CN108203983A - A kind of deep foundation pit supporting structure and method - Google Patents

A kind of deep foundation pit supporting structure and method Download PDF

Info

Publication number
CN108203983A
CN108203983A CN201810175662.0A CN201810175662A CN108203983A CN 108203983 A CN108203983 A CN 108203983A CN 201810175662 A CN201810175662 A CN 201810175662A CN 108203983 A CN108203983 A CN 108203983A
Authority
CN
China
Prior art keywords
soil nailing
soil
hole
layer
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810175662.0A
Other languages
Chinese (zh)
Inventor
陈昌俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810175662.0A priority Critical patent/CN108203983A/en
Publication of CN108203983A publication Critical patent/CN108203983A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of deep foundation pit supporting structure and methods, and including soil nailing, drainpipe and stiffener, the soil nailing includes perpendicular soil nailing and oblique soil nailing;Perpendicular soil nailing is inserted vertically into soil layer, and it is 5m to erect soil nailing spacing;Turn hole in side slope, the vertical spacing in turn hole hole position is 1.5m, level interval 1.2m, the oblique soil nailing of installation in hole;Between soil nailing and soil nailing, 20 stiffeners of φ, depth 2m, protruded length 100mm are squeezed into;Side slope sets branch armour layer, and 400mm~800mm, φ >=35mm horizontal drain pipes are inserted at plate brad supporting face layer back, and plate brad supporting face layer 20mm~50mm is stretched out in drainpipe one end, and draining tube spacing is 2m.The application combination deep pit digging feature compared with the disturbance reduced to the soil body of limits, is installed, the technologies such as slip casting by soil nailing, improves the mechanical property of slope soil, improve the globality of slope soil and homeostasis ability, side slope is made more to stablize.

Description

A kind of deep foundation pit supporting structure and method
Technical field
The present invention relates to excavations, and in particular to a kind of deep foundation pit supporting structure and method.
Background technology
In foundation pit construction, if foundation pit supporting method is improper, cause that resistance to shear of soil, intensity drastically reduces sends out excavation slope Raw local failure or overall collapse, supporting construction inclination, collapse sliding, cause serious engineering accident consequence and massive losses.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of deep foundation pit supporting structure and method, with reference to Deep pit digging feature, using method for supporting deep foundation pit, compared with the disturbance reduced to the soil body of limits, installed by soil nailing, The technologies such as slip casting improve the mechanical property of slope soil, improve the globality of slope soil and homeostasis ability, make side slope more Add stabilization.
The purpose of the present invention is achieved through the following technical solutions:A kind of method for supporting deep foundation pit, it includes as follows Step:
S1:The earthwork layer and section for needing plate brad supporting is excavated, every layer of cutting depth is 1m~2m, every section of excavation length For 10m~18m, forbid slope soil of backbreaking or disturb, excavation slope should reserve 100mm and manually carry out side slope cleaning, make side Slope is smooth, and meets the Slope Design gradient;
S2:The soil nailing hole position that will be drilled is marked and numbered in side slope, the vertical spacing in hole position is 1.5m, level Spacing is 1.2m, and after the completion of label, using anchor bolt works drill hole of drilling machine, drilling diameter 100mm, depth is first row 8m, the Two row 7m, third row, the 4th row are 6m, and it is 5m to erect soil nailing spacing;
S3:Soil nailing reinforcing bar is installed;
S4:After soil nailing installs, using slip casing by pressure, Grouting Pipe is inserted at bottom hole 300mm first, uses low pressure 0.4MPa slip castings are removed Grouting Pipe is slowly outer during slip casting, and Grouting Pipe grout outlet is always positioned at slurry surface hereinafter, convenient for discharge soil The gentle bubble of air in nail hole is using high pressure 1.5MPa slip castings at soil nailing hole surface 1.5m, soil nailing hole is filled slurry and is tieed up It holds 5 minutes, blocks in time later, slurry pressure in soil nailing hole is made slowly to spread;
S5:400mm~800mm, φ >=35mm horizontal drain pipes are inserted at plate brad supporting face layer back, drainpipe one end is stretched Go out plate brad supporting face layer 20mm~50mm, draining tube spacing is 2m, convenient for the ponding after branch armour layer is discharged from the soil body;
S6:Between soil nailing and soil nailing, 20 stiffeners of φ, depth 2m, protruded length 100mm are squeezed into;
S7:In side slope surface assembling reinforcement net, bound using 8 reinforcing bar single-layer bidirectionals of φ, spacing 180mm, soil nailing reinforcing bar With bar-mat reinforcement, stiffener firm welding;
S8:C20 pea gravel concretens are sprayed, gunite concrete thickness is 100mm, and coagulation is sprayed in top edge to extension 1m It should be segmented progress when native, according to spraying from top to bottom in same section, carry out watering maintenance after injection is completed 2 hours, avoid splitting Seam.
It is preferred that in S2, during drilling, alignment hole position is answered slowly to pierce, when piercing 3m or so and soil layer is stablized, Acceleration pierces.
It is preferred that in S6, stiffener is into quincuncial arrangement.
A kind of deep foundation pit supporting structure, including soil nailing, drainpipe and stiffener, the soil nailing is including perpendicular soil nailing and tiltedly Soil nailing;
Perpendicular soil nailing is inserted vertically into soil layer, and it is 5m to erect soil nailing spacing;
Turn hole in side slope, the vertical spacing in turn hole hole position is 1.5m, level interval 1.2m, the oblique soil nailing of installation in hole;
Between soil nailing and soil nailing, 20 stiffeners of φ, depth 2m, protruded length 100mm are squeezed into;
Side slope sets branch armour layer, and 400mm~800mm, φ >=35mm horizontal drainages are inserted at plate brad supporting face layer back Plate brad supporting face layer 20mm~50mm is stretched out in pipe, drainpipe one end, and draining tube spacing is 2m.
It is preferred that the drilling diameter of turn hole is 100mm in side slope.
It is preferred that set four casting nail hole positions from top to bottom in side slope, depth is first row 8m, second row 7m, third row, the 4th row are 6m.
It is preferred that in side slope surface assembling reinforcement net, bound using 8 reinforcing bar single-layer bidirectionals of φ, spacing is 180mm, soil nailing reinforcing bar and bar-mat reinforcement, stiffener firm welding.
It is preferred that gutter is set near side slope bottom.
It is preferred that branch armour layer is made of C20 pea gravel concretens.
It is preferred that supporting surface thickness is 100mm, top edge is to extension 1m.
The beneficial effects of the invention are as follows:With reference to deep pit digging feature, using method for supporting deep foundation pit, compared with subtracting for limits The disturbance to the soil body is lacked, has been installed by soil nailing, the technologies such as slip casting, improved the mechanical property of slope soil, improve slope soil Globality and homeostasis ability, make side slope more stablize.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
In figure, 1- drainpipes, 2- branch armour layers, 3.1- erects soil nailing, the oblique soil nailing of 3.2- first rows, and 3.3- second rows are tiltedly native Nail, 3.4- thirds arrange oblique soil nailing, the 4th oblique soil nailings of row of 3.5-, 4- gutters, 5- stiffeners.
Specific embodiment
Technical scheme of the present invention is described in further detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to It is as described below.
A kind of method for supporting deep foundation pit, it includes the following steps:
S1:The earthwork layer and section for needing plate brad supporting is excavated, every layer of cutting depth is 1m~2m, every section of excavation length For 10m~18m, forbid slope soil of backbreaking or disturb, excavation slope should reserve 100mm and manually carry out side slope cleaning, make side Slope is smooth, and meets the Slope Design gradient;
S2:The soil nailing hole position that will be drilled is marked and numbered in side slope, the vertical spacing in hole position is 1.5m, level Spacing is 1.2m, and after the completion of label, using anchor bolt works drill hole of drilling machine, drilling diameter 100mm, depth is first row 8m, the Two row 7m, third row, the 4th row are 6m, and it is 5m to erect 3.1 spacing of soil nailing;
S3:Soil nailing reinforcing bar is installed;
S4:After soil nailing installs, using slip casing by pressure, Grouting Pipe is inserted at bottom hole 300mm first, uses low pressure 0.4MPa slip castings are removed Grouting Pipe is slowly outer during slip casting, and Grouting Pipe grout outlet is always positioned at slurry surface hereinafter, convenient for discharge soil The gentle bubble of air in nail hole is using high pressure 1.5MPa slip castings at soil nailing hole surface 1.5m, soil nailing hole is filled slurry and is tieed up It holds 5 minutes, blocks in time later, slurry pressure in soil nailing hole is made slowly to spread;
S5:400mm~800mm, φ >=35mm horizontal drain pipes 1, drainpipe 1 one are inserted at plate brad supporting face 2 back of layer Plate brad supporting face layer 220mm~50mm is stretched out at end, and 1 spacing of drainpipe is 2m, convenient for by the ponding after branch armour layer 2 from the soil body Discharge;
S6:Between soil nailing and soil nailing, 20 stiffeners 5 of φ, depth 2m, protruded length 100mm are squeezed into;
S7:In side slope surface assembling reinforcement net, bound using 8 reinforcing bar single-layer bidirectionals of φ, spacing 180mm, soil nailing reinforcing bar Firm welding is used with bar-mat reinforcement, stiffener 5;
S8:C20 pea gravel concretens are sprayed, gunite concrete thickness is 100mm, and coagulation is sprayed in top edge to extension 1m It should be segmented progress when native, according to spraying from top to bottom in same section, carry out watering maintenance after injection is completed 2 hours, avoid splitting Seam.
In a preferred embodiment, in S2, during drilling, alignment hole position is answered slowly to pierce, when piercing 3m or so and soil layer When stablizing, accelerate to pierce.
In a preferred embodiment, in S6, stiffener 5 is into quincuncial arrangement.
As shown in Figure 1, a kind of deep foundation pit supporting structure, including soil nailing, drainpipe 1 and stiffener 5, the soil nailing packet Include perpendicular soil nailing 3.1 and oblique soil nailing;
Perpendicular soil nailing 3.1 is inserted vertically into soil layer, and it is 5m to erect 3.1 spacing of soil nailing;
Turn hole in side slope, the vertical spacing in turn hole hole position is 1.5m, level interval 1.2m, the oblique soil nailing reinforcing bar of installation in hole;
Between soil nailing and soil nailing, φ 20 (diameter 20mm) stiffener 5, depth 2m, protruded length 100mm are squeezed into;
Side slope setting branch armour layer 2 is inserted into 400mm~800mm, φ >=35mm horizontal rows at plate brad supporting face 2 back of layer Plate brad supporting face layer 220mm~50mm is stretched out in water pipe 1,1 one end of drainpipe, and 1 spacing of drainpipe is 2m.
In a preferred embodiment, the drilling diameter of turn hole is 100mm in side slope.
In a preferred embodiment, four casting nail hole positions are set from top to bottom in side slope, depth is first row 8m, the Two row 7m, third row, the 4th row are 6m, and soil nailing hole sets soil nailing in position, and the diameter of oblique soil nailing is 25mm;
Soil-nail parameter is consistent with corresponding hole site depth, i.e., oblique 3.2 length of soil nailing of first row is 8000mm, and second row is tiltedly native 3.3 length are followed closely as 7000mm, third arranges oblique 3.4 length of soil nailing as 6000mm, and oblique 3.5 length of soil nailing of the 4th row is 6000mm.
In a preferred embodiment, in side slope surface assembling reinforcement net, using φ 8 (diameter 8mm) reinforcing bar single-layer bidirectional Binding, spacing 180mm, soil nailing reinforcing bar use firm welding with bar-mat reinforcement, stiffener 5.
In a preferred embodiment, gutter 4 is set near side slope bottom;Close to the position on 2 top of branch armour layer It installs and is equipped with gutter 4.
In a preferred embodiment, branch armour layer 2 is made of C20 pea gravel concretens.
In a preferred embodiment, 2 thickness of branch armour layer is 100mm, and top edge is to extension 1m.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, it is noted that all All any modification, equivalent and improvement made within the spirit and principles in the present invention etc. should be included in the guarantor of the present invention Within the scope of shield.

Claims (10)

1. a kind of method for supporting deep foundation pit, which is characterized in that it includes the following steps:
S1:The earthwork layer and section for needing plate brad supporting is excavated, every layer of cutting depth is 1m~2m, and every section of excavation length is 10m~18m, forbids slope soil of backbreaking or disturb, and excavation slope should reserve 100mm and manually carry out side slope cleaning;
S2:The soil nailing hole position that will be drilled is marked and numbered in side slope, the vertical spacing in hole position is 1.5m, level interval For 1.2m, after the completion of label, using anchor bolt works drill hole of drilling machine, drilling diameter 100mm, depth is first row 8m, second row 7m, third row, the 4th row are 6m, and it is 5m to erect soil nailing spacing;
S3:Soil nailing reinforcing bar is installed;
S4:After soil nailing installs, using slip casing by pressure, Grouting Pipe is inserted at bottom hole 300mm first, with low pressure 0.4MPa Slip casting is removed Grouting Pipe is slowly outer during slip casting, and Grouting Pipe grout outlet is always positioned at slurry surface hereinafter, convenient in discharge soil nailing hole Air and bubble are using high pressure 1.5MPa slip castings at soil nailing hole surface 1.5m, and soil nailing hole is filled 5 points of slurry and maintenance Clock blocks, slurry pressure in soil nailing hole is made slowly to spread in time later;
S5:400mm~800mm, φ >=35mm horizontal drain pipes are inserted at plate brad supporting face layer back, soil is stretched out in drainpipe one end Branch armour layer 20mm~50mm is followed closely, draining tube spacing is 2m;
S6:Between soil nailing and soil nailing, 20 stiffeners of φ, depth 2m, protruded length 100mm are squeezed into;
S7:It in side slope surface assembling reinforcement net, is bound using 8 reinforcing bar single-layer bidirectionals of φ, spacing 180mm, soil nailing reinforcing bar and steel Muscle net, stiffener firm welding;
S8:Spray C20 pea gravel concretens, gunite concrete thickness is 100mm, and top edge is to extension 1m, during gunite concrete It should be segmented progress, according to spraying from top to bottom in same section, carry out watering maintenance after injection is completed 2 hours, avoid crack.
2. a kind of method for supporting deep foundation pit according to claim 1, it is characterised in that:In S2, during drilling, alignment hole position is answered It slowly pierces, when piercing 3m or so and soil layer is stablized, accelerates to pierce.
3. a kind of method for supporting deep foundation pit according to claim 1, it is characterised in that:In S6, stiffener is into quincunx Arrangement.
4. a kind of deep foundation pit supporting structure, it is characterised in that:It includes soil nailing, drainpipe and stiffener, the soil nailing packet Include perpendicular soil nailing and oblique soil nailing;
Perpendicular soil nailing is inserted vertically into soil layer, and it is 5m to erect soil nailing spacing;
Turn hole in side slope, the vertical spacing in turn hole hole position is 1.5m, level interval 1.2m, the oblique soil nailing of installation in hole;
Between soil nailing and soil nailing, 20 stiffeners of φ, depth 2m, protruded length 100mm are squeezed into;
Side slope sets branch armour layer, and 400mm~800mm, φ >=35mm horizontal drain pipes, row are inserted at plate brad supporting face layer back Plate brad supporting face layer 20mm~50mm is stretched out in water pipe one end, and draining tube spacing is 2m.
5. a kind of deep foundation pit supporting structure according to claim 4, it is characterised in that:The drilling diameter of turn hole is in side slope 100mm。
6. a kind of deep foundation pit supporting structure according to claim 4 or 5, it is characterised in that:It is set from top to bottom in side slope Four casting nail hole positions are put, depth is first row 8m, second row 7m, and third row, the 4th row are 6m.
7. a kind of deep foundation pit supporting structure according to claim 4, it is characterised in that:In side slope surface assembling reinforcement net, It is bound using 8 reinforcing bar single-layer bidirectionals of φ, spacing 180mm, soil nailing reinforcing bar and bar-mat reinforcement, stiffener firm welding.
8. a kind of deep foundation pit supporting structure according to claim 4, it is characterised in that:Draining is set near side slope bottom Ditch.
9. a kind of deep foundation pit supporting structure according to claim 4, it is characterised in that:Branch armour layer is by C20 microlith coagulations Soil is made.
10. a kind of deep foundation pit supporting structure according to claim 4 or 9, it is characterised in that:Supporting surface thickness is 100mm, top edge is to extension 1m.
CN201810175662.0A 2018-03-02 2018-03-02 A kind of deep foundation pit supporting structure and method Pending CN108203983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810175662.0A CN108203983A (en) 2018-03-02 2018-03-02 A kind of deep foundation pit supporting structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810175662.0A CN108203983A (en) 2018-03-02 2018-03-02 A kind of deep foundation pit supporting structure and method

Publications (1)

Publication Number Publication Date
CN108203983A true CN108203983A (en) 2018-06-26

Family

ID=62605055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810175662.0A Pending CN108203983A (en) 2018-03-02 2018-03-02 A kind of deep foundation pit supporting structure and method

Country Status (1)

Country Link
CN (1) CN108203983A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914954A (en) * 2018-08-22 2018-11-30 中国电建集团成都勘测设计研究院有限公司 Slope support method of the pre support in conjunction with permanent support
CN109295943A (en) * 2018-09-27 2019-02-01 湖北宜化江家墩矿业有限公司 A kind of barren rock cinder field Grouting Pipe and slip casting application method
CN109914422A (en) * 2019-03-01 2019-06-21 华北水利水电大学 A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN110004938A (en) * 2019-03-27 2019-07-12 中冶成都勘察研究总院有限公司 A kind of foundation pit side-wall structural strengthening suspension device
CN110206043A (en) * 2019-06-18 2019-09-06 新疆交通建设集团股份有限公司 Soil nailing and construction method for supporting
CN111287198A (en) * 2020-03-18 2020-06-16 福建工程学院 Supporting structure of soft soil foundation pit and construction method thereof
CN111676980A (en) * 2020-06-01 2020-09-18 重庆弘粟建筑科技有限公司 Foundation pit supporting construction method
CN113356250A (en) * 2021-06-11 2021-09-07 北京建材地质工程有限公司 Horizontal pressurization long well drainage method for large-diameter dewatering drainage non-dry stratum
CN115045260A (en) * 2022-06-29 2022-09-13 中建三局四川建筑装备有限公司 Stirring backfilling method of solidified soil
CN116201141A (en) * 2023-04-03 2023-06-02 中国五冶集团有限公司 Method for preventing orifice soil from being disturbed during soil nail construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090015363A (en) * 2007-08-08 2009-02-12 주식회사 효석종합건설 Repairing method for bulging of reinforced soil retaing wall and soil-nail structure used for it
CN102425174A (en) * 2011-12-10 2012-04-25 中国建筑西南勘察设计研究院有限公司 Drainage tubular pile and soil nailing wall composite supporting structure
CN102619229A (en) * 2012-04-13 2012-08-01 孙涛 Ecological supporting and protecting system and construction method using flexible cladding soil nailing wall combined with reinforced earth
CN102877470A (en) * 2012-07-27 2013-01-16 湖南恒盾岩土工程注浆科技有限公司 Combined soil nailing construction method
CN104727318A (en) * 2015-03-23 2015-06-24 大连理工大学 Foundation ditch composite concrete nail supporting structure and method
CN205116185U (en) * 2015-11-17 2016-03-30 苏州市民用建筑设计院有限责任公司 A supporting construction for weak soil foundation ditch

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090015363A (en) * 2007-08-08 2009-02-12 주식회사 효석종합건설 Repairing method for bulging of reinforced soil retaing wall and soil-nail structure used for it
CN102425174A (en) * 2011-12-10 2012-04-25 中国建筑西南勘察设计研究院有限公司 Drainage tubular pile and soil nailing wall composite supporting structure
CN102619229A (en) * 2012-04-13 2012-08-01 孙涛 Ecological supporting and protecting system and construction method using flexible cladding soil nailing wall combined with reinforced earth
CN102877470A (en) * 2012-07-27 2013-01-16 湖南恒盾岩土工程注浆科技有限公司 Combined soil nailing construction method
CN104727318A (en) * 2015-03-23 2015-06-24 大连理工大学 Foundation ditch composite concrete nail supporting structure and method
CN205116185U (en) * 2015-11-17 2016-03-30 苏州市民用建筑设计院有限责任公司 A supporting construction for weak soil foundation ditch

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陈肇元等: "《土钉支护在基坑工程中的应用》", 31 August 1997 *
高树君等: "土钉支护技术在党政中心附属楼深基坑工程中的应用", 《经济技术协作信息》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914954A (en) * 2018-08-22 2018-11-30 中国电建集团成都勘测设计研究院有限公司 Slope support method of the pre support in conjunction with permanent support
CN108914954B (en) * 2018-08-22 2020-04-14 中国电建集团成都勘测设计研究院有限公司 Slope supporting method combining pre-supporting and permanent supporting
CN109295943A (en) * 2018-09-27 2019-02-01 湖北宜化江家墩矿业有限公司 A kind of barren rock cinder field Grouting Pipe and slip casting application method
CN109295943B (en) * 2018-09-27 2021-04-13 湖北宜化江家墩矿业有限公司 Grouting pipe for waste slag yard and grouting using method
CN109914422A (en) * 2019-03-01 2019-06-21 华北水利水电大学 A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN110004938A (en) * 2019-03-27 2019-07-12 中冶成都勘察研究总院有限公司 A kind of foundation pit side-wall structural strengthening suspension device
CN110206043A (en) * 2019-06-18 2019-09-06 新疆交通建设集团股份有限公司 Soil nailing and construction method for supporting
CN111287198A (en) * 2020-03-18 2020-06-16 福建工程学院 Supporting structure of soft soil foundation pit and construction method thereof
CN111676980A (en) * 2020-06-01 2020-09-18 重庆弘粟建筑科技有限公司 Foundation pit supporting construction method
CN113356250A (en) * 2021-06-11 2021-09-07 北京建材地质工程有限公司 Horizontal pressurization long well drainage method for large-diameter dewatering drainage non-dry stratum
CN115045260A (en) * 2022-06-29 2022-09-13 中建三局四川建筑装备有限公司 Stirring backfilling method of solidified soil
CN116201141A (en) * 2023-04-03 2023-06-02 中国五冶集团有限公司 Method for preventing orifice soil from being disturbed during soil nail construction

Similar Documents

Publication Publication Date Title
CN108203983A (en) A kind of deep foundation pit supporting structure and method
CN109854255B (en) Method for processing tunnel unconverged collapse
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN105155550B (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN107060774B (en) A kind of anti-tunnel portal wall damage device and construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN108166483A (en) Bored pile construction method
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN110043295A (en) It is a kind of first to encircle the Tunnel Landslide processing method filled out afterwards
CN104632249A (en) Tunnel system supporting technology used in loose and soft broken surrounding rock
CN104234726A (en) Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone
CN110284885A (en) Shield inspection-pit construction method
CN204825928U (en) Excavation supporting
CN112281927A (en) Construction method for treating leakage of independent foundation of frame column
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN216342131U (en) Shield tunnel invades limit stake and handles reinforced structure
CN106065628A (en) Based on the major diameter running water pipe security protection construction method forever facing the theory of combination
CN107237339A (en) A kind of concrete cut increases leakage preventing structure and its construction method
CN207919564U (en) A kind of deep foundation pit supporting structure
CN209277905U (en) Tunnel bilayer I-steel preliminary bracing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180626