CN108103948A - Erection crane and thereafter anchor device - Google Patents

Erection crane and thereafter anchor device Download PDF

Info

Publication number
CN108103948A
CN108103948A CN201711423644.1A CN201711423644A CN108103948A CN 108103948 A CN108103948 A CN 108103948A CN 201711423644 A CN201711423644 A CN 201711423644A CN 108103948 A CN108103948 A CN 108103948A
Authority
CN
China
Prior art keywords
anchor
erection crane
suspender belt
anchor device
crane according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711423644.1A
Other languages
Chinese (zh)
Inventor
刘怀刚
高世强
肖向荣
夏晖
张会昌
雷志超
杨卫平
杨杰
赵升辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge South China Engineering Co Ltd
Priority to CN202210028701.0A priority Critical patent/CN114319130A/en
Priority to CN201711423644.1A priority patent/CN108103948A/en
Publication of CN108103948A publication Critical patent/CN108103948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of rear anchor device of erection crane, including:Anchor assemblies apply preload component of the precompression on the steel suspender belt including steel suspender belt and from top to bottom;Pulley arrangement slides piece, left-hand thread wheel carrier and the inverse buckling wheel on the left-hand thread wheel carrier including being connected to below the steel suspender belt.The rear anchor device of the present invention with reference to pulley arrangement, can realize the Forward of bridge floor track easily, while reduce the risk that erection crane topples after simply preload component is released.

Description

Erection crane and thereafter anchor device
Technical field
The present invention relates to equipment for bridge construction technical field, specifically, the present invention relates to a kind of erection crane and thereafter Anchor device.
Background technology
The rear anchor point of erection crane plays an important role in the Forward of erection crane.In the prior art, rear anchor point On the one hand the effect of anchoring is played, on the one hand aids in erection crane Forward.If the setting of rear anchor point is unreasonable, it is easy to cause Erection crane topples.
It is therefore desirable to provide one kind to move forward convenient for bridge floor track, while anchor device after the erection crane of antidumping.
The content of the invention
The purpose of the present invention be intended to provide it is a kind of realize the Forward of bridge floor track easily, while the erection crane of antidumping and its Anchor device afterwards.
To achieve these goals, the present invention provides following technical scheme:
A kind of rear anchor device of erection crane, including:
Anchor assemblies apply preload component of the precompression on the steel suspender belt including steel suspender belt and from top to bottom;
Pulley arrangement slides piece, left-hand thread wheel carrier and mounted on the left-hand thread including being connected to below the steel suspender belt Inverse buckling wheel on wheel carrier.
Preferably, the preload component equipped with the first anchor being fixedly connected with erection crane, described first Anchor in the lower section of erection crane truss by setting one group of shoulder pole girder combination anchor pole to be anchored.
Preferably, the preload component is further included immediately below first anchor, and is fixed on bridge floor track Second anchor of lower section, second anchor include shoulder pole girder and extend downwardly from first anchor Anchor pole.
Preferably, the preload component is further included immediately below second anchor, and is fixed on bridge floor box beam 3rd anchor of lower section, the 3rd anchor include shoulder pole girder and are extended downwardly from second anchor Anchor pole.
Preferably, one end of the steel suspender belt is connected by axis pin with erection crane.
Preferably, described slide slides the interconnection of piece pedestal between piece and the steel suspender belt by setting, and the steel is hung The bottom of band is extended downwardly equipped with one group and the first opposite otic placode, the top for sliding piece pedestal are upwardly extended equipped with one group And the second opposite otic placode, first otic placode are connected with second otic placode by pin joint.
Preferably, the bottom for sliding piece pedestal is flat.
Preferably, the horizontal direction for sliding piece is equipped with handle.
Preferably, the side of the steel suspender belt is additionally provided with a pair of through the steel suspender belt and to connect the left-hand thread wheel carrier First through hole.
Preferably, the top of the left-hand thread wheel carrier is equipped with two pieces of panels that are relatively fixed, and is set on two pieces of fixed panels There is one group of second opposite through hole, the pin simultaneously through the first through hole and the second through hole is set between the fixed panel Axis makes the left-hand thread wheel carrier be connected with the steel suspender belt.
Preferably, the upper end of the fixed panel is set to trapezoidal, is connected between two pieces of fixed panels by connecting plate.
Preferably, the connecting plate is respectively arranged on the both sides of the fixed panel, so that in the top of the left-hand thread wheel carrier It is empty.
Preferably, supporting leg is distributed in the both sides of the left-hand thread wheel carrier, and two supporting legs are set up in parallel, the top part of supporting leg The both ends of the fixed panel are not connected to, and two supporting leg bottom insides connect inverse buckling wheel respectively.
The present invention also provides a kind of erection cranes, use such as anchor device after erection crane described in any one of the above embodiments.
Compared with prior art, the solution of the present invention has the following advantages:
1. the rear anchor device of the present invention, can be easily with reference to the pulley arrangement of the present invention after simply preload component is released It realizes the Forward of bridge floor track, while reduces the risk that erection crane topples.
It, need not 2. the left-hand thread wheel carrier of the rear anchor device of the present invention is simple in structure, and can be directly connected with steel suspender belt It is connected and is fixed by traditional equalizer bar, so as to simplifies the structure of rear anchor device.
The additional aspect of the present invention and advantage will be set forth in part in the description, these will become from the following description It obtains substantially or is recognized by the practice of the present invention.
Description of the drawings
Above-mentioned and/or additional aspect and advantage of the invention will become from the following description of the accompanying drawings of embodiments Substantially and it is readily appreciated that, wherein:
Fig. 1 is the structure diagram of the erection crane of one embodiment of the invention;
Fig. 2 is the connection relationship diagram of steel suspender belt and pulley arrangement in anchor device after the present invention;
Fig. 3 is the structure diagram of steel suspender belt in anchor device after the present invention;
Fig. 4 is the structure diagram for sliding piece pedestal after the present invention in anchor device;
Fig. 5 is the structure diagram for sliding piece after the present invention in anchor device;
Fig. 6 is the structure diagram of inverse buckling wheel and left-hand thread wheel carrier in anchor device after the present invention.
Wherein, 10- anchor assemblies;101- steel suspender belts;The first otic placodes of 1011-;1012- first through hole;102- preload components; The first anchors of 1021-;The second anchors of 1022-;The 3rd anchors of 1023-;20- pulley arrangements;201- slides piece; 2011- handles;202- slides piece pedestal;The second otic placodes of 2021-;2022- securing plates;203- left-hand thread wheel carriers;2031- stationary planes Plate;The second through holes of 2032-;2033- supporting legs;2034- connecting plates;204- inverse buckling wheels;30- truss;40- tracks;50- box beams;60- Front fulcrum;Suspension centre before 61-;62- suspender belts;100- trussings;200- anchor systems;Anchor device after 2001-;2002- track anchors It is fixedly mounted with and puts;The basket system rear suspension of 2003- bottoms;300- bottoms basket system.
Specific embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not construed as limiting the claims.In addition, such as The detailed description of fruit known technology is for showing the invention is characterized in that unnecessary, then to omit it.
Referring to Fig. 1, erection crane mainly includes trussing 100, anchor system 200, tackling system (not shown), bottom basket 300 grade parts of system form.Wherein anchor system 200 mainly includes rear anchor device 2001, track anchor 2002 and bottom basket System rear suspension 2003, the rear anchor device 2001, track anchor 2002 are anchored at the horizontal stroke of overlapping girder steel by shoulder pole girder Below beam, bottom basket system rear suspension 2003 is then anchored at the front end of track 40.
Referring to Fig. 1-2, the embodiment of the present invention provides a kind of rear anchor device 2001 of erection crane, including anchor assemblies 10 with Pulley arrangement 20, the anchor assemblies 10 include steel suspender belt 101 and apply precompression from top to bottom on the steel suspender belt 101 Preload component 102, the pulley arrangement 20, which includes being connected to below the steel suspender belt 101, slides piece 201, left-hand thread wheel carrier 203 And the inverse buckling wheel 204 on the left-hand thread wheel carrier 203.Being equipped with for the preload component 102 is fixed with erection crane First anchor 1021 of connection, first anchor 1021 in the lower section of erection crane truss 30 by setting one group Shoulder pole girder (not shown) combination anchor pole (not shown) is anchored.The preload component 102 is further included positioned at the described first anchoring Immediately below device 1021, and it is fixed on the second anchor 1022 of 40 lower section of bridge floor track, second anchor 1022 The anchor pole extended downwardly including shoulder pole girder and from first anchor 1021.The preload component 102, which further includes, to be located at Immediately below second anchor 1022, and the 3rd anchor 1023 of 50 lower section of bridge floor box beam is fixed on, the described 3rd Anchor 1023 includes shoulder pole girder and the anchor pole extended downwardly from second anchor 1022.The anchor pole uses The JL32 fining twisted steels of 785MPa, every anchor pole applies 20T pretensions during construction.One end of the steel suspender belt 101 passes through pin Axis is fixed at the rear anchor point of erection crane.Pass through first anchor 1021, the second anchor 1022 and the 3rd anchor It is fixedly mounted with and puts 1023 and fix respectively, and coordinate the steel suspender belt 101 being fixed on the erection crane so that energy when applying precompression The fixation of anchor device 2001 enough after realization erection crane;Meanwhile when releasing prestressing force, the steel suspender belt 101 can drive institute It states pulley arrangement 20 to move up, so that a determining deviation is formed between the pulley arrangement 20 and institute's erection crane track 40, with reality The walking of existing erection crane or the movement of erection crane track 40.
With reference to Fig. 2-4, described slide slides the interconnection of 202 phase of piece pedestal between piece 201 and the steel suspender belt 101 by setting It connects, the bottom of the steel suspender belt 101 is extended downwardly equipped with one group and the first opposite otic placode 1011, described to slide piece pedestal 202 Top upwardly extended equipped with one group and the second opposite otic placode 2021, first otic placode 1011 and second otic placode 2021 It connects to slide the interconnection between piece 201 and the steel suspender belt 101 described in realization by pin joint.It is described to slide piece pedestal Between the second otic placode 2021 on 202, a pair of of securing plate 2022 can be added, to slide piece pedestal 202 and steel suspender belt described in reinforcement Connection between 101.The bottom for sliding piece pedestal 202 is flat, to be bonded to realize with the piece 201 that slides Connection.With reference to Fig. 5, the piece 201 that slides is preferably tetrafluoro slide type bearing, also known as tetrafluoro slide plate.By being slided in the tetrafluoro Cutting and 202 anchor of piece pedestal will be slided in slot in plate, and can prevent tetrafluoro slide plate from skidding off to slide beyond piece pedestal 202.It utilizes Low-friction coefficient between tetrafluoro slide plate and erection crane track 40, the Forward for making erection crane horizontal direction are unrestricted.In order to The carrying and installation of piece 201 are slided described in auxiliary, handle 2011 can be added in the horizontal direction for sliding piece 201.
The side of the steel suspender belt 101 is additionally provided with a pair of through the steel suspender belt 101 and to connect the left-hand thread wheel carrier 203 first through hole 1012.Referring to Fig. 6, the top of the left-hand thread wheel carrier 203 is equipped with two pieces of panels 2031 that are relatively fixed, institute The axis pin for setting between fixed panel 2031 and running through 1012 and second through hole 2032 of first through hole simultaneously is stated, makes the left-hand thread Wheel carrier 203 is connected with the steel suspender belt 101.The upper end of the fixed panel 2031 is set to trapezoidal, two pieces of fixed panels It is connected between 2031 by connecting plate 2034.The connecting plate 2034 is respectively arranged on the both sides of the fixed panel 2031, so that The top of the left-hand thread wheel carrier 203 is hollow.Supporting leg 2033, two supporting legs are distributed in the both sides of the left-hand thread wheel carrier 203 2033 are set up in parallel, and the top of supporting leg 2033 is connected to the both ends of the fixed panel 2031, two supporting legs 2033 Bottom inside connects inverse buckling wheel 204 respectively.The left-hand thread wheel carrier 203 and inverse buckling wheel 204 by left-hand thread erection crane I-shaped On track.The structure of left-hand thread wheel carrier 203 of the present invention is simple, and can be directly connected with steel suspender belt 101, need not be by tradition Equalizer bar be connected and fixed, simplify the structure of rear anchor device 2001.
Referring again to Fig. 1, before anchor device 2001 can be used cooperatively erection crane track 40 after erection crane of the invention It moves:First, erection crane front fulcrum 60 is jacked up using erection crane oil overhold, front fulcrum 60 and 40 top surface of track is made to separate about 5mm, and ensure the balance of 60 both sides of front fulcrum.Secondly, after the lateral stability of erection crane truss 30 is ensured, by by precompressed The anchor pole at the first anchor 1021 in component 102 loosens, but does not remove the anchor assemblies 10, so as to which anchor is pre- after releasing Pulling force, make it is described slide piece 201 and separate about 5mm with track 40, by other anchoring releasings of 40 bottom of erection crane track, track After 40 Forwards are in place, in time by 40 bottom anchor of track, that is, the Forward of erection crane track 40 is completed.
Anchor device 2001 can coordinate erection crane to move forward after the erection crane of the present invention:First, will be propped up before erection crane The slowly decentralization of point 60, the anchor connection of preceding suspension centre 61 is suitably unclamped, makes 62 stress of suspender belt, is carried out track 40 and is moved forward.Then, will The second anchor 1022 in the preload component 102 is released from track 40, the inverse buckling wheel 204 is made slowly to hang in-orbit On the top plate in road 40, then will be after the rear anchor connection releasing of bottom basket system, you can carry out erection crane Forward.
The present invention also provides a kind of erection cranes, use such as anchor device after erection crane described in any one of the above embodiments 2001.Anchor device 2001 can prevent from toppling during the Forward of erection crane after erection crane of the present invention, be erection crane The Forward offer foundation for security of track 40 and erection crane, and convenient construction, strong applicability, except being suitable for erection crane, Apply also for other common equipment for bridge construction such as Hanging Basket.
The above is only some embodiments of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (14)

1. a kind of rear anchor device of erection crane, which is characterized in that including:
Anchor assemblies apply preload component of the precompression on the steel suspender belt including steel suspender belt and from top to bottom;
Pulley arrangement slides piece, left-hand thread wheel carrier and mounted on the left-hand thread wheel carrier including being connected to below the steel suspender belt On inverse buckling wheel.
2. the rear anchor device of erection crane according to claim 1, which is characterized in that the preload component is equipped with and bridge The first anchor that face loop wheel machine is fixedly connected, first anchor in the lower section of erection crane truss by setting one group Shoulder pole girder combination anchor pole is anchored.
3. the rear anchor device of erection crane according to claim 2, which is characterized in that the preload component, which further includes, to be located at Immediately below first anchor, and the second anchor below bridge floor track is fixed on, the second anchor bag Include shoulder pole girder and the anchor pole extended downwardly from first anchor.
4. the rear anchor device of erection crane according to claim 3, which is characterized in that the preload component, which further includes, to be located at Immediately below second anchor, and the 3rd anchor below bridge floor box beam is fixed on, the 3rd anchor bag Include shoulder pole girder and the anchor pole extended downwardly from second anchor.
5. the rear anchor device of erection crane according to claim 1, which is characterized in that one end of the steel suspender belt passes through pin Axis is connected with erection crane.
6. the rear anchor device of erection crane according to claim 1, which is characterized in that described to slide piece and the steel suspender belt Between by set slide piece pedestal be connected with each other, the bottom of the steel suspender belt is extended downwardly equipped with one group and the first opposite ear Plate, the top for sliding piece pedestal is upwardly extended equipped with one group and the second opposite otic placode, first otic placode and described the Two otic placodes are connected by pin joint.
7. the rear anchor device of erection crane according to claim 6, which is characterized in that it is described slide piece pedestal bottom be Flat.
8. the rear anchor device of erection crane according to claim 1, which is characterized in that the horizontal direction for sliding piece is set There is handle.
9. the rear anchor device of erection crane according to claim 1, which is characterized in that the side of the steel suspender belt is additionally provided with A pair runs through the steel suspender belt and the first through hole to connect the left-hand thread wheel carrier.
10. the rear anchor device of erection crane according to claim 9, which is characterized in that set at the top of the left-hand thread wheel carrier Have two pieces of panels that are relatively fixed, two pieces of fixed panels are equipped with one group of second opposite through hole, the fixed panel it Between set simultaneously through the axis pin of the first through hole and the second through hole, the left-hand thread wheel carrier is made to be connected with the steel suspender belt.
11. the rear anchor device of erection crane according to claim 10, which is characterized in that the upper end of the fixed panel is set To be trapezoidal, connected between two pieces of fixed panels by connecting plate.
12. the rear anchor device of erection crane according to claim 11, which is characterized in that the connecting plate is respectively arranged on institute The both sides of fixed panel are stated, so that the top of the left-hand thread wheel carrier is hollow.
13. the rear anchor device of erection crane according to claim 10, which is characterized in that the both sides of the left-hand thread wheel carrier point Supporting leg is furnished with, two supporting legs are set up in parallel, and the both ends of the fixed panel are connected at the top of supporting leg, described in two Supporting leg bottom inside connects inverse buckling wheel respectively.
14. a kind of erection crane, which is characterized in that it is used as anchor fills after claim 1-13 any one of them erection cranes It puts.
CN201711423644.1A 2017-12-25 2017-12-25 Erection crane and thereafter anchor device Pending CN108103948A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202210028701.0A CN114319130A (en) 2017-12-25 2017-12-25 Bridge deck crane and rear anchor device thereof
CN201711423644.1A CN108103948A (en) 2017-12-25 2017-12-25 Erection crane and thereafter anchor device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711423644.1A CN108103948A (en) 2017-12-25 2017-12-25 Erection crane and thereafter anchor device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210028701.0A Division CN114319130A (en) 2017-12-25 2017-12-25 Bridge deck crane and rear anchor device thereof

Publications (1)

Publication Number Publication Date
CN108103948A true CN108103948A (en) 2018-06-01

Family

ID=62212946

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202210028701.0A Pending CN114319130A (en) 2017-12-25 2017-12-25 Bridge deck crane and rear anchor device thereof
CN201711423644.1A Pending CN108103948A (en) 2017-12-25 2017-12-25 Erection crane and thereafter anchor device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202210028701.0A Pending CN114319130A (en) 2017-12-25 2017-12-25 Bridge deck crane and rear anchor device thereof

Country Status (1)

Country Link
CN (2) CN114319130A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003221875A (en) * 2002-01-30 2003-08-08 Kajima Corp Rail-less slide method
CN201665823U (en) * 2009-12-04 2010-12-08 中国第一冶金建设有限责任公司 Bridge hanging basket cast-in-situ construction triangular rear anchor inverse buckling wheel enhanced type rail
CN102373673A (en) * 2011-11-24 2012-03-14 中铁二十一局集团有限公司 Bridge construction rolling shaft hanging basket across railway existing line and use method thereof
KR101193608B1 (en) * 2012-04-18 2012-10-23 주식회사 인터컨스텍 Beam launcher anchorage system for constructing bridge
CN202705915U (en) * 2012-07-27 2013-01-30 中国建筑土木建设有限公司 Self-supporting hanging basket rapid forward moving device for passenger special line
CN204080651U (en) * 2014-10-29 2015-01-07 中铁建大桥工程局集团第五工程有限公司 A kind of Diamond-Shape Form Traveler main couple walking system for road and bridge construction
CN105839549A (en) * 2016-05-20 2016-08-10 中国水利水电第十工程局有限公司 Truss type cantilever construction hanging basket
CN207846225U (en) * 2017-12-25 2018-09-11 中交路桥华南工程有限公司 Erection crane and thereafter anchor device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203834366U (en) * 2014-03-12 2014-09-17 滨州市博远模板有限公司 Energy-saving universal hanging basket for bridge construction
CN105908626A (en) * 2016-04-15 2016-08-31 中铁五局集团有限公司 Self-balancing reverse locking wheel structure of suspension basket
CN106284083A (en) * 2016-08-15 2017-01-04 云南云岭桥隧科技有限公司 Pushing tow climbs shifting formula cable crane arch bridge hanging method
CN107034791A (en) * 2017-06-27 2017-08-11 中交第三航务工程局有限公司 A kind of assembling method of Cantilever Casting Construction Hanging Basket
CN107447678A (en) * 2017-09-27 2017-12-08 中国葛洲坝集团第五工程有限公司 A kind of erection crane of the two-way positioning of energy

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003221875A (en) * 2002-01-30 2003-08-08 Kajima Corp Rail-less slide method
CN201665823U (en) * 2009-12-04 2010-12-08 中国第一冶金建设有限责任公司 Bridge hanging basket cast-in-situ construction triangular rear anchor inverse buckling wheel enhanced type rail
CN102373673A (en) * 2011-11-24 2012-03-14 中铁二十一局集团有限公司 Bridge construction rolling shaft hanging basket across railway existing line and use method thereof
KR101193608B1 (en) * 2012-04-18 2012-10-23 주식회사 인터컨스텍 Beam launcher anchorage system for constructing bridge
CN202705915U (en) * 2012-07-27 2013-01-30 中国建筑土木建设有限公司 Self-supporting hanging basket rapid forward moving device for passenger special line
CN204080651U (en) * 2014-10-29 2015-01-07 中铁建大桥工程局集团第五工程有限公司 A kind of Diamond-Shape Form Traveler main couple walking system for road and bridge construction
CN105839549A (en) * 2016-05-20 2016-08-10 中国水利水电第十工程局有限公司 Truss type cantilever construction hanging basket
CN207846225U (en) * 2017-12-25 2018-09-11 中交路桥华南工程有限公司 Erection crane and thereafter anchor device

Also Published As

Publication number Publication date
CN114319130A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN201250385Y (en) Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting
CN106400701B (en) A kind of list girder low level balanced cantilever assembly Bridge Erector
CN110130229A (en) It a kind of several juxtaposed double cantilever erections machines and its sets a roof beam in place and passing method
CN208774768U (en) A kind of mountain construction materials transportation system
CN108330751A (en) A kind of pin ladder type forestry mountainous region gyrocar track
CN104003320B (en) Hydraulic pressure changes the outfit frame and rapid-assembling method thereof
CN105926427A (en) Pier and beam transitional connecting structure
CN108342982A (en) A kind of hybrid combining girder stayed-cable bridge cable crane track cable beam-ends is from anchor structure
CN207846225U (en) Erection crane and thereafter anchor device
CN105735103A (en) Portable quick installation can dismantle bridge on foot
CN111576240A (en) Assembled bent cap construction safety protection integration platform
CN106087775B (en) For setting up intercity track and subway U beam self-balancing via hole type Bridge Erectors
CN212358026U (en) Assembled bent cap construction safety protection integration platform
CN108103948A (en) Erection crane and thereafter anchor device
CN204059201U (en) Bridge Erector
CN202730569U (en) Simply-supported beam track skeleton laying car
CN205348000U (en) Cradle construction device of asymmetric arc variable cross section thin wing board case roof beam
CN106320190A (en) Platform of bridge maintenance, consolidation and suspension construction
CN205874991U (en) It crosses cellular type frame bridge crane to be used for setting up intercity track and subway U roof beam self -balancing
CN206599729U (en) A kind of Single column pier bridge anti-overturning devices based on structure self-balancing
CN105648915B (en) The cradle construction device of asymmetric arc variable cross-section thin wing slab box beam
CN107740310A (en) A kind of novel high-elasticity vibration damping iron chair
CN113293712A (en) Cantilever beam construction is with hanging basket
CN208949658U (en) A kind of monorail transit consolidation formula two-orbit beam
CN102797201B (en) Simply supported beam track panel laying vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181109

Address after: 528400 19, 3, Central Plaza, 1 Xing Zheng Road, East District, Zhongshan, Guangdong.

Applicant after: Road & Bridge South China Engineering Co., Ltd.

Applicant after: Road & Bridge International Co., Ltd.

Address before: 528400 19, 3, Central Plaza, 1 Xing Zheng Road, East District, Zhongshan, Guangdong.

Applicant before: Road & Bridge South China Engineering Co., Ltd.

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Xia Hui

Inventor after: Xiao Xiangrong

Inventor after: Zhang Huichang

Inventor after: Liu Huaigang

Inventor after: Gao Shiqiang

Inventor after: Lei Zhichao

Inventor after: Yang Weiping

Inventor after: Yang Jie

Inventor after: Zhao Shenghui

Inventor before: Liu Huaigang

Inventor before: Gao Shiqiang

Inventor before: Xiao Xiangrong

Inventor before: Xia Hui

Inventor before: Zhang Huichang

Inventor before: Lei Zhichao

Inventor before: Yang Weiping

Inventor before: Yang Jie

Inventor before: Zhao Shenghui

CB03 Change of inventor or designer information