CN108221689A - A kind of bridge beam body sealing off and covering anchorage template support method - Google Patents

A kind of bridge beam body sealing off and covering anchorage template support method Download PDF

Info

Publication number
CN108221689A
CN108221689A CN201810001265.1A CN201810001265A CN108221689A CN 108221689 A CN108221689 A CN 108221689A CN 201810001265 A CN201810001265 A CN 201810001265A CN 108221689 A CN108221689 A CN 108221689A
Authority
CN
China
Prior art keywords
kelly
beam body
grab
clamping plate
sliding shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810001265.1A
Other languages
Chinese (zh)
Inventor
邓立新
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201810001265.1A priority Critical patent/CN108221689A/en
Publication of CN108221689A publication Critical patent/CN108221689A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of bridge beam body sealing off and covering anchorage template support methods, including kelly, grab, securing plate, sliding shoe, clamping plate, a kind of bridge beam body sealing off and covering anchorage template support method, pass through the effect of slidingtype clamping clamping device, the installation operation of construction personnel can be facilitated, avoid conventionally employed bolt fixed mode, it is not only troublesome in poeration, the dismounting in also inconvenient later stage, eventually by above-mentioned, it is good so as to reach stability, save artificial and material, it is repeatable to utilize, it is at low cost, the purpose of practical function is apparent, and also substantially increase the template dress in sealing off and covering anchorage construction, tear efficiency open;The support pattern can also be generalized to some other such as railway T-beam, the beam type such as highway box beam, highway T beams, i.e., conducive to the popularization and application of industry simultaneously.

Description

A kind of bridge beam body sealing off and covering anchorage template support method
Technical field
The present invention relates to bridge sealing off and covering anchorage construction field, specifically one kind is construction personnel during beam body sealing off and covering anchorage It is convenient to provide, and saves equipment, material, a kind of artificial sealing off and covering anchorage template support mode.
Background technology
With the rapid development that China's economy obtains, based on the transport development one of built also quickly grow.Bridge is built If being also an important component in transport development, present bridge sealing off and covering anchorage takes installation screw rod on anchor plate to stretch mostly Go out sealing off and covering anchorage template and fix sealing off and covering anchorage template with the mode that nut is tightened, cut off screw rod after pouring.What time the method denounces if having, First, trouble is cut off in screw rod installation, time-consuming for sealing off and covering anchorage template support;Second is that screw rod will also carry out secondary place after cutting off to sealing off and covering anchorage face Reason, influences sealing off and covering anchorage efficiency and quality;Third, screw size will be matched with anchor plate preformed hole, once mismatching will cause material unrestrained Take.
According to above-mentioned, by taking ten railway projects HSSG-2 of the Chinese marks Yunmeng beam making field as an example, which undertakes 461 prefabricated box -beams Task since ministry of materials's buying early period sealing off and covering anchorage screw diameter is more slightly larger than anchor plate preformed hole, causes sealing off and covering anchorage template that can not install, from And sealing off and covering anchorage construction is influenced, in view of disadvantages described above, it is really necessary to design a kind of bridge beam body sealing off and covering anchorage template support method.
Invention content
The technical problems to be solved by the invention are:A kind of bridge beam body sealing off and covering anchorage template support method is provided, to solve The problem of background technology proposes.
In order to solve the above technical problems, the technical scheme is that:A kind of bridge beam body sealing off and covering anchorage template support method, packet Kelly, grab, securing plate, sliding shoe, clamping plate are included, the kelly is the rectangle body of rod, and the grab is located on the left of kelly, institute The grab stated is integrally connected with kelly, and the grab, for hooking beam body side, the securing plate is located at before and after grab Both ends, the securing plate are integrally connected with grab, and the securing plate is used to strengthen grab and one side contacts of beam body are secured Property, the sliding shoe is connected through kelly outer wall, the sliding shoe with kelly slip, and the sliding shoe is used to adjust Section movement, the clamping plate are located at sliding shoe bottom, and the clamping plate is integrally connected with sliding shoe, and the clamping plate is used to match Close grab clamping beam body.
Its work step is as follows:
(1), during model sheetinstallat;The grab on the left of kelly is hooked into beam body side first, that is, realizes grab and securing plate and beam The contact of body is bonded, and synchronous kelly is with being in horizontality, then the assembly of sliding shoe and clamping plate is right from kelly at the top of beam body Side is inserted in, and is then tapped on the right side of clamping plate with extraneous iron hammer, i.e., by the effect of iron hammer impact force, make clamping plate drive sliding shoe along Kelly moves from right to left, when clamping plate contacts beam body opposite side, by clamping plate and the effect of grab mutual cooperation, so as to real Now the device and beam body grip;
(2) when, template is dismantled;It is tapped on the left of clamping plate, i.e., is impacted using vibration and iron hammer with extraneous iron hammer first, so as to Realize the loosening of clamping plate, i.e. clamping plate drives sliding shoe to be moved from left to right along kelly, at this time by aforesaid operations, so as to real The now separation dismounting of the device and beam body.
Further, the kelly, grab, securing plate, sliding shoe, clamping plate are all metal material.
Further, upper and lower ends are additionally provided with arc fillet, and the arc fillet facilitates slip on the right side of the kelly Block is inserted in kelly.
Further, the kelly front end is additionally provided with graduation apparatus, and the graduation apparatus is connected, and institute with kelly using printing The graduation apparatus stated is used to measure beam body width.
Further, gap size is 0.1-0.2mm between the kelly and sliding shoe, that is, passes through the work compared with small gap With the fastness between raising sliding shoe and kelly resists generated expansive force after stress.
Compared with prior art, a kind of bridge beam body sealing off and covering anchorage template support method, passes through slidingtype clamping clamping device Effect, the installation operation of construction personnel can be facilitated, avoid conventionally employed bolt fixed mode, it is not only troublesome in poeration, also not The dismounting of phase after an action of the bowels, eventually by above-mentioned, so as to reach stability is good, save artificial and material, it is repeatable utilize, it is at low cost, The purpose of practical function is apparent, and also substantially increase the template dress in sealing off and covering anchorage construction, tear efficiency open;The support pattern may be used also simultaneously It is some other such as railway T-beam, the beam type such as highway box beam, highway T beams, i.e., conducive to the popularization and application of industry to be generalized to.
Description of the drawings
Fig. 1 is kelly, grab, securing plate, sliding shoe and clamping plate installation condition stereogram;
Fig. 2 is kelly, grab, securing plate, sliding shoe and clamping plate installation condition front view;
Fig. 3 is kelly, grab and securing plate position front view;
Fig. 4 is sealing off and covering anchorage template support front schematic view;
Fig. 5 is sealing off and covering anchorage template support side schematic view.
Kelly 1, grab 2, securing plate 3, sliding shoe 4, clamping plate 5, arc fillet 101, graduation apparatus 102.
Specific embodiment
Hereinafter, a variety of specific details are elaborated, in order to provide the saturating of the concept to forming described embodiment basis Thorough understanding.However, it will be apparent to those skilled in the art that described embodiment can be in these no specific details In it is some or all in the case of put into practice.In other cases, well-known processing step is not specifically described.
Embodiment
A kind of bridge beam body sealing off and covering anchorage template support method, including kelly 1, grab 2, securing plate 3, sliding shoe 4, clamping plate 5, institute The kelly 1 stated is the rectangle body of rod, and the grab 2 is located at 1 left side of kelly, and the grab 2 is integrally connected with kelly 1, and institute For the grab 2 stated for hooking beam body side, the securing plate 3 is located at 2 rear and front end of grab, the securing plate 3 and grab 2 Be integrally connected, and the securing plate 3 is for strengthening grab 2 and one side contacts fastness of beam body, the sliding shoe 4 through 1 outer wall of kelly, the sliding shoe 4 are connected with the slip of kelly 1, and the sliding shoe 4 is used to adjust movement, the clamping plate 5 are located at 4 bottom of sliding shoe, and the clamping plate 5 is integrally connected with sliding shoe 4, and the clamping plate 5 is used to that grab 2 to be coordinated to clamp Beam body.
Its work step is as follows:
During model sheetinstallat;The grab 2 in the left side of kelly 1 is hooked into beam body side first, that is, realize grab 2 and securing plate 3 with The contact fitting of beam body, synchronous kelly 1 at the top of beam body in horizontality, then by the assembly of sliding shoe 4 and clamping plate 5 from card 1 right side of bar is inserted in, and then taps 5 right side of clamping plate with extraneous iron hammer, i.e., by the effect of iron hammer impact force, drives clamping plate 5 and slide Motion block 4 moves from right to left along kelly 1, when clamping plate 5 contacts beam body opposite side, is cooperated by clamping plate 5 and grab 2 Effect, so as to fulfill gripping for the device and beam body, when template is dismantled;5 left side of clamping plate is tapped with extraneous iron hammer first, It is impacted using vibration and iron hammer, so as to fulfill the loosening of clamping plate 5, i.e. clamping plate 5 drives sliding shoe 4 to make along kelly 1 by a left side It moves right, at this time by aforesaid operations, is dismantled so as to fulfill the separation of the device and beam body, the kelly 1, adds grab 2 Solid plate 3, sliding shoe 4, clamping plate 5 are all metal material, and the 1 right side upper and lower ends of kelly are additionally provided with arc fillet 101, and institute The arc fillet 101 stated facilitates sliding shoe 4 to be inserted in kelly 1, and 1 front end of kelly is additionally provided with graduation apparatus 102, the scale Table 102 is connected with kelly 1 using printing, and the graduation apparatus 102 is used to measure beam body width, the kelly 1 and slip Gap size is 0.1-0.2mm between block 4, i.e., by the effect compared with small gap, improves secured between sliding shoe 4 and kelly 1 Property, that is, generated expansive force after stress is resisted, which is clamped by slidingtype clamping The effect of mechanism can facilitate the installation operation of construction personnel, avoid conventionally employed bolt fixed mode, not only troublesome in poeration, The dismounting in also inconvenient later stage, eventually by above-mentioned, so as to reach stability is good, save artificial and material, it is repeatable utilize, cost Low, the purpose of practical function is apparent, and also substantially increase the template dress in sealing off and covering anchorage construction, tear efficiency open;The support pattern simultaneously It can also be generalized to some other such as railway T-beam, the beam type such as highway box beam, highway T beams, i.e., conducive to the popularization and application of industry.
The present invention is not limited to above-mentioned specific embodiment, those of ordinary skill in the art from above-mentioned design, Without performing creative labour, the various transformation made are within the scope of the present invention.

Claims (5)

1. a kind of bridge beam body sealing off and covering anchorage template support method, including kelly, grab, securing plate, sliding shoe, clamping plate, the card Bar is the rectangle body of rod, and the grab is located on the left of kelly, and the grab is integrally connected with kelly, and the grab is used for Beam body side is hooked, the securing plate is located at grab rear and front end, and the securing plate is integrally connected, and described with grab Securing plate is for strengthening grab and one side contacts fastness of beam body, and the sliding shoe is through kelly outer wall, the slip Block is connected with kelly slip, and the sliding shoe, for adjusting movement, the clamping plate is located at sliding shoe bottom, the folder Plate is integrally connected with sliding shoe, and the clamping plate is used to that grab to be coordinated to clamp beam body.
Its work step is as follows:
(1), during model sheetinstallat;The grab on the left of kelly is hooked into beam body side first, that is, realizes grab and securing plate and beam body Contact fitting, synchronous kelly in horizontality, then by the assembly of sliding shoe and clamping plate at the top of beam body on the right side of kelly with covering Enter, then tapped on the right side of clamping plate with extraneous iron hammer, i.e., by the effect of iron hammer impact force, clamping plate is made to drive sliding shoe along kelly It moves from right to left, when clamping plate contacts beam body opposite side, by clamping plate and the effect of grab mutual cooperation, so as to fulfill this Device and beam body grip;
(2) when, template is dismantled;It is tapped on the left of clamping plate, i.e., is impacted using vibration and iron hammer with extraneous iron hammer first, so as to fulfill The loosening of clamping plate, i.e. clamping plate drive sliding shoe to be moved from left to right along kelly, at this time by aforesaid operations, so as to fulfill this The separation dismounting of device and beam body.
2. a kind of bridge beam body sealing off and covering anchorage template support method as described in claim 1, it is characterised in that the kelly, card Hook, securing plate, sliding shoe, clamping plate are all metal material.
3. a kind of bridge beam body sealing off and covering anchorage template support method as described in claim 1, it is characterised in that on the right side of the kelly Upper and lower ends are additionally provided with arc fillet, and the arc fillet facilitates sliding shoe to be inserted in kelly.
A kind of 4. bridge beam body sealing off and covering anchorage template support method as described in claim 1, it is characterised in that the kelly front end Graduation apparatus is additionally provided with, the graduation apparatus is connected with kelly using printing, and the graduation apparatus is used to measure beam body width.
5. a kind of bridge beam body sealing off and covering anchorage template support method as described in claim 1, it is characterised in that the kelly and cunning Gap size is 0.1-0.2mm between motion block, i.e., by the effect compared with small gap, improves secured between sliding shoe and kelly Property, that is, resist generated expansive force after stress.
CN201810001265.1A 2018-01-02 2018-01-02 A kind of bridge beam body sealing off and covering anchorage template support method Pending CN108221689A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810001265.1A CN108221689A (en) 2018-01-02 2018-01-02 A kind of bridge beam body sealing off and covering anchorage template support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810001265.1A CN108221689A (en) 2018-01-02 2018-01-02 A kind of bridge beam body sealing off and covering anchorage template support method

Publications (1)

Publication Number Publication Date
CN108221689A true CN108221689A (en) 2018-06-29

Family

ID=62642351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810001265.1A Pending CN108221689A (en) 2018-01-02 2018-01-02 A kind of bridge beam body sealing off and covering anchorage template support method

Country Status (1)

Country Link
CN (1) CN108221689A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109605552A (en) * 2018-12-20 2019-04-12 安徽开源路桥有限责任公司 A kind of precast beam end leakproof sizing device and construction technology

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW362673U (en) * 1998-02-12 1999-06-21 Pi Sheng Entpr Co Ltd Fixed device of construction templet
CN201261944Y (en) * 2008-09-19 2009-06-24 常州第一建筑工程有限公司 Template clamper
CN102094521A (en) * 2009-12-10 2011-06-15 顾晓刚 Template fixture
CN203296385U (en) * 2013-06-21 2013-11-20 云南云岭高速公路桥梁工程有限公司 Graduated concrete form corner clamp
CN106049850A (en) * 2016-07-08 2016-10-26 深圳市建设(集团)有限公司 Length-adjustable pull rod structure of scaffold or formwork support
CN205777505U (en) * 2016-05-26 2016-12-07 中铁三局集团有限公司 Beam-ends sealing off and covering anchorage concrete construction typified form
EP3144450A1 (en) * 2014-09-09 2017-03-22 Guangzhou Yida Machinery Co., Ltd. Connecting clamp for template splicing
CN106808564A (en) * 2017-04-07 2017-06-09 中铁十七局集团第三工程有限公司 A kind of three word button box beams end-blocking template and box beam end blocking method
CN206769392U (en) * 2017-05-08 2017-12-19 重庆建工住宅建设有限公司 A kind of falsework
CN206815828U (en) * 2017-06-05 2017-12-29 中国建筑第七工程局有限公司 There is side bar prestressed concrete beam indent sealing off and covering anchorage device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW362673U (en) * 1998-02-12 1999-06-21 Pi Sheng Entpr Co Ltd Fixed device of construction templet
CN201261944Y (en) * 2008-09-19 2009-06-24 常州第一建筑工程有限公司 Template clamper
CN102094521A (en) * 2009-12-10 2011-06-15 顾晓刚 Template fixture
CN203296385U (en) * 2013-06-21 2013-11-20 云南云岭高速公路桥梁工程有限公司 Graduated concrete form corner clamp
EP3144450A1 (en) * 2014-09-09 2017-03-22 Guangzhou Yida Machinery Co., Ltd. Connecting clamp for template splicing
CN205777505U (en) * 2016-05-26 2016-12-07 中铁三局集团有限公司 Beam-ends sealing off and covering anchorage concrete construction typified form
CN106049850A (en) * 2016-07-08 2016-10-26 深圳市建设(集团)有限公司 Length-adjustable pull rod structure of scaffold or formwork support
CN106808564A (en) * 2017-04-07 2017-06-09 中铁十七局集团第三工程有限公司 A kind of three word button box beams end-blocking template and box beam end blocking method
CN206769392U (en) * 2017-05-08 2017-12-19 重庆建工住宅建设有限公司 A kind of falsework
CN206815828U (en) * 2017-06-05 2017-12-29 中国建筑第七工程局有限公司 There is side bar prestressed concrete beam indent sealing off and covering anchorage device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109605552A (en) * 2018-12-20 2019-04-12 安徽开源路桥有限责任公司 A kind of precast beam end leakproof sizing device and construction technology
CN109605552B (en) * 2018-12-20 2023-09-19 安徽开源路桥有限责任公司 Precast beam slab end slurry leakage prevention device and construction process

Similar Documents

Publication Publication Date Title
CN205733686U (en) The reclaimer robot of electronic drain valve control assembly machine
CN108221689A (en) A kind of bridge beam body sealing off and covering anchorage template support method
CN206844322U (en) Rigid connection node of steel pipe column and H-shaped steel beam
US2847943A (en) Mobile railway ballast tamping machine with track lifting mechanism
US3019608A (en) Apparatus for balancing and holding pile-driving hammers on sheet piling
CN206554534U (en) A kind of late poured band support adjustable fixing device
CN109025270A (en) A kind of concrete post erecting device and application method
CN208702154U (en) A kind of building template reinforcement tools
CN208830164U (en) A kind of bridge beam body sealing off and covering anchorage supporting construction
CN207256525U (en) A kind of embedded parts positioning device
CN207079948U (en) A kind of life rope fixed mount
CN205499289U (en) Removable sectional type removal built
CN107891609A (en) One kind can share grid, spoiler robotic ultrasound wave soldering system
CN103521983B (en) A kind of structure butt joint technology device
CN207402359U (en) A kind of auxiliary device during sky iron bridge welding
CN208965569U (en) A kind of steel lifted trunk wall body attachment device
CN214573419U (en) Novel road and bridge crack consolidate device
CN206646805U (en) A kind of attachment means, template and shear wall formwork for being used to connect shear wall formwork
CN206420910U (en) A kind of capacitor voltage withstanding test platform electricity container fixing device
CN206891863U (en) Tear frock
CN206689713U (en) A kind of the screwed lock mechanism
CN105428958B (en) A kind of grounding pin extracting apparatus
CN105442829B (en) A kind of anti-skidding universal wall-connecting piece of the hoop formula with non-slipping block
CN205712913U (en) Cambered surface molding decorative board mounting structure
CN209228147U (en) Hole column concrete placings application specific form is checked in a kind of subway field wire library

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629

RJ01 Rejection of invention patent application after publication