CN108222339A - A kind of easy construction cell system system of high-precision - Google Patents
A kind of easy construction cell system system of high-precision Download PDFInfo
- Publication number
- CN108222339A CN108222339A CN201711472556.0A CN201711472556A CN108222339A CN 108222339 A CN108222339 A CN 108222339A CN 201711472556 A CN201711472556 A CN 201711472556A CN 108222339 A CN108222339 A CN 108222339A
- Authority
- CN
- China
- Prior art keywords
- weights
- hoist
- upright bar
- mobile jib
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 21
- 229910000746 Structural steel Inorganic materials 0.000 claims abstract description 10
- 239000011521 glass Substances 0.000 claims description 8
- 239000002390 adhesive tape Substances 0.000 claims description 6
- 210000002435 tendon Anatomy 0.000 claims description 5
- 229920002943 EPDM rubber Polymers 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 4
- 230000037431 insertion Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 241000124892 Barbus Species 0.000 claims 1
- 210000004027 cell Anatomy 0.000 description 15
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000009434 installation Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 5
- 230000002146 bilateral effect Effects 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000018199 S phase Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 210000002421 cell wall Anatomy 0.000 description 1
- 230000003831 deregulation Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/967—Details of the cross-section of the mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a kind of easy construction cell system systems of high-precision, including a plurality of cell cubes, male and female upright bar of each cell cube by several crossbeams and positioned at crossbeam both sides is spliced to form, and the upright bar is fixed by hanger structure and agent structure, it is characterised in that:The hanger structure includes hanging seat and weights-hoist component, the hanging seat both ends are fixed respectively by bolt kit and angle iron connecting piece, the angle iron connecting piece is fixed by bolt and the built-in fitting of the agent structure, the weights-hoist component includes the first weights-hoist and the second weights-hoist that are connect respectively with male and female upright bar, the hanging seat is equipped with first, second hanging hole coordinated with first, second weights-hoist, first weights-hoist and the second weights-hoist are inserted in respectively in the corresponding hanging hole, and are passed through fastener and fixed.The present invention realizes mounting for cell cube upright bar and agent structure by hanger structure, and construction is convenient, easily operated.
Description
Technical field
The present invention relates to a kind of cell cube curtain wall more particularly to a kind of easy construction cell system systems of high-precision.
Background technology
Compared to conventional frame formula curtain wall, cell cube curtain wall is assembled in factory process, and scene only needs to lift, single
First body component is directly anchored in agent structure, is no longer to install element composition frame, then install glass one by one, such knot
Structure has following advantage:
1. building site short time limit.Since cell cube establishment of component is carried out in factory, it can be synchronous with building site civil construction
It carries out, saves building site workload, building site is only lifted, and the working hour consumed on-site in this way greatly reduces, and makes curtain wall quickly
Install and integrally closed, form building enclosure, it also can start to lift after civil engineering completes certain altitude, formed civil engineering with
The scene that curtain wall is advanced side by side greatly shortens building total lever factor, particularly high-rise building, can be contracted by cross-operation
It casual labourer's phase, increases investment returns.
2. since cell cube component seam is by being formed to inserting, it is adapted to being deformed caused by temperature change etc.
Ability is especially good, and noise is small during displacement.
3. cell cube establishment of component, assembling are completed in factory, therefore quality control conditions are better than building site, unit group
Part internal soundness is better than what building site assembled, so as to improve curtain wall total quality.
In the prior art, it is usually that bolt is fixed or is directly welded and fixed between post end and agent structure, such as China
Disclosed in utility model patent《A kind of cell cube curtain wall system》(CN203640113U), it is by lifting bearing and hanger structure
Connection realize connection between column and agent structure, wherein hanger structure includes connector, L-type steel pendant and gasket, institute
It states connector one end to fix through bolt and the upright bar, card insertion is in the slot of one side edgefold of L-type steel pendant in the middle part of the other end
Interior, the end of the connector is spirally connected an adjusting bolt, which is butted on the horizontal sides of the L-type steel pendant
On, the horizontal sides of the L-type steel pendant are equipped with horizontally extending sliding slot, and the lifting bearing is equipped with vertical direction
The waist hole of arrangement, the L-type steel pendant by a fixing bolt through the circular hole on the gasket and the sliding slot on L-type steel pendant,
It is fixed in the waist hole of the lifting bearing, the horizontal sides bottom surface of the L-type steel pendant is welded and fixed with the lifting bearing, institute
Gasket bottom surface and the horizontal sides top surface of the L-type steel pendant is stated to be welded and fixed.The waist arranged with reference to vertical direction on lifting bearing
Horizontal concrete chute on hole and L-type steel pendant obtains L-R, the fixed position in anterior-posterior both direction is adjusted, then pass through connection
Sliding of the part on flanging in slot, upper and lower position is adjusted by adjusting bolt, so as to form three-dimensional regulation installation, improves installation
Flexibility and simplicity.
However, during lifting, although the installation in multiple directions can be obtained by above-mentioned waist hole, horizontal concrete chute etc.
It adjusts, but the size in de-regulation all directions again while lifting, still there are difficulty in practical operation, especially in high level
During outer wall operation, it is desirable to have a kind of more simple form of construction work, it is easier to position, without adjusting relative position relation repeatedly
Mounting structure, to lift while, are directly fixedly mounted.
Invention content
It is an object of the present invention to provide a kind of easy construction cell system systems of high-precision, by the improvement of structure, simplify installation stream
Journey, location control is also more accurate, is easy to construct.
In order to achieve the above objectives, the technical solution adopted by the present invention is:A kind of easy construction cell system system of high-precision, including
A plurality of cell cubes, male and female upright bar of each cell cube by several crossbeams and positioned at crossbeam both sides are spliced to form, both sides
The adjacent cell cube coordinates grafting to form the upright bar of curtain wall by public bar and female upright bar, the upright bar by hanger structure with
Agent structure is fixed, and the hanger structure includes hanging seat and weights-hoist component, and the hanging seat both ends pass through bolt kit and angle respectively
Steel fastener is fixed, and the angle iron connecting piece is fixed by bolt and the built-in fitting of the agent structure, the weights-hoist component packet
The first weights-hoist and the second weights-hoist being connect respectively with male and female upright bar are included, the hanging seat is equipped with what is coordinated with first, second weights-hoist
First, second hanging hole, first weights-hoist and the second weights-hoist are inserted in respectively in the corresponding hanging hole, and are passed through fastener and consolidated
It is fixed.
In above-mentioned technical proposal, first, second hanging hole is T-shaped hole, wherein the first hanging hole is hung for limiting hanging hole, second
Hole is matched to adjust hanging hole, the limiting hanging hole with first weights-hoist, and the lateral dimension for adjusting hanging hole is more than described
The physical dimension of second weights-hoist makes second weights-hoist have the degree of freedom of transverse shifting in the adjusting hanging hole.
In above-mentioned technical proposal, the inside of first, second hanging hole is equipped with close to the side of the agent structure and fixes
Screw hole, first weights-hoist and the second weights-hoist are connect respectively by fastener with the fixing threaded hole.
In above-mentioned technical proposal, the angle iron connecting piece corresponds to the hanging seat junction and is equipped with adjusting waist hole, the adjusting
Waist hole is arranged perpendicular to the agent structure.
In above-mentioned technical proposal, the front end of the upright bar, the outside of glass panel are equipped with ornamental strip, and the ornamental strip includes
The male lines being connect with the public bar and the bus bar being connect with female upright bar, the front end of the ornamental strip are equipped with male and female line
Locating piece is equipped with upper and lower line orientation part two-by-two between the adjacent ornamental strip.
In above-mentioned technical proposal, the public affairs lines are connected with bus bar by a connection piece with corresponding upright bar respectively, institute
It states connector to be made of mobile jib, locking member and several screws, the opposite flank of the public bar and female upright bar is equipped with indent
Slot, the mobile jib offer mounting hole, the screw is through master respectively in the inner groovy on the mobile jib and inner groovy slot bottom
Mounting hole on bar, inner groovy is fixed with the locking member, and the mobile jib is extended on the outside of the glass panel, and passes through screw
It is fixed with the ornamental strip.
Further technical solution is, between the mobile jib and the inner groovy slot bottom, inner groovy slot bottom and the locking
Heat-insulating cushion block is respectively equipped between part.
In above-mentioned technical proposal, card slot, the connection are equipped at the public affairs lines connector corresponding with bus bar
The mobile jib of part is inserted in corresponding card slot, and mounting hole is offered on the card slot slot bottom, and the mobile jib is passed through by the screw
The mounting hole is connect with the public lines or bus bar.
Further, a positioning convex tendon is equipped in the middle part of the mobile jib, the public affairs lines or bus bar are equipped with and the positioning
The locating slot of convex ribs cooperation, the card slot correspond to the mobile jib top equipped with flanging, and the mobile jib is equipped with and is matched with the flanging
Notch.
In above-mentioned technical proposal, the upright bar and crossbeam are opening-closed sectional material, the both sides difference of the public bar insertion end
Card slot is offered, each card slot is embedded with an ethylene-propylene-diene monomer adhesive tape, is tightly connected with the slot wall of female upright bar.
Since above-mentioned technical proposal is used, the present invention has following advantages compared with prior art:
1. in the present invention upright bar with the connection mode of agent structure in a manner that notch links, installation unit body when
Waiting directly to be inserted into weights-hoist in hanging seat, fixed with fastener, installation procedure is more rapidly simple;
2. being first limiting hanging hole, side can adjust the lateral position that weights-hoist is inserted into, make installation more clever to adjust hanging hole
Dexterous victory;
3. ornamental strip front end sets male and female line orientation part, line orientation part up and down is set, simultaneously between adjacent decoration item
Ornamental strip on four direction up and down is fixed, improves the installation accuracy of curtain wall entirety, promotes aesthetics;
4. it is connected between ornamental strip and upright bar by connector, and connector mobile jib is embedded, can increase the strong of section bar
It spends, and increases heat-insulating cushion block, more energy conservation and environmental protection;
5. upright bar, using opening-closed sectional material, improves the intensity of same prismatic shapes lower beam part with crossbeam;
6. male and female upright bar splicing position uses bilateral adhesive tape sealing, watertightness and air-tightness are improved.
Description of the drawings
Fig. 1 is the structure diagram of the embodiment of the present invention one;
Fig. 2 is the close-up schematic view of Fig. 1;
Fig. 3 is the schematic top plan view of Fig. 1;
Fig. 4 is the close-up schematic view of Fig. 3;
Fig. 5 is that hanger structure mounts schematic diagram in the embodiment of the present invention one;
Fig. 6 is the structure diagram of female upright bar in the embodiment of the present invention one;
Fig. 7 is the structure diagram of connector in the embodiment of the present invention one;
Fig. 8 is the structure diagram of public lines in the embodiment of the present invention one.
Wherein:1st, crossbeam;2nd, public bar;3rd, female upright bar;4th, hanger structure;5th, agent structure;6th, hanging seat;7th, it first hangs
Code;8th, bolt kit;9th, angle iron connecting piece;10th, bolt;11st, built-in fitting;12nd, the second weights-hoist;13rd, the first hanging hole;14th, second
Hanging hole;15th, fastener;16th, waist hole is adjusted;17th, glass panel;18th, ornamental strip;19th, public lines;20th, bus bar;21st, male and female
Line orientation part;22nd, upper and lower locating piece;23rd, connector;24th, mobile jib;25th, locking member;26th, screw;27th, inner groovy;28th, every
Heat pad block;29th, card slot;30th, positioning convex tendon;31st, locating slot;32nd, flanging;33rd, notch;34th, ethylene-propylene-diene monomer adhesive tape.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments:
Embodiment one:Referring to shown in Fig. 1~8, a kind of easy construction cell system system of high-precision, including a plurality of cell cubes,
Male and female upright bar of each cell cube by several crossbeams 1 and positioned at 1 both sides of crossbeam is spliced to form, the adjacent list in both sides
First body coordinates the upright bar of grafting composition curtain wall by public bar 2 with female upright bar 3, and the upright bar passes through hanger structure 4 and main body knot
Structure 5 is fixed, and the hanger structure includes hanging seat 6 and weights-hoist component 7, and 6 both ends of hanging seat pass through bolt kit 8 and angle steel respectively
Connector 9 is fixed, and the angle iron connecting piece 9 is fixed by bolt 10 and the built-in fitting 11 of the agent structure 5, the weights-hoist group
Part 7 includes the first weights-hoist 7 and the second weights-hoist 12 that are connect respectively with male and female upright bar, and the hanging seat 6 is equipped with and first, second
First, second hanging hole of weights-hoist cooperation, 7 and second weights-hoist 12 of the first weights-hoist are inserted in respectively in the corresponding hanging hole, and
It is fixed by fastener 15.
As shown in Fig. 3,5, first, second hanging hole is T-shaped hole, wherein the first hanging hole 13 is hung for limiting hanging hole, second
Hole 14 is matched to adjust hanging hole, the limiting hanging hole with first weights-hoist 7, and the lateral dimension for adjusting hanging hole is more than institute
The physical dimension of the second weights-hoist 12 is stated, makes second weights-hoist 12 that there is the degree of freedom of transverse shifting in the adjusting hanging hole.
The inside of first, second hanging hole is equipped with fixing threaded hole, first weights-hoist 7 and the close to the side of the agent structure 5
Two weights-hoists 12 are connect respectively by fastener 15 with the fixing threaded hole.When actually lifting, determining for hanging hole is limited by side
Position, opposite side adjust the left and right adjusting of hanging hole, can will be inserted into 6 corresponding hanging hole of hanging seat with first, second weights-hoist that upright bar connects
It is interior, then coordinated by fastener 15 and fixing threaded hole, weights-hoist and hanging seat 6 are fixed, complete installation, convenient and quick construction.
As shown in Figure 1, 2, the angle iron connecting piece 9 corresponds to 6 junction of hanging seat and is equipped with adjusting waist hole 16, the adjusting
Waist hole 16 is arranged perpendicular to the agent structure 5.By adjusting waist hole 16, can adjust between hanging seat 6 and agent structure 5 away from
From, also can indirectly adjust the position relationship between upright bar and agent structure 5, to curtain wall carry out leveling.
As shown in Figure 1,3, the front end of the upright bar, glass panel 17 outside be equipped with ornamental strip 18, the ornamental strip 18
The bus bar 20 being connect including the male lines 19 that are connect with the public bar 2 and with female upright bar 3, before the ornamental strip 18
End is equipped with male and female line orientation part 21, for limiting the distance between male and female two panels lines relationship, the adjacent decoration two-by-two
Upper and lower locating piece 22 is equipped between item 18.
As shown in Figure 3,4, the public lines 19 are connected with bus bar 20 by a connection piece 23 with corresponding upright bar respectively,
The connector 23 is made of mobile jib 24, locking member 25 and several screws 26, the opposite side of the public bar 2 and female upright bar 3
Face is equipped with inner groovy 27, and the mobile jib 24 is opened respectively in the inner groovy 27 on 27 slot bottom of the mobile jib 24 and inner groovy
Equipped with mounting hole, the screw 26 is fixed through the mounting hole on mobile jib 24, inner groovy 27 and the locking member 25, the mobile jib 24
17 outside of glass panel is extended to, and passes through screw 26 and is fixed with the ornamental strip 18.It is different from previous connector, this
Connector 23 in embodiment is embedded, increases the thickness of section bar, enhances the bonding strength of connector 23.
As shown in figure 4, between 27 slot bottom of the mobile jib 24 and the inner groovy, 27 slot bottom of inner groovy and the locking member 25
Between be respectively equipped with heat-insulating cushion block 28, more energy efficient environmental protection.
As shown in Figure 7,8, card slot 29 is equipped at the public lines 19 connector 23 corresponding with bus bar 20, it is described
The mobile jib 24 of connector 23 is inserted in corresponding card slot 29, and mounting hole is offered on 29 slot bottom of card slot, and the mobile jib 24 is logical
The screw 26 is crossed to connect with the public lines 19 or bus bar 20 across the mounting hole.
As shown in fig. 7,24 middle part of mobile jib is equipped with a positioning convex tendon 30, the public affairs lines 19 or bus bar 20 are equipped with
With the locating slot 31 of the positioning convex tendon 30 cooperation, the card slot 29 corresponds to 24 top of mobile jib equipped with flanging 32, the mobile jib
24 are equipped with and the 32 matched notch 33 of flanging.Mobile jib 24 and public lines 19 or bus bar 20 are passed through into notch 33 and flanging 32
Cooperation, similar to the occlusion between Tenon, form integral structure, connection is more firm.
As shown in Fig. 3,6, the upright bar and crossbeam 1 are opening-closed sectional material, improve the intensity of same prismatic shapes lower beam part.
The both sides of 2 insertion end of public bar offer card slot 29 respectively, and each card slot 29 is embedded with an ethylene-propylene-diene monomer adhesive tape
34, it is tightly connected with the slot wall of female upright bar 3.Crossbeam 1 and upright bar using bilateral adhesive tape sealing, improve watertightness with it is airtight
Property.
Claims (10)
1. a kind of easy construction cell system system of high-precision, including a plurality of cell cubes, each cell cube is by several crossbeams
And the male and female upright bar positioned at crossbeam both sides is spliced to form, the adjacent cell cube in both sides is inserted by public bar and female upright bar cooperation
The upright bar for forming curtain wall is connect, the upright bar is fixed by hanger structure and agent structure, it is characterised in that:The hanger structure packet
Hanging seat and weights-hoist component are included, the hanging seat both ends are fixed respectively by bolt kit and angle iron connecting piece, the angle iron connecting piece
It is fixed by bolt and the built-in fitting of the agent structure, the weights-hoist component includes connect respectively with male and female upright bar first
Weights-hoist and the second weights-hoist, the hanging seat are equipped with first, second hanging hole coordinated with first, second weights-hoist, first weights-hoist
It is inserted in respectively in the corresponding hanging hole with the second weights-hoist, and passes through fastener and fix.
2. the easy construction cell system system of high-precision according to claim 1, it is characterised in that:First, second hanging hole
For T-shaped hole, wherein the first hanging hole is limiting hanging hole, the second hanging hole is adjusts hanging hole, the limiting hanging hole and first weights-hoist
It matches, the lateral dimension for adjusting hanging hole is more than the physical dimension of second weights-hoist, makes second weights-hoist described
Adjusting has the degree of freedom of transverse shifting in hanging hole.
3. the easy construction cell system of high-precision according to claim 1 or 2, it is characterised in that:First, second hanging hole
Inside, close to the agent structure side be equipped with fixing threaded hole, first weights-hoist and the second weights-hoist pass through fastening respectively
Part is connect with the fixing threaded hole.
4. the easy construction cell system of high-precision according to claim 1, it is characterised in that:The angle iron connecting piece corresponds to institute
It states hanging seat junction and is equipped with adjusting waist hole, the adjusting waist hole is arranged perpendicular to the agent structure.
5. the easy construction cell system of high-precision according to claim 1, it is characterised in that:The front end of the upright bar, glass
The outside of panel is equipped with ornamental strip, and the ornamental strip includes the male lines being connect with the public bar and connect with female upright bar
Bus bar, the front end of the ornamental strip is equipped with male and female line orientation part, is equipped with up and down between the adjacent ornamental strip two-by-two
Line orientation part.
6. the easy construction cell system of high-precision according to claim 5, it is characterised in that:The public affairs lines and bus bar point
It is not connected by a connection piece with corresponding upright bar, the connector is made of mobile jib, locking member and several screws, the public affairs
The opposite flank of upright bar and female upright bar is equipped with inner groovy, and the mobile jib is in the inner groovy, the mobile jib and inner groovy slot
Mounting hole is offered on bottom respectively, the screw is fixed through the mounting hole on mobile jib, inner groovy and the locking member, the mobile jib
It extends on the outside of the glass panel, and passes through screw and fixed with the ornamental strip.
7. the easy construction cell system of high-precision according to claim 6, it is characterised in that:The mobile jib and the inner groovy
Heat-insulating cushion block is respectively equipped between slot bottom, between inner groovy slot bottom and the locking member.
8. the easy construction cell system of high-precision according to claim 6, it is characterised in that:The public affairs lines and bus bar pair
It answers and card slot is equipped at the connector, the mobile jib of the connector is inserted in corresponding card slot, is opened up on the card slot slot bottom
There is mounting hole, the mobile jib passes through the mounting hole to be connect with the public lines or bus bar by the screw.
9. the easy construction cell system of high-precision according to claim 8, it is characterised in that:It is equipped in the middle part of the mobile jib certain
Position convex ribs, the public affairs lines or bus bar are equipped with the locating slot coordinated with the positioning convex tendon, and the card slot corresponds to the mobile jib
Top is equipped with flanging, and the mobile jib is equipped with and the matched notch of the flanging.
10. the easy construction cell system of high-precision according to claim 1, it is characterised in that:The upright bar and crossbeam are
Opening-closed sectional material, the both sides of the public bar insertion end offer card slot respectively, and each card slot is embedded with an ethylene-propylene-diene monomer
Adhesive tape is tightly connected with the slot wall of female upright bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711472556.0A CN108222339B (en) | 2017-12-29 | 2017-12-29 | High-precision unit system easy to construct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711472556.0A CN108222339B (en) | 2017-12-29 | 2017-12-29 | High-precision unit system easy to construct |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108222339A true CN108222339A (en) | 2018-06-29 |
CN108222339B CN108222339B (en) | 2024-03-26 |
Family
ID=62645899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711472556.0A Active CN108222339B (en) | 2017-12-29 | 2017-12-29 | High-precision unit system easy to construct |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108222339B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629912A (en) * | 2019-10-08 | 2019-12-31 | 中哲创建科技股份有限公司 | Semi-closed curtain wall device of integrated lamp and assembling method thereof |
CN111827539A (en) * | 2019-04-23 | 2020-10-27 | 钱丰领 | Glass curtain wall fixing assembly |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006169906A (en) * | 2004-12-20 | 2006-06-29 | Shin Nikkei Co Ltd | Panel unit and curtain wall structure |
CN102400507A (en) * | 2011-11-16 | 2012-04-04 | 广东金刚幕墙工程有限公司 | Decoration line system for back-bolt curtain wall |
CN202430873U (en) * | 2011-12-22 | 2012-09-12 | 中建(长沙)不二幕墙装饰有限公司 | Hanger device for connecting unit curtain wall and building main body structure |
CN103015577A (en) * | 2011-09-27 | 2013-04-03 | 苏州金螳螂幕墙有限公司 | Unit curtain wall with transverse external architectural element |
CN203640113U (en) * | 2013-12-25 | 2014-06-11 | 苏州苏明装饰股份有限公司 | Unit curtain wall system |
CN204609059U (en) * | 2015-03-20 | 2015-09-02 | 广州江河幕墙***工程有限公司 | Cell cube curtain wall sunk type suspension member syndeton |
CN206737222U (en) * | 2017-03-28 | 2017-12-12 | 深圳市宝鹰建设集团股份有限公司 | Cell cube section curtain wall installing device |
CN208502008U (en) * | 2017-12-29 | 2019-02-15 | 苏州苏明装饰股份有限公司 | A kind of cell cube curtain wall system |
-
2017
- 2017-12-29 CN CN201711472556.0A patent/CN108222339B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006169906A (en) * | 2004-12-20 | 2006-06-29 | Shin Nikkei Co Ltd | Panel unit and curtain wall structure |
CN103015577A (en) * | 2011-09-27 | 2013-04-03 | 苏州金螳螂幕墙有限公司 | Unit curtain wall with transverse external architectural element |
CN102400507A (en) * | 2011-11-16 | 2012-04-04 | 广东金刚幕墙工程有限公司 | Decoration line system for back-bolt curtain wall |
CN202430873U (en) * | 2011-12-22 | 2012-09-12 | 中建(长沙)不二幕墙装饰有限公司 | Hanger device for connecting unit curtain wall and building main body structure |
CN203640113U (en) * | 2013-12-25 | 2014-06-11 | 苏州苏明装饰股份有限公司 | Unit curtain wall system |
CN204609059U (en) * | 2015-03-20 | 2015-09-02 | 广州江河幕墙***工程有限公司 | Cell cube curtain wall sunk type suspension member syndeton |
CN206737222U (en) * | 2017-03-28 | 2017-12-12 | 深圳市宝鹰建设集团股份有限公司 | Cell cube section curtain wall installing device |
CN208502008U (en) * | 2017-12-29 | 2019-02-15 | 苏州苏明装饰股份有限公司 | A kind of cell cube curtain wall system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827539A (en) * | 2019-04-23 | 2020-10-27 | 钱丰领 | Glass curtain wall fixing assembly |
CN110629912A (en) * | 2019-10-08 | 2019-12-31 | 中哲创建科技股份有限公司 | Semi-closed curtain wall device of integrated lamp and assembling method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108222339B (en) | 2024-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202073219U (en) | Component type curtain wall general for exposed, hidden frames | |
CN105283609B (en) | Section construction unit and construction and the method for transporting section construction unit | |
CN103726597B (en) | Adopt the frame type cell curtain wall of auxiliary mounting deck and profile of tooth corner brace and profile of tooth bearing | |
CN105804298B (en) | Construction method of honeycomb-shaped convex irregular curtain wall | |
CN105178502A (en) | Novel light composite batten exterior wall and assembling method thereof | |
CN108222339A (en) | A kind of easy construction cell system system of high-precision | |
CN211523693U (en) | Vertical lines curtain system of cell cube aluminum plate | |
CN208502008U (en) | A kind of cell cube curtain wall system | |
CN207776274U (en) | Water-proof roofing harden structure and building | |
CN206337686U (en) | A kind of bright hidden frame connection auxiliary frame of curtain wall and its curtain wall system | |
CN113404210A (en) | Assembled heat-preservation and decoration integrated wall and manufacturing and mounting process thereof | |
CN206607736U (en) | A kind of house construction engineering construction ceiling structure | |
CN111305503A (en) | Assembled wallboard wall-hanging node and installation method thereof | |
CN104294975B (en) | A kind of aluminum facade attachment means | |
CN217001418U (en) | Door and window frame mounting system and door and window system | |
CN102817427A (en) | Component type curtain wall system provided with vertical keel at outdoor side | |
CN206625355U (en) | Aluminium alloy structure house | |
CN201428182Y (en) | Easy installing movable board room | |
CN209429343U (en) | A kind of plate-jointing structure of concealed frame glass curtain wall | |
CN105113684B (en) | A kind of unit assembled building external protecting system and its construction method equipped with window | |
CN114033276A (en) | Door and window frame mounting system and door and window system | |
CN205077678U (en) | Outer containment system's of building panel unit | |
CN204531194U (en) | A kind of device improving metal Roof wind resistance | |
CN205348477U (en) | Steel aluminium combines curtain stand form | |
CN207794381U (en) | A kind of cell cube curtain wall system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |