CN108166471A - A kind of complicated geological converts beam construction method - Google Patents

A kind of complicated geological converts beam construction method Download PDF

Info

Publication number
CN108166471A
CN108166471A CN201711463168.6A CN201711463168A CN108166471A CN 108166471 A CN108166471 A CN 108166471A CN 201711463168 A CN201711463168 A CN 201711463168A CN 108166471 A CN108166471 A CN 108166471A
Authority
CN
China
Prior art keywords
conversion beam
rest stand
reinforcement
conversion
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711463168.6A
Other languages
Chinese (zh)
Other versions
CN108166471B (en
Inventor
王丽梅
袁银书
付国刚
郭建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201711463168.6A priority Critical patent/CN108166471B/en
Publication of CN108166471A publication Critical patent/CN108166471A/en
Application granted granted Critical
Publication of CN108166471B publication Critical patent/CN108166471B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of complicated geologicals to convert beam construction method, includes the following steps:(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, first with the rock supporting course for meeting setting requirement for bearing capacity around advance borehole method detection solution cavity;(2) it digs at foundation pit to rock supporting course top surface, then in two adjacent foundation pits to continuing to be excavated to exposing solution cavity between rock supporting course;(3) solution cavity is backfilled with rubble;(4) laying bed course is inclined cross between two adjacent rock supporting courses, the position of conversion beam and frame column is then determined on bed course;(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand;(6) concrete of conversion beam and frame column is poured, the casting direction of the conversion beam concrete is symmetrically carried out from centre to both sides.This method ensure that conversion beam steel bar colligation is solid and reliable, and design position is accurate, ensure that the pouring quality of conversion beam concrete.

Description

A kind of complicated geological converts beam construction method
Technical field
The present invention relates to a kind of constructions of conversion beam, more particularly to a kind of complicated geological conversion beam construction method.
Background technology
At present, the house architectural structure in China mainly based on reinforced concrete structure, and also employ large span more Building structure so that traditional bored pile foundation has obtained good development, but for for there are the ground of solution cavity Base basis, especially solution cavity face absolute altitude fluctuating difference is big, and size variation differs, and without the foundation of certain rule.At this Regional Construction building will extremely be prudent in dealing with, and particularly skyscraper will more should be double cautious.
Chinese patent application No. is CN201210073760.6 disclose " lower part original structure reinforce with top newly add builds The method of simultaneous construction ", this method lower part original structure are the structure that need to be reinforced, and superstructure builds structure newly to add, In the case of the original load-carrying members stress in lower part allows, passed down by setting measure conversion beam completion top newly plus building structural load It passs, realizes that up-down structure can construct simultaneously.Upper load is placed on the measure conversion beam of setting by the invention, passes through vertical structure Load is transmitted, can make lower part original structure reinforcing engineering and top newly plus build structure to be carried out at the same time construction.This patent is lower part original There are structural strengthening and top newly-built structure to construct simultaneously the conversion beam of setting, be not suitable for the conversion beam in complicated solution cavity geology Construction.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of construction and installation it is convenient, it is solid and reliable, Disposably put into a kind of small, economic and practical complicated geological conversion beam construction method.
A kind of complicated geological converts beam construction method, includes the following steps:
(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, around advance borehole method detection solution cavity Meet the rock supporting course of setting requirement for bearing capacity;
(2) it digs at foundation pit to rock supporting course top surface, then continues in two adjacent foundation pits between rock supporting course It is excavated to exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam and frame is then determined on bed course The position of trestle;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in binding conversion beam Reinforcing bar while, lay tremie pipe every 1.5~2m at the relatively sparse place of reinforcing bar, bind the reinforcing bar and frame of the conversion beam The reinforcing bar step of trestle is:(a) steel pipe support rest stand is taken on bed course, the steel pipe support rest stand is by more vertical branch Support is firmly connected to each other composition, and the steel pipe support rest stand is divided into multilayered structure up and down;(b) it is put in lowest level steel pipe support It puts and horizontal support is laid on the under(-)chassis of frame;(c) the horizontal support higher slice be laid with binding conversion beam lower placing of reinforcement and The lower placing of reinforcement of frame column;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level The horizontal support that steel pipe support rest stand is taken away;(f) it is laid with binding in the horizontal support higher slice of the last layer support rest stand The upper placing of reinforcement of conversion beam and the upper placing of reinforcement of frame column, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, it will The upper placing of reinforcement of frame column is fixed with lower placing of reinforcement;(g) step (d) is repeated, is taken out in last layer steel pipe support rest stand Horizontal support is walked, repeats the step (e) and step (f), until completing reinforcing bar binding and the frame column on whole conversion beams Reinforcing bar binding;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;
(6) pour the concrete of conversion beam and frame column, the casting method of the conversion beam concrete be from centre to The symmetrical placement layer by layer in both sides.
The method of the present invention takes basic conversion beam, using the foundation structure form of beam upper prop.Verify solution cavity periphery under basis Meet the intact rock of code requirement, do the supporting course that basis dress changes beam, isolated footing column is played on conversion beam.Outside complete scar It is backfilled at solution cavity with rubble.When binding the reinforcing bar of conversion beam, using steel pipe support rest stand, layering is laid with assembling reinforcement, layering Detach the horizontal support of rest stand.It ensure that conversion beam steel bar colligation is solid and reliable, design position is accurate.Conversion beam concrete pours It builds direction symmetrically to carry out from centre to both sides, to ensure the stabilization of support system.Conversion beam concrete uses the original of thin concrete lift Then.The area for increasing concrete parts working face is poured in this way, is conducive to the discharge of the concrete parts heat of hydration, is also beneficial to drop The lateral pressure of template when low concrete pours.The method that concrete is poured using fixed point, under concrete by being laid in beam in advance Expects pipe carries out blanking, makes concrete filling in beam that can carry out from bottom to top, and the aggregate accumulation of conversion beam top, lower part is avoided to pour leakiness The phenomenon that occur, ensure that the pouring quality of conversion beam concrete.
Description of the drawings
Fig. 1 is conversion beam and frame column construction node signal in a kind of complicated geological conversion beam construction method of the present invention Figure;
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is described in detail.
A kind of complicated geological conversion beam construction method as shown in Figure 1, includes the following steps:
(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, around advance borehole method detection solution cavity Meet the rock supporting course of setting requirement for bearing capacity, as shown in the figure rock supporting course 1 and rock supporting course 2;
(2) it digs at foundation pit to rock supporting course top surface, then continues in two adjacent foundation pits between rock supporting course It is excavated to exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam 3 and frame is then determined on bed course The position of trestle 4;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in binding conversion beam 3 Reinforcing bar while, lay tremie pipe every 1.5~2m at the relatively sparse place of reinforcing bar, bind the reinforcing bar and frame of the conversion beam The reinforcing bar step of trestle is:(a) steel pipe support rest stand is taken on bed course, the steel pipe support rest stand is by more vertical branch Support is firmly connected to each other composition, and the steel pipe support rest stand is divided into multilayered structure up and down;(b) it is put in lowest level steel pipe support It puts and horizontal support is laid on the under(-)chassis of frame;(c) the horizontal support higher slice be laid with binding conversion beam lower placing of reinforcement and The lower placing of reinforcement of frame column;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level The horizontal support that steel pipe support rest stand is taken away;(f) it is laid with binding in the horizontal support higher slice of the last layer support rest stand The upper placing of reinforcement of conversion beam and the upper placing of reinforcement of frame column, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, it will The upper placing of reinforcement of frame column is fixed with lower placing of reinforcement;(g) step (d) is repeated, is taken out in last layer steel pipe support rest stand Horizontal support is walked, repeats the step (e) with step (f) until completing the reinforcing bar binding on whole conversion beams and frame column Reinforcing bar is bound;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;The reinforcing bar of conversion beam and frame column in this step Binding method is using existing method.
(6) concrete of conversion beam 3 and frame column 4 is poured, the casting method of the conversion beam concrete is from centre To the symmetrical placement layer by layer in both sides, the length of the preferred conversion beam is more than 1.5 times of conversion deck-molding.
Embodiment 1
(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, around advance borehole method detection solution cavity Meet the rock supporting course of setting requirement for bearing capacity;
(2) it digs at foundation pit to rock supporting course top surface, then continues in two adjacent foundation pits between rock supporting course It is excavated to exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam 3 and frame is then determined on bed course The position of trestle 4;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in binding conversion beam 3 Reinforcing bar while, lay tremie pipe every 1.5m at the relatively sparse place of reinforcing bar, bind the reinforcing bar and frame of the conversion beam The reinforcing bar step of column is:(a) steel pipe support rest stand is taken on bed course, the steel pipe support rest stand is by more vertical supportings Composition is firmly connected to each other, the steel pipe support rest stand is divided into multilayered structure up and down;(b) it is shelved in lowest level steel pipe support Horizontal support is laid on the under(-)chassis of frame;(c) the lower placing of reinforcement and frame of binding conversion beam are laid in the horizontal support higher slice The lower placing of reinforcement of trestle;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level steel The horizontal support that pipe support rest stand is taken away;(f) binding is laid in the horizontal support higher slice of the last layer support rest stand to turn The upper placing of reinforcement of beam and the upper placing of reinforcement of frame column are changed, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, by frame The upper placing of reinforcement of trestle is fixed with lower placing of reinforcement;(g) step (d) is repeated, is taken away in last layer steel pipe support rest stand Horizontal support repeats the step (e) and step (f) until completing the reinforcing bar binding on whole conversion beams and the steel of frame column Muscle is bound;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;The reinforcing bar of conversion beam and frame column ties up in this step Bundle method is using existing method.
(6) concrete of conversion beam 3 and frame column 4 is poured, the casting method of the conversion beam concrete is from centre Symmetrically divide three layers to both sides to pour.The length of the conversion beam is more than 1.5 times of conversion deck-molding.
When binding the reinforcing bar of conversion beam, using steel pipe support rest stand, layering is laid with assembling reinforcement, and layering detaches rest stand Horizontal support.It ensure that conversion beam steel bar colligation is solid and reliable, design position is accurate.The casting direction of conversion beam concrete is therefrom Between symmetrically carried out to both sides, to ensure the stabilization of support system.Conversion beam concrete uses the original of " thin concrete lift, incremental " Then.The area for increasing concrete parts working face is poured in this way, is conducive to the discharge of the concrete parts heat of hydration, is also beneficial to drop The lateral pressure of template when low concrete pours.
Embodiment 2
(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, around advance borehole method detection solution cavity Meet the rock supporting course of setting requirement for bearing capacity;
(2) it digs at foundation pit to rock supporting course top surface, then continues in two adjacent foundation pits between rock supporting course It is excavated to exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam 3 and frame is then determined on bed course The position of trestle 4;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in binding conversion beam 3 Reinforcing bar while, lay tremie pipe every 2m at the relatively sparse place of reinforcing bar, bind the reinforcing bar and frame column of the conversion beam Reinforcing bar step be:(a) take steel pipe support rest stand on bed course, the steel pipe support rest stand by more vertical supportings that This composition that is fixedly linked, the steel pipe support rest stand are divided into multilayered structure up and down;(b) in lowest level steel pipe support rest stand Under(-)chassis on be laid with horizontal support;(c) the lower placing of reinforcement and frame of binding conversion beam are laid in the horizontal support higher slice The lower placing of reinforcement of column;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level steel pipe The horizontal support that support rest stand is taken away;(f) it is laid with binding conversion in the horizontal support higher slice of the last layer support rest stand The upper placing of reinforcement of beam and the upper placing of reinforcement of frame column, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, by frame The upper placing of reinforcement of column is fixed with lower placing of reinforcement;(g) step (d) is repeated, horizontal stroke is taken away in last layer steel pipe support rest stand Support repeats the step (e) and step (f) until completing the reinforcing bar binding on whole conversion beams and the reinforcing bar of frame column Binding;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;The binding of the reinforcing bar of conversion beam and frame column in this step Method is using existing method.
(6) concrete of conversion beam 3 and frame column 4 is poured, the casting method of the conversion beam concrete is from centre Symmetrically divide three layers to both sides to pour.The length of the conversion beam is more than 1.5 times of conversion deck-molding.
When binding the reinforcing bar of conversion beam, using steel pipe support rest stand, layering is laid with assembling reinforcement, and layering detaches rest stand Horizontal support.It ensure that conversion beam steel bar colligation is solid and reliable, design position is accurate.The casting direction of conversion beam concrete is therefrom Between symmetrically carried out to both sides, to ensure the stabilization of support system.Conversion beam concrete uses the original of " thin concrete lift, incremental " Then.The area for increasing concrete parts working face is poured in this way, is conducive to the discharge of the concrete parts heat of hydration, is also beneficial to drop The lateral pressure of template when low concrete pours.
Embodiment 3
(1) under the conditions of having existing for solution cavity in foundation pit position to be dug, around advance borehole method detection solution cavity Meet the rock supporting course of setting requirement for bearing capacity;
(2) it digs at foundation pit to rock supporting course top surface, then continues in two adjacent foundation pits between rock supporting course It is excavated to exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam 3 and frame is then determined on bed course The position of trestle 4;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in binding conversion beam 3 Reinforcing bar while, lay tremie pipe every 1.8m at the relatively sparse place of reinforcing bar, bind the reinforcing bar and frame of the conversion beam The reinforcing bar step of column is:(a) steel pipe support rest stand is taken on bed course, the steel pipe support rest stand is by more vertical supportings Composition is firmly connected to each other, the steel pipe support rest stand is divided into multilayered structure up and down;(b) it is shelved in lowest level steel pipe support Horizontal support is laid on the under(-)chassis of frame;(c) the lower placing of reinforcement and frame of binding conversion beam are laid in the horizontal support higher slice The lower placing of reinforcement of trestle;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level steel The horizontal support that pipe support rest stand is taken away;(f) binding is laid in the horizontal support higher slice of the last layer support rest stand to turn The upper placing of reinforcement of beam and the upper placing of reinforcement of frame column are changed, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, by frame The upper placing of reinforcement of trestle is fixed with lower placing of reinforcement;(g) step (d) is repeated, is taken away in last layer steel pipe support rest stand Horizontal support repeats the step (e) and step (f) until completing the reinforcing bar binding on whole conversion beams and the steel of frame column Muscle is bound;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;The reinforcing bar of conversion beam and frame column ties up in this step Bundle method is using existing method.
(6) concrete of conversion beam 3 and frame column 4 is poured, the casting method of the conversion beam concrete is from centre Symmetrically divide three layers to both sides to pour.The length of the conversion beam is more than 1.5 times of conversion deck-molding.
When binding the reinforcing bar of conversion beam, using steel pipe support rest stand, layering is laid with assembling reinforcement, and layering detaches rest stand Horizontal support.It ensure that conversion beam steel bar colligation is solid and reliable, design position is accurate.The casting direction of conversion beam concrete is therefrom Between symmetrically carried out to both sides, to ensure the stabilization of support system.Conversion beam concrete uses the original of " thin concrete lift, incremental " Then.The area for increasing concrete parts working face is poured in this way, is conducive to the discharge of the concrete parts heat of hydration, is also beneficial to drop The lateral pressure of template when low concrete pours.

Claims (2)

1. a kind of complicated geological converts beam construction method, it is characterised in that includes the following steps:
(1) it under the conditions of having existing for solution cavity in foundation pit position to be dug, detects first with advance borehole method and meets around solution cavity Set the rock supporting course of requirement for bearing capacity;
(2) it digs at foundation pit to rock supporting course top surface, then continues to excavate between rock supporting course in two adjacent foundation pits To exposing solution cavity;
(3) solution cavity is backfilled with rubble;
(4) laying bed course is inclined cross between two adjacent rock supporting courses, conversion beam and frame column is then determined on bed course Position;
(5) reinforcing bar of conversion beam and frame column is bound on the bed course using support rest stand, in the steel of binding conversion beam While muscle, tremie pipe is laid every 1.5~2m at the relatively sparse place of reinforcing bar, binds the reinforcing bar and frame column of the conversion beam Reinforcing bar step be:(a) take steel pipe support rest stand on bed course, the steel pipe support rest stand by more vertical supportings that This composition that is fixedly linked, the steel pipe support rest stand are divided into multilayered structure up and down;(b) in lowest level steel pipe support rest stand Under(-)chassis on be laid with horizontal support;(c) the lower placing of reinforcement and frame of binding conversion beam are laid in the horizontal support higher slice The lower placing of reinforcement of column;(d) horizontal support is taken away;(e) it is laid on the under(-)chassis of last layer support rest stand from lowest level steel pipe The horizontal support that support rest stand is taken away;(f) it is laid with binding conversion in the horizontal support higher slice of the last layer support rest stand The upper placing of reinforcement of beam and the upper placing of reinforcement of frame column, and by the lower placing of reinforcement of conversion beam and upper placing of reinforcement banding fixed, by frame The upper placing of reinforcement of column is fixed with lower placing of reinforcement;(g) step (d) is repeated, horizontal stroke is taken away in last layer steel pipe support rest stand Support repeats the step (e) and step (f), until completing the reinforcing bar binding on whole conversion beams and the steel of frame column Muscle is bound;(h) vertical supporting for entirely taking steel pipe support rest stand is removed;
(6) concrete of conversion beam and frame column is poured, the casting method of the conversion beam concrete is from centre to both sides Symmetrical placement layer by layer.
2. complicated geological according to claim 1 converts beam construction method, it is characterised in that:The length of the conversion beam Conversion deck-molding more than 1.5 times.
CN201711463168.6A 2017-12-28 2017-12-28 Construction method of complicated geological transfer beam Active CN108166471B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711463168.6A CN108166471B (en) 2017-12-28 2017-12-28 Construction method of complicated geological transfer beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711463168.6A CN108166471B (en) 2017-12-28 2017-12-28 Construction method of complicated geological transfer beam

Publications (2)

Publication Number Publication Date
CN108166471A true CN108166471A (en) 2018-06-15
CN108166471B CN108166471B (en) 2019-12-27

Family

ID=62519629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711463168.6A Active CN108166471B (en) 2017-12-28 2017-12-28 Construction method of complicated geological transfer beam

Country Status (1)

Country Link
CN (1) CN108166471B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337229Y (en) * 1998-05-15 1999-09-08 南京市民用建筑设计研究院 Beam pillar-plate column combined structure
CN201459913U (en) * 2009-08-20 2010-05-12 广东省建科建筑设计院 Joint of composite steel concrete transition box beam wrapping composite steel concrete transition column
CN203008375U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Conversion beam stanchion
CN106917331A (en) * 2017-04-20 2017-07-04 长沙理工大学 The road structure and its construction method of a kind of deep-lying karst area water sealing consolidation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337229Y (en) * 1998-05-15 1999-09-08 南京市民用建筑设计研究院 Beam pillar-plate column combined structure
CN201459913U (en) * 2009-08-20 2010-05-12 广东省建科建筑设计院 Joint of composite steel concrete transition box beam wrapping composite steel concrete transition column
CN203008375U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Conversion beam stanchion
CN106917331A (en) * 2017-04-20 2017-07-04 长沙理工大学 The road structure and its construction method of a kind of deep-lying karst area water sealing consolidation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈树艺: "对某高层建筑深基坑逆作法施工实例的分析", 《广东科技》 *

Also Published As

Publication number Publication date
CN108166471B (en) 2019-12-27

Similar Documents

Publication Publication Date Title
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN1948633A (en) Tray type excarvating contrary construction method
CN203174619U (en) Reverse raft concrete terrace
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN103321234B (en) Constructing method of load-bearing structure built on high slope or geological complex area
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN107246005A (en) Super-large diameter bores and buries steel pipe hollow foundation pile and its construction method
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN106351331A (en) Multi-floor basement reverse and normal combined construction process
CN103104102A (en) Construction method for underground storey-addition reconstruction
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN206902734U (en) A kind of earth construction of soft foundation zone
CN106283948B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN1837514A (en) Column supported underground continuous wall
CN208328968U (en) A kind of upper stake suitable for large-scale cyclic load is casted anchor novel foundation
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN108166471A (en) A kind of complicated geological converts beam construction method
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN207812473U (en) Frame device structure is shelved in a kind of component and support
CN212175363U (en) Frame-type anti-skidding structure with road system
CN106120853A (en) A kind of inverted construction method of frame bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20191227

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20240109