CN108204244A - 矸石间隔充填采煤法 - Google Patents
矸石间隔充填采煤法 Download PDFInfo
- Publication number
- CN108204244A CN108204244A CN201611192068.XA CN201611192068A CN108204244A CN 108204244 A CN108204244 A CN 108204244A CN 201611192068 A CN201611192068 A CN 201611192068A CN 108204244 A CN108204244 A CN 108204244A
- Authority
- CN
- China
- Prior art keywords
- filling
- coal
- caving
- spoil
- mining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 21
- 239000002699 waste material Substances 0.000 claims abstract description 13
- 239000010878 waste rock Substances 0.000 claims abstract description 5
- 238000005065 mining Methods 0.000 abstract description 25
- 230000000694 effects Effects 0.000 abstract description 7
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000005283 ground state Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000010454 slate Substances 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
本发明公开了一种矸石间隔充填采煤法,涉及煤矿开采方法技术领域。现有的矸石充填采煤法,需要利用矸石把采空区完全充填。不仅增加了矿井辅助运输成本,还极大的影响采煤作业,充填工人的劳动量也非常大,并且开采厚煤层时产生的矸石不足以完全充填采空区,无法应用现有的矸石充填采煤法。本发明针对上述问题提出以下技术方案:根据各煤矿顶板条件计算顶板岩层垮落步距,在顶板可能垮落的位置利用普通矸石充填法实施精准充填,支撑将要垮落的顶板岩层。所述精准充填是只在顶板可能垮落的位置充填一个平行于采煤工作面的充填矸石带,支撑将要垮落的顶板岩层。所述矸石带,底部宽度10米~20米。
Description
技术领域
本发明涉及煤矿开采方法,尤其涉及一种矸石间隔充填采煤法。
背景技术
随着煤炭资源的大量开采,建筑物下、铁路下、水体下压煤问题越来越突出,严重影响着国家能源需求和矿山企业的正常生产。与此同时,煤炭生产中伴随着固体废弃物矸石的排放,其传统的处理方式是由井下提升至地表堆积,这种处理矸石的方法会对地面生态环境造成严重破坏。
现有的利用矸石充填采空区的采煤方法,是利用矸石把采空区完全充填,这种充填采煤方法虽然可以有效控制地表下沉,提高煤炭资源采出率,解决矸石堆积污染地面生态环境问题,但是运送大量的矸石到采空区进行充填作业,不仅增加了矿井辅助运输成本,还极大的影响采煤作业,充填工人的劳动量也非常大,并且开采厚煤层时产生的矸石不足以完全充填采空区,无法应用现有的矸石充填采煤法。
发明内容
本发明的目的是提供一种矸石间隔充填方法,解决现有完全矸石充填方法充填作业量大、矿井辅助运输压力大、影响采煤作业,开采厚煤层时无法应用矸石充填采煤法,等问题。
为实现上述目的,本发明采取以下技术方案:根据各煤矿顶板条件计算顶板岩层垮落步距,在顶板可能垮落的位置利用普通矸石充填法实施精准充填,支撑将要垮落的顶板岩层。
进一步的技术方案在于:所述精准充填是只在顶板可能垮落的位置充填一个平行于采煤工作面的充填矸石带,支撑将要垮落的顶板岩层。
进一步的技术方案在于:所述矸石带,底部宽度10米~20米。当煤矿产生的矸石量较大或者开采煤层较厚时,所述矸石带底部宽度取大值。当煤矿产生的矸石量较小或者开采煤层较薄时,所述矸石带底部宽度取小值。
采取以上技术方案的有益效果是:矸石间隔充填法不仅可以有效控制地表下沉,矸石堆积在地表产生的污染问题,而且大大的减少了矸石充填量,从而减少了矿井辅助运输压力,降低了充填作业对采煤作业的影响,降低了吨煤成本,扩大了矸石充填采煤法的应用范围。
附图说明
图1是间隔充填效果示意图
图2是充填工作面示意图
其中:1-上覆岩层 2-顶板 3-采空区 4-充填矸石带 5-顶板理论垮落位置 6-充填开采液压支架 7-煤体 8-底卸式矸石刮板输送机 9-自动夯实机 10-煤炭刮板输送机11-割煤机
具体实施方式
下面结合附图对本发明的实施做进一步的说明:
第一步:根据上覆岩层1和顶板2的物质组成及岩性推断出顶板2的垮落长度。
第二步:自开切眼开始,充填开采液压支架6支撑顶板2,割煤机11切割煤体7,割下的煤用煤炭刮板输送机10运出采煤工作面,此阶段不进行充填工作,形成采空区3。
第三步:随着采煤工作的进行,充填开采液压支架6不断前移,当充填开采液压支架6与顶板理论垮落位置5距离5米~10米时(当煤矿产生的矸石量较大或者开采煤层较厚时,所述距离取大值。当煤矿产生的矸石量较小或者开采煤层较薄时,所述距离取小值),打开底卸式矸石刮板输送机8的漏料孔,进行充填作业,边充填边用自动夯实机9夯实充填带矸石,直至形成完整充填矸石带4.
第四步:形成完整充填矸石带4后,关闭底卸式矸石刮板输送机8的漏料孔,停止充填作业,只进行采煤作业。
第五步:重复第三步和第四步,直到一个采区采完,转移到下一个采区。
Claims (1)
1.矸石间隔充填采煤法,其特征在于:根据各煤矿顶板条件计算顶板岩层垮落步距,在顶板可能垮落的位置利用普通矸石充填法实施精准充填,支撑将要垮落的顶板岩层,所述精准充填是只在顶板可能垮落的位置充填一个平行于采煤工作面的充填矸石带,支撑将要垮落的顶板岩层,所述矸石带,底部宽度10米~20米。当煤矿产生的矸石量较大或者开采煤层较厚时,所述矸石带底部宽度取大值。当煤矿产生的矸石量较小或者开采煤层较薄时,所述矸石带底部宽度取小值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611192068.XA CN108204244A (zh) | 2016-12-20 | 2016-12-20 | 矸石间隔充填采煤法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611192068.XA CN108204244A (zh) | 2016-12-20 | 2016-12-20 | 矸石间隔充填采煤法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108204244A true CN108204244A (zh) | 2018-06-26 |
Family
ID=62603715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611192068.XA Pending CN108204244A (zh) | 2016-12-20 | 2016-12-20 | 矸石间隔充填采煤法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108204244A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109611134A (zh) * | 2018-11-12 | 2019-04-12 | 山东科技大学 | 一种用于松散体条带充填的注浆锚索及条带充填方法 |
CN109681206A (zh) * | 2018-08-20 | 2019-04-26 | 华北科技学院 | 一种采煤填充控制地表沉降的方法 |
CN111335943A (zh) * | 2020-03-11 | 2020-06-26 | 西安科技大学 | 一种利用顶板垮落碎胀充填与定向钻孔点源式间隔注浆减损方法 |
CN113914931A (zh) * | 2021-09-30 | 2022-01-11 | 山东科技大学 | 采煤过程中利用矸石隔离带进行采空区封存抑燃的方法 |
CN115341903A (zh) * | 2022-08-19 | 2022-11-15 | 中国矿业大学 | 面向煤炭开采和耕地保护协同发展的地下采煤设计方法 |
CN115341903B (zh) * | 2022-08-19 | 2024-07-02 | 中国矿业大学 | 面向煤炭开采和耕地保护协同发展的地下采煤设计方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705838A (zh) * | 2009-11-05 | 2010-05-12 | 冀中能源邯郸矿业集团有限公司 | 一种采空区阻隔式充填方法 |
CN101725368A (zh) * | 2009-11-28 | 2010-06-09 | 山东科技大学 | 厚煤层大采高工作面沿空留巷方法 |
CN103993882A (zh) * | 2014-05-26 | 2014-08-20 | 中国矿业大学 | 一种冒落区注浆充填置换条带煤柱的方法 |
CN104712358A (zh) * | 2015-02-05 | 2015-06-17 | 中国矿业大学 | 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法 |
CN105317459A (zh) * | 2015-11-19 | 2016-02-10 | 中国矿业大学(北京) | 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法 |
-
2016
- 2016-12-20 CN CN201611192068.XA patent/CN108204244A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705838A (zh) * | 2009-11-05 | 2010-05-12 | 冀中能源邯郸矿业集团有限公司 | 一种采空区阻隔式充填方法 |
CN101725368A (zh) * | 2009-11-28 | 2010-06-09 | 山东科技大学 | 厚煤层大采高工作面沿空留巷方法 |
CN103993882A (zh) * | 2014-05-26 | 2014-08-20 | 中国矿业大学 | 一种冒落区注浆充填置换条带煤柱的方法 |
CN104712358A (zh) * | 2015-02-05 | 2015-06-17 | 中国矿业大学 | 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法 |
CN105317459A (zh) * | 2015-11-19 | 2016-02-10 | 中国矿业大学(北京) | 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109681206A (zh) * | 2018-08-20 | 2019-04-26 | 华北科技学院 | 一种采煤填充控制地表沉降的方法 |
CN109611134A (zh) * | 2018-11-12 | 2019-04-12 | 山东科技大学 | 一种用于松散体条带充填的注浆锚索及条带充填方法 |
CN109611134B (zh) * | 2018-11-12 | 2020-03-31 | 山东科技大学 | 一种用于松散体条带充填的注浆锚索及条带充填方法 |
CN111335943A (zh) * | 2020-03-11 | 2020-06-26 | 西安科技大学 | 一种利用顶板垮落碎胀充填与定向钻孔点源式间隔注浆减损方法 |
CN111335943B (zh) * | 2020-03-11 | 2021-06-15 | 西安科技大学 | 一种利用顶板垮落碎胀充填与定向钻孔点源式间隔注浆减损方法 |
CN113914931A (zh) * | 2021-09-30 | 2022-01-11 | 山东科技大学 | 采煤过程中利用矸石隔离带进行采空区封存抑燃的方法 |
CN113914931B (zh) * | 2021-09-30 | 2023-11-28 | 山东科技大学 | 采煤过程中利用矸石隔离带进行采空区封存抑燃的方法 |
CN115341903A (zh) * | 2022-08-19 | 2022-11-15 | 中国矿业大学 | 面向煤炭开采和耕地保护协同发展的地下采煤设计方法 |
CN115341903B (zh) * | 2022-08-19 | 2024-07-02 | 中国矿业大学 | 面向煤炭开采和耕地保护协同发展的地下采煤设计方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2013358812B2 (en) | Solid-filling coal mining method with two pre-excavated tunnels for advancing | |
CN101586460B (zh) | 一种采煤固体物充填方法 | |
CN104405437B (zh) | 一种固体充填与综采混合式工作面开采方法 | |
WO2016206618A1 (zh) | 长壁开采n00工法 | |
CN107387084B (zh) | 一种沿空留巷减少切顶深度的施工方法 | |
CN103590830B (zh) | 多矿体露天地下时空同步开采方法 | |
CN207004567U (zh) | 与沿空留巷相结合的煤矿充填开采巷道 | |
CN108204244A (zh) | 矸石间隔充填采煤法 | |
CN101749020A (zh) | 充填法前进式采煤 | |
CN103016053A (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN105464700B (zh) | 综采‑充填混合开采工作面充填段长度确定方法 | |
CN101915100B (zh) | 煤矿井下黄土充填采煤方法 | |
CN102877848B (zh) | 采煤与矸石胶结条带充填同步进行方法 | |
CN109630112B (zh) | 一种切顶充填的n00采矿法 | |
CN109869150A (zh) | 一种矿山资源分段全采局充开采方法 | |
WO2019015362A1 (zh) | 一种浅埋煤层保水开采方法及其应用 | |
CN104453994A (zh) | 一种放顶矸巷旁充填沿空留巷方法 | |
CN108331580B (zh) | 一种清洁高效的采煤方法 | |
CN108952725B (zh) | 一种适用于缓倾斜薄矿体的低贫化采矿方法 | |
CN105240012A (zh) | 一种实现煤柱同采的f型区段采煤方法 | |
CN110284883A (zh) | 一种露天煤矿端帮采排充开采方法 | |
CN105971607A (zh) | 一种中厚煤层沿空留巷方法 | |
CN108547658A (zh) | 一种大倾角极薄煤层矸石自溜回填采空区方法 | |
CN204436462U (zh) | 一种高强复合冰袋 | |
CN202810855U (zh) | 井下移动式掘底矸石胶结条带充填*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180626 |