CN108109082A - A kind of Destination Management method and system - Google Patents

A kind of Destination Management method and system Download PDF

Info

Publication number
CN108109082A
CN108109082A CN201711216009.6A CN201711216009A CN108109082A CN 108109082 A CN108109082 A CN 108109082A CN 201711216009 A CN201711216009 A CN 201711216009A CN 108109082 A CN108109082 A CN 108109082A
Authority
CN
China
Prior art keywords
module
scenic spot
people
tourist
spot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711216009.6A
Other languages
Chinese (zh)
Inventor
李光煌
罗辉
陈滨
覃国秘
李耀军
钟志威
朱鹏惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Saiyi Technology Development Co Ltd
Original Assignee
Shenzhen Saiyi Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Saiyi Technology Development Co Ltd filed Critical Shenzhen Saiyi Technology Development Co Ltd
Priority to CN201711216009.6A priority Critical patent/CN108109082A/en
Publication of CN108109082A publication Critical patent/CN108109082A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/14Travel agencies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Destination Management method, including:Obtain the current flow of the people in scenic spot;Acquisition has purchased day ticket but has also been introduced into tourist's quantity at scenic spot;It is expected that the flow of the people on the day of scenic spot;The degree of crowding on the day of flow of the people situation prediction scenic spot on the estimation;Staff is allocated according to the estimated degree of crowding at each sight spot in scenic spot;Adjust the entrance ticket ticketing quantity on the same day;The current remaining poll of display;Show scenic spot parking lot residue parking stall number.The present invention also provides a kind of tour management system, including user terminal, Scene Tourist management platform, server.A kind of Destination Management method and system provided by the invention help user to know the situation at scenic spot in advance, tourist to be facilitated to understand scenic spot situation in advance, make selection of going on a tour;On the other hand, be also convenient for scenic spot improve service level, reasonable distribution manpower and materials.

Description

A kind of Destination Management method and system
Technical field
The present invention relates to technical field of intelligence and tour field, and in particular to a kind of Destination Management method and system.
Background technology
Travelling is a kind of important leisure relaxation pattern in people's life, but due in actual life, people have a holiday or vacation when Between compare concentration, also result in scenic spot and concentrated in vacation tourist, scenic spot excess load service all brings scenic spot and tourist bad It influences.Due to festivals or holidays collective's trip, popular scenic spot is caused to have a full house, and the problem of some scenic spots produce an unexpected winner, at popular scenic spot, Tourist is when going sight-seeing scenic spot, often due to people is too many and causes tourist that cannot perceive environment, the history at scenic spot etc. well.For This, it is necessary to it proposes a kind of Destination Management method and system, user is helped to know the situation at scenic spot in advance, tourist to be facilitated to shift to an earlier date Understand scenic spot situation, make selection of going on a tour;On the other hand, be also convenient for scenic spot improve service level, reasonable distribution manpower and materials.
The content of the invention
In view of above-mentioned deficiencies of the prior art, the present invention proposes a kind of Destination Management method and system, and user is helped to shift to an earlier date Know the situation at scenic spot, tourist to be facilitated to understand scenic spot situation in advance, make selection of going on a tour;On the other hand, scenic spot is also convenient for carry High service level, reasonable distribution manpower and materials.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of Destination Management method, which is characterized in that including:
Obtain the current flow of the people in scenic spot;
Acquisition has purchased day ticket but has also been introduced into tourist's quantity at scenic spot;
It is expected that the flow of the people on the day of scenic spot;
The degree of crowding on the day of flow of the people situation prediction scenic spot on the estimation;
Staff is allocated according to the estimated degree of crowding at each sight spot in scenic spot;
Adjust the entrance ticket ticketing quantity on the same day;
The current remaining poll of display;
Show scenic spot parking lot residue parking stall number.
Wherein, the flow of the people on the day of the estimated scenic spot further includes:
Obtain historical data of the scenic spot with the period;
Obtain the sum of tourist's quantity of the current flow of the people in scenic spot and booking;
It is expected that scenic spot remaining time on same day section sells ticket data.
Wherein, it is described that staff is allocated according to the estimated degree of crowding at each sight spot in scenic spot, it further includes:
Obtain the current flow of the people data in each sight spot in scenic spot;
Transfer flow of the people historical data of the sight spot with the period;
Predict the flow of the people data on the day of the sight spot.
Wherein, the display scenic spot parking lot residue parking stall number, including:
Obtain the parking stall number that each parking lot in scenic spot is not stopped;
Obtain the parking stall number for having preengage parking;
Obtain the remaining parking stall number in scenic spot parking lot.
It is special including user terminal, Scene Tourist management platform, server the present invention also provides a kind of tour management system Sign is that the Scene Tourist management platform includes:Main control module, locating module, data acquisition module, data input module, Data outputting module, selecting module, statistical module, memory module, timing module, Charging Module, communication module, display module, Analysis module;
The locating module, data acquisition module, data input module, data outputting module, selecting module, statistics mould Block, memory module, timing module, Charging Module, communication module, display module, analysis module are electric with the main control module respectively Property connection;
The Scene Tourist management platform is connected to the server by the communication module;
Power module is powered for the Scene Tourist management platform.
Wherein, the system also includes:Registration module, the registration module are used for Scene Tourist management described in user's registration The account of platform.
Wherein, the system also includes:Identification module, the identification module are used to identify the identity of user.
Wherein, the identification module includes:Identifying code identification, cell-phone number identification, password identification.
Wherein, the registration module includes:Social account registration module, phone number registration module, ID card No. note Volume module.
Wherein, the Charging Module includes:Monetary charge module, mobile payment Charging Module, remaining sum Charging Module.
Compared with prior art, the present invention has the advantages that:
A kind of Destination Management method and system provided by the invention help user to know the situation at scenic spot in advance, with convenient Tourist understands scenic spot situation in advance, makes selection of going on a tour;On the other hand, be also convenient for scenic spot improve service level, reasonable distribution people Power material resources.
Description of the drawings
Fig. 1 is the application scenarios schematic diagram of Destination Management method of the present invention;
Fig. 2 is the flow diagram of one embodiment of the invention Destination Management method;
Fig. 3 is the flow diagram of another embodiment of the present invention Destination Management method;
Fig. 4 is the flow diagram of another embodiment of the present invention Destination Management method;
Fig. 5 is the flow diagram of another embodiment of the present invention Destination Management method;
Fig. 6 is the system block diagram of one embodiment of the invention tour management system;
Fig. 7 is the system block diagram of another embodiment of the present invention tour management system;
Fig. 8 is the system block diagram of another embodiment of the present invention tour management system;
Fig. 9 is the system block diagram of another embodiment of the present invention tour management system;
Figure 10 is the system block diagram of another embodiment of the present invention tour management system;
Figure 11 is the system block diagram of another embodiment of the present invention tour management system.
Specific embodiment
Embodying the exemplary embodiment of feature of present invention and advantage will in detail describe in above specification.It should be understood that It is that the present invention there can be various variations in different embodiments, neither departs from the scope of the present invention, and it is therein Illustrate and illustrate inherently to be illustrated as being used rather than to limit the present invention.
Below in conjunction with attached drawing, the present invention is further described.
As shown in Figure 1, Fig. 1 is the application scenarios schematic diagram of Destination Management method of the present invention.Destination Management side in the present invention Method in application process, including:User terminal 100, Scene Tourist management platform 200, server 300.User terminal 100, scenic spot trip Mutually communication link is all established between play pipe platform 200, server 300.User terminal 100 can be user smart mobile phone, The equipment such as tablet computer, PC, user terminal 100 access scape by the communication link established between Scene Tourist management platform 200 Area's Destination Management platform 200.User terminal 100 can also access service by the communication link established between server 300 Device 300, server 300 can also obtain information by the communication link between user terminal 100 from user terminal 100.
As shown in Fig. 2, Fig. 2 is the flow diagram of one embodiment of the invention Destination Management method.Destination Management of the present invention Method includes:
Step S101:Obtain the current flow of the people in scenic spot.Scene Tourist management platform 200 gets the current stream of people in scenic spot Amount.The current flow of the people in scenic spot refers to that by the end of current time the same day enters tourist's quantity at scenic spot.
Step S102:Acquisition has purchased day ticket but has also been introduced into tourist's quantity at scenic spot.Scene Tourist management platform obtains It gets and has crossed ticket, but do not enter into the quantity of the tourist of scenic spot record.Purchased day ticket quantity can from sight spot ticket office, Internet ticket sales end gets the day ticket quantity sold;Have been enter into the gate that tourist's quantity at scenic spot can be checked by scenic spot To obtain the quantity into the tourist at scenic spot.
Step S103:It is expected that the flow of the people on the day of scenic spot.Scenic spot is pre- with reference to coming with period historical data, current ticketing data Survey the flow of the people on the day of scenic spot.
Step S104:The degree of crowding on the day of flow of the people situation prediction scenic spot on the estimation.Work as at prediction scenic spot at scenic spot After it flow of the people, tourist's quantity that scenic spot can load is compared, to predict the degree of crowding on the same day.For example, for some compared with Greatly, geographical location is special, needs the scape for going sight-seeing scenic spot by bus, tourist needs the scenic spot stayed, needs stay or eat at scenic spot Area can integrate the data such as the maximum freight volume of scenic spot traffic, tourist's quantity that the lodging amount that scenic spot can provide, scenic spot can receive To predict the degree of crowding on the day of scenic spot.
Step S105:Staff is allocated according to the estimated degree of crowding at each sight spot in scenic spot.Gathering around on the day of scenic spot is predicted After the degree of squeezing, according to historical data, predict the degree of crowding at each sight spot in scenic spot, and work people is allocated according to the degree of crowding Member to ensure the normal operation at scenic spot, also ensures the safety of tourist.
Step S106:Adjust the entrance ticket ticketing amount on the same day.After the degree of crowding on the day of predicting scenic spot, adjustment is worked as It entrance ticket ticketing amount services the problem of triggering to avoid scenic spot excess load.
Step S107:The current remaining poll of display.After the entrance ticket ticketing amount on the day of adjustment, current remaining ticket is shown Quantity tourist to be facilitated to know the current degree of crowding in scenic spot, and makes rational plan of travel.
Step S108:Show scenic spot parking lot residue parking stall number.The parking space number evidence in parking lot is got, and shows parking The remaining parking stall number of field, tourist get the remaining parking space number in scenic spot, with side before scenic spot is entered by user terminal 100 Just the good parking problem of tourist's schedule ahead.
As shown in figure 3, Fig. 3 is the flow diagram of another embodiment of the present invention Destination Management method.Step S103 is also wrapped Include following steps:
Step S1031:Obtain historical data of the scenic spot with the period.Transfer flow of the people data of the history with period scenic spot.It needs It is noted that Scene Tourist management platform 200 collects tourism data over the years, and recording period, each period people from scenic spot Traffic statistics, before the flow of the people on the day of estimated scenic spot, with reference to scenic spot with the historical data of period, to aid in prediction scenic spot The flow of the people on the same day.
Step S1032:Obtain the sum of tourist's quantity of the current flow of the people in scenic spot and booking.It is collected from scenic spot gate Obtained in data and currently have been enter into tourist's quantity at scenic spot, i.e., current flow of the people, and get the current flow of the people in scenic spot and The sum of tourist's quantity in booking Dan Weiru gardens.
Step S1033:It is expected that scenic spot remaining time on same day section sells ticket data.And remaining time section of the scenic spot on the day of Ticket of selling be data.It is data from present period ticketing, with reference to the historical data of same period, prediction scenic spot remaining time on the same day The ticket of selling of section is data.
As shown in figure 4, Fig. 4 is the flow diagram of another embodiment of the present invention Destination Management method.Step S105 is also wrapped Include following steps:
Step S1051:Obtain the current flow of the people data in each sight spot in scenic spot.Each sight spot at scenic spot is obtained, cut-off is extremely worked as The flow of the people data at preceding moment.The approach of acquisition passes through lock to be collected at the gate of scenic spot entrance by the end of current time Machine ticket checking enters tourist's quantity at scenic spot.
Step S1052:Transfer flow of the people historical data of the sight spot with the period.Scene Tourist management platform 200 is transferred together The flow of the people historical data of period.
Step S1053:Predict the flow of the people data on the day of the sight spot.It is same according to current flow of the people data and the sight spot The flow of the people historical data of period predicts the flow of the people data on the day of the sight spot.
As shown in figure 5, Fig. 5 is the flow diagram of another embodiment of the present invention Destination Management method.Step S108 is also wrapped Include following steps:
Step S1081:Obtain the parking stall number that each parking lot in scenic spot is not stopped.It is obtained from the entrance administrative office in each parking lot in scenic spot The parking space number evidence in each parking lot is taken, the entrance administrative office in each parking lot in scenic spot obtains used parking stall in parking lot in real time Number, the parking stall number not stopped.
Step S1082:Obtain the parking stall number for having preengage parking.The entrance management in each parking lot in scenic spot, which is in, gets scenic spot After the parking stall number that each parking lot is not stopped, the period of the parking stall number for having preengage parking and reservation parking is obtained.
Step S1083:Obtain the remaining parking stall number in scenic spot parking lot.The parking stall do not stopped by obtaining each parking lot in scenic spot Number and the parking stall number for having preengage parking, to obtain the remaining parking stall number in scenic spot parking lot.Tourist can be accessed by user terminal 100 Scene Tourist management platform 200 gets the remaining parking stall number in scenic spot parking lot.
The present invention also provides a kind of tour management system, below in conjunction with attached drawing to tour management system of the present invention It is further described.
As shown in fig. 6, Fig. 6 is the system block diagram of one embodiment of the invention tour management system.Tourism pipe in the present invention Reason system includes user terminal 100, Scene Tourist management platform 200, server 300.Scene Tourist management platform 200 includes:It is main Control module 201, locating module 202, data acquisition module 203, data input module 204, data outputting module 205, selection mould Block 206, statistical module 207, memory module 208, timing module 209, Charging Module 210, communication module 211, display module 212nd, analysis module 213.The locating module 202, data acquisition module 203, data input module 204, data outputting module 205th, selecting module 206, statistical module 207, memory module 208, timing module 209, Charging Module 210, communication module 211, Display module 212, analysis module 213 are electrically connected respectively with the main control module 201.
The Scene Tourist management platform 200 is connected to the server 300 by the communication module 211.Scenic spot trip Play pipe platform 200 passes through the communication link established between communication module 211, with server 300.It can in server 300 To store the historical data of scenic spot tourist, analysis data etc..
Power module 220 is powered for the Scene Tourist management platform 200.Power module 220 can pass through adapter It is connected to the alternating current or rechargeable battery of Scene Tourist management platform 200.
Wherein, main control module 201 is used to control the course of work of the Scene Tourist management platform 200, main control module 201 It is instructed by being sent to modules, controls the work of modules.
Locating module 202 is used to position the position where scenic spot.Locating module is also used for determining that tourist passes through user terminal 100 Position where the sight spot inputted.For example, tourist selects a position by user terminal 100, locating module 202 passes through positioning Determine the selected position of tourist.
Data acquisition module 203 is used to obtain data from user terminal 100 and server 300.The data of acquisition can be The data that tourist is inputted by user terminal 100 or the data got by communication module 211 from server.
Data input module 204 is used to receive the data that tourist is inputted by user terminal 100, such as log-on data, place Data, advisory data etc..
Data outputting module 205 is used for 100 output data of user terminal, when tourist accesses scenic spot trip by user terminal 100 After play pipe platform 200, Scene Tourist management platform 200 feeds back relevant letter by data outputting module 205 to user terminal 100 Breath.
Selecting module 206 is used to provide selection for tourist, enters for example, selection is bought tickets from which door at scenic spot, selects to use Place that the place of meal, selection are stayed etc..
Statistical module 207 such as counts flow of the people, the statistics some time at certain period scenic spot for collecting tourist information and counting The ticketing quantity of Duan Jingqu, tourist enter the distribution situation of scenic spot at any time etc..
Memory module 208 is used to store the tourist's distributed number, the ticketing quantity of each period, registered user of each period Information, registered user booking record etc. information.
Timing module 209 is used to calculate tourist from the time to leaving scenic spot, stayed into scenic spot at scenic spot, and These data are transmitted to analysis module 213, analysis module 213 analyze each period tourist enter scenic spot distribution and it is each when Section tourist leaves the distribution at scenic spot.
Charging Module 210 is used to collect the expense of purchase entrance ticket, expense of purchase service etc..
Communication module 211 is used to lead between Scene Tourist management platform 200 and server 300 and between user terminal 100 News.The communication mode of communication module 211 and server 300 is wire communication, logical between communication module 211 and user terminal 100 Letter mode is at least at least one of wire communication and wireless communication.
Display module 212 is used to show scenic spot currently remaining poll, entrance ticket price, scenic spot parking lot residue vehicle to user The information such as digit.
Analysis module 213 is used to analyze the data of the statistics of statistical module 207, and analysis module 213 analyzes each period tourist The distribution at scenic spot is left in distribution and each period tourist into scenic spot.
As shown in fig. 7, Fig. 7 is the system block diagram of another embodiment of the present invention tour management system.The scenic spot trip of the present invention Play pipe platform 200 further includes registration module 214.Registration module 214 is for tourist by user terminal 100 in Scene Tourist pipe Log-on message in platform 200, the account of registration tourist attraction management platform 200.The logon mode that registration module 214 is supported can To include:Phone number registered user, social account registered user, identity card registered user, user name registered user.Register mould Block 214 can also include authentication module, to verify the identity of the user of application for registration account.
As shown in figure 8, Fig. 8 is the system block diagram of another embodiment of the present invention tour management system.The scenic spot trip of the present invention Play pipe platform 200 further includes identification module 215.Identification module 215 is used to identify the identity of user.Work as detection To user login exception or be user for a long time without logging into or when account number cipher continuous several times input by mistake, identity is known Other module 215 identifies the identity information of user feedback to identify the identity of user by sending identity identification information to user.
As shown in figure 9, Fig. 9 is the system block diagram of another embodiment of the present invention tour management system.Identity in the present invention Identification module 215 is included with lower part:
Identifying code identification 2151, for receiving identifying code input by user, and identifies identifying code, whether just to compare it Really, the identity of user is verified with this.
Cell-phone number identification 2152, the cell-phone number for providing a user send identity identification information, pass through mobile phone in user After number receiving the identity identification information and correctly enter, you can the identity of good authentication user.
Password identification 2153, for checking identification password input by user, to verify the identity of user.
As shown in Figure 10, Figure 10 is the system block diagram of another embodiment of the present invention tour management system.Note in the present invention Volume module 214 is included with lower part:
Social account registration module 2141:Scene Tourist management in the social account registration present invention that user passes through oneself Platform 200, the social activity account, such as:QQ number, WeChat ID etc..
Cell-phone number registration module 2142:When user registers the Scene Tourist management platform 200 in the present invention with cell-phone number, The phone number provided when cell-phone number registration module 2142 is by user's registration sends verification short message to user, when being verified When, user passes through the success of 2142 register account number of cell-phone number registration module.
Identification card number registration module 2143:When user is needed through the Scene Tourist management in the identification card number registration present invention During platform 200, the account of Scene Tourist management platform 200 in the present invention is registered by identification card number registration module 2143.
As shown in figure 11, Figure 11 is the system block diagram of another embodiment of the present invention tour management system.Receipts in the present invention Taking module 210 is included with lower part:
Monetary charge module 2101, for collecting cash, monetary charge module 2102 can identify the cash of fixed species, It such as can recognize that the banknote of 50 yuan, 100 yuan face amounts, after user pays in cash, monetary charge module 2102 identifies use first Whether the cash of family payment is species as defined in monetary charge module 2102, then calculates the total amount of cash for payment, purchase The quantity for the admission ticket bought, and calculate whether the amount of money of small change and small change.
Mobile payment Charging Module 2102, user, when mobile payments mode is paid the bill, are moved with wechat, Alipay, Internetbank Payment module identifies that user is specifically to be paid the bill with which kind of mobile payment mode, and passes through module gathering of collecting money accordingly.
Remaining sum Charging Module 2103, remaining sum Charging Module 2103 are used to collect the expense that user is paid with remaining sum.For example, with Family possesses the member card at the scenic spot, and member card can be used for supplementing with money, when paying expense with member card, can enjoy member privilege, For collecting the charges according to price for member, the expense deducts remaining sum Charging Module from the remaining sum of member card.
In conclusion a kind of Destination Management method and system provided by the invention, help user to know the feelings at scenic spot in advance Condition tourist to be facilitated to understand scenic spot situation in advance, makes selection of going on a tour;On the other hand, scenic spot is also convenient for improve service level, close Reason distribution manpower and materials.
Although describing the present invention with reference to exemplary embodiment, it is to be understood that, term used is explanation and example Property, term and not restrictive.Since the present invention can be embodied in a variety of forms without departing from the spiritual or substantive of invention, It should therefore be appreciated that the above embodiment is not limited to any foregoing details, and should be in the spirit that appended claims are limited With widely explained in scope, therefore the whole variations fallen into claim or its equivalent scope and remodeling all should be accompanying power Profit requirement is covered.

Claims (10)

  1. A kind of 1. Destination Management method, which is characterized in that including:
    Obtain the current flow of the people in scenic spot;
    Acquisition has purchased day ticket but has also been introduced into tourist's quantity at scenic spot;
    It is expected that the flow of the people on the day of scenic spot;
    The degree of crowding on the day of flow of the people situation prediction scenic spot on the estimation;
    Staff is allocated according to the estimated degree of crowding at each sight spot in scenic spot;
    Adjust the entrance ticket ticketing quantity on the same day;
    The current remaining poll of display;
    Show scenic spot parking lot residue parking stall number.
  2. 2. according to the method described in claim 1, it is characterized in that, the flow of the people on the day of the estimated scenic spot further includes:
    Obtain historical data of the scenic spot with the period;
    Obtain the sum of tourist's quantity of the current flow of the people in scenic spot and booking;
    It is expected that scenic spot remaining time on same day section sells ticket data.
  3. 3. according to the method described in claim 1, it is characterized in that, described allocate according to the estimated degree of crowding at each sight spot in scenic spot Staff further includes:
    Obtain the current flow of the people data in each sight spot in scenic spot;
    Transfer flow of the people historical data of the sight spot with the period;
    Predict the flow of the people data on the day of the sight spot.
  4. 4. according to the method described in claim 1, it is characterized in that, it is described display scenic spot parking lot residue parking stall number, including:
    Obtain the parking stall number that each parking lot in scenic spot is not stopped;
    Obtain the parking stall number for having preengage parking;
    Obtain the remaining parking stall number in scenic spot parking lot.
  5. 5. a kind of tour management system, including user terminal, Scene Tourist management platform, server, which is characterized in that the scenic spot Destination Management platform includes:Main control module, locating module, data acquisition module, data input module, data outputting module, choosing Select module, statistical module, memory module, timing module, Charging Module, communication module, display module, analysis module;
    The locating module, data acquisition module, data outputting module, selecting module, statistical module, are deposited data input module Storage module, timing module, Charging Module, communication module, display module, analysis module electrically connect respectively with the main control module It connects;
    The Scene Tourist management platform is connected to the server by the communication module;
    Power module is powered for the Scene Tourist management platform.
  6. 6. system according to claim 5, which is characterized in that the system also includes:Registration module, the registration module For the account of Scene Tourist management platform described in user's registration.
  7. 7. system according to claim 5, which is characterized in that the system also includes:Identification module, the identity Identification module is used to identify the identity of user.
  8. 8. system according to claim 7, which is characterized in that the identification module includes:Identifying code identification, mobile phone Number identification, password identification.
  9. 9. system according to claim 6, which is characterized in that the registration module includes:Social account registration module, hand Machine number registration module, ID card No. registration module.
  10. 10. system according to claim 5, which is characterized in that the Charging Module includes:Monetary charge module, movement Pay Charging Module, remaining sum Charging Module.
CN201711216009.6A 2017-11-28 2017-11-28 A kind of Destination Management method and system Pending CN108109082A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711216009.6A CN108109082A (en) 2017-11-28 2017-11-28 A kind of Destination Management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711216009.6A CN108109082A (en) 2017-11-28 2017-11-28 A kind of Destination Management method and system

Publications (1)

Publication Number Publication Date
CN108109082A true CN108109082A (en) 2018-06-01

Family

ID=62208493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711216009.6A Pending CN108109082A (en) 2017-11-28 2017-11-28 A kind of Destination Management method and system

Country Status (1)

Country Link
CN (1) CN108109082A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711759A (en) * 2019-03-04 2019-05-03 黄河水利职业技术学院 A kind of visitor management device for Destination Management
CN110148025A (en) * 2019-05-22 2019-08-20 郑州智通互联电子有限公司 A kind of scenic spot intelligence ticket sale system based on big data
CN110210668A (en) * 2019-05-31 2019-09-06 苏州朗捷通智能科技有限公司 Smart travel method of servicing and system
CN110458530A (en) * 2019-08-14 2019-11-15 四川省交通勘察设计研究院有限公司 A kind of tourism plateform system and terminal towards tourist
CN110706513A (en) * 2019-10-27 2020-01-17 恒大智慧科技有限公司 Parking space reservation management system, method, community platform and storage medium
CN110991492A (en) * 2019-11-12 2020-04-10 广西大学 Tourism demand prediction method and system based on hierarchical pattern recognition
CN111126715A (en) * 2020-01-03 2020-05-08 成都中科大旗软件股份有限公司 Scenic spot passenger flow volume management and control system
CN111754209A (en) * 2020-07-02 2020-10-09 福建云宿网络科技有限公司 Travel comprehensive service method and system based on big data sharing
CN111915040A (en) * 2020-08-05 2020-11-10 江苏经贸职业技术学院 Tourism management system and mode

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101101648A (en) * 2007-07-30 2008-01-09 深圳市融合视讯科技有限公司 Parking lot booking system and its use method
CN103136703A (en) * 2012-12-27 2013-06-05 中州大学 Method and system for statistics and process of tourist density distribution
CN104951845A (en) * 2015-05-29 2015-09-30 华南理工大学 Tourist attraction saturation pre-warning method with function of passenger flow volume fitting on basis of network attention
CN206292863U (en) * 2016-08-31 2017-06-30 浙江铭盛科技有限公司 Smart travel comprehensive management platform
CN107230330A (en) * 2017-07-12 2017-10-03 东南大学 A kind of tourist communications management system based on big data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101101648A (en) * 2007-07-30 2008-01-09 深圳市融合视讯科技有限公司 Parking lot booking system and its use method
CN103136703A (en) * 2012-12-27 2013-06-05 中州大学 Method and system for statistics and process of tourist density distribution
CN104951845A (en) * 2015-05-29 2015-09-30 华南理工大学 Tourist attraction saturation pre-warning method with function of passenger flow volume fitting on basis of network attention
CN206292863U (en) * 2016-08-31 2017-06-30 浙江铭盛科技有限公司 Smart travel comprehensive management platform
CN107230330A (en) * 2017-07-12 2017-10-03 东南大学 A kind of tourist communications management system based on big data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓锐: "景区电子门禁***人流统计和控制预警实现的讨论", 《电子世界》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711759A (en) * 2019-03-04 2019-05-03 黄河水利职业技术学院 A kind of visitor management device for Destination Management
CN110148025A (en) * 2019-05-22 2019-08-20 郑州智通互联电子有限公司 A kind of scenic spot intelligence ticket sale system based on big data
CN110210668A (en) * 2019-05-31 2019-09-06 苏州朗捷通智能科技有限公司 Smart travel method of servicing and system
CN110458530A (en) * 2019-08-14 2019-11-15 四川省交通勘察设计研究院有限公司 A kind of tourism plateform system and terminal towards tourist
CN110706513A (en) * 2019-10-27 2020-01-17 恒大智慧科技有限公司 Parking space reservation management system, method, community platform and storage medium
CN110991492A (en) * 2019-11-12 2020-04-10 广西大学 Tourism demand prediction method and system based on hierarchical pattern recognition
CN110991492B (en) * 2019-11-12 2022-07-12 广西大学 Tourism demand prediction method and system based on hierarchical pattern recognition
CN111126715A (en) * 2020-01-03 2020-05-08 成都中科大旗软件股份有限公司 Scenic spot passenger flow volume management and control system
CN111126715B (en) * 2020-01-03 2023-05-12 成都中科大旗软件股份有限公司 Scenic spot passenger flow control system
CN111754209A (en) * 2020-07-02 2020-10-09 福建云宿网络科技有限公司 Travel comprehensive service method and system based on big data sharing
CN111915040A (en) * 2020-08-05 2020-11-10 江苏经贸职业技术学院 Tourism management system and mode

Similar Documents

Publication Publication Date Title
CN108109082A (en) A kind of Destination Management method and system
CN105023467B (en) A kind of parking position remote subscription system and method
CN107945088A (en) A kind of scenic spot management method and system
KR101556947B1 (en) Parking lot management method, parking lot managing server and parking lot managing system
CN106056403B (en) A kind of rail traffic expense of riding determines method and system
CN103700149B (en) Highway tolling system based on LBS and expressway tol lcollection method based on LBS
CN106652550A (en) Parking space management system and method enabling reservation function and positioning function
US20100153279A1 (en) Systems and methods for global transportation,vetting, and payment
CN105957157A (en) Parking information service system and parking information service method for realizing accurate parking space reservation
CN107945293A (en) It is a kind of to be used for the not parking Intelligent parking lot systems deducted fees automatically of ETC and method
WO2010141229A2 (en) Electrical power metering and billing network
WO2013190566A2 (en) Centralized toll tracking, payment and monitoring system using geo location enabled devices
CN105719133A (en) Multifunctional vehicle-mounted POS terminal system and self-adaptive work method thereof
WO2009098813A1 (en) Route-bus fare payment system
CN105551095B (en) Passing control method, apparatus and system
Kabir et al. An IoT based intelligent parking system for the unutilized parking area with real-time monitoring using mobile and web application
KR102296356B1 (en) Method And Apparatus for Providing Pet Taxi Service
US20220277279A1 (en) Method, device, and system for providing vehicle sharing service
CN114373256A (en) Reservation mechanism-based venue entrance verification method, system and storage medium
Shimi et al. An intelligent parking management system using RFID technology based on user preferences
JP7012964B2 (en) Vehicle passage information processing system
CN108629860A (en) For charge processing method, apparatus, system and the medium at toll on the road and bridge station
CN110364021A (en) A kind of parking space management system
CN113034707A (en) Method for paying parking fees and corresponding computer program product
CN108038921A (en) A kind of vehicle in and out port management method, device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180601

WD01 Invention patent application deemed withdrawn after publication