CN108316327A CN201810171052.3A CN201810171052A CN108316327A CN 108316327 A CN108316327 A CN 108316327A CN 201810171052 A CN201810171052 A CN 201810171052A CN 108316327 A CN108316327 A CN 108316327A
Authority
CN
China
Prior art keywords
template
open caisson
stupefied
construction method
latch closure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810171052.3A
Other languages
Chinese (zh)
Inventor
洪沪民
孙焕斌
刘克亮
王靖
唐子健
王轶喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201810171052.3A priority Critical patent/CN108316327A/en
Publication of CN108316327A publication Critical patent/CN108316327A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to Construction Technology field, specifically a kind of open caisson template and its construction method, including several standard segments template, each standard segment template include modular unit and support unit, the modular unit includes:Panel, several masters be stupefied, connector, spiral latch closure, back cord, and the support unit includes:Bearing diagonal, supporting boot and Screw arbor with nut at both-ends, the stupefied parallel arrangement successively of several masters is arranged on panel, the described back cord setting the stupefied top both sides of master and perpendicular to be set to several masters it is stupefied on, the side of the back cord connects bearing diagonal by connector, it is connected by supporting boot between two bearing diagonals in the template of same standard segment, is connected by spiral latch closure between the template of adjacent modular segment.The scope of application of the construction method is wider, easy construction, and reliability is high, and concrete surface is smoother smooth, overall beautiful.In addition, the speed of application of the present invention is fast, duration effect is apparent and loss is few, it is at low cost.

Description

A kind of open caisson template and its construction method
[technical field]
The present invention relates to Construction Technology field, specifically a kind of open caisson template and its construction method.
[background technology]
In open caisson template construction, traditional mold method is that template is processed into typified form, but this by design radial The versatility of kind way template is bad, and formwork cost is once amortized, and cost is higher.Another uses combined steel, need to set It sets split bolt to reinforce template, be cut off after concrete setting, then by screw rod, this traditional construction technique will produce seam Gap, in case of rich groundwater just will produce leakage during well sinking, and the gap between combined steel can influence concrete Surface quality.
[invention content]
The purpose of the present invention is exactly to solve the above problem in the prior art, a kind of structure novel is provided, safety can It leans on, open caisson template easy for construction, including several standard segments template, each standard segment template includes modular unit and branch Unit is supportted, the modular unit includes:Panel, several masters be stupefied, connector, spiral latch closure, back cord, the support unit packet It includes:Bearing diagonal, supporting boot and Screw arbor with nut at both-ends, the stupefied parallel arrangement successively of several masters are arranged on panel, and the back cord is set Set the stupefied top both sides of master and perpendicular to be set to several masters it is stupefied on, the side of the back cord connects bearing diagonal by connector, It is connected by supporting boot between two bearing diagonals in the template of same standard segment, passes through spiral between the template of adjacent modular segment Latch closure connects, and Screw arbor with nut at both-ends is common templates reinforcing mode, is distributed in template.
The panel uses glued board.
The master is stupefied to use "Ji" type steel and wood composite beam.
The invention also includes a kind of open caisson template construction methods, pour one section standard knot of sinking after the quasi- segment template of a feast-brand mark Section template.
Construction method includes the following steps:
A) preparation of construction;
B) arc full-page proof guiding ruler sets up, positions;
C) template circular arc adjustment molding;
D) several standard segments template is installed;
E) form bracing system is installed;
F) concreting;
G) form removable;
H) template cleaning and repairing;
I) subsequent processing.
In step c), the distance of back cord in the template of adjacent modular segment is adjusted by adjusting spiral latch closure, and thus Complete the variation of entire form surfacing radian, to be regulated just set and locking screw latch closure fixes its shape at required shape, and makes each Segmentation back cord forms entirety.
The adjustment of template circular arc includes the following steps:
1) the spiral latch closure between back cord section and section is first unclamped;
2) it while being adjusted in synchronism two spiral latch closures up and down in the same direction, makes two spiral latch closure simultaneous retractables, form surfacing is gradually Become camber, the big sample ruler of template arc is used to check template arc in adjustment process;
3) by the template mixed up compared with big sample ruler, until arc radius full-page proof;
4) check that template surface has zero defect;
5) after form surfacing and radius are met the requirements, adjusting bolt between adjustable back cord section and section is tightened;
6) thorough cleaning is carried out to template, ensures that template surface is smoother smooth, then smear one layer of demoulding in template surface Form removal is convenient in agent.
This method uses main support of two bearing diagonals different in size as the adjustable plank sheathing of circular arc, and two supports are simultaneously It is connected to the supporting boot for being fixed on ground, show that template generates by calculating the thickness for pouring the borehole wall and primary concreting height Lateral pressure, and then obtain the intensity and length of required bearing diagonal, ensure side of the template in installation, dismounting and adjustment process Just and it is safe.
In step f), include the following steps:
1) before pouring, check that template contral line position is accurate, horizontal, cross dimensions and headroom size meet design and want It asks, various connectors, support element and reinforcing fitting must firmly install, non-loosening phenomenon, and formwork edge joint is tight;
2) various built-in fittings, pre-buried hole site are accurate, fixation, and the delivery pipe close to perfusion working face connects hose, pacifies Funnel and sliding slot are filled, so that concrete is sent to arch;
3) construction in layer is used when concreting, between flexible pipe outlet is centered in inner and outer template, concreting speed Degree control is in 10-15m3/ h often pours one layer, is made firm by ramming using poker vibrator closely knit.
In step g), when intensity reaches 75% i.e. collapsible die of design strength after the completion of concreting, form removal includes Following steps:
1) when form removal, according to matching board design regulation carry out, it then follows first prop up and tears open afterwards, rear branch is first torn open, first non-weight bearing area with Rear load-bearing position and top-down principle;
2) back cord and spiral latch closure of the template after removing should unclamp in time, template is unfolded, and have defect to panel It is repaired in time, and panel is cleared up.
Beneficial effects of the present invention include:
1. the scope of application of the construction method is wider, easy construction, reliability is high;
2. safe and reliable, concrete surface is smoother smooth, overall beautiful;
3. speed of application is fast, duration effect is apparent and loss is few, at low cost.
[description of the drawings]
Fig. 1 the embodiment of the present invention methods construction schematic diagram
Fig. 2 (a) is structural schematic diagram of the embodiment of the present invention;
Fig. 2 (b) is the side view of Fig. 2 (a) of the present invention;
Fig. 2 (c) is the vertical view of Fig. 2 (a) of the present invention;
Fig. 3 is the method for the present invention process flow chart figure;
As shown, in figure:1. wood panel, 2. " several " Zee bar steel Z clark beams, 3. connectors, 4. back cords, 5. spirals Latch closure, 6. bearing diagonals, 7. supporting boots
[specific implementation mode]
The invention will be further described below in conjunction with the accompanying drawings, and the structure and principle of this device are for the people of this profession It is very clearly.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this Invention.
The construction procedure of the present invention is as shown in Figure 3 comprising:
A) preparation of construction;
B) arc full-page proof guiding ruler sets up, positions;
C) template circular arc adjustment molding;
D) several standard segments template is installed;
E) form bracing system is installed;
F) concreting;
G) form removable;
H) template cleaning and repairing;
I) subsequent processing.
Wherein, the adjustable range of variable circular wooden formwork is that the distance between adjacent back cord provides, and it is main to adjust operation Flexible by the spiral latch closure for being erected at wooden model back, to complete the continuous variation of plank sheathing panel radian, it is to be regulated at Just set and locking screw latch closure fixes its shape to required shape, and keeps each segmentation steel back prismatic integral.
The regulating step of variable circular wooden formwork includes:
1) the spiral latch closure between back cord section and section is first unclamped;
2) it while being adjusted in synchronism two spiral latch closures up and down in the same direction, makes two spiral latch closure simultaneous retractables, form surfacing is gradually Become camber, the big sample ruler of template arc is used to check template arc in adjustment process.
3) by the circle curve template mixed up compared with big sample ruler, until arc radius full-page proof.
4) check that template surface has zero defect.
5) after form surfacing and radius are met the requirements, adjusting bolt between adjustable back cord section and section is tightened.
6) thorough cleaning is carried out to template, ensures that template surface is smoother smooth, then smear one layer of demoulding in template surface Form removal is convenient in agent.
Variable circular wooden formwork adjusts key technology:
1) when adjusting spiral latch closure, two lead screw should keep as possible simultaneously, in the same direction, it is synchronous, and governing speed cannot It is too fast.
If 2) adjust small radii, should repeatedly it be adjusted, it can not one-time-reach-place.
3) after adjusting forming, the bolt between back cord should be tightened in time;
4) spiral latch closure between all segmentation back cords should be totally released before adjusting, prevents from drawing bad formwork steel back cord when adjusting Or make panel deformation.
Main support present invention preferably employs two bearing diagonals different in size as the adjustable plank sheathing of circular arc, two supports It is connected to the supporting boot for being fixed on ground simultaneously.Template is obtained by calculating the thickness for pouring the borehole wall and primary concreting height The lateral pressure of generation, and then obtain the intensity and length of required bearing diagonal, ensure template in installation, dismounting and adjustment process Convenience and safety.
Template is after installation is complete, after structure size passed examination, carry out " variable circular wooden formwork support system inspection, it is right Stress is complicated or collection stage casing is supported reinforcing, prevents template stress deformation in concreting process.Reinforce acceptance(check) It afterwards, can casting concrete.
Concrete construction includes the following steps:
1) before pouring, check whether template contral line position is accurate, level, cross dimensions and headroom size, which meet, to be set Meter requires.Various connectors, support element and reinforcing fitting must firmly install, non-loosening phenomenon, and formwork edge joint is tight.
2) various built-in fittings, pre-buried hole site are accurate, fixed secured.For after so that concrete pipeline is installed no longer Mobile, the delivery pipe close to perfusion working face will connect hose and necessary funnel and sliding slot etc., so that concrete is sent to arch Portion.
3) construction in layer is wanted when concreting, between should flexible pipe outlet being centered in inner and outer template, and concreting Speed is not easy too fast, is controlled under normal circumstances in 10-15m3/h.Often pour one layer, should as a plug vibrator make firm by ramming it is closely knit.
Form removable step includes:
When intensity reaches 75% i.e. collapsible die of design strength after the completion of concreting;
1) when form removal, the regulation that should be designed according to matching board carries out, it then follows first props up and tears open afterwards, rear branch is first torn open, first non-weight bearing area With rear load-bearing position and top-down principle.Forbid to be prized firmly with sledgehammer.
2) back cord and spiral latch closure of the arc-shaped adjustable plank sheathing after removing should unclamp in time, template is unfolded, and right Panel has being repaired in time for defect, and clears up panel.

Claims (10)

1. a kind of open caisson template, it is characterised in that including several standard segments template, each standard segment template includes template Unit and support unit, the modular unit include:Panel, several masters be stupefied, connector, spiral latch closure, back cord, the branch Supportting unit includes:Bearing diagonal, supporting boot and Screw arbor with nut at both-ends, the stupefied parallel arrangement successively of several masters is arranged on panel, described Back cord setting the stupefied top both sides of master and perpendicular to be set to several masters it is stupefied on, the side of the back cord is connected by connector Bearing diagonal is connected between two bearing diagonals in the template of same standard segment by supporting boot, between the template of adjacent modular segment It is connected by spiral latch closure.
2. a kind of open caisson template as described in claim 1, it is characterised in that the panel uses glued board.
3. a kind of open caisson template as described in claim 1, it is characterised in that the master is stupefied to use "Ji" type steel and wood composite Beam.
4. a kind of open caisson template construction method, it is characterised in that using the open caisson template knot as described in claims 1 to 3 is any Structure pours the quasi- segment template of a feast-brand mark of sinking after the quasi- segment template of a feast-brand mark.
5. a kind of open caisson template construction method as claimed in claim 4, it is characterised in that include the following steps:
A) preparation of construction;
B) arc full-page proof guiding ruler sets up, positions;
C) template circular arc adjustment molding;
D) several standard segments template is installed;
E) form bracing system is installed;
F) concreting;
G) form removable;
H) template cleaning and repairing;
I) subsequent processing.
6. a kind of open caisson template construction method as claimed in claim 5, it is characterised in that in step c), by adjusting spiral Latch closure adjusts the distance of back cord in the template of adjacent modular segment, and thus completes the variation of entire form surfacing radian, waits adjusting Saving into required shape, just set and locking screw latch closure fixes its shape, and so that each segmentation heel is formed entirety.
7. such as a kind of open caisson template construction method described in claim 5 or 6, it is characterised in that the adjustment of template circular arc includes following Step:
1) the spiral latch closure between heel section and section is first unclamped;
2) it while being adjusted in synchronism two spiral latch closures up and down in the same direction, two spiral latch closure simultaneous retractables, form surfacing is made to crossfade into Arc checks template arc in adjustment process with the big sample ruler of template arc;
3) by the template mixed up compared with big sample ruler, until arc radius full-page proof;
4) check that template surface has zero defect;
5) after form surfacing and radius are met the requirements, adjusting bolt between adjustable heel section and section is tightened;
6) thorough cleaning is carried out to template, ensures that template surface is smoother smooth, then smear one layer of releasing agent in template surface, just In form removal.
8. a kind of open caisson template construction method as claimed in claim 5, it is characterised in that use two oblique branch different in size The main support as template is supportted, two support while being connected to the supporting boot for being fixed on ground, and the thickness of the borehole wall is poured by calculating Degree and primary concreting height obtain the lateral pressure that template generates, and then obtain the intensity and length of required bearing diagonal, protect Demonstrate,prove convenience and safety of the template in installation, dismounting and adjustment process.
9. a kind of open caisson template construction method as claimed in claim 4, it is characterised in that in step f), including following step Suddenly:
1) before pouring, checking that template contral line position is accurate, horizontal, cross dimensions and headroom size meet design requirement, Various connectors, support element and reinforcing fitting must firmly install, non-loosening phenomenon, and formwork edge joint is tight;
2) various built-in fittings, pre-buried hole site are accurate, fixation, and hose, installation leakage are connect close to the delivery pipe of perfusion working face Bucket and sliding slot, so that concrete is sent to arch;
3) construction in layer, between flexible pipe outlet is centered in inner and outer template, concreting speed control are used when concreting System is in 10-15m3/ h often pours one layer, is made firm by ramming using poker vibrator closely knit.
10. a kind of open caisson template construction method as claimed in claim 4, it is characterised in that in step g), concreting After the completion when intensity reaches 75% i.e. collapsible die of design strength, form removal includes the following steps:
1) it when form removal, is carried out according to the regulation of matching board design, it then follows first prop up and tear open afterwards, rear branch is first torn open, and first non-weight bearing area is held with after Weight position and top-down principle;
2) back cord and spiral latch closure of the template after removing should unclamp in time, template is unfolded, and have the timely of defect to panel It is repaired, and panel is cleared up.
CN201810171052.3A 2018-03-01 2018-03-01 A kind of open caisson template and its construction method Pending CN108316327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810171052.3A CN108316327A (en) 2018-03-01 2018-03-01 A kind of open caisson template and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810171052.3A CN108316327A (en) 2018-03-01 2018-03-01 A kind of open caisson template and its construction method

Publications (1)

Publication Number Publication Date
CN108316327A true CN108316327A (en) 2018-07-24

Family

ID=62900035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810171052.3A Pending CN108316327A (en) 2018-03-01 2018-03-01 A kind of open caisson template and its construction method

Country Status (1)

Country Link
CN (1) CN108316327A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456058A (en) * 2019-11-15 2020-07-28 中铁市政环境建设有限公司 Sectional type open caisson template and construction method thereof
CN112523243A (en) * 2019-09-19 2021-03-19 派利有限公司 Caisson template

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201962608U (en) * 2011-03-09 2011-09-07 天津第四市政建筑工程有限公司 Adjustable viaduct concrete anti-collision guardrail template supporting device
CN201990905U (en) * 2011-01-25 2011-09-28 秦皇岛老虎重工有限公司 Concrete pouring construction mold for nonballast track slab base
CN105672337A (en) * 2016-03-03 2016-06-15 杭州江润科技有限公司 Construction method for cast-in-situ caisson formwork-supporting system
CN106192758A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN206091283U (en) * 2016-07-01 2017-04-12 绍兴文理学院 Hydraulic pressure is from climbing formula elevartor shaft regularization operation platform
CN208023599U (en) * 2018-03-01 2018-10-30 中铁上海工程局集团有限公司 A kind of open caisson template

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201990905U (en) * 2011-01-25 2011-09-28 秦皇岛老虎重工有限公司 Concrete pouring construction mold for nonballast track slab base
CN201962608U (en) * 2011-03-09 2011-09-07 天津第四市政建筑工程有限公司 Adjustable viaduct concrete anti-collision guardrail template supporting device
CN105672337A (en) * 2016-03-03 2016-06-15 杭州江润科技有限公司 Construction method for cast-in-situ caisson formwork-supporting system
CN206091283U (en) * 2016-07-01 2017-04-12 绍兴文理学院 Hydraulic pressure is from climbing formula elevartor shaft regularization operation platform
CN106192758A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN208023599U (en) * 2018-03-01 2018-10-30 中铁上海工程局集团有限公司 A kind of open caisson template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523243A (en) * 2019-09-19 2021-03-19 派利有限公司 Caisson template
CN111456058A (en) * 2019-11-15 2020-07-28 中铁市政环境建设有限公司 Sectional type open caisson template and construction method thereof

Similar Documents

Publication Publication Date Title
CN103939114B (en) A kind of outstanding rail chassis lining construction method
CN104196055B (en) Outer wall of basement lower die board construction method
CN106988525A (en) A kind of skyscraper aluminum alloy mould plate construction method
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN105926942A (en) Construction method of combined aluminum/steel frame wood-plastic formwork system
CN107060075A (en) A kind of supporting construction connected for fabricated construction beam slab and installation method
CN107310025A (en) The fabricated device and method for prefabricating of a kind of Prefabricated bar boots
CN109680930A (en) Early-dismantling support system construction method
CN207582956U (en) A kind of one-time formed constructing device of concrete window tongue and groove
CN209799969U (en) A integrally lift up cantilever formwork device for quick construction shaft lining cutting
CN103276893A (en) Novel composite structure for supporting rigid building template and construction method
CN206337819U (en) A kind of bracing means of concrete structure templates for expansion joints
CN107524461A (en) A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect
CN103758348A (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN108316327A (en) A kind of open caisson template and its construction method
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN104975614B (en) Shaped steel combination formula single side formwork strengthening construction engineering method
CN117027859A (en) Tunnel lining double-trolley combined device and integral pouring construction method
CN108590147A (en) Assembling the shaped steel suspension scaffolding and its construction method
CN208023599U (en) A kind of open caisson template
CN110158951A (en) A kind of frame structure wooden template construction method entirely
CN207048305U (en) A kind of shear wall, which dissipates, spells formwork support structure
CN106835992A (en) A kind of arcuate structure clear-water concrete construction of cast-in-situ box-beam method
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN104453235B (en) Current conversion station fire wall construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination