CN108256831A - The method that Engineering documents Management is carried out based on visualization BIM models - Google Patents
The method that Engineering documents Management is carried out based on visualization BIM models Download PDFInfo
- Publication number
- CN108256831A CN108256831A CN201810104927.8A CN201810104927A CN108256831A CN 108256831 A CN108256831 A CN 108256831A CN 201810104927 A CN201810104927 A CN 201810104927A CN 108256831 A CN108256831 A CN 108256831A
- Authority
- CN
- China
- Prior art keywords
- data
- engineering
- bim
- bim models
- models
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000012800 visualization Methods 0.000 title claims abstract description 13
- 238000007726 management method Methods 0.000 claims abstract description 36
- 241001269238 Data Species 0.000 claims abstract description 15
- 238000013523 data management Methods 0.000 claims abstract description 8
- 239000000463 material Substances 0.000 claims description 9
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000003860 storage Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 11
- 238000005516 engineering process Methods 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000012797 qualification Methods 0.000 description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 238000002716 delivery method Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Evolutionary Computation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Architecture (AREA)
- Pure & Applied Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Civil Engineering (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This application involves a kind of methods for carrying out Engineering documents Management based on visualization BIM models, include the following steps:BIM model datas are connected by data-interface;BIM models charging assembly loading BIM model datas in utilizing works data management tool;Selected member or selected member and engineering data table is created on BIM models in build list table;To engineering data table into edlin and access on BIM models.The application in Engineering documents Management tool by realizing the Engineering documents Management based on BIM models, solve the problems, such as that BIM models are associated with mounting with engineering data datamation, working efficiency is greatly improved, while realizes the visualization problem of Engineering documents Management.
Description
Technical field
The present invention relates to a kind of method for carrying out Engineering documents Management based on visualization BIM models, suitable for engineering management
Technical field.
Background technology
BIM technology is based on every relevant information data of construction-engineering project, and mould is emulated by digital information
Intend real information possessed by building, by three-dimensional building model, realize project supervision, estate management, equipment management, number
Change the functions such as processing, engineering management.It has information completeness, information relevance, consistency on messaging, visualization, harmony,
Simulation, optimization property and it can go out eight big feature of figure.The projects such as construction unit, designing unit, unit in charge of construction, supervisor are joined
With side in identical platform, same building information model is shared.BIM technology developed in recent years in the application of construction project industry
Rapidly, construction project is being done step-by-step from planning, design, construction, the management of operation Life cycle.
On the other hand, engineering data establishment and management be through one of the entire work progress of construction project it is very important
Work is the most important content of project delivery method.Engineering documents Management is usually carried out by engineering data table, engineering data
Table is the important avatar of project delivery method, while is also most important data carrier in work progress.Entirely
Process relative recording that construction project can retain after being completed, the only engineering data data of data trace, therefore engineering data
There is irreplaceable role.At present whole building industry engineering data establishment and management be all by Engineering documents Management work
Have to complete,
At present, the developing direction of BIM technology is generally concentrated in work progress management, progress monitoring and cost control, but
It is and thinks little of the management of engineering data.Simultaneously as the strongly professional of Engineering documents Management, difficulty are larger, at present for work
The research that journey data management tool is combined with BIM still belongs to blank.BIM technology introducing Engineering documents Management tool can be solved effectively
The industry problems that certainly current BIM models mount automatically with engineering data.
Invention content
Engineering is carried out based on visualization BIM models it is an object of the invention to overcome the deficiencies of the prior art and provide one kind
The method of data management, includes the following steps:
(1) BIM model datas are connected by data-interface;
(2) the BIM models charging assembly loading BIM model datas in utilizing works data management tool;
(3) selected member or selected member and engineering data table is created in build list table on BIM models;
(4) on BIM models to engineering data table into edlin and access.
Preferably, the access way of BIM models is:The BIM models stored on the local computer are importing directly into work
In journey data management tool;Or BIM model datas on Cloud Server are directly invoked by interface, and be loaded into engineering data
In management tool.
Preferably, BIM models charging assembly is for the IFC forms light weighed model of standard and based on BIM design tools
The loading middleware of the light weighed model of plug-in unit conversion is converted, including the parsing of standardized structural volume data form and display module two
The data format file of light weighed model is parsed into normal structure volume data by part, then using graphics engine by BIM models
It is shown;The BIM model datas of loading include geometry data, build list table data and the structure attribute number of BIM models
According to.
Preferably, it is further comprising the steps of in step (3):It is single or multiple in selected member list in BIM views
Component selects single or multiple components on BIM models, sends out after creating engineering data instruction, lists relevant engineering
Data Table List;It selects corresponding engineering data table and creates, system can load engineering data list data and read automatically
The data of BIM models are taken, are filled up in engineering data table;Data are preserved after working out, while means of storage is provided with engineering
The incidence relation data of material, the related data of formation can be synchronized to Cloud Server storage.
Preferably, in addition on BIM models engineering data data are counted.It specifically, can be in BIM models
By being counted to the data for being associated with engineering data on floor, autonomous system and/or construction unit node, associated work is obtained
The information of journey data table, the engineering data table printed and unprinted engineering data table.
The application is embedded in BIM models in Engineering documents Management tool for the first time, by Engineering documents Management tool
It realizes the Engineering documents Management based on BIM models, there is following technical advantage:
1st, really solving the problems, such as that BIM models can not be automated with engineering data data is associated with mounting, exists for BIM models
Obstacle has been cleared away in the application in the fields such as construction management, quality surveillance, archives of city construction, greatly improves working efficiency;
2nd, the visualization of Engineering documents Management is realized, it is low to solve previous engineering data lookup inconvenience, the efficiency of management
Inferior many practical problems.
Description of the drawings
Fig. 1 is shown to be shown according to the flow of method for carrying out Engineering documents Management based on visualization BIM models of the application
It is intended to.
Specific embodiment
The present invention is described in detail below in conjunction with embodiment and attached drawing, it should be pointed out that described reality
It applies example and is intended merely to facilitate the understanding of the present invention, and do not play any restriction effect to it.
The application is by BIM models embedded in Engineering documents Management tool, so as to fulfill the visualization to engineering data
Management, while greatly improve the establishment efficiency of engineering data.Specifically, the application based on visualization BIM models carry out
The method of Engineering documents Management includes the following steps:
(1) BIM model datas are connected by data-interface.
The access of BIM models can provide two ways, and a kind of is that the BIM models of storage on the local computer is direct
It imported into Engineering documents Management tool;Another kind is the BIM model datas directly invoked by interface on Cloud Server, and is added
It is downloaded in Engineering documents Management tool.
(2) the BIM models charging assembly loading BIM model datas in utilizing works data management tool.
BIM models charging assembly can be converted for the IFC forms light weighed model of standard and based on BIM design tools
The loading middleware of the light weighed model of plug-in unit conversion, including the parsing of standardized structural volume data form and Viewer display modules
The data format file of light weighed model is parsed into normal structure volume data, is then drawn using the figure of Viewer by two parts
It holds up and is shown BIM models in the form of three-dimensional.Loading BIM model datas are divided into two parts, first, loading BIM models is several
What graph data, second is that the information data in loading BIM models, including build list table data and structure attribute data etc..
Specifically, " BIM views " workspace can be increased in Engineering documents Management tool, BIM is called in workspace
Model charging assembly, loaded and displayed BIM models.Light weighed model of the BIM model supports based on standard IFC forms and based on special
The light weighed model of BIM design tools conversion plug-in unit conversion, such as:BIM moulds based on the conversion of Revit modellings tool insert
Type.The BIM model datas imported from Cloud Server, are consistent by the BIM models of synchronized update interface and Cloud Server.
(3) selected member or selected member and engineering data table is created in build list table on BIM models.
Specifically, correlation is read from process database by information such as process, structure, the materials in BIM model components
The engineering data form template list of connection.For example, when choosing the wall body construction of sole plate of certain building, can read
Association table includes:Material accessory entry test record sheet, reinforcing bar former material supply of material producer qualification, reinforcing bar former material dealer qualification,
Reinforcing bar former material product certificate, reinforcing bar former material quality certificate, witness record, steel test report, raw material of reinforcement rebar inspection lot
Inspection of quality record, concrete bearing intension testing report, concrete provider qualification, concrete cast in situs record sheet etc..
Single or multiple components in BIM views in selected member list select single or more on BIM models
A component is sent out after creating engineering data instruction, and system can list relevant engineering data Table List automatically;Selection is corresponding
Engineering data table simultaneously creates, and system can load engineering data list data and read the data of BIM models automatically (for example, can
To be engineering information, axis position, quantities etc.), and Auto-writing is to engineering data table.Data are preserved after working out,
Means of storage and the incidence relation data of engineering data simultaneously, the related data of formation can be synchronized to Cloud Server storage.
(4) on BIM models to engineering data table into edlin and access.
Corresponding component is selected on BIM build list tables or BIM models, inquires the engineering data table that component association creates
Lattice data can also directly show engineering data table and modify to data.It preferably, can also be right on BIM models
Engineering data data are counted.For example, by association on the nodes such as the floor of BIM models, autonomous system, construction unit
The data of engineering data are counted, and be can obtain associated engineering data table, the engineering data table printed and are not printed
The information such as engineering data table.
The application solves BIM by realizing the Engineering documents Management based on BIM models in Engineering documents Management tool
Model is associated with the problem of mounting with engineering data datamation, greatly improves working efficiency, while realizes engineering money
The visualization problem of expects pipe reason.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than the present invention is protected
The limitation of range is protected, although being explained in detail with reference to preferred embodiment to the present invention, those of ordinary skill in the art should
Work as understanding, technical scheme of the present invention can be modified or replaced equivalently, without departing from the reality of technical solution of the present invention
Matter and range.
Claims (6)
- A kind of 1. method that Engineering documents Management is carried out based on visualization BIM models, which is characterized in that include the following steps:(1) BIM model datas are connected by data-interface;(2) the BIM models charging assembly loading BIM model datas in utilizing works data management tool;(3) selected member or selected member and engineering data table is created in build list table on BIM models;(4) on BIM models to engineering data table into edlin and access.
- 2. according to the method described in claim 1, it is characterized in that, the access way of BIM models is:The BIM models stored on the local computer are importing directly into Engineering documents Management tool;OrThe BIM model datas on Cloud Server are directly invoked by interface, and are loaded into Engineering documents Management tool.
- 3. method according to claim 1 or 2, which is characterized in that BIM model charging assemblies are the IFC lattice for standard Formula light weighed model and the loading middleware of light weighed model converted based on BIM design tools conversion plug-in unit, including standardization Structured data form parses and display module two parts, and the data format file of light weighed model is parsed into normal structure body Then BIM models are shown by data using graphics engine;The BIM model datas of loading include the geometric figure of BIM models Data, build list table data and structure attribute data.
- It is 4. according to the method described in claim 3, it is characterized in that, further comprising the steps of in step (3):Single or multiple components in BIM views in selected member list select single or multiple structures on BIM models Part sends out after creating engineering data instruction, lists relevant engineering data Table List;Select corresponding engineering data table simultaneously It creates, system can load engineering data list data and read the data of BIM models automatically, be filled up in engineering data table; Data are preserved after working out, while means of storage and the incidence relation data of engineering data, the related data of formation can synchronize It is stored to Cloud Server.
- 5. according to the described method of any one of claim 1-4, which is characterized in that also include providing engineering on BIM models Material data are counted.
- 6. according to the method described in claim 5, it is characterized in that, in the floor of BIM models, autonomous system and/or unit work Cheng Jiedian is upper by being counted to the data for being associated with engineering data, the engineering for obtain associated engineering data table, having printed The information of data table and unprinted engineering data table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104927.8A CN108256831B (en) | 2018-02-02 | 2018-02-02 | Method for managing engineering data based on visual BIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104927.8A CN108256831B (en) | 2018-02-02 | 2018-02-02 | Method for managing engineering data based on visual BIM model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108256831A true CN108256831A (en) | 2018-07-06 |
CN108256831B CN108256831B (en) | 2021-07-30 |
Family
ID=62743572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810104927.8A Active CN108256831B (en) | 2018-02-02 | 2018-02-02 | Method for managing engineering data based on visual BIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108256831B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240656A (en) * | 2018-08-02 | 2019-01-18 | 中衡设计集团股份有限公司 | A kind of Structure Calculation and analysis system based on web |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN109829241A (en) * | 2019-02-20 | 2019-05-31 | 中建一局集团第二建筑有限公司 | A method of it is constructed using the administrative skill based on architectural engineering process data |
CN110503387A (en) * | 2019-07-29 | 2019-11-26 | 兰州容大信息科技有限公司 | BIM model verification method and device during railway BIM project construction |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN112307543A (en) * | 2020-10-30 | 2021-02-02 | 湖南宝家云建筑工程管理有限公司 | Visual model construction method for guiding house construction and house construction system |
CN112700555A (en) * | 2020-12-31 | 2021-04-23 | 珠海派诺科技股份有限公司 | High configurable configuration 3D data visualization implementation method, electronic device and storage medium |
CN113688445A (en) * | 2020-05-19 | 2021-11-23 | 中交二公局第三工程有限公司 | Method for manufacturing engineering data three-dimensional index map |
CN116662257A (en) * | 2023-04-18 | 2023-08-29 | 北京永拓工程咨询股份有限公司 | Engineering data management method and system |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050028232A (en) * | 2003-09-18 | 2005-03-22 | 주식회사 맨인텍 | Integrated 3-dimension plant engineering review system and it's review process |
US20090092318A1 (en) * | 2007-10-03 | 2009-04-09 | Esker, Inc. | One-screen reconciliation of business document image data, optical character recognition extracted data, and enterprise resource planning data |
CN102509331A (en) * | 2011-10-25 | 2012-06-20 | 江苏南大先腾信息产业有限公司 | Dynamic model building method based on three-dimensional (3D) engine |
CN102693553A (en) * | 2011-08-26 | 2012-09-26 | 新奥特(北京)视频技术有限公司 | Method and device for creating charts achieving three-dimensional effect |
CN102708126A (en) * | 2011-02-28 | 2012-10-03 | 微软公司 | Data visualization design and view systems and methods |
CN103353956A (en) * | 2013-06-09 | 2013-10-16 | 华中科技大学 | Automatic standard detection early-warning system and working method thereof for special construction scheme of deep foundation pit |
KR20140118477A (en) * | 2013-03-29 | 2014-10-08 | 한국건설기술연구원 | Module and method for inputting property value of realtime automatic reviewable bim tool |
CN104462539A (en) * | 2014-12-24 | 2015-03-25 | 中国电建集团成都勘测设计研究院有限公司 | Three-dimensional visual original exploration data management method |
CN104504497A (en) * | 2014-12-03 | 2015-04-08 | 上海同筑信息科技有限公司 | BIM engineering information management system and method |
CN104766155A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | Engineering project element management method and system based on BIM |
CN104881751A (en) * | 2015-06-04 | 2015-09-02 | 北京建工土木工程有限公司 | System and method for construction material management based on building information model |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
CN106354945A (en) * | 2016-08-31 | 2017-01-25 | 天河大成建筑云科技(天津)有限公司 | Device and method for dynamic association of two-dimensional and three-dimensional engineering data based on building information modeling lightweight |
CN107038554A (en) * | 2017-03-30 | 2017-08-11 | 浙江精工钢结构集团有限公司 | Steel construction BIM informatization management methods and system based on Cloud Server |
CN107436785A (en) * | 2017-07-21 | 2017-12-05 | 东风设计研究院有限公司 | Revit software informations interactive system and exchange method based on information system |
CN107515974A (en) * | 2017-08-14 | 2017-12-26 | 中建三局第二建设工程有限责任公司 | Architectural engineering operation management platform construction method and system based on BIM |
-
2018
- 2018-02-02 CN CN201810104927.8A patent/CN108256831B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050028232A (en) * | 2003-09-18 | 2005-03-22 | 주식회사 맨인텍 | Integrated 3-dimension plant engineering review system and it's review process |
US20090092318A1 (en) * | 2007-10-03 | 2009-04-09 | Esker, Inc. | One-screen reconciliation of business document image data, optical character recognition extracted data, and enterprise resource planning data |
CN102708126A (en) * | 2011-02-28 | 2012-10-03 | 微软公司 | Data visualization design and view systems and methods |
CN102693553A (en) * | 2011-08-26 | 2012-09-26 | 新奥特(北京)视频技术有限公司 | Method and device for creating charts achieving three-dimensional effect |
CN102509331A (en) * | 2011-10-25 | 2012-06-20 | 江苏南大先腾信息产业有限公司 | Dynamic model building method based on three-dimensional (3D) engine |
KR20140118477A (en) * | 2013-03-29 | 2014-10-08 | 한국건설기술연구원 | Module and method for inputting property value of realtime automatic reviewable bim tool |
CN103353956A (en) * | 2013-06-09 | 2013-10-16 | 华中科技大学 | Automatic standard detection early-warning system and working method thereof for special construction scheme of deep foundation pit |
CN104504497A (en) * | 2014-12-03 | 2015-04-08 | 上海同筑信息科技有限公司 | BIM engineering information management system and method |
CN104462539A (en) * | 2014-12-24 | 2015-03-25 | 中国电建集团成都勘测设计研究院有限公司 | Three-dimensional visual original exploration data management method |
CN104766155A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | Engineering project element management method and system based on BIM |
CN104881751A (en) * | 2015-06-04 | 2015-09-02 | 北京建工土木工程有限公司 | System and method for construction material management based on building information model |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
CN106354945A (en) * | 2016-08-31 | 2017-01-25 | 天河大成建筑云科技(天津)有限公司 | Device and method for dynamic association of two-dimensional and three-dimensional engineering data based on building information modeling lightweight |
CN107038554A (en) * | 2017-03-30 | 2017-08-11 | 浙江精工钢结构集团有限公司 | Steel construction BIM informatization management methods and system based on Cloud Server |
CN107436785A (en) * | 2017-07-21 | 2017-12-05 | 东风设计研究院有限公司 | Revit software informations interactive system and exchange method based on information system |
CN107515974A (en) * | 2017-08-14 | 2017-12-26 | 中建三局第二建设工程有限责任公司 | Architectural engineering operation management platform construction method and system based on BIM |
Non-Patent Citations (7)
Title |
---|
FRANK OPITZ 等: "Integration of Document- and Model-based Building Information for Project Management Support", 《PROCEDIA ENGINEERING》 * |
YU-CHENG LIN: "Construction 3D BIM-based knowledge management system:a case study", 《JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT》 * |
刘剑峰: "科技研发中心项目地下室综合管线BIM技术应用", 《施工技术》 * |
张昆 等: "基于BIM的施工资料管理软件集成研究探索", 《工程质量》 * |
王婷 等: "基于BIM的施工资料管理***平台架构研究", 《工程管理学报》 * |
纪彦忠 等: "CityMaker中三维模型数据的数据库组织方法与应用扩展", 《城市勘测》 * |
魏振华 等: "基于免费组件的IFC数据三维图形交互模块研究", 《土木建筑工程信息技术》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240656A (en) * | 2018-08-02 | 2019-01-18 | 中衡设计集团股份有限公司 | A kind of Structure Calculation and analysis system based on web |
CN109240656B (en) * | 2018-08-02 | 2021-09-21 | 中衡设计集团股份有限公司 | Web-based structural calculation and analysis system |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN109829241A (en) * | 2019-02-20 | 2019-05-31 | 中建一局集团第二建筑有限公司 | A method of it is constructed using the administrative skill based on architectural engineering process data |
CN110503387A (en) * | 2019-07-29 | 2019-11-26 | 兰州容大信息科技有限公司 | BIM model verification method and device during railway BIM project construction |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN113688445A (en) * | 2020-05-19 | 2021-11-23 | 中交二公局第三工程有限公司 | Method for manufacturing engineering data three-dimensional index map |
CN113688445B (en) * | 2020-05-19 | 2024-04-19 | 中交二公局第三工程有限公司 | Method for making engineering data three-dimensional index map |
CN112307543A (en) * | 2020-10-30 | 2021-02-02 | 湖南宝家云建筑工程管理有限公司 | Visual model construction method for guiding house construction and house construction system |
CN112700555A (en) * | 2020-12-31 | 2021-04-23 | 珠海派诺科技股份有限公司 | High configurable configuration 3D data visualization implementation method, electronic device and storage medium |
CN112700555B (en) * | 2020-12-31 | 2023-11-14 | 珠海派诺科技股份有限公司 | High-configurable 3D data visualization realization method, electronic equipment and storage medium |
CN116662257A (en) * | 2023-04-18 | 2023-08-29 | 北京永拓工程咨询股份有限公司 | Engineering data management method and system |
Also Published As
Publication number | Publication date |
---|---|
CN108256831B (en) | 2021-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108256831A (en) | The method that Engineering documents Management is carried out based on visualization BIM models | |
CN110363852B (en) | Three-dimensional digital beam field, construction method, computer equipment and storage medium | |
CN109885626A (en) | Urban construction digital archives intelligent management system based on structural data and BIM model | |
CN102411764B (en) | The data management system of grid equipment and management method | |
CN111400812A (en) | BIM-based method for designing machining drawing of assembled structure shear wall | |
CN106354945A (en) | Device and method for dynamic association of two-dimensional and three-dimensional engineering data based on building information modeling lightweight | |
CN106611246A (en) | Integrated management system of land and resources | |
CN108984895A (en) | A kind of model automatic identifying method based on XML heterogeneous platform | |
CN106446319A (en) | Assembly visualization process design method | |
CN103616855A (en) | Three-dimensional simulation assembly-based cutting tool management system and management method thereof | |
CN104407576A (en) | Realization method for general type production and manufacturing unit and control system thereof | |
CN102708249A (en) | Method and system for product modular configuration | |
CN101944153A (en) | Component-based container terminal three-dimensional simulation method | |
WO2021228118A1 (en) | Central air conditioner intelligent design method, system and device | |
CN104216845A (en) | Process-oriented complex product final assembly data information transmitting method | |
CN114077764A (en) | Method for establishing temporary model based on three-dimensional GIS and BIM integration and application | |
CN108170855A (en) | A kind of CityGML and IFC data unified query and data pick-up method | |
Fortin et al. | Manufacturing Process Management: iterative synchronisation of engineering data with manufacturing realities | |
CN109801040A (en) | Multidimensional mould based on BIM examines design collaboration platform | |
CN116663098A (en) | Construction scene graphical management method and device based on BIM | |
CN105930483A (en) | Object format generation method, apparatus and system | |
KR101547120B1 (en) | Layered discrete event simulation method for prediction and management of production schedule | |
He et al. | Exploring key elements and performance of BIM and VR technologies in the project management of assembled buildings | |
Dong et al. | Realizing, Twinning, and Applying IFC-based 4D Construction Management Information Model of Prefabricated Buildings | |
CN112115694B (en) | Simulation report generation method and device based on multi-element data structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |