CN108222952A - Airport taxi runway subsidence control method in shield crossing operation - Google Patents

Airport taxi runway subsidence control method in shield crossing operation Download PDF

Info

Publication number
CN108222952A
CN108222952A CN201711364291.2A CN201711364291A CN108222952A CN 108222952 A CN108222952 A CN 108222952A CN 201711364291 A CN201711364291 A CN 201711364291A CN 108222952 A CN108222952 A CN 108222952A
Authority
CN
China
Prior art keywords
shield
monitoring
airport
control method
taxi runway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711364291.2A
Other languages
Chinese (zh)
Inventor
郑世兴
朱涛
易宏
王亚东
张怡潾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201711364291.2A priority Critical patent/CN108222952A/en
Publication of CN108222952A publication Critical patent/CN108222952A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Airport taxi runway subsidence control method in being run the present invention relates to a kind of shield crossing, comprises the concrete steps that:(1)The adjustment of shield driving parameter is instructed by comprehensive monitoring measure, wearing installation opportunity field plane track under control shield can normal operation;(2) by carrying out grouting and reinforcing to tunnel upper half ring soil layer, airport plane track posterior settlement is effectively controlled;The present invention uses simple and practicable construction method, effectively controls the influence generated during shield crossing and later stage operation to airport taxi runway, reaches safety, reduction surrounding enviroment influence purpose.

Description

Airport taxi runway subsidence control method in shield crossing operation
Technical field
The present invention relates to the construction method that a kind of shield wears important structure building under, especially a kind of shield crossing airport Plane track (in operation) subsidence control method.
Background technology
With the development of metro construction, the situation of the important structure building of shield crossing is more and more, complicated and changeable The characteristics of cause extreme influence to shield construction, handle duration and cost often well beyond expection.Therefore, it studies and complete The construction method of the important structure building of kind shield crossing, becomes a problem urgently to be resolved hurrily.
Therefore, it is necessary to be directed to the construction characteristic of shield crossing airport taxi runway (in operation), worn under shield by studying Airport taxi runway construction technology captures under shield and wears the technical barrier of airport taxi runway in operation, it was demonstrated that shield construction Airport infrastructure construction in applicability and reliability, for domestic and international airport infrastructure construction provide more thinkings and Selection, strengthens the popularity and sustainability of the application of shield construction technique, while promotes socio-economic development, meets social need It asks.
Invention content
The present invention is to provide for airport taxi runway subsidence control method in a kind of shield crossing operation, to improve shield Pass through the purpose of important structure building construction method.
To achieve the above object, the technical scheme is that:Airport taxi runway settles in a kind of shield crossing operation Control method, the specific steps are:
(1) adjustment of shield driving parameter is instructed by comprehensive monitoring measure, installation opportunity field is worn under control shield and slides Runway can normal operation;
(2) by carrying out grouting and reinforcing to tunnel upper half ring soil layer, the posterior settlement of airport plane track is effectively controlled.
The specific method of the comprehensive monitoring measure:Deep layer monitoring holes are set, bury automatic monitoring device, are formed with certainly Based on dynamic monitoring, the monitoring system supplemented by personal monitoring, the comprehensive monitoring measure being combined using automatic monitoring and personal monitoring.
The specific method of the tunnel upper half ring grouting and reinforcing:Injected hole is reserved by section of jurisdiction, Grouting Pipe is inserted into corresponding soil Cement grout by multiple, a small amount of, uniform slip casting principle, is relatively evenly injected soil by layer, combined ground settlement monitoring data Layer, to control airport plane track posterior settlement.
The beneficial effects of the invention are as follows:
The present invention is directed to the construction characteristic of shield crossing airport taxi runway (in operation), can by this construction technology Crossing construction is carried out while the safe handling of airport taxi runway is ensured, has given full play to shield-tunneling construction technique on homogeneous stratum The advantages that middle disturbance is small, speed of application is fast, sedimentation is easily controllable, further reduces the influence to surrounding enviroment, is domestic and international machine Field infrastructure construction provides wider thinking and selection, makes full use of the underground space, increases economic efficiency.
Description of the drawings
Fig. 1 is slip casting flow chart in method of the invention;
Grouting Pipe schematic diagram when Fig. 2 is non-slip casting state;
Grouting Pipe diagram when Fig. 3 is slip casting state is intended to.
Specific embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
A kind of shield crossing airport taxi runway (in operation) subsidence control method, Specific construction step are as follows:
(1) comprehensive monitoring measure
The soil layer that shield crossing taxiway is related to is 4. silt clay, while be close to upper strata 3. 2 sandy silt, and chiltern Silt sensitivity is higher, and sedimentation is also easy to produce after disturbance.And airport taxiway road structure is thicker, Qi Dao faces are 40cm (20+ 20) roadbed of+36~42cm of solid cement stabilization gravel thickness cast-in-place concretes, also 50cm thickness, the sedimentation of the lower section soil body are difficult to Road surface embodies in time.It under condition of not suspending on airport limitation, is limited, is not enough to full for the automatic monitoring location of taxiway Sufficient engineering monitoring demand in the case that personal monitoring is limited there is also entry time, need to set deep layer monitoring holes, bury automation Monitoring device is formed based on monitoring automatically, the monitoring system supplemented by personal monitoring.
(2) tunnel upper half ring grouting and reinforcing measure
Tunnel soil body consolidation grouting, as shown in Figure 1, being inserted into Grouting Pipe (see Fig. 2) and from tunnel using by section of jurisdiction injected hole Soil layer carries out the reinforcement measure of slip casting outside section of jurisdiction in road.First preformed hole is dredged with impact drill during consolidation grouting, then by 2 meters Slip casting tube vibration inserts in the hole at 1.75 meters on the outside of tunnel tube wall;With special blowout hookup being installed, and will be unidirectional Ball valve is connected in Grouting Pipe (see Fig. 3), so as to slip casting.If have the situation that slurries or underground water leak, first blowout prevention is filled It puts in preformed hole, and connects non-return valve, slip casting seamless steel pipe is directly squeezed into prescribed depth, underground is prevented to reach The purpose of water or slurries leakage.

Claims (3)

1. a kind of airport taxi runway subsidence control method in shield crossing operation, which is characterized in that the specific steps are:
(1)The adjustment of shield driving parameter is instructed by comprehensive monitoring measure, controls and wears installation opportunity field plane track under shield It can normal operation;
(2)By carrying out grouting and reinforcing to tunnel upper half ring soil layer, the posterior settlement of airport plane track is effectively controlled.
2. airport taxi runway subsidence control method in shield crossing operation according to claim 1, it is characterised in that:Institute State the specific method of comprehensive monitoring measure:Set deep layer monitoring holes, bury automatic monitoring device, formed using automatic monitoring as It is main, the monitoring system supplemented by personal monitoring, the comprehensive monitoring measure being combined using automatic monitoring and personal monitoring.
3. airport taxi runway subsidence control method in shield crossing operation according to claim 1, it is characterised in that:Institute State the specific method of tunnel upper half ring grouting and reinforcing:Injected hole is reserved by section of jurisdiction, Grouting Pipe is inserted into corresponding soil layer, in combination Cement grout by multiple, a small amount of, uniform slip casting principle, is relatively evenly injected soil layer, with control machine by face settlement monitoring data Field plane track posterior settlement.
CN201711364291.2A 2017-12-18 2017-12-18 Airport taxi runway subsidence control method in shield crossing operation Pending CN108222952A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711364291.2A CN108222952A (en) 2017-12-18 2017-12-18 Airport taxi runway subsidence control method in shield crossing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711364291.2A CN108222952A (en) 2017-12-18 2017-12-18 Airport taxi runway subsidence control method in shield crossing operation

Publications (1)

Publication Number Publication Date
CN108222952A true CN108222952A (en) 2018-06-29

Family

ID=62649708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711364291.2A Pending CN108222952A (en) 2017-12-18 2017-12-18 Airport taxi runway subsidence control method in shield crossing operation

Country Status (1)

Country Link
CN (1) CN108222952A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206938A (en) * 2020-03-24 2020-05-29 石家庄铁源工程咨询有限公司 Anti-settling method for shield machine to pass through airport taxiway
CN113982637A (en) * 2021-09-28 2022-01-28 广西大学 Tunnel reinforcing method for controlling deformation of lower horizontal shield tunnel caused by excavation of foundation pit in upward floating manner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1975112A (en) * 2006-12-14 2007-06-06 同济大学 Shield tunnel subsidence control method based on exploring radar
CN102080548A (en) * 2010-12-29 2011-06-01 上海隧道工程股份有限公司 Construction method of tunnel to cross airport runway by shield method
CN102733816A (en) * 2012-07-10 2012-10-17 河海大学 Deformation control method when shield traverse building within short distance
CN103510960A (en) * 2013-10-22 2014-01-15 北京交通大学 Sectionalized sedimentation control method for long-distance penetration of shield tunneling among building group
CN104807440A (en) * 2015-05-15 2015-07-29 中铁二局股份有限公司 Full automatic high-frequency ground settlement monitoring method for airport
CN205401985U (en) * 2016-04-01 2016-07-27 天津市乾丰防腐保温工程有限公司 A large -scale anticorrosive steel pipe for push pipe construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1975112A (en) * 2006-12-14 2007-06-06 同济大学 Shield tunnel subsidence control method based on exploring radar
CN102080548A (en) * 2010-12-29 2011-06-01 上海隧道工程股份有限公司 Construction method of tunnel to cross airport runway by shield method
CN102733816A (en) * 2012-07-10 2012-10-17 河海大学 Deformation control method when shield traverse building within short distance
CN103510960A (en) * 2013-10-22 2014-01-15 北京交通大学 Sectionalized sedimentation control method for long-distance penetration of shield tunneling among building group
CN104807440A (en) * 2015-05-15 2015-07-29 中铁二局股份有限公司 Full automatic high-frequency ground settlement monitoring method for airport
CN205401985U (en) * 2016-04-01 2016-07-27 天津市乾丰防腐保温工程有限公司 A large -scale anticorrosive steel pipe for push pipe construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206938A (en) * 2020-03-24 2020-05-29 石家庄铁源工程咨询有限公司 Anti-settling method for shield machine to pass through airport taxiway
CN113982637A (en) * 2021-09-28 2022-01-28 广西大学 Tunnel reinforcing method for controlling deformation of lower horizontal shield tunnel caused by excavation of foundation pit in upward floating manner
CN113982637B (en) * 2021-09-28 2023-06-06 广西大学 Tunnel reinforcing method for controlling floating deformation of downward shield tunnel caused by foundation pit excavation

Similar Documents

Publication Publication Date Title
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
Zhang et al. Field tests of pumping-recharge technology for deep confined aquifers and its application to a deep excavation
CN109630137A (en) An a kind of tunnel high position passes through the backfill processing construction method of huge molten chamber
CN105629309B (en) Bored grouting slurries space range of scatter and path description method
CN104153352A (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN105134219B (en) Soft rock strata freezing shaft borehole wall construction technology
CN102383412A (en) Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN106437798A (en) Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN110359540A (en) A kind of shallow earthing Large Diameter Pipeline high water level wears the artificial jacking construction engineering method of existing road
CN109026010A (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN113463670A (en) Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction
CN105673025A (en) Underground engineering loess tunnel ground surface settlement control construction process
CN109779639A (en) Suitable for wearing the anti-floating control method in existing major diameter tunnel in arenaceous stratum shield
CN107965325A (en) Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN107386309A (en) The prominent water burst method for blocking of the mine big flow high flow rate pipeline crack type karst that is recessed
CN106812134A (en) Reserved long term line passes through the plain stake reinforcement system and its construction method of existing lines part
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN108222952A (en) Airport taxi runway subsidence control method in shield crossing operation
CN107448204A (en) Closely wear construction method of deep foundation ditch down in sandy gravel accumulation horizon shallow burial hidden digging tunnel
CN109610427A (en) Karst foundation visits the slip casting construction method for filling that combination, slurries are controllable, monitor in real time
CN113605933A (en) Grouting reinforcement method for underground excavation channel of close-distance underpass subway station
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629

RJ01 Rejection of invention patent application after publication