CN108166981B - Tunnel soft rock large deformation section construction technology - Google Patents

Tunnel soft rock large deformation section construction technology Download PDF

Info

Publication number
CN108166981B
CN108166981B CN201711495254.5A CN201711495254A CN108166981B CN 108166981 B CN108166981 B CN 108166981B CN 201711495254 A CN201711495254 A CN 201711495254A CN 108166981 B CN108166981 B CN 108166981B
Authority
CN
China
Prior art keywords
slip casting
grouting
pressure
hole
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711495254.5A
Other languages
Chinese (zh)
Other versions
CN108166981A (en
Inventor
张松
弯晓林
赵忠洋
苏影
成赫
李飞
成栋
徐迎
常涛
邹来生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201711495254.5A priority Critical patent/CN108166981B/en
Publication of CN108166981A publication Critical patent/CN108166981A/en
Application granted granted Critical
Publication of CN108166981B publication Critical patent/CN108166981B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Tunnel soft rock large deformation section construction technology is related to constructing tunnel technique.It mainly solves situations such as current large deformation section construction is easily caused danger and invents.Advance geologic prediction is carried out plus the method for deepening blasthole detection plus method and advance geologic the probing method of geological radar using TSP;The process of pipe canopy is during construction is advanced: cloth hole, pore-forming, intubation, sealing, slip casting;The process of construction advanced tubule is: cloth hole, pore-forming, intubation, sealing, slip casting;Then preliminary bracing is carried out, measure mainly has: hollow bolt, grouting rock bolt, reinforced mesh and steelframe;Last gunite concrete.Advantage is to can guarantee that construction safety and quality, construction period are short.

Description

Tunnel soft rock large deformation section construction technology
Technical field:
The present invention relates to constructing tunnel techniques, are specifically related to a kind of construction technology of tunnel soft rock large deformation section.
Background technique:
When deep tunnel passes through soft rock and shear-zone, large deformation is generally produced under the conditions of high-ground stress and rich water.It is this It is big to become feature are as follows: rock deformation is big, generally can achieve several tens cm, velocity of displacement quickly, if supporting is improper, initial stage branch Shield will deform, crack, or even landslide.
Mechanism of great distortion is usually divided into two major classes by people:
It (1) is to excavate the stresses re-distribution formed to be more than Surrounding Rock Strength and plasticity variation occurs one of the reason of large deformation. If it happens slowly just belong to extrusion (just belonging to rock burst if it is immediately occurred).
(2) two the reason of large deformation are certain mineralogical compositions and the water reaction in rock and are expanded.It expands During the country rock of deformation generally has higher intensity, deformation to occur mainly in tunnel operation when excavating, bottom is normally behaved as Portion is heaved, and tunnel top and abutment wall keep preferable working condition.
This large deformation harm is huge, has seriously threatened engineering safety, has affected construction quality, has constrained the duration.If It deals with improperly, easily causes danger.
Summary of the invention:
Technical problem to be solved by the invention is to provide a kind of certifiable construction safety and quality, construction period short tunnel Road soft rock large deformation section construction technology.
Above-mentioned purpose is achieved in that
One, advance geologic prediction:
Using geophysical prospecting (TSP+ geological radar), Advance Drilling method (advance geologic drills method+intensification blasthole detection);
TSP: weak, broken formation or Karst Area, forecast distance is 100-120m every time, the front and back lap of splice twice 10m or more;Forecast distance is 120-150m every time in rock mass complete hard rock stratum area, and the lap of splice is not less than 10m;
Geological radar method: geologic radar detection is mainly used for Karst, also can be used for fault belt, weak intercalated layer not The detection of homogeneous body, every 25m is primary, and a underrange is 30m, front and back lap of splice 5m or more twice;
Advance boreholes: proposed adoption impact drill and revolution coring, short distance physical prospecting forward probe exists abnormal in verifying Location, bore diameter use 89. active breaking belt forward probe length 80-100m of ф, the lap of splice be not less than 10m, remaining Location forward probe length is not less than 30m.The lap of splice is not less than 5m twice for front and back.Whether coring is according to different geology for drilling Condition and detection purpose determine;
Deepen blasthole: i.e. intensification blasthole forward probe obtains geology using path shallow bore hole is bored on tunnel excavation working face A kind of method of information, each circulation lay 3-20 intensification blasthole when being drilled with blasthole, deepen 3m or more conduct compared with cyclic advance Exploration hole;
Two, Specific construction scheme:
(1), advanced middle pipe canopy:
Advance support is to guarantee adjoining rock stability, and the major measure of excavation construction safety is the key that guarantee smoothly to excavate work Sequence, with 5~7 ° of outer limbs, squeezes into steel pipe, slip casting to excavation face front, is formed and is enclosed to side in face of excavating along excavation contour line The pre support of rock;
Conduit uses 76 mm hot rolled seamless steel tube of specification Φ, wall thickness 6mm, single long 6m;Guan Peng is processed into tip in front end, Tube body is drilled with slurry hole, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, 5 °~7 ° tail end of conduit 0.3 of extrapolation angle Rice range does not drill, and pipe tail welding 8 mm of φ puts more energy into hoop;
A cloth hole: according to the middle line of the detail design of middle pipe canopy and excavated section, along vault outer contour center elevation and Offset distance carries out cloth hole setting-out, and to plug in pricker as the spacing of pipe canopy in marking of control;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, using pipe canopy machine pore-forming, boring direction It is required that straight, it must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards pipe canopy length and determines;Steel pipe It is parallel with tunnel axis to squeeze into arch country rock, steel pipe circumferential direction spacing 40cm to design 5 °~7 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing middle pipe canopy, is pushed into conduit using pipe canopy machine, and power It asks pipe dingle end in same profile and protruded length less than 30cm to be advisable;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
In an e every dozen complete row after tube shed grouting, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete It exists side by side steel arch-shelf, after the completion of preliminary bracing, makes next row conduit and slip casting again by design, the lap of splice is greater than 2.0m between every row;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence, and slurries convert step by step from thin to thick, first dilute It is dense afterwards, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting;
The drilling of injected hole: construction uses pipe canopy machine drill hole, and when push pipe pays attention to that steel pipe tail portion is protected not to be damaged, so as to The connection of high-pressure slip-casting pipe, squeezing into country rock length is 6m, and it is welded together with I-steel steelframe;
The installation of Grouting Pipe: in scheduled position, the spindle not less than aperture is wound in the flax silk for speckling with CS clay Plunger with good screw thread protective cap, then with impact device is driven into pipe the depth of requirement, makes flax silk in tube inserting holes Plunger and hole wall sufficiently squeeze tightly, then fill aperture with CS clay again;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses flood afterwards Hole;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage is shown, is controlled to adjust by grouting pump, works as pipe When roadlock power≤0.2MPa, drag losses can be omitted, and are monitored by being pumped, oil pressure is set according to pump pressure and the relationship of oil pressure Value, it is ensured that slip casting process safety is convenient;
The control of grouting pump amount: pump amount size is determined according to stratum midge rate or water absorption rate or drilling water yield, anhydrous The method of first pressure injection list liquid cement slurry or clear water can be used to measure the midge rate of drilling in hole;When there is water, according to drilling water outlet Amount and pump capacity determine pump amount: generally requiring pump amount not less than water yield, but when water yield is greater than the maximum pump discharge of pump, Ying Under the conditions of mixture ratios for meeting the requirements pump, as far as possible with big pump amount slip casting;
Slip casting terminates using single hole ending standard: grouting pressure is stepped up, and designs final pressure and stable 10min when reaching, 80% of grouting amount not less than design grouting amount is to start to use level pressure slip casting into the 1/4. of slurry speed into slurry speed, when slip casting pressure When power reaches or approaches design final pressure value, terminate slip casting, and when grouting pressure is close to or up to the 80% of design final pressure, as occurred The spillage of snare can terminate slip casting after interval slip casting;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole Slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, when shortening gel Between, a small amount of low-pressure slip castings or intermittent slip casting are carried out, slurries is made to have relative retention time in crack, so as to gel, but is stopped Gel time of the time no more than mixing slurry is stayed, is just avoided that generation slip casting is not full;
(2), advanced tubule:
Along excavation contour line, with 10~15 ° of outer limbs, steel pipe, slip casting is squeezed into excavation face front, is formed to excavation face The pre support of front country rock;
Conduit uses 42 mm hot rolled seamless steel tube of specification Φ, wall thickness 3.5mm, single long 3.5m -4.0m, and catheter proximal end adds Work is at tip, and tube body, which is drilled with, starches hole, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, and 10 °~15 ° of extrapolation angle 0.3 meter of range of tail end of conduit does not drill;
Conduit is inserted into after being drilled using air pressure gun, manually or mechanically external force is driven into or just heads into;
Construction process:
A cloth hole: according to the middle line of the detail design of ductule and excavated section, along vault outer contour center elevation and Offset distance carries out cloth hole setting-out, and to plug in pricker as the spacing of marking of control ductule;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, using drilling jumbo pore-forming, drilling side It is straight to requiring, it must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards ductule length and determines; Steel pipe is parallel with tunnel axis to squeeze into arch country rock, steel pipe circumferential direction spacing 40cm to design 10 °~15 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing ductule, pushes away drilling jumbo by conduit when necessary Enter;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
After e every dozen complete row grouting with small pipe, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete It exists side by side steel arch-shelf, after the completion of preliminary bracing, makes next row conduit and slip casting again by design, the lap of splice is greater than 1.0m between every row;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence;Slurries convert step by step from thin to thick, first dilute It is dense afterwards, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting, considers that single-pipe grouting amount is smaller, using aperture mixer Pressure injection of complete opening;
Slurries preparation: cement slurry uses cement paste blender pulping, and is stored with special slurry storing tube;
The drilling of injected hole: construction is drilled using air rock drill, dedicated to head into, and when push pipe pays attention to protection steel pipe tail Portion is not damaged, and to connect with high-pressure slip-casting pipe, squeezing into country rock length is 3.5m -4m, and it is welded with I-steel steelframe Together;
The installation of Grouting Pipe: with holes using pipe shaft, one end is that the steel floral tube of tip makees Grouting Pipe;
The installation method of Grouting Pipe is: in scheduled position, being wound in the flax silk for speckling with CS clay not less than aperture Spindle plunger;In tube inserting holes, with good screw thread protective cap, then with impact device pipe is driven into the depth of requirement, Squeeze flax silk plunger and hole wall sufficiently tightly;Then aperture is filled with CS clay again;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses flood afterwards Hole;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage is shown, is controlled to adjust by grouting pump, works as pipe When roadlock power≤0.2MPa, drag losses can be omitted, and are monitored by being pumped, oil pressure is set according to pump pressure and the relationship of oil pressure Value, it is ensured that slip casting process safety is convenient;
Slip casting ending standard: under normal circumstances, using level pressure slip casting;When grouting pressure reaches or approaches design final pressure value When, terminate slip casting;And the 80% of final pressure is designed when grouting pressure is close to or up to, such as there is the spillage of snare, through interval slip casting Afterwards, slip casting can be terminated;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole Slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, when shortening gel Between, a small amount of low-pressure slip castings or intermittent slip casting are carried out, slurries is made to have relative retention time in crack, so as to gel, but is stopped Gel time of the time no more than mixing slurry is stayed, is just avoided that generation slip casting is not full;
(3), preliminary bracing:
System supporting measure mainly has: gunite concrete, hollow bolt, grouting rock bolt, reinforced mesh and steelframe are temporarily faced upward Arch, false stull;After tunnel excavation, the concrete of 3~5cm thickness is just sprayed immediately first;It finishes to muck removal and is applied again by design requirement Make anchor, net, bracing members combined supporting, and gunite concrete is to design thickness;
Mortar anchor constructing method:
It is drilled using air rock drill, anchor pole hole location is vertical with scar, and design hole location deviation ± 150mm, drilling depth Allowable error ± 50mm;With aggregate chips in high-pressure blast cleaning hole after drilling, then anchor pole is installed, intubating length is not less than design length The 95% of degree;After using high-pressure blast borehole cleaning after pore-forming, first by 4~5mm of internal diameter, the same anchor pole of flexible plastic exhaust pipe of 1~1.5mm of wall thickness It is sent into and is drilled to bottom hole together, and stay the excess length of 0.5m or so outside hole, Grouting Pipe is then fixed on orifice position, and Anchor pole aperture is blocked, after confirmation exhaust pipe is unimpeded, using dual exhaust method slip casting, until comb gas is not vented or overflows thin pulp When stop, extract exhaust pipe, after mortar reaches intensity install backing plate tightening nuts;
Hollow grouting anchor construction method:
A drilling:
Hollow bolt boring method is the same as grouting rock bolt boring method;
B anchor pole is installed:
Drilling finishes, and before installing anchor pole, first cleans aggregate chips in bolthole with high-pressure blast, then hollow bolt is inserted into anchor pole Hole, anchor pole insertion depth should meet design code, the exposed 10~20cm of anchor pole, in order to connect with pneumatic mortar machine grout outlet;
C mud jacking:
Before mud jacking, the dedicated stop grouting plug of anchor pole is pre-installed at bolthole, when mud jacking, anchor pole head is connect with slip casting machine grout outlet, is opened Beginning mud jacking;After cement slurry pressure is full in hole, stop grouting plug is held out against immediately, prevents slurries from flowing out;
The installation of d backing plate:
Mud jacking finishes, after nominal strength to be achieved, start install anchor pole special backing plate, tightening nuts, backing plate should ensure that with Branch mask scar is closely connected;
(4), screwing steel bars net;
(5), bracing members are constructed:
Steelframe support uses profile steel frame and 2 kinds of grillage;
For bracing members as rigid arch, the stiffness and strength of support are big, can make temporary support and individually bear biggish enclose Rock pressure power, the occasion for needing to carry immediately in weak broken wall rock use;
Bracing members processing and fabricating:
Bracing members press design size welding production, and when production guarantees that the radian of every section and size meet design requirement, root According to design size on steel arch-shelf forming mill first examination processing 1-2 piece, adjustment jack examines steel arch-shelf radius satisfaction to set when processing After meter requires, jack is fixed, batch production processing is carried out;
The bracing members that clod wash is completed, on-site consolidation is carried out on the spot on the terrace of setting-out, connecting plate is welded at every section both ends, section It is connected with securely between point by connecting plate, guarantees that steel arch-shelf is non-warping, size meets design requirement;
Bracing members installation:
Steelframe is installed by design requirement, and installation tolerance should meet code requirement, and lock foot anchor tube (bar) is utilized after installation Positioning;When backbreaking larger, hogback spray fill out with first branch peer concrete so that supporting is closely connected with country rock, deformation controlling for rock surrounding gateways into One step develops, longitudinally connected securely with connection steel bar rod between two rows of steelframes, to form whole force structure;
(6), gunite concrete:
Construction method:
The loosening stone of scar is cleared up before injection, and embedded jetting thickness control mark nail, every 1~2m set one Root;Concrete concentrates mix with concrete spraying station, mixes and stirs material using concrete special conveying and is transported to setting;
Spray at the beginning of construction of shotcrete point and spray secondary progress again, be just sprayed on excavations (or partial excavation) after the completion immediately into Row, to close scar as early as possible, prevents surface layer peeling;Multiple pneumatically placed concrete carries out after the installation of anchor pole, linked network and steelframe, is formed as early as possible Composite Supporting System, to inhibit surrouding rock deformation;It is sprayed and is put down with concrete between steelframe, protective layer cannot be less than 4cm;
Mixture will be with mixing with spray, and feed is continuous;Spraying operation segmentation, fragment, layering, from bottom to top successively carry out;Point When layer injection, later layer should carry out after previous layer concrete final set, if 1h row injection again after final set, needs first to clean spray with geomantic omen Level;Spraying machine wind pressure of work is stablized, and spray head is maintained within the scope of 0.6~1.5 meter at a distance from by spray plane, and the angle of injection is most Good to keep vertical with by spray plane, sprinkler operational should continuously move in a circle, and form helical form, gunite concrete final set Subsequent cycle operation can be carried out after 3h.
The invention has the advantages that this construction technology mainly uses advance support, advance geologic prediction, advance reinforcement;Supporting Measure in place, quick closure in place, technical measures carry out overall control country rock large deformation in place etc. for lining cutting follow-up.It should be into construction Row advance geologic prediction tests crustal stress, judges whether there is large deformation according to monitoring data, and according to deformation size and Actual conditions take following working measure: it is big to forecast that means are established by advanced predictions such as horizontal protruded drill hole, detecting earth stress Deformation Prediction system;Using anchor, note, spray integrated surrounding rock consolidation support system;Immediate support after excavation lays work using loopful Word steelframe, makes full use of self;Preliminary bracing anchor pole uses hollow grouting anchor, when necessary using lengthening anchor pole; Increase preliminary bracing deformation allowance, improve secondary liner structure intensity, using reinforcement composite lining structure.It can guarantee construction Safety and quality, construction period are short.
Specific embodiment:
One, advance geologic prediction:
Using geophysical prospecting (TSP+ geological radar), Advance Drilling method (advance geologic drills method+intensification blasthole detection);
TSP: weak, broken formation or Karst Area, forecast distance is 100-120m every time, the front and back lap of splice twice 10m or more;Forecast distance is 120-150m every time in rock mass complete hard rock stratum area, and the lap of splice is not less than 10m;
Geological radar method: geologic radar detection is mainly used for Karst, also can be used for fault belt, weak intercalated layer not The detection of homogeneous body, every 25m is primary, and a underrange is 30m, front and back lap of splice 5m or more twice;
Advance boreholes: proposed adoption impact drill and revolution coring, short distance physical prospecting forward probe exists abnormal in verifying Location, bore diameter use 89. active breaking belt forward probe length 80-100m of ф, the lap of splice be not less than 10m, remaining Location forward probe length is not less than 30m.The lap of splice is not less than 5m twice for front and back.Whether coring is according to different geology for drilling Condition and detection purpose determine;
Deepen blasthole: i.e. intensification blasthole forward probe obtains geology using path shallow bore hole is bored on tunnel excavation working face A kind of method of information, each circulation lay 3-20 intensification blasthole when being drilled with blasthole, deepen 3m or more conduct compared with cyclic advance Exploration hole;
Two, Specific construction scheme:
(1), advanced middle pipe canopy:
Advance support is to guarantee adjoining rock stability, and the major measure of excavation construction safety is the key that guarantee smoothly to excavate work Sequence, with 5~7 ° of outer limbs, squeezes into steel pipe, slip casting to excavation face front, is formed and is enclosed to side in face of excavating along excavation contour line The pre support of rock;
Conduit uses 76 mm hot rolled seamless steel tube of specification Φ, wall thickness 6mm, single long 6m;Guan Peng is processed into tip in front end, Tube body is drilled with slurry hole, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, 5 °~7 ° tail end of conduit 0.3 of extrapolation angle Rice range does not drill, and pipe tail welding 8 mm of φ puts more energy into hoop;
A cloth hole: according to the middle line of the detail design of middle pipe canopy and excavated section, along vault outer contour center elevation and Offset distance carries out cloth hole setting-out, and to plug in pricker as the spacing of pipe canopy in marking of control;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, using pipe canopy machine pore-forming, boring direction It is required that straight, it must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards pipe canopy length and determines;Steel pipe It is parallel with tunnel axis to squeeze into arch country rock, steel pipe circumferential direction spacing 40cm to design 5 °~7 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing middle pipe canopy, is pushed into conduit using pipe canopy machine, and power It asks pipe dingle end in same profile and protruded length less than 30cm to be advisable;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
In an e every dozen complete row after tube shed grouting, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete It exists side by side steel arch-shelf, after the completion of preliminary bracing, makes next row conduit and slip casting again by design, the lap of splice is greater than 2.0m between every row;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence, and slurries convert step by step from thin to thick, first dilute It is dense afterwards, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting;
The drilling of injected hole: construction uses pipe canopy machine drill hole, and when push pipe pays attention to that steel pipe tail portion is protected not to be damaged, so as to The connection of high-pressure slip-casting pipe, squeezing into country rock length is 6m, and it is welded together with I-steel steelframe;
The installation of Grouting Pipe: in scheduled position, the spindle not less than aperture is wound in the flax silk for speckling with CS clay Plunger with good screw thread protective cap, then with impact device is driven into pipe the depth of requirement, makes flax silk in tube inserting holes Plunger and hole wall sufficiently squeeze tightly, then fill aperture with CS clay again;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses flood afterwards Hole;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage is shown, is controlled to adjust by grouting pump, works as pipe When roadlock power≤0.2MPa, drag losses can be omitted, and are monitored by being pumped, oil pressure is set according to pump pressure and the relationship of oil pressure Value, it is ensured that slip casting process safety is convenient;
The control of grouting pump amount: pump amount size is determined according to stratum midge rate or water absorption rate or drilling water yield, anhydrous The method of first pressure injection list liquid cement slurry or clear water can be used to measure the midge rate of drilling in hole;When there is water, according to drilling water outlet Amount and pump capacity determine pump amount: generally requiring pump amount not less than water yield, but when water yield is greater than the maximum pump discharge of pump, Ying Under the conditions of mixture ratios for meeting the requirements pump, as far as possible with big pump amount slip casting;
Slip casting terminates using single hole ending standard: grouting pressure is stepped up, and designs final pressure and stable 10min when reaching, 80% of grouting amount not less than design grouting amount is to start to use level pressure slip casting into the 1/4. of slurry speed into slurry speed, when slip casting pressure When power reaches or approaches design final pressure value, terminate slip casting, and when grouting pressure is close to or up to the 80% of design final pressure, as occurred The spillage of snare can terminate slip casting after interval slip casting;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole Slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, when shortening gel Between, a small amount of low-pressure slip castings or intermittent slip casting are carried out, slurries is made to have relative retention time in crack, so as to gel, but is stopped Gel time of the time no more than mixing slurry is stayed, is just avoided that generation slip casting is not full;
(2), advanced tubule:
Along excavation contour line, with 10~15 ° of outer limbs, steel pipe, slip casting is squeezed into excavation face front, is formed to excavation face The pre support of front country rock;
Conduit uses 42 mm hot rolled seamless steel tube of specification Φ, wall thickness 3.5mm, single long 3.5m -4.0m, and catheter proximal end adds Work is at tip, and tube body, which is drilled with, starches hole, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, and 10 °~15 ° of extrapolation angle 0.3 meter of range of tail end of conduit does not drill;
Conduit is inserted into after being drilled using air pressure gun, manually or mechanically external force is driven into or just heads into;
Construction process:
A cloth hole: according to the middle line of the detail design of ductule and excavated section, along vault outer contour center elevation and Offset distance carries out cloth hole setting-out, and to plug in pricker as the spacing of marking of control ductule;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, using drilling jumbo pore-forming, drilling side It is straight to requiring, it must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards ductule length and determines; Steel pipe is parallel with tunnel axis to squeeze into arch country rock, steel pipe circumferential direction spacing 40cm to design 10 °~15 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing ductule, pushes away drilling jumbo by conduit when necessary Enter;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
After e every dozen complete row grouting with small pipe, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete It exists side by side steel arch-shelf, after the completion of preliminary bracing, makes next row conduit and slip casting again by design, the lap of splice is greater than 1.0m between every row;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence;Slurries convert step by step from thin to thick, first dilute It is dense afterwards, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting, considers that single-pipe grouting amount is smaller, using aperture mixer Pressure injection of complete opening;
Slurries preparation: cement slurry uses cement paste blender pulping, and is stored with special slurry storing tube;
The drilling of injected hole: construction is drilled using air rock drill, dedicated to head into, and when push pipe pays attention to protection steel pipe tail Portion is not damaged, and to connect with high-pressure slip-casting pipe, squeezing into country rock length is 3.5m -4m, and it is welded with I-steel steelframe Together;
The installation of Grouting Pipe: with holes using pipe shaft, one end is that the steel floral tube of tip makees Grouting Pipe;
The installation method of Grouting Pipe is: in scheduled position, being wound in the flax silk for speckling with CS clay not less than aperture Spindle plunger;In tube inserting holes, with good screw thread protective cap, then with impact device pipe is driven into the depth of requirement, Squeeze flax silk plunger and hole wall sufficiently tightly;Then aperture is filled with CS clay again;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses flood afterwards Hole;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage is shown, is controlled to adjust by grouting pump, works as pipe When roadlock power≤0.2MPa, drag losses can be omitted, and are monitored by being pumped, oil pressure is set according to pump pressure and the relationship of oil pressure Value, it is ensured that slip casting process safety is convenient;
Slip casting ending standard: under normal circumstances, using level pressure slip casting;When grouting pressure reaches or approaches design final pressure value When, terminate slip casting;And the 80% of final pressure is designed when grouting pressure is close to or up to, such as there is the spillage of snare, through interval slip casting Afterwards, slip casting can be terminated;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole Slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, when shortening gel Between, a small amount of low-pressure slip castings or intermittent slip casting are carried out, slurries is made to have relative retention time in crack, so as to gel, but is stopped Gel time of the time no more than mixing slurry is stayed, is just avoided that generation slip casting is not full;
(3), preliminary bracing:
System supporting measure mainly has: gunite concrete, hollow bolt, grouting rock bolt, reinforced mesh and steelframe;It opens in tunnel After digging, the concrete of 3~5cm thickness is just sprayed immediately first;It is finished to muck removal and applies anchor, net, bracing members joint by design requirement again Supporting, and gunite concrete is to design thickness;
Mortar anchor constructing method:
It is drilled using air rock drill, anchor pole hole location is vertical with scar, and design hole location deviation ± 150mm, drilling depth Allowable error ± 50mm;With aggregate chips in high-pressure blast cleaning hole after drilling, then anchor pole is installed, intubating length is not less than design length The 95% of degree;After using high-pressure blast borehole cleaning after pore-forming, first by 4~5mm of internal diameter, the same anchor pole of flexible plastic exhaust pipe of 1~1.5mm of wall thickness It is sent into and is drilled to bottom hole together, and stay the excess length of 0.5m or so outside hole, Grouting Pipe is then fixed on orifice position, and Anchor pole aperture is blocked, after confirmation exhaust pipe is unimpeded, using dual exhaust method slip casting, until comb gas is not vented or overflows thin pulp When stop, extract exhaust pipe, after mortar reaches intensity install backing plate tightening nuts;
Hollow grouting anchor construction method:
A drilling:
Hollow bolt boring method is the same as grouting rock bolt boring method;
B anchor pole is installed:
Drilling finishes, and before installing anchor pole, first cleans aggregate chips in bolthole with high-pressure blast, then hollow bolt is inserted into anchor pole Hole, anchor pole insertion depth should meet design code, the exposed 10~20cm of anchor pole, in order to connect with pneumatic mortar machine grout outlet;
C mud jacking:
Before mud jacking, the dedicated stop grouting plug of anchor pole is pre-installed at bolthole, when mud jacking, anchor pole head is connect with slip casting machine grout outlet, is opened Beginning mud jacking;After cement slurry pressure is full in hole, stop grouting plug is held out against immediately, prevents slurries from flowing out;
The installation of d backing plate:
Mud jacking finishes, after nominal strength to be achieved, start install anchor pole special backing plate, tightening nuts, backing plate should ensure that with Branch mask scar is closely connected;
(4), screwing steel bars net;
(5), bracing members are constructed:
Steelframe support uses profile steel frame and 2 kinds of grillage;
For bracing members as rigid arch, the stiffness and strength of support are big, can make temporary support and individually bear biggish enclose Rock pressure power, the occasion for needing to carry immediately in weak broken wall rock use;
Bracing members processing and fabricating:
Bracing members press design size welding production, and when production guarantees that the radian of every section and size meet design requirement, root According to design size on steel arch-shelf forming mill first examination processing 1-2 piece, adjustment jack examines steel arch-shelf radius satisfaction to set when processing After meter requires, jack is fixed, batch production processing is carried out;
The bracing members that clod wash is completed, on-site consolidation is carried out on the spot on the terrace of setting-out, connecting plate is welded at every section both ends, section It is connected with securely between point by connecting plate, guarantees that steel arch-shelf is non-warping, size meets design requirement;
Bracing members installation:
Steelframe is installed by design requirement, and installation tolerance should meet code requirement, and lock foot anchor tube (bar) is utilized after installation Positioning;When backbreaking larger, hogback spray fill out with first branch peer concrete so that supporting is closely connected with country rock, deformation controlling for rock surrounding gateways into One step develops, longitudinally connected securely with connection steel bar rod between two rows of steelframes, to form whole force structure;
(6), gunite concrete:
Construction method:
The loosening stone of scar is cleared up before injection, and embedded jetting thickness control mark nail, every 1~2m set one Root;Concrete concentrates mix with concrete spraying station, mixes and stirs material using concrete special conveying and is transported to setting;
Spray at the beginning of construction of shotcrete point and spray secondary progress again, be just sprayed on excavations (or partial excavation) after the completion immediately into Row, to close scar as early as possible, prevents surface layer peeling;Multiple pneumatically placed concrete carries out after the installation of anchor pole, linked network and steelframe, is formed as early as possible Composite Supporting System, to inhibit surrouding rock deformation;It is sprayed and is put down with concrete between steelframe, protective layer cannot be less than 4cm;
Mixture will be with mixing with spray, and feed is continuous;Spraying operation segmentation, fragment, layering, from bottom to top successively carry out;Point When layer injection, later layer should carry out after previous layer concrete final set, if 1h row injection again after final set, needs first to clean spray with geomantic omen Level;Spraying machine wind pressure of work is stablized, and spray head is maintained within the scope of 0.6~1.5 meter at a distance from by spray plane, and the angle of injection is most Good to keep vertical with by spray plane, sprinkler operational should continuously move in a circle, and form helical form, gunite concrete final set Subsequent cycle operation can be carried out after 3h.

Claims (1)

1. tunnel soft rock large deformation section construction technology, it is characterized in that:
One, advance geologic prediction:
Using geophysical prospecting and advance geologic probing method+intensification blasthole detection Advance Drilling method of TSP+ geological radar;
TSP: weak, broken formation or Karst Area, forecast distance is 100-120m every time, front and back lap of splice 10m twice More than;Forecast distance is 120-150m every time in rock mass complete hard rock stratum area, and the lap of splice is not less than 10m;
Geological radar method: geologic radar detection is mainly used for Karst, and it is uneven also to can be used for fault belt, weak intercalated layer The detection of body, every 25m is primary, and a underrange is 30m, front and back lap of splice 5m or more twice;
Advance boreholes: proposed adoption impact drill and revolution coring, there is abnormal ground in short distance physical prospecting forward probe in verifying Section, bore diameter use 89. active breaking belt forward probe length 80-100m of ф, and the lap of splice is not less than 10m, remaining location Forward probe length is not less than 30m, and the lap of splice is not less than 5m twice for front and back, and whether coring is according to different geological conditions for drilling It is determined with detection purpose;
Deepen blasthole: i.e. intensification blasthole forward probe obtains geological information using path shallow bore hole is bored on tunnel excavation working face A kind of method, each circulation lays 3-20 intensifications blasthole when being drilled with blasthole, deepens 3m or more compared with cyclic advance and be used as to detect Hole;
Two, Specific construction scheme:
(1), advanced middle pipe canopy:
Advance support is to guarantee adjoining rock stability, and the major measure of excavation construction safety is the critical process for guaranteeing smoothly to excavate, edge Excavation contour line, with 5~7 ° of outer limbs, to excavation face in front of squeeze into steel pipe, slip casting, formed to the pre- of country rock square in face of excavating Supporting;
Conduit uses specification Φ 76mm hot rolled seamless steel tube, wall thickness 6mm, single long 6m;Guan Peng is processed into front end tip, and tube body bores If starching hole thoroughly, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, extrapolation angle 5 °~7 ° tail end of conduit, 0.3 meter of range It does not drill, pipe tail welding φ 8mm puts more energy into hoop;
A cloth hole: according to the middle line of the detail design of middle pipe canopy and excavated section, along vault outer contour center elevation and offset distance into Row cloth hole setting-out, and to plug in pricker as the spacing of pipe canopy in marking of control;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, using pipe canopy machine pore-forming, boring direction requirement It is straight, it must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards pipe canopy length and determines;Steel pipe and tunnel Road axis squeezes into arch country rock, steel pipe circumferential direction spacing 40cm in parallel to design 5 °~7 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing middle pipe canopy, is pushed into conduit using pipe canopy machine, and make every effort to pipe Dingle end is in same profile and protruded length less than 30cm to be advisable;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
In an e every dozen complete row after tube shed grouting, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete and exist side by side Steel arch-shelf after the completion of preliminary bracing, makes next row conduit and slip casting by design, the lap of splice is greater than 2.0m between every row again;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence, and slurries convert step by step from thin to thick, after first dilute It is dense, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting;
The drilling of injected hole: construction uses pipe canopy machine drill hole, and when push pipe pays attention to that steel pipe tail portion is protected not to be damaged, so as to high pressure Grouting Pipe connection, squeezing into country rock length is 6m, and it is welded together with I-steel steelframe;
The installation of Grouting Pipe: in scheduled position, being wound in the spindle plunger not less than aperture with the flax silk for speckling with CS clay, In tube inserting holes, with good screw thread protective cap, then with impact device pipe is driven into the depth of requirement, make flax silk plunger with Hole wall sufficiently squeezes tightly, then fills aperture with CS clay again;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses big water hole afterwards;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage show, is controlled to adjust by grouting pump, when pipeline resistance When power≤0.2MPa, drag losses are omitted, and are monitored by being pumped, oil pressure value is set according to pump pressure and the relationship of oil pressure, it is ensured that Slip casting process safety is convenient;
The control of grouting pump amount: pump amount size is determined according to stratum midge rate or water absorption rate or drilling water yield, is adopted in no water hole The midge rate of drilling is measured with the method for first pressure injection list liquid cement slurry or clear water;When there is water, according to drilling water yield and pump Ability determines pump amount: it is required that pump amount is not less than water yield, but when water yield is greater than the maximum pump discharge of pump, should want meeting pump Under the conditions of mixture ratios asked, as far as possible with big pump amount slip casting;
Slip casting terminates using single hole ending standard: grouting pressure is stepped up, and designs final pressure and stable 10min, slip casting when reaching 80% of amount not less than design grouting amount is to start to use level pressure slip casting into the 1/4. of slurry speed into slurry speed, works as grouting pressure When reaching or approaching design final pressure value, terminate slip casting, and when grouting pressure is close to or up to the 80% of design final pressure, as enclosed The spillage of set terminates slip casting after interval slip casting;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, shortens gel time, into Row a small amount of low-pressure slip castings or intermittent slip casting, make slurries have relative retention time in crack, so as to gel, but the residence time No more than the gel time of mixing slurry, just it is avoided that generation slip casting is not full;
(2), advanced tubule:
Along excavation contour line, with 10~15 ° of outer limbs, steel pipe, slip casting is squeezed into excavation face front, is formed to side in face of excavating The pre support of country rock;
Conduit uses specification Φ 42mm hot rolled seamless steel tube, wall thickness 3.5mm, single long 3.5m -4.0m, and catheter proximal end is processed into Tip, tube body are drilled with slurry hole, aperture 6-8mm, 10~20cm of pitch of holes, quincuncial arrangement, 10 °~15 ° conduits of extrapolation angle 0.3 meter of range of tail end does not drill;
Conduit is inserted into after being drilled using air pressure gun, manually or mechanically external force is driven into or just heads into;
Construction process:
A cloth hole: according to the middle line of the detail design of ductule and excavated section, along vault outer contour center elevation and offset distance into Row cloth hole setting-out, and to plug in pricker as the spacing of marking of control ductule;
B pore-forming: erection orientation stand first determines punching direction, position and the elevation angle, and using drilling jumbo pore-forming, boring direction is wanted It asks straight, must not be bent and collapse hole, aperture is mating with diameter of steel tube, is not more than 50mm, and hole depth regards ductule length and determines;Steel pipe It is parallel with tunnel axis to squeeze into arch country rock, steel pipe circumferential direction spacing 40cm to design 10 °~15 ° of the elevation angle;
C intubation: direction and the angle of alignment pore are required when installing ductule, is pushed into drilling jumbo by conduit when necessary;
D sealing: pneumatically placed concrete 10~15cm thickness closes reinforcement around pipe tail;
After e every dozen complete row grouting with small pipe, excavates arch and apply radial system anchor pole, steel mesh, gunite concrete and exist side by side Steel arch-shelf after the completion of preliminary bracing, makes next row conduit and slip casting by design, the lap of splice is greater than 1.0m between every row again;
Slip casting:
From bottom to top, slip casting uses single tube or multitube parallel slip casting to grouting sequence;Slurries convert step by step from thin to thick, after first dilute It is dense, after slip casting is complete, aperture is blocked immediately, prevents slurries from outflowing;
Grouting mode: the slip casting of TBW-250 grouting pump is selected in slip casting, considers that single-pipe grouting amount is smaller, using aperture mixer complete opening Pressure injection;
Slurries preparation: cement slurry uses cement paste blender pulping, and is stored with special slurry storing tube;
The drilling of injected hole: construction is drilled using air rock drill, dedicated to head into, and when push pipe pays attention to protecting steel pipe tail portion not It is damaged, to connect with high-pressure slip-casting pipe, squeezing into country rock length is 3.5m -4m, and it is welded on one with I-steel steelframe It rises;
The installation of Grouting Pipe: with holes using pipe shaft, one end is that the steel floral tube of tip makees Grouting Pipe;The installation method of Grouting Pipe is: In scheduled position, the spindle plunger not less than aperture is wound in the flax silk for speckling with CS clay;In tube inserting holes, band Good screw thread protective cap, then with impact device pipe is driven into the depth of requirement, squeeze flax silk plunger and hole wall sufficiently tightly;So Aperture is filled with CS clay again afterwards;
Be discharged to periphery for water is squeezed, mud jacking sequence are as follows: first infuse no water hole, after be marked with water hole;Small water hole is first infused, infuses big water hole afterwards;
Grouting pressure control: grouting pressure is subject to the value that orifice pressure gage show, is controlled to adjust by grouting pump, when pipeline resistance When power≤0.2MPa, drag losses are omitted, and are monitored by being pumped, oil pressure value is set according to pump pressure and the relationship of oil pressure, it is ensured that Slip casting process safety is convenient;
Slip casting ending standard: under normal circumstances, using level pressure slip casting;When grouting pressure reaches or approaches design final pressure value, Terminate slip casting;And the 80% of final pressure is designed when grouting pressure is close to or up to, and such as there is the spillage of snare, after interval slip casting, Terminate slip casting;
The processing of slip casting abnormal phenomenon:
Grout leaking phenomenon occurs for a, i.e., when slurry is flowed out from other holes, using more pump slip castings simultaneously or blocking grout leaking hole slip casting;
B slurry pressure increases suddenly, it may occur however that plugging, shutdown inspection;
C slurries grouting amount is very big, and lengthy pressure does not increase, then should adjust concentration of slurry and match ratio, shortens gel time, into Row a small amount of low-pressure slip castings or intermittent slip casting, make slurries have relative retention time in crack, so as to gel, but the residence time No more than the gel time of mixing slurry, just it is avoided that generation slip casting is not full;
(3), preliminary bracing:
System supporting measure mainly has: gunite concrete, hollow bolt, grouting rock bolt, reinforced mesh and steelframe;Tunnel excavation Afterwards, the concrete of 3~5cm thickness is just sprayed immediately first;It is finished to muck removal and applies anchor, net, bracing members joint branch by design requirement again Shield, and gunite concrete is to design thickness;
Mortar anchor constructing method:
It is drilled using air rock drill, anchor pole hole location is vertical with scar, and design hole location deviation ± 150mm, and drilling depth permits Perhaps error ± 50mm;With aggregate chips in high-pressure blast cleaning hole after drilling, then anchor pole is installed, intubating length is not less than design length 95%;With after high-pressure blast borehole cleaning after pore-forming, first by 4~5mm of internal diameter, the flexible plastic exhaust pipe of 1~1.5mm of wall thickness with anchor pole together Drilling is sent into bottom hole, and stays the excess length of 0.5m outside hole, Grouting Pipe is then fixed on orifice position, and by bolthole Mouth blocking, after confirmation exhaust pipe is unimpeded, using dual exhaust method slip casting, stopping when comb gas is not vented or overflows thin pulp, Exhaust pipe is extracted, backing plate tightening nuts are installed after mortar reaches intensity;
Hollow grouting anchor construction method:
A drilling:
Hollow bolt boring method is the same as grouting rock bolt boring method;
B anchor pole is installed:
Drilling finishes, and before installing anchor pole, first cleans aggregate chips in bolthole with high-pressure blast, then hollow bolt is inserted into bolthole, anchor Bar insertion depth should meet design code, the exposed 10~20cm of anchor pole, in order to connect with pneumatic mortar machine grout outlet;
C mud jacking:
Before mud jacking, the dedicated stop grouting plug of anchor pole is pre-installed at bolthole, when mud jacking, anchor pole head is connect with slip casting machine grout outlet, starts to press Slurry;After cement slurry pressure is full in hole, stop grouting plug is held out against immediately, prevents slurries from flowing out;
The installation of d backing plate:
Mud jacking finishes, and after nominal strength to be achieved, starts to install anchor pole special backing plate, tightening nuts, backing plate should ensure that and supporting Face scar is closely connected;
(4), screwing steel bars net;
(5), bracing members are constructed:
Steelframe support uses profile steel frame and 2 kinds of grillage;
For bracing members as rigid arch, the stiffness and strength of support are big, can make temporary support and individually bear biggish country rock pressure Power, the occasion for needing to carry immediately in weak broken wall rock use;
Bracing members processing and fabricating:
Bracing members press design size welding production, and when production guarantees that the radian of every section and size meet design requirement, according to setting Size first examination processing 1-2 piece on steel arch-shelf forming mill is counted, adjustment jack is examined steel arch-shelf radius to meet design and wanted when processing After asking, jack is fixed, carries out batch production processing;
The bracing members that clod wash is completed, carry out on-site consolidation on the spot on the terrace of setting-out, connecting plate is welded at every section both ends, between node It is connected with securely by connecting plate, guarantees that steel arch-shelf is non-warping, size meets design requirement;
Bracing members installation:
Steelframe is installed by design requirement, and installation tolerance should meet code requirement, is positioned after installation using lock foot anchor tube;It backbreaks When larger, hogback spray fill out with first branch peer concrete so that supporting is closely connected with country rock, the further development of deformation controlling for rock surrounding gateways, It is longitudinally connected securely with connection steel bar rod between two rows of steelframes, to form whole force structure;
(6), gunite concrete:
Construction method:
The loosening stone of scar is cleared up before injection, and embedded jetting thickness control mark nail, every 1~2m set one;It is mixed Solidifying soil concentrates mix with concrete spraying station, mixes and stirs material using concrete special conveying and is transported to setting;
It sprays at the beginning of construction of shotcrete point and sprays secondary progress again, be just sprayed on excavation and carry out immediately after the completion, to close rock as early as possible Face prevents surface layer peeling;Multiple pneumatically placed concrete carries out after the installation of anchor pole, linked network and steelframe, forms Composite Supporting System as early as possible, with Inhibit surrouding rock deformation;It is sprayed and is put down with concrete between steelframe, protective layer cannot be less than 4cm;
Mixture will be with mixing with spray, and feed is continuous;Spraying operation segmentation, fragment, layering, from bottom to top successively carry out;Layering spray When penetrating, later layer should carry out after previous layer concrete final set, if 1h row injection again after final set, needs first to clean spray-up with geomantic omen Face;Spraying machine wind pressure of work is stablized, and spray head is maintained within the scope of 0.6~1.5 meter at a distance from by spray plane, and the angle of injection is best Keep vertical with by spray plane, sprinkler operational should continuously move in a circle, and form helical form, gunite concrete final set 3h After can carry out subsequent cycle operation.
CN201711495254.5A 2017-12-31 2017-12-31 Tunnel soft rock large deformation section construction technology Active CN108166981B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711495254.5A CN108166981B (en) 2017-12-31 2017-12-31 Tunnel soft rock large deformation section construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711495254.5A CN108166981B (en) 2017-12-31 2017-12-31 Tunnel soft rock large deformation section construction technology

Publications (2)

Publication Number Publication Date
CN108166981A CN108166981A (en) 2018-06-15
CN108166981B true CN108166981B (en) 2019-10-15

Family

ID=62516457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711495254.5A Active CN108166981B (en) 2017-12-31 2017-12-31 Tunnel soft rock large deformation section construction technology

Country Status (1)

Country Link
CN (1) CN108166981B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678772A (en) * 2018-07-17 2018-10-19 湖南科技大学 A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN108868843A (en) * 2018-08-21 2018-11-23 华东建工集团有限公司 A kind of anchor rod support method in tunnel
CN109989777B (en) * 2019-04-03 2020-06-09 中铁十八局集团有限公司 Method for controlling initial support large deformation of tunnel small-mileage extrusion deformation section
CN110130924A (en) * 2019-05-09 2019-08-16 中国电建集团华东勘测设计研究院有限公司 By force to tunnel combined support system and construction method under the conditions of strong rock burst on active
CN110284889A (en) * 2019-06-24 2019-09-27 中铁隧道局集团有限公司 A kind of flat pilot tunnel Enlargement excavation method of TBM
CN110185457B (en) * 2019-06-24 2020-08-04 中铁隧道局集团有限公司 TBM (Tunnel boring machine) horizontal pilot tunnel construction method
CN110195604B (en) * 2019-06-24 2020-12-08 中铁隧道局集团有限公司 Construction method for tunnel main tunnel TBM (tunnel boring machine) tunneling section
CN110985063B (en) * 2019-12-20 2021-03-30 交通运输部公路科学研究所 Tunnel advanced large pipe shed detection and karst cave treatment construction method
CN111485890B (en) * 2020-04-08 2022-03-15 内蒙古金陶股份有限公司 Tunneling method of roadway
CN111997624A (en) * 2020-08-18 2020-11-27 中交二公局第三工程有限公司 Shallow-buried large-section underground excavation rectangular tunnel construction method
CN112814697A (en) * 2020-12-28 2021-05-18 中铁十九局集团第六工程有限公司 Advanced pre-support process method for tunnel with tillite layer
CN114320303A (en) * 2021-12-09 2022-04-12 中国铁建大桥工程局集团有限公司 Method for excavating vertical shaft flood discharge tunnel body support
CN114320362B (en) * 2021-12-18 2024-04-09 中国建筑一局(集团)有限公司 Primary support structure and support method for mountain-penetrating highway tunnel in complex area
CN114961790A (en) * 2022-05-27 2022-08-30 中南大学 Shield synchronous grouting construction method and construction effect evaluation method thereof
CN117052344B (en) * 2023-08-04 2024-05-31 内蒙古平庄煤业(集团)有限责任公司老公营子煤矿 Leakage blocking drilling method for goaf of close-range coal seam group

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244133B (en) * 2013-05-17 2016-01-20 贵州省公路工程集团有限公司 The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN104747194A (en) * 2015-03-10 2015-07-01 中铁九局集团有限公司 Three-wire parallel small spacing large section tunnel group construction method
CN105464669B (en) * 2015-10-31 2017-11-14 中铁二十局集团有限公司 Plenty water weak surrounding rock major long tunnel construction method
CN106194195A (en) * 2016-07-22 2016-12-07 中铁建大桥工程局集团第五工程有限公司 Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method
CN106121661A (en) * 2016-08-08 2016-11-16 中铁二局集团有限公司 A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN106437726B (en) * 2016-11-02 2018-04-13 中铁二十局集团第五工程有限公司 Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method

Also Published As

Publication number Publication date
CN108166981A (en) 2018-06-15

Similar Documents

Publication Publication Date Title
CN108166981B (en) Tunnel soft rock large deformation section construction technology
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN108678777B (en) Support method for tunnel fault fracture zone section
CN106837352A (en) Fault belt surrounding rock tunnel construction method
CN112431599B (en) Tunnel excavation method for upper soft and lower hard stratum
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN106837351A (en) Tunnel Karst water detects Treatment Methods
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN104481560A (en) Roadway roof aquifer treatment method
CN110056369A (en) A kind of construction method at tunnel's entrance and exit hole
JP7257086B2 (en) Comprehensive Construction Method for Low Overburden Sections of Tunnels
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN111997624A (en) Shallow-buried large-section underground excavation rectangular tunnel construction method
CN108457658A (en) A kind of texture stratum tunnel list hole bidirectional construction crosses section constructing method
CN110130901A (en) On across both wired Urban Underground mining sectbn construction methods
CN109139046A (en) Segmenting slip casting self-drilling type barrel vault advanced support method
CN112267899A (en) Tunnel exit construction method
CN108678753A (en) Reverse-slope tunnel construction method
CN108915702B (en) Shield receiving method in circular small-section tunnel
CN113137235B (en) Construction method of high-ground-stress soft rock extrusion large-deformation tunnel
CN109505612A (en) Big descending bored tunnel shield sky selection structure and construction technology
CN109578035A (en) Steel pipe draining lock foot stake and construction method
CN112539066A (en) Rapid construction method for karst development long tunnel
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN108798718B (en) Tunnel front-bearing subsequent grouting method

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant