CN108315514A - Blast furnace opening loading method - Google Patents

Blast furnace opening loading method Download PDF

Info

Publication number
CN108315514A
CN108315514A CN201810135303.2A CN201810135303A CN108315514A CN 108315514 A CN108315514 A CN 108315514A CN 201810135303 A CN201810135303 A CN 201810135303A CN 108315514 A CN108315514 A CN 108315514A
Authority
CN
China
Prior art keywords
blast furnace
furnace
blast
loading method
blow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810135303.2A
Other languages
Chinese (zh)
Other versions
CN108315514B (en
Inventor
陈畏林
郑华伟
贺珑
强农厂
张勇
李汉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Co Ltd
Priority to CN201810135303.2A priority Critical patent/CN108315514B/en
Publication of CN108315514A publication Critical patent/CN108315514A/en
Application granted granted Critical
Publication of CN108315514B publication Critical patent/CN108315514B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture Of Iron (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention belongs to BF Technology in Bao Steel fields, specifically disclose a kind of blast furnace opening loading method.It includes the following steps:1) each system debug before blast furnace opening and the preparation of blow-on furnace charge;2) empty coke is added into blast furnace, and be filled to furnace bosh or less to form the position of furnace charge cohesive zone;3) it send hot wind to blast furnace, controls wind pressure >=0.100Mpa, and during air-supply continue to be added into blast furnace empty burnt normal to stockline.The blast furnace opening process of the present invention uses half charging method, cold blow-on furnace charge is avoided disposably to put into blast furnace, simultaneously, band wind is blasted after pre-mounted part furnace charge, band wind catches up with stockline that can blow loose metal column, on the one hand the gas permeability for advantageously ensuring that stock column, is on the other hand conducive to the abundant burning of furnace charge, achievees the purpose that save furnace charge.

Description

Blast furnace opening loading method
Technical field
The present invention relates to blast furnace opening process, belong to BF Technology in Bao Steel field, are filled more particularly to a kind of blast furnace opening Material method.
Background technology
Blast furnace is the beginning in generation furnace life, it is newly-built, in repair, overhaul blast furnace will undergo blow-on recovery process, each blow-on Whether recovery process is smooth, directly affects the progress of the stove chief of a pit's phase stable smooth operation and indices after blow-on.Blow in burden is not It is simply full furnace charge will to be filled below blast-furnace line, more important is according to the reasonable gas fluid distrbution demand of blast furnace, by mine coke Distribution at the desired position, while reducing charging powder amount, for the coal gas circulation road for providing unobstructed after air-supply.
The blow in burden method generally used at present is divided by whether charging process blows:Band wind feeds and is filled without wind Material, wherein the powder in furnace charge can be blown out by cold wind outside stove with wind loading process, effectively reduces charging powder, meanwhile, it is roused Wind effect, it is of a relatively loose that furnace charge installs rear stock column, then commonly with wind charge mode before air-supply according to calculating Blow-on material is filled to normal stockline by feeding table feeding, is blown and is restored according still further to the air-supply regulation being made ready beforehand for, however this dress The problems such as material mode can cause permeability of stock column poor, and air-supply resume speed is slow, is unfavorable for the smooth recovery of blast furnace opening.
Invention content
In order to solve the above technical problems, working of a furnace fluctuation resistant frequency after blast furnace restores can be reduced the invention discloses a kind of Blast furnace opening loading method.
To achieve the above object, the invention discloses a kind of blast furnace opening loading method, it includes the following steps:
1) each system debug before blast furnace opening and the preparation of blow-on furnace charge;
2) empty coke is added into blast furnace, and be filled to furnace bosh or less to form the position of furnace charge cohesive zone;
3) hot wind, control hot wind wind pressure >=0.100Mpa are sent to blast furnace, and continued into blast furnace during sending hot wind It is normal to stockline that empty coke is added, after the stockline of blast furnace is normal, you can add normal furnace charge into blast furnace.
It is further preferred that in the step 3), between the top temperature that controls blast furnace roof is 100~300 DEG C, according to blast furnace The top temperature control charging rate of furnace roof, if the top temperature of blast furnace roof is less than 100 DEG C, further according to current charging rate Accelerate charging rate, if the top temperature of blast furnace roof is higher than 300 DEG C, further slows down charging speed according to current charging rate Degree.
Still further preferably, the hot wind in step 3) provides for the hot-blast stove of blast furnace, ensures sending heat to blast furnace Before wind, the dome temperature of hot-blast stove is more than 1100 DEG C.
Still further preferably, between empty burnt basicity control described in step 2) and step 3) is 0.9~1.0, step 2) it is consistent with empty burnt constituent and the constituent of blow-on furnace charge described in step 3).
Still more preferably, the blow-on furnace charge in step 1) includes coke and ore, and the ore includes dolomite, stone At least one of lime stone, sinter, pellet, silica mine and manganese ore.
Still more preferably, each system of step 1) includes at blast furnace feeding and feeding system, supply air system and slag iron Reason system.
Advantageous effect:
1, blast furnace opening process of the invention uses half charging method, and cold blow-on furnace charge is avoided disposably to put into blast furnace In, meanwhile, band wind is blasted after pre-mounted part furnace charge, band wind catches up with stockline that can blow loose metal column, on the one hand advantageously ensures that the saturating of stock column On the other hand gas is conducive to the abundant burning of furnace charge, achievees the purpose that fuel consumption;
2, for blast furnace opening process of the invention after furnace condition recovery is normal, the air quantity of blast furnace is relatively steady, reduces stove There is the frequency fluctuated in condition.
Specific implementation mode
In order to preferably explain the present invention, below in conjunction with seven blast furnace March of the limited iron-smelter of Wuhan Iron and Steel Plant blow-on process into one Step illustrates the main contents of the present invention, but present disclosure is not limited solely to following embodiment.
Present embodiment discloses a kind of seven blast furnace opening loading methods, specifically comprise the following steps:
1) preparation before blow-on:Adjust tapping machine angle (the present embodiment is preferably 6 °);Tap drain skirt before State of Blast Furnace Good yellow sand;Yellow sand, coke powder are padded in slag iron ditch;Prepare the oxygen hose of burning oxygen carefully;Yellow sand, coke powder have been padded in front of sand mouth, it is fixed Good baffle;Dry pit is cleaned out;The hot-blast stove of burned blast furnace before air-supply ensures that the dome temperature of the preceding hot-blast stove of air-supply is more than 1100℃;It is ready to make wadding that (for making the material composition of wadding, the form for making lining belongs to conventional technical means, does not appoint What restriction requirement);Get out blow-on furnace charge;
The blow-on furnace charge of the present embodiment includes coke and ore, and the ore includes dolomite, lime stone, sinter, ball Nodulizing, silica mine and manganese ore, the preparation amount that the blow-on furnace charge of seven blast furnaces of the present embodiment is obtained by calculation are as shown in table 1;
1 seven blast furnace opening materials list (one) of table
Kind Sintering Pelletizing Silica Lime stone Dolomite Manganese ore
Quantity (t) 4000 1000 200 150 150 100
2) pre-mounted part blow-on furnace charge:It is packed into empty coke first into blast furnace, then divides 4 times and O/C2.2 material is added, finally mends again Add empty coke, it is described empty burnt including 280 tons of coke, 42 tons of dolomite, 42 tons of lime stone, 9.6 tons of silica, 14 tons of manganese Mine, the O/C2.2 material include 112 tons of coke, 7.2 tons of dolomite, 7.2 tons of lime stone, 176 tons of sinter, 13.7 Silica, 4 tons of the manganese ore of ton;It is specific as shown in table 2;Furnace charge soft heat can be formed below the part blow-on furnace charge to furnace bosh of prepackage The position of band, the present embodiment are filled to the position of stockline 16.84m;
3) it is 1550m to send hot wind, control hot wind wind pressure >=0.100Mpa, control air quantity to blast furnace3/ min, and in air-supply It is empty burnt normal to stockline to continue the addition into blast furnace in the process, the speed by controlling charging is to ensure the top temperature of blast furnace roof Between 100~300 DEG C;The burnt situation of sky being added in the present embodiment is specifically as shown in table 2;I.e. by 440 tons of coke, 28.8 tons Dolomite, 27.3 tons of lime stone, 7.4 tons of sinter, 55.2 tons of silica, 16 tons of manganese ore are filled to stockline in the middle part of shaft The position of 13.42m, continue by 260 tons of coke, 16 tons of dolomite, 16 tons of lime stone, 440 tons of sinter, 92 tons Pellet, 29.2 tons of silica, 8 tons of manganese ore are filled to the position of upper shaft stockline 9.58m, finally by 340 tons of coke, 12 Dolomite, 12 tons of lime stone, 750 tons of sinter, 150 tons of pellet, 31.2 tons of silica, 12 tons of the manganese ore dress of ton To the position of upper shaft stockline 4.06m.
Specifically, after sending hot wind to blast furnace, stockline puts a stock rod at shaft middle and lower part per 30min, according to spy The stockline of survey strictly presses feeding plan feeding.
According to top temperature control feeding rhythm, stockline is gradually caught up with.
After stockline reaches upper shaft, stock rod is taken to follow the mode feeding of charge level detection.
After stockline reaches 6.0m, according to the turning angle of normal production setting, according to the matrix automatic distributing set.
2 seven blast furnace opening materials list (two) of table
After above-mentioned stockline restores normal, ensure the air quantity of blast furnace and normal feeding quantity.
In addition, the basicity of the furnace charge indicated in above-mentioned Tables 1 and 2 controls between 0.9~1.0.
It is that quick, the smooth blow-on of seven blast furnaces creates that the present embodiment, which uses half charging method, good permeability of stock column, Condition;
The air quantity of this blow-on is relatively large and quite steady, in addition to the air quantity fluctuation caused by the discharge of stokehold slag iron, is expecting That there is a phenomenon where air quantity atrophys in dynamic later recovery process.
Above example is only best citing, rather than a limitation of the embodiments of the present invention.Except above-described embodiment Outside, the present invention also has other embodiment.All technical solutions formed using equivalent substitution or equivalent transformation, all fall within the present invention It is required that protection domain.

Claims (6)

1. a kind of blast furnace opening loading method, it is characterised in that:It includes the following steps:
1) each system debug before blast furnace opening and the preparation of blow-on furnace charge;
2) empty coke is added into blast furnace, and be filled to furnace bosh or less to form the position of furnace charge cohesive zone;
3) hot wind, control hot wind wind pressure >=0.100Mpa are sent to blast furnace, and continues to be added into blast furnace during sending hot wind The empty burnt stockline to blast furnace is normal.
2. blast furnace opening loading method according to claim 1, it is characterised in that:In the step 3), State of Blast Furnace is controlled Between the top temperature on top is 100~300 DEG C, according to the top temperature control charging rate of blast furnace roof.
3. blast furnace opening loading method according to claim 1, it is characterised in that:The hot wind in step 3) is blast furnace Hot-blast stove provide, ensured before sending hot wind to blast furnace, the dome temperature of hot-blast stove is more than 1100 DEG C.
4. blast furnace opening loading method according to claim 1, it is characterised in that:Empty burnt basicity control described in step 2) It is made as between 0.9~1.0, between empty burnt basicity control described in step 3) is 0.9~1.0.
5. blast furnace opening loading method according to claim 1, it is characterised in that:Blow-on furnace charge in step 1) includes coke Charcoal and ore, the ore include at least one of dolomite, lime stone, sinter, pellet, silica mine and manganese ore.
6. blast furnace opening loading method according to claim 1, it is characterised in that:Each system of step 1) includes that blast furnace supplies Material and feeding system, supply air system and slag iron processing system.
CN201810135303.2A 2018-02-09 2018-02-09 Blast furnace blow-in charging method Active CN108315514B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810135303.2A CN108315514B (en) 2018-02-09 2018-02-09 Blast furnace blow-in charging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810135303.2A CN108315514B (en) 2018-02-09 2018-02-09 Blast furnace blow-in charging method

Publications (2)

Publication Number Publication Date
CN108315514A true CN108315514A (en) 2018-07-24
CN108315514B CN108315514B (en) 2019-12-31

Family

ID=62903480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810135303.2A Active CN108315514B (en) 2018-02-09 2018-02-09 Blast furnace blow-in charging method

Country Status (1)

Country Link
CN (1) CN108315514B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593149A (en) * 2019-02-20 2020-08-28 新疆八一钢铁股份有限公司 Smooth blow-in method for large blast furnace for iron making
CN113046502A (en) * 2019-12-27 2021-06-29 山西建龙实业有限公司 Blast furnace smelting method for preparing large-ore-batch circulating ore composite material
CN114672600A (en) * 2022-04-20 2022-06-28 攀钢集团攀枝花钢铁研究院有限公司 Method for eliminating accumulation of vanadium-titanium ore blast furnace smelting hearth center

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54127806A (en) * 1978-03-27 1979-10-04 Sumitomo Metal Ind Ltd Blast furnace operation
CN101671751A (en) * 2009-10-14 2010-03-17 首钢总公司 Quantification blow-in method for blast furnace
CN104131119A (en) * 2014-06-20 2014-11-05 甘肃酒钢集团宏兴钢铁股份有限公司 Blast furnace start-up charging ignition method
CN105506203A (en) * 2015-12-24 2016-04-20 首钢总公司 Blast furnace blow-in burdening method
CN106011339A (en) * 2016-07-07 2016-10-12 首钢总公司 Blow-in burdening method for blast furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54127806A (en) * 1978-03-27 1979-10-04 Sumitomo Metal Ind Ltd Blast furnace operation
CN101671751A (en) * 2009-10-14 2010-03-17 首钢总公司 Quantification blow-in method for blast furnace
CN104131119A (en) * 2014-06-20 2014-11-05 甘肃酒钢集团宏兴钢铁股份有限公司 Blast furnace start-up charging ignition method
CN105506203A (en) * 2015-12-24 2016-04-20 首钢总公司 Blast furnace blow-in burdening method
CN106011339A (en) * 2016-07-07 2016-10-12 首钢总公司 Blow-in burdening method for blast furnace

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郝志忠 等: ""包钢8#高炉开炉达产实践"", 《包钢科技》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593149A (en) * 2019-02-20 2020-08-28 新疆八一钢铁股份有限公司 Smooth blow-in method for large blast furnace for iron making
CN113046502A (en) * 2019-12-27 2021-06-29 山西建龙实业有限公司 Blast furnace smelting method for preparing large-ore-batch circulating ore composite material
CN114672600A (en) * 2022-04-20 2022-06-28 攀钢集团攀枝花钢铁研究院有限公司 Method for eliminating accumulation of vanadium-titanium ore blast furnace smelting hearth center
CN114672600B (en) * 2022-04-20 2023-08-29 攀钢集团攀枝花钢铁研究院有限公司 Method for eliminating central accumulation of smelting hearth of vanadium titanium ore blast furnace

Also Published As

Publication number Publication date
CN108315514B (en) 2019-12-31

Similar Documents

Publication Publication Date Title
CN108330238B (en) A method of utilizing the smelting vanadium-titanium magnetite by blast furnace of superelevation oxygen-enriched air blast
CN104131122B (en) A kind of iron-smelting process based on winding-up coal gas of high temperature
Liu et al. Low carbon operation of super-large blast furnaces in China
CN106011341B (en) The method that blast furnace process schreyerite carries high-coal ratio
CN101445848A (en) Process and device for continuous steelmaking from ferriferous material
CN104232822B (en) The method of high-phosphor oolitic hematite vanadium titano-magnetite blast furnace ironmaking
CN113774178A (en) Production system of Ou metallurgical furnace and hydrogen-rich carbon circulation blast furnace coupling
CN114457203B (en) Method for treating furnace hearth aberration of European smelting furnace gasification furnace
CN108315514A (en) Blast furnace opening loading method
CN106868245B (en) A kind of molten iron making processes of two-step method
CN104328242B (en) Method for making steel containing vanadium titanium high phosphorus hot metal
CN102399921A (en) Blast furnace blowing-in batching method
CN108913831A (en) Method for determining coal injection amount of blast furnace
CN103205514B (en) Method for smelting qualified pig iron from low-grade dilution ores containing high quantities of harmful elements
CN109321699A (en) A kind of method of the blast furnace stockline dropping blowing out not residual iron placing burn-up dead coke heap of tuyere area
CN108676947A (en) Method for determining granularity of mixed pulverized coal for blast furnace injection
CN107090529B (en) Production method is quickly reached after a kind of high-titanium type vanadium-titanium magnetite blast furnace staying
CN102912049B (en) Method for eliminating central coke feeding of blast furnace
CN106591524A (en) Low-cost blast furnace smelting method
CN110172535A (en) A kind of blast furnace drop stockline to bosh replacement cooling wall binder and answer wind distribution
CN113416808B (en) Method for controlling zinc load of blast furnace
CN108504803A (en) A kind of technique improving Coal Injection Amount into BF
CN110835662B (en) Furnace stewing material charging method for rapidly recovering furnace condition of blast furnace
CN114480770A (en) Gasification furnace charge level lowering and furnace shutdown method for Ou smelting furnace
CN114395655A (en) Method for reducing energy consumption of Ou metallurgical furnace process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant