CN108149562A - A kind of offshore approach span reinforcing device - Google Patents
A kind of offshore approach span reinforcing device Download PDFInfo
- Publication number
- CN108149562A CN108149562A CN201611096053.3A CN201611096053A CN108149562A CN 108149562 A CN108149562 A CN 108149562A CN 201611096053 A CN201611096053 A CN 201611096053A CN 108149562 A CN108149562 A CN 108149562A
- Authority
- CN
- China
- Prior art keywords
- cylinder
- motor
- controller
- sliding block
- interior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/005—Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Foundations (AREA)
Abstract
A kind of offshore approach span reinforcing device, including reinforcing platform, inserted link, second cylinder, second motor, pitching pile, strut, first motor, first cylinder, flange bearing, stent, first sliding block, first sliding rail, controller, water storage box, rack, second sliding block, second sliding rail, rubber swelling item, through-hole, nozzle, third cylinder, gear and third motor, the first sliding rail of installation on the right side of the reinforcing platform, first sliding block is installed on the first sliding rail, strut is installed on first sliding block, mounting bracket on strut, first motor is installed on stent, first cylinder is installed on the output shaft of the first motor, pitching pile is installed on the piston rod of first cylinder, pitching pile passes through strut, the second motor of installation in pitching pile, second cylinder is installed on the output shaft of the second motor;It is an advantage of the invention that:With multiple reinforcement measure.
Description
Technical field
The present invention relates to a kind of offshore approach span reinforcing devices, belong to bridge construction facility technology field.
Background technology
Access bridge refers to, positioned at main bridge both ends, the bridge span instead of high embankment, main bridge bridge opening being connected to from access bridge abutment
Part, it is to be parallel to the downward component of access bridge bridge floor, the prior art to reduce the gravity of automobile that access bridge, which is made long purpose,
Access bridge generally all be one reinforcing platform, reinforce platform be mounted between access bridge and ground, play the role of support access bridge, reinforce
Platform only has applied force between ground, and the side wall for reinforcing platform and ground does not have reinforcement measure.In order to solve above-mentioned difficulties, need out
Sending out a has the offshore approach span reinforcing device of multiple reinforcement measure.
Invention content
The object of the present invention is to provide a kind of offshore approach span reinforcing devices.
The problem to be solved in the present invention is that the access bridge of the prior art is generally all a reinforcing platform, reinforces platform and ground
Side wall does not have the problem of reinforcement measure.
Purpose to realize the present invention, the technical solution adopted by the present invention are:
A kind of offshore approach span reinforcing device, including reinforce platform, inserted link, the second cylinder, the second motor, pitching pile, strut, the first motor,
First cylinder, flange bearing, stent, the first sliding block, the first sliding rail, controller, water storage box, rack, the second sliding block, second are slided
Rail, rubber swelling item, through-hole, nozzle, third cylinder, gear and third motor, the first sliding rail of the reinforcing platform right side installation, the
First sliding block on one sliding rail to be installed, strut is installed on the first sliding block, mounting bracket on strut installs the first motor on stent, and
First cylinder is installed on the output shaft of one motor, the first cylinder is mounted on flange bearing, and flange bearing is rack-mount, the
Pitching pile is installed, pitching pile passes through strut, the second motor is installed in pitching pile, is pacified on the output shaft of the second motor on the piston rod of one cylinder
The second cylinder is filled, inserted link is installed on the piston rod of the second cylinder, inserted link is located in pitching pile, installation gear, the axis of gear in inserted link
It is connected by shaft coupling with third motor, third motor is mounted in inserted link, and on the left of gear and gear respectively installs tooth in both sides up and down
Item, rack are mounted on the second sliding block, and the second sliding block is mounted on the second sliding rail, and the second sliding rail is mounted in inserted link, rack bar side
Rubber swelling item is installed in face, and through-hole is equipped in rubber swelling item, third cylinder is installed in rack, is pacified on the piston rod of third cylinder
Nozzle is filled, nozzle is extend into through-hole, and nozzle is connected by pipeline with water storage box, and water storage box is mounted in rack, controller peace
Mounted in reinforcing in platform, controller is connected by conducting wire with the first motor, the second motor, third motor and nozzle respectively.
First solenoid valve built in first cylinder, the first solenoid valve are connected by conducting wire with controller.
Second solenoid valve built in second cylinder, second solenoid valve are connected by conducting wire with controller.
Third solenoid valve built in the third cylinder, third solenoid valve are connected by conducting wire with controller.
It is an advantage of the invention that:Platform will be reinforced to install on ground by the sea, reinforcing platform is made to be located under access bridge, platform will be reinforced and used
Concrete is fixed between ground and access bridge, is moved down strut with external piling machine device, is moved down the first sliding block,
Pitching pile is made to be moved to ground side;Controller controls the first electric motor starting, rotates the first cylinder, rotates pitching pile, make reinforcing
Platform and the side wall on ground have reinforcement measure;Controller controls the first cylinder to do stretching motion, is rotating pitching pile and is inserted into ground
It is interior;Controller controls the second electric motor starting, rotates the second cylinder, rotates inserted link;It is flexible that controller controls the second cylinder to do
Movement, is rotating inserted link and is inserted into ground;Controller controls third electric motor starting, rotates gear, moves rack, makes
Rubber swelling item is moved on in soil;Controller control third cylinder does stretching motion, and nozzle is moved in through-hole, and nozzle is to rubber
Glue Expandable strip is sprayed water, and rubber swelling item is made to be expanded after absorbing water and is become larger, rubber swelling item is made to be embedded into the gap of soil stone, is made
Inserted link is firmly inserted in soil, and inserted link is made firmly to be inserted in soil, makes the side wall on reinforcing platform and ground have reinforcement measure.
Description of the drawings
Fig. 1 is a kind of offshore approach span reinforcing device overall structure figure of the present invention;
Fig. 2 is the enlarged structure schematic diagram of the internal structure of inserted link;
In figure:1st, platform 2, inserted link 3, the second cylinder 4, the second motor 5, pitching pile 6, strut 7, the first motor 8, the are reinforced
One cylinder 9, flange bearing 10, stent 11, the first sliding block 12, the first sliding rail 13, controller 14, water storage box 15, rack
16th, the second sliding block 17, the second sliding rail 18, rubber swelling item 19, through-hole 20, nozzle 21, third cylinder 22, gear 23,
Third motor 24, access bridge.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and embodiments.
A kind of 24 reinforcing device of offshore approach span of the present invention, including reinforcing platform 1, inserted link 2, the second cylinder 3, the second motor 4, pitching pile
5th, strut 6, the first motor 7, the first cylinder 8, flange bearing 9, stent 10, the first sliding block 11, the first sliding rail 12, controller 13,
Water storage box 14, rack 15, the second sliding block 16, the second sliding rail 17, rubber swelling item 18, through-hole 19, nozzle 20, third cylinder 21,
Gear 22 and third motor 23,1 right side of reinforcing platform install the first sliding rail 12, the first sliding block 11 are installed on the first sliding rail 12,
Strut 6 is installed, mounting bracket 10 on strut 6 installs the first motor 7 on stent 10, the control of controller 13 the on first sliding block 11
One motor 7 starts, and rotates the first cylinder 8, rotates pitching pile 5, and reinforcing platform 1 and the side wall on ground is made to have reinforcement measure;First
First cylinder 8 is installed, the first cylinder 8 is mounted on flange bearing 9, and flange bearing 9 is mounted on stent 10 on the output shaft of motor 7
On, the first solenoid valve built in the first cylinder 8, the first solenoid valve is connected by conducting wire with controller 13, the control of controller 13 first
Cylinder 8 does stretching motion, is rotating pitching pile 5 and is inserted into ground;Pitching pile 5, pitching pile 5 are installed on the piston rod of first cylinder 8
Across strut 6, second motor 4 is installed in pitching pile 5, platform 1 will be reinforced and installed on ground by the sea, reinforcing platform 1 is made to be located at access bridge 24
Under, platform 1 will be reinforced and be fixed between ground and access bridge 24 with concrete, strut 6 is moved down with external piling machine device, make
First sliding block 11 moves down, and pitching pile 5 is made to be moved to ground side;Controller 13 controls the second motor 4 to start, and makes the second cylinder
3 rotations, rotate inserted link 2;Second cylinder 3 is installed on the output shaft of second motor 4, second solenoid valve built in the second cylinder 3,
Two solenoid valves are connected by conducting wire with controller 13, and controller 13 controls the second cylinder 3 to do stretching motion, is rotating inserted link 2
It is inserted into ground;Inserted link 2 is installed on the piston rod of second cylinder 3, inserted link 2 is located in pitching pile 5, installation gear 22 in inserted link 2,
The axis of gear 22 is connected by shaft coupling with third motor 23, and third motor 23 is mounted in inserted link 2, and controller 13 controls third
Motor 23 starts, and rotates gear 22, moves rack 15, and rubber swelling item 18 is made to move on in soil;The left side of gear 22 and
Gear respectively installs rack 15 in both sides about 22, and rack 15 is mounted on the second sliding block 16, and the second sliding block 16 is mounted on the second sliding rail
On 17, the second sliding rail 17 is mounted in inserted link 2,15 side of rack installation rubber swelling item 18, interior be equipped with of rubber swelling item 18 is led to
Hole 19, the interior installation third cylinder 21 of rack 15, third solenoid valve built in third cylinder 21, third solenoid valve pass through conducting wire and control
Device 13 is connected, and nozzle 20 is installed on the piston rod of third cylinder 21, and nozzle 20 extend into through-hole 19, nozzle 20 by pipeline with
Water storage box 14 is connected, and water storage box 14 is mounted in rack 15, and controller 13 controls third cylinder 21 to do stretching motion, and nozzle 20 moves
It moves in through-hole 19, nozzle 20 is sprayed water to rubber swelling item 18, and rubber swelling item 18 is made to be expanded after absorbing water and is become larger, makes rubber swelling
Item 18 is embedded into the gap of soil stone, and inserted link 2 is made firmly to be inserted in soil, and inserted link 2 is made firmly to be inserted in soil, is made
Reinforcing the side wall on platform 1 and ground has reinforcement measure, and controller 13, which is mounted on, to be reinforced in platform 1, controller 13 by conducting wire respectively with
First motor 7, the second motor 4, third motor 23 are connected with nozzle 20.
Application method of the present invention:Platform 1 will be reinforced to install on ground by the sea, reinforcing platform 1 is made to be located under access bridge 24, will be reinforced
Platform 1 is fixed on concrete between ground and access bridge 24, is moved down strut 6 with external piling machine device, is made the first sliding block
11 move down, and pitching pile 5 is made to be moved to ground side;Controller 13 controls the first motor 7 to start, and rotates the first cylinder 8, makes
Pitching pile 5 rotates, and reinforcing platform 1 and the side wall on ground is made to have reinforcement measure;Controller 13 controls the first cylinder 8 to do stretching motion, makes
Pitching pile 5, which is rotating, to be inserted into ground;Controller 13 controls the second motor 4 to start, and rotates the second cylinder 3, revolves inserted link 2
Turn;Controller 13 controls the second cylinder 3 to do stretching motion, is rotating inserted link 2 and is inserted into ground;Controller 13 controls third
Motor 23 starts, and rotates gear 22, moves rack 15, and rubber swelling item 18 is made to move on in soil;Controller 13 controls
Third cylinder 21 does stretching motion, and nozzle 20 is moved in through-hole 19, and nozzle 20 is sprayed water to rubber swelling item 18, makes rubber swelling
Item 18 expands after absorbing water to become larger, and rubber swelling item 18 is made to be embedded into the gap of soil stone, inserted link 2 is made firmly to be inserted in soil
In, inserted link 2 is made firmly to be inserted in soil, reinforcing platform 1 and the side wall on ground is made to have reinforcement measure.
Claims (4)
1. a kind of offshore approach span reinforcing device, including reinforcing platform(1), inserted link(2), the second cylinder(3), the second motor(4), pitching pile
(5), strut(6), the first motor(7), the first cylinder(8), flange bearing(9), stent(10), the first sliding block(11), first slide
Rail(12), controller(13), water storage box(14), rack(15), the second sliding block(16), the second sliding rail(17), rubber swelling item
(18), through-hole(19), nozzle(20), third cylinder(21), gear(22)With third motor(23), it is characterized in that:The reinforcing
Platform(1)Right side is installed by the first sliding rail(12), the first sliding rail(12)The first sliding block of upper installation(11), the first sliding block(11)Upper installation branch
Bar(6), strut(6)Upper mounting bracket(10), stent(10)The first motor of upper installation(7), the first motor(7)Output shaft on pacify
Fill the first cylinder(8), the first cylinder(8)Mounted on flange bearing(9)On, flange bearing(9)Mounted on stent(10)On, first
Cylinder(8)Piston rod on pitching pile is installed(5), pitching pile(5)Across strut(6), pitching pile(5)The second motor of interior installation(4), second
Motor(4)Output shaft on the second cylinder is installed(3), the second cylinder(3)Piston rod on inserted link is installed(2), inserted link(2)It is located at
Pitching pile(5)It is interior, inserted link(2)Interior installation gear(22), gear(22)Axis pass through shaft coupling and third motor(23)It is connected, third
Motor(23)Mounted on inserted link(2)It is interior, gear(22)Left side and gear(22)Upper and lower both sides are respectively installed by rack(15), rack(15)
Mounted on the second sliding block(16)On, the second sliding block(16)Mounted on the second sliding rail(17)On, the second sliding rail(17)Mounted on inserted link
(2)It is interior, rack(15)Side is installed by rubber swelling item(18), rubber swelling item(18)It is interior to be equipped with through-hole(19), rack(15)It is interior
Third cylinder is installed(21), third cylinder(21)Piston rod on nozzle is installed(20), nozzle(20)It extend into through-hole(19)It is interior,
Nozzle(20)Pass through pipeline and water storage box(14)It is connected, water storage box(14)Mounted on rack(15)It is interior, controller(13)It is mounted on
Reinforce platform(1)It is interior, controller(13)By conducting wire respectively with the first motor(7), the second motor(4), third motor(23)And spray
Head(20)It is connected.
2. a kind of offshore approach span reinforcing device according to claim 1, it is characterized in that:First cylinder(8)Built-in first
Solenoid valve, the first solenoid valve pass through conducting wire and controller(13)It is connected.
3. a kind of offshore approach span reinforcing device according to claim 1, it is characterized in that:Second cylinder(3)Built-in second
Solenoid valve, second solenoid valve pass through conducting wire and controller(13)It is connected.
4. a kind of offshore approach span reinforcing device according to claim 1, it is characterized in that:The third cylinder(21)Built-in third
Solenoid valve, third solenoid valve pass through conducting wire and controller(13)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611096053.3A CN108149562B (en) | 2016-12-02 | 2016-12-02 | Offshore approach bridge reinforcing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611096053.3A CN108149562B (en) | 2016-12-02 | 2016-12-02 | Offshore approach bridge reinforcing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108149562A true CN108149562A (en) | 2018-06-12 |
CN108149562B CN108149562B (en) | 2020-11-13 |
Family
ID=62470026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611096053.3A Active CN108149562B (en) | 2016-12-02 | 2016-12-02 | Offshore approach bridge reinforcing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108149562B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302240A (en) * | 2020-10-16 | 2021-02-02 | 骆梅 | Self-reinforced cement insulating brick |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2556254Y (en) * | 2002-07-09 | 2003-06-18 | 马俊杰 | Removable portable vehicle-driving bridge |
CN201390925Y (en) * | 2009-04-08 | 2010-01-27 | 中铁二院工程集团有限责任公司 | Transition section subgrade structure of high speed railway bridges |
CN104727235A (en) * | 2015-03-31 | 2015-06-24 | 吴本刚 | Bridge overall strengthening device |
KR20150145749A (en) * | 2014-06-19 | 2015-12-31 | 한국도로공사 | Support slab and construction method thereof |
CN105649535A (en) * | 2015-12-30 | 2016-06-08 | 浙江海洋学院 | Offshore drilling equipment |
WO2016162059A1 (en) * | 2015-04-08 | 2016-10-13 | Technische Universität Hamburg-Harburg | Device for damping vibrations of a bridge |
-
2016
- 2016-12-02 CN CN201611096053.3A patent/CN108149562B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2556254Y (en) * | 2002-07-09 | 2003-06-18 | 马俊杰 | Removable portable vehicle-driving bridge |
CN201390925Y (en) * | 2009-04-08 | 2010-01-27 | 中铁二院工程集团有限责任公司 | Transition section subgrade structure of high speed railway bridges |
KR20150145749A (en) * | 2014-06-19 | 2015-12-31 | 한국도로공사 | Support slab and construction method thereof |
CN104727235A (en) * | 2015-03-31 | 2015-06-24 | 吴本刚 | Bridge overall strengthening device |
WO2016162059A1 (en) * | 2015-04-08 | 2016-10-13 | Technische Universität Hamburg-Harburg | Device for damping vibrations of a bridge |
CN105649535A (en) * | 2015-12-30 | 2016-06-08 | 浙江海洋学院 | Offshore drilling equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302240A (en) * | 2020-10-16 | 2021-02-02 | 骆梅 | Self-reinforced cement insulating brick |
Also Published As
Publication number | Publication date |
---|---|
CN108149562B (en) | 2020-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108301857B (en) | Rock anchor | |
CN107142872B (en) | Highway barrier Rebar bonding device and its construction method | |
CN109680705B (en) | Anti-frost heaving system for contact net pillar foundation and preparation process thereof | |
CN205349351U (en) | Tunnel disease comprehensive improvement system | |
CN106501079A (en) | A kind of roadbed power stress model pilot system | |
CN110656589B (en) | Bridge expansion joint intelligent repairing device with damping effect and construction method | |
CN108149562A (en) | A kind of offshore approach span reinforcing device | |
CN103362331A (en) | Double-layer automobile stereoscopic parking device | |
EP3339513B1 (en) | Sluice gate | |
JP2023517152A (en) | Telescopic self-adaptive drilling support system for rock formation control during coal mining | |
CN112459072A (en) | Layered grouting device and application thereof | |
CN108914998B (en) | Reinforced soil retaining wall damage mechanism experimental device and working method | |
CN106284999A (en) | Assembled architecture haydite concrete batten of internal partition mounting process | |
CN103938505B (en) | Orbit traffic floating board is with easily changing rubber shock absorber and replacing options thereof | |
JP5231889B2 (en) | Method for protecting hole wall of cast-in-place pile | |
CN102155583B (en) | Method and structure for laying ore pulp pipelines in sliding masses, collapse bodies and debris flow areas | |
CN103759962B (en) | A kind of large tunnel simulation loading experimental platform equipment | |
JP2023134732A (en) | System and method for constructing impervious wall | |
CN104653222B (en) | Prefabricated evacuation platform for shield interval tunnel | |
CN108035380B (en) | Support and hanger embedded assembly and embedded installation construction method thereof | |
CN206110215U (en) | Hydraulic suction dredge with pine mud function | |
JP2009121085A (en) | Construction method for ground vibration propagation suppressing structure | |
CN114704288A (en) | A shock attenuation is from restoring to throne tunnel structure for broken area of fault | |
CN110481711A (en) | Offshore exploration platform spud leg erection device | |
CN106092500A (en) | A kind of circular column leg Offshore Platform analog synthesis monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |