device of clinker brick
Technical field
The present invention relates to refractory raw materials to manufacture field, especially a kind of layering material pulling device of clinker brick.
Background technology
Alumina powder is to be pressed into adobe using semidry method, block pattern row pattern is in kiln car using industrial alumina powder as raw material On after drying into tunnel oven high temperature firing, clinker is through cooling, broken, the micron order fine powder that is obtained after grinding after burning.Due to height Top and the bottom stratification of hot gas in warm tunnel oven causes larger upper and lower temperature difference, the only upper and lower temperature difference at the clinkering zone highest temperature just to reach Nearly 20 DEG C, the chemical composition difference of the top and the bottom clinker after being burnt so as to cause same kiln car is larger, generates two different productions Product need to be divided into the top part and the bottom part a point discharging respectively when unloading.Existing discharge way:Kiln car top clinker brick after cooling by Manual cleaning, the use of lower part clinker brick take off material machine and take off material automatically.The discharge way can just be opened after need to waiting until clinker cooling completely Beginning manual cleaning, the production cycle is long, and increases worker's workload, and therefore, it is necessary to design a kind of layering of clinker brick to take off material dress It sets, to improve such case.
Invention content
The purpose of the present invention is to propose to a kind of layering material pulling devices of clinker brick, divide the clinker brick being fired into Layer takes off material, to distinguish product, reduces artificial.
The present invention uses following technical scheme:A kind of layering material pulling device of clinker brick, including:Material-pulling device takes off material Device and track, on the ground among the material-pulling device, material pulling device is orbited the track laying by car body; The material-pulling device includes:Scraping wings, blanking plate, push rod, oil cylinder, push rod support arm and oil cylinder support arm, the pusher Plate is rectangle tabular structure, and upper end side is connected with blanking plate, and blanking plate is inclined rectangular slab, and lower end is solid with supporting rod It is scheduled on the lower part of scraping wings;Horizontal direction is respectively fixedly connected with blanking plate homonymy in the middle part of the scraping wings both ends Push rod, the push rod other end are fixedly connected with oil cylinder;The push rod support arm is each attached on wall or ground, is all provided with thereon It is equipped with pilot hole, the both ends of every push rod are mounted on by pilot hole on push rod support arm;The oil cylinder support arm is also solid Fixed to be both provided with pilot hole thereon on the ground, each oil cylinder one end is hinged with ground fixing device, the one end being connect with push rod It is installed in the pilot hole of oil cylinder support arm;The material pulling device includes:Take off rack, car body, lifting cylinder, raising board and Push cylinder;The rack of taking off is made of bottom frame, hopper, top frame, pull rod and clump weight, and bottom frame is rectangular frame structure, and one End is provided with hopper, and the other end is provided with clump weight, and middle part is fixedly installed two parallel pull rods, and top frame is rectangular frame knot Structure, the one week step for being equipped with indent in inside, is fixedly connected on four diagonal control arms on bottom frame below;The car body, which is located at, to be taken off Rack lower part, is fixedly installed connection frame thereon, connect on frame fixed setting there are four rectangular distribution and on bottom frame The matched cuboid locating piece of pull rod;The lifting cylinder lower end is fixed on Middle face on car body, and upper end is installed with Rectangle raising board, the step clearance cooperation of inside below the appearance and size and top frame of raising board;Push cylinder one end hinge It is connected in the middle part of the connection frame side of car body, the other end is hingeably secured to ground.
The length of the blanking plate is less than the length of scraping wings, is more than the length of hopper.
Its pilot hole of push rod support arm on the same root push rod coordinates with push rod clearance, and two holes center and The pilot hole center of oil cylinder support arm is located on the same line.
The upper level of the connection frame is concordant with the height of scraping wings upper end.
The beneficial effects of the invention are as follows:Material pulling device is taken off when unloading top clinker brick, and material-pulling device serves as striker plate, can keep off Half part of staying is not got off by band, and the different clinker brick of quality is separated discharge, is not exclusively cooled down and is realized in clinker Automatically material is taken off, has both saved the time, improved work efficiency, has also mitigated worker's workload.
Description of the drawings
Fig. 1 is the overall structure front view of the present invention.
Fig. 2 is the vertical view of the present invention.
Fig. 3 is material pulling device schematic diagram.
Fig. 4 is material-pulling device schematic diagram.
In figure, 1, bottom frame, 2, hopper, 3, top frame, 4, pull rod, 5, clump weight, 6, diagonal control arm, 7, lifting cylinder, 8, lifting Plate, 9, car body, 10, locating piece, 11, connection frame, 12, push cylinder, 13, track, 14, scraping wings, 15, blanking plate, 16, push away Bar, 17, push rod support arm, 18, oil cylinder support arm, 19, oil cylinder, 20, ground fixing device, 21, melt pit.
Specific implementation mode
The present invention is described in further detail with reference to the accompanying drawings of the specification.
As shown in Figure 1 and Figure 2, a kind of layering material pulling device of clinker brick, including:Material-pulling device, material pulling device and track 13, the track 13 is layed on the ground among material-pulling device, and material pulling device is run by car body 9 on track 13;Institute The material-pulling device stated includes:Scraping wings 14, blanking plate 15, push rod 16, oil cylinder 19, push rod support arm 17 and oil cylinder support arm 18; The scraping wings 14 is rectangle tabular structure, and upper end side is connected with blanking plate 15, and blanking plate 15 is inclined rectangle Plate, lower end are fixed on the lower part of scraping wings 14 with supporting rod;Distinguish with 15 homonymy of blanking plate in the middle part of 14 both ends of scraping wings It is fixedly connected with the push rod 16 of a horizontal direction, 16 other end of push rod is fixedly connected with oil cylinder 19;The push rod support arm 17 are each attached on wall or ground, are both provided with pilot hole thereon, and the both ends of every push rod 16 are installed by pilot hole On push rod support arm 17;The oil cylinder support arm 18 is also secured on ground, is both provided with pilot hole, each oil cylinder thereon 19 one end are hinged with ground fixing device 20, and the one end being connect with push rod 16 is installed in the pilot hole of oil cylinder support arm 18; The material pulling device includes:Take off rack, car body 9, lifting cylinder 7, raising board 8 and push cylinder 12;It is described take off rack by Bottom frame 1, hopper 2, top frame 3, pull rod 4 and clump weight 5 are constituted, and bottom frame 1 is rectangular frame structure, and one end is provided with hopper 2, another End is provided with clump weight 5, and middle part is fixedly installed two parallel pull rods 4, and the top frame 3 is rectangular frame structure, under One week step for being equipped with indent, is fixedly connected on four diagonal control arms 6 on bottom frame 1 on the inside of face;The car body 9, which is located at, takes off rack Lower part, be fixedly installed thereon connection frame 11, connect frame 11 on fixed setting there are four it is rectangular distribution and on bottom frame 1 4 matched cuboid locating piece 10 of pull rod;7 lower end of lifting cylinder is fixed on Middle face on car body 9, and peace is fixed in upper end Equipped with rectangle raising board 8, the appearance and size of raising board 8 coordinates with the step clearance of inside below top frame 3;The push cylinder 12 one end are hinged in the middle part of 11 side of connection frame of car body 9, and the other end is hingeably secured to ground..
The length of the blanking plate 15 is less than the length of scraping wings 14, is more than the length of hopper 2, clinker when convenient for taking off material Brick falls into melt pit, and will not pound and fall on mechanically.
Its pilot hole of push rod support arm 17 on the same root push rod 16 and 16 clearance fit of push rod, and two holes Center and the pilot hole center of oil cylinder support arm 18 are located on the same line, and ensure that the direction of power when pusher is horizontal, push rod is flat It is steady to promote.
The upper level of the connection frame 11 is concordant with the height of 14 upper end of scraping wings, ensures point of clinker brick heap Layer height, and material pulling device does not collide material-pulling device.
In use, the clinker brick of block pattern row pattern is transported to immediately ahead of layering material pulling device, the scraping wings 14 of material-pulling device Push away near simultaneously contradicts chamotte brick heap, starts material pulling device, and the clinker brick on 14 top of scraping wings is discharged into right side melt pit 21;Then it pushes away The continuation of scraping wings 14 of material device promotes to the left, and remaining clinker brick is pushed into left side melt pit 21, that is, completes layering and takes off material.
Part not in the detailed description of the invention is the prior art.

Claims (4)

1. a kind of layering material pulling device of clinker brick, it is characterized in that:Including:Material-pulling device, material pulling device and track, it is described On ground among the material-pulling device, material pulling device is orbited track laying by car body;The material-pulling device packet It includes:Scraping wings, blanking plate, push rod, oil cylinder, push rod support arm and oil cylinder support arm, the scraping wings are rectangle tabular knot Structure, upper end side are connected with blanking plate, and blanking plate is inclined rectangular slab, and lower end is fixed on supporting rod under scraping wings Portion;The push rod of a horizontal direction is respectively fixedly connected in the middle part of the scraping wings both ends with blanking plate homonymy, push rod is another End is fixedly connected with oil cylinder;The push rod support arm is each attached on wall or ground, is both provided with pilot hole thereon, often The both ends of root push rod are mounted on by pilot hole on push rod support arm;The oil cylinder support arm is also secured on ground, On be both provided with pilot hole, each oil cylinder one end is hinged with ground fixing device, and the one end being connect with push rod is installed in oil cylinder In the pilot hole of support arm;The material pulling device includes:Take off rack, car body, lifting cylinder, raising board and push cylinder;Institute The rack of taking off stated is made of bottom frame, hopper, top frame, pull rod and clump weight, and bottom frame is rectangular frame structure, and one end is provided with material Bucket, the other end are provided with clump weight, and middle part is fixedly installed two parallel pull rods, and top frame is rectangular frame structure, below The one week step for being equipped with indent in inside, is fixedly connected on four diagonal control arms on bottom frame;The car body, which is located at, takes off rack lower part, It is fixedly installed connection frame thereon, connects and is fixedly installed on frame there are four rectangular distribution and is matched with the pull rod on bottom frame Cuboid locating piece;The lifting cylinder lower end is fixed on Middle face on car body, and upper end is installed with rectangle raising board, The step clearance cooperation of inside below the appearance and size and top frame of raising board;Described push cylinder one end is hinged on the company of car body It connects in the middle part of frame side, the other end is hingeably secured to ground.
2. a kind of layering material pulling device of clinker brick according to claim 1, it is characterized in that:The length of the blanking plate Degree is more than the length of hopper less than the length of scraping wings.
3. a kind of layering material pulling device of clinker brick according to claim 1, it is characterized in that:The same root push rod On its pilot hole of push rod support arm and push rod clearance coordinate, and the pilot hole centre bit at two holes center and oil cylinder support arm In on same straight line.
4. a kind of layering material pulling device of clinker brick according to claim 1, it is characterized in that:Described connects the upper of frame Apparent height is concordant with the height of scraping wings upper end.
CN201810371940.XA 2018-04-24 2018-04-24 Layered raking device for clinker bricks Active CN108328362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810371940.XA CN108328362B (en) 2018-04-24 2018-04-24 Layered raking device for clinker bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810371940.XA CN108328362B (en) 2018-04-24 2018-04-24 Layered raking device for clinker bricks

Publications (2)

Publication Number Publication Date
CN108328362A true CN108328362A (en) 2018-07-27
CN108328362B CN108328362B (en) 2023-10-20

Family

ID=62934409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810371940.XA Active CN108328362B (en) 2018-04-24 2018-04-24 Layered raking device for clinker bricks

Country Status (1)

Country Link
CN (1) CN108328362B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3834298A (en) * 1972-06-28 1974-09-10 Forrest Paschal Machinery Co Brick unloader-stacker apparatus
CN2846081Y (en) * 2005-10-27 2006-12-13 黄海强 Improvement of brick machine material pulling device push rod and link rod shaft structure
CN202784875U (en) * 2012-08-20 2013-03-13 王超 Unstacking robot
CN106853924A (en) * 2015-12-08 2017-06-16 襄阳凌霄模具有限公司 A kind of fired brick unstacker
CN106956938A (en) * 2017-03-16 2017-07-18 贵阳圣幸机电设备有限公司 Full-automatic fetching brick machine
CN208199838U (en) * 2018-04-24 2018-12-07 洛阳利尔中晶光伏材料有限公司 A kind of layering material pulling device of clinker brick

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3834298A (en) * 1972-06-28 1974-09-10 Forrest Paschal Machinery Co Brick unloader-stacker apparatus
CN2846081Y (en) * 2005-10-27 2006-12-13 黄海强 Improvement of brick machine material pulling device push rod and link rod shaft structure
CN202784875U (en) * 2012-08-20 2013-03-13 王超 Unstacking robot
CN106853924A (en) * 2015-12-08 2017-06-16 襄阳凌霄模具有限公司 A kind of fired brick unstacker
CN106956938A (en) * 2017-03-16 2017-07-18 贵阳圣幸机电设备有限公司 Full-automatic fetching brick machine
CN208199838U (en) * 2018-04-24 2018-12-07 洛阳利尔中晶光伏材料有限公司 A kind of layering material pulling device of clinker brick

Also Published As

Publication number Publication date
CN108328362B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN102503510B (en) Production process for firing alumina foamed ceramic filter board in roller kiln
CN103276408B (en) Preparation method of high-quality prebaked anode for 500KA electrolytic cell
CN208199838U (en) A kind of layering material pulling device of clinker brick
CN105984014B (en) A kind of production method of Ceramic Tiles of the natural-like stone with crackle
CN102368017A (en) Granular material multilayer calcining furnace and calcining method
CN108328362A (en) A kind of layering material pulling device of clinker brick
CN101870561B (en) Large automatic shaft lime kiln
CN109520284A (en) A kind of five-part form magnesia unslacked energy conservation and environmental protection shaft furnace
CN106338200A (en) Method for producing quick lime through brickmaking waste heat
CN101509724B (en) Smelting blast deflecting wall for vertical pellet furnace and drying bed
CN106827211A (en) A kind of ceramic brick feeding bucket and use its production system and method
CN115682738A (en) Carbide high temperature calcining device
CN203413957U (en) Reciprocating type steel-structure brick kiln
CN207273529U (en) One kind sintering pavior brick automatic production line
CN205275469U (en) A production line for making foamed ceramics heated board
CN108384913A (en) A kind of efficient reduction coal base shaft furnace
CN206736105U (en) A kind of large-scale calcining light calcined magnesia reverberatory furnace automatic discharge apparatus
CN106746767A (en) Double-deck spray burning type stone flour, stone lime burning tunnel cave
CN107010936A (en) A kind of heat-resistant high-strength ceramics and its production technology and application
CN201713439U (en) Large automatic shaft limekiln
CN111792939A (en) High-aluminum brick and preparation method thereof
CN209383671U (en) A kind of active lime firing system
CN206680388U (en) Double-deck spray burning type stone flour, stone lime burning tunnel cave
US20140377037A1 (en) Solid fuel skewer suspension burning system
CN207735340U (en) A kind of electric-melting magnesium returns to the processing unit of material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 471322 Baisha Town Industrial Agglomeration Area, Yichuan County, Luoyang City, Henan Province

Applicant after: Luoyang Lier Functional Materials Co.,Ltd.

Address before: 471322 Baisha Town Industrial Agglomeration Area, Yichuan County, Luoyang City, Henan Province

Applicant before: LUOYANG LIER ZHONGJING PHOTOVOLTAIC MATERIAL Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240613

Address after: 471000 Luolong science and Technology Park, Luoyang hi tech Industrial Development Zone, Henan Province

Patentee after: LUOYANG LIER REFRACTORY MATERIAL Co.,Ltd.

Country or region after: China

Address before: 471322 Baisha Town Industrial Agglomeration Area, Yichuan County, Luoyang City, Henan Province

Patentee before: Luoyang Lier Functional Materials Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right