CN108037158A - A kind of method and apparatus being detected using metal detection line to grouting material plumpness - Google Patents

A kind of method and apparatus being detected using metal detection line to grouting material plumpness Download PDF

Info

Publication number
CN108037158A
CN108037158A CN201711475080.6A CN201711475080A CN108037158A CN 108037158 A CN108037158 A CN 108037158A CN 201711475080 A CN201711475080 A CN 201711475080A CN 108037158 A CN108037158 A CN 108037158A
Authority
CN
China
Prior art keywords
grouting
sleeve
grouting material
connector
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711475080.6A
Other languages
Chinese (zh)
Inventor
钱冠龙
郭耀斌
郝志强
王爱军
朱清华
谢松
郝敏
程亮
赵思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sida Jian Mao Technology Development Co Ltd Tianjin Branch
BEIJING SIDA JIANMAO TECHNOLOGY DEVELOPMENT Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
Original Assignee
Beijing Sida Jian Mao Technology Development Co Ltd Tianjin Branch
BEIJING SIDA JIANMAO TECHNOLOGY DEVELOPMENT Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sida Jian Mao Technology Development Co Ltd Tianjin Branch, BEIJING SIDA JIANMAO TECHNOLOGY DEVELOPMENT Co Ltd, Central Research Institute of Building and Construction Co Ltd MCC Group filed Critical Beijing Sida Jian Mao Technology Development Co Ltd Tianjin Branch
Priority to CN201711475080.6A priority Critical patent/CN108037158A/en
Publication of CN108037158A publication Critical patent/CN108037158A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N27/00Investigating or analysing materials by the use of electric, electrochemical, or magnetic means
    • G01N27/02Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating impedance
    • G01N27/04Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating impedance by investigating resistance
    • G01N27/06Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating impedance by investigating resistance of a liquid

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The present invention relates to a kind of method and apparatus being detected using metal detection line to grouting material plumpness, especially a kind of method and apparatus being detected using metal detection line to the grouting material plumpness for the connector that is in the milk in precast concrete, use electric resistance measuring apparatus, measure the resistance value between grouting material in metal detection line and the connector grouting duct in insertion sleeve slurry outlet, when measurement result is below predetermined resistance, then think that the grouting material at barrel bore metal detection line end is full, when being more than predetermined resistance such as measurement result, then judge that the grouting material in connector at test point is not full, that is the grouting material plumpness of connector does not meet quality requirement.The present invention does not destroy any position of precast concrete, and method is simple, highly practical, fast and reliable, can solve prefabricated concrete structure prefabricated post, the Non-Destructive Testing of vertical reinforcement grouting jointing grouting material plumpness in dry wall judges problem.

Description

A kind of method and apparatus being detected using metal detection line to grouting material plumpness
Technical field
The present invention relates to a kind of method and apparatus being detected using metal detection line to grouting material plumpness, especially It is a kind of that method and apparatus are detected to the grouting material plumpness in precast concrete using metal detection line, it is specifically used for The detection side of the grouting material plumpness of vertical reinforcement grouting jointing in prefabricated concrete structure prefabricated post, dry wall Method, using the present invention is simple, convenient, quick, efficient, cost is low, better than existing grouting connector grouting material plumpness Lossless detection method.
Background technology
Sleeve grouting connection is the main connection that prefabricated concrete structure builds vertical prefabricated components Reinforcement Method, grouting quality of connection are the key points for influencing building safety.National sector standard《Bar connecting grout sleeve》JG/ T398 defines the requirement to grout sleeve structure and material,《Prefabricated concrete structure technical regulation》JGJ 1、《Reinforcing bar set Cylinder grouting connection application technology code》Applications and examination of the JGJ355 to reinforcing bar grout sleeve connection method are made that clear and definite rule It is fixed.When being produced using the precast concrete of pre-buried grout sleeve connection, longitudinally connected reinforcing bar and the grout sleeve one of component End is linked together using mechanical joining methods, or in the grouting connecting cavity at the prefabricated end of connection reinforcing bar insertion sleeve, sleeve is put Close in precast concrete bottom position and be fixed on component cheek board, sleeve lateral wall upper position is set to be used to be vented With the slurry outlet of grouting material outflow and lower part close to set by prefabricated components bottom for the grout hole being in the milk into sleeve, The outer surface of prefabricated components is drawn out to by connecting plastic tube, all being installed with each reinforcing bar of sleeved steel reinforcement cage, built-in fitting and After fixing, casting concrete, then jolt ramming, maintenance shaping, are finally made the concrete prefabricated elements such as wall or column, prefabricated External surface of structural member side wall leaves grouting and the pulp pore of each sleeve, and front part of dispatching from the factory is removed to member profile size, connection steel Outside the position of muscle and grout sleeve is checked, also patency inspection is carried out one by one to the sleeve grout hole on component, slurry outlet Look into, construction and installation scene is transported to after qualified, precast concrete is hung into specified structure layer assigned position with lifting equipment, is pacified In the existing structure in lower part, during installation, the connection reinforcing bar that substructure is stretched out upwards is inserted respectively into the pre- of top installation In the corresponding sleeve of member bottom section processed, the grouting connection of member reinforcing steel bar is then carried out.
According to national sector standard《Reinforced bar sleeve grouting connection application technology code》The regulation of JGJ355, sleeve grouting connect Inspection of examination of the construction to grouting quality including the examination to grouting material test block pressure resistance intensity and the closely knit plumpness of grouting is connect to test Receive, the grouting material progress compression strength detection that the grouting material compression strength test block left and taken by scene can be to finally hardening, and structure In part reinforced bar sleeve grouting connector the closely knit plumpness of grouting at present can only by component surface grouting and pulp pore at The full situation observation of grouting material is judged that the quality inspection side of application grouting connection is also such abroad.
In the practice of actual grouting construction, since objective or human factor often results in the defects of grouting plumpness is insufficient, The grouting of sleeve inner is not can determine that sometimes by the grouting of component surface and the observation of the full situation of pulp pore grouting material Expect plumpness.The several years has been carried out in the Study on nondestructive detection method work of domestic closely knit plumpness of being in the milk to sleeve, for above-mentioned The connector of quality problems, existing visual examination and endoscopic observation method can not be all seen inside the full pulp pore of grouting material Situation, therefore emphasis falls on research lossless detection method, it is proposed that industrial x-ray method, elastic wave or supercritical ultrasonics technology, pre-buried Sensor method, steel wire drawing method etc., but these methods respectively have not in terms of practicality, the scope of application, accuracy of judgement degree and cost Foot, it is difficult to be widely applied in engineering.This is difficult for the key point of fabricated construction-connector grouting plumpness quality judging Topic does not solve, and the safety reliability of assembly concrete building structure is just difficult to determine, seriously affects the scale of building industrialization Change development, therefore be badly in need of preferably grouting plumpness lossless detection method.
There is one kind about in the vertical precast shear wall Reinforcement connection method of prefabricated concrete structure building Beam slurry anchor overlap joint connection, its connecting node are constructed in national sector standard《Prefabricated concrete structure technical regulation》JGJ 1- It is described in the A.0.2 bar of 2014 appendix A, is done in installation of the 12nd chapter Section 3 to the connection method of the standard Corresponding requirements, the 13.2.2 articles in the 13rd chapter of the standard proposes grouting and answers closely knit full requirement.Constraint slurry anchor The Joining Technology of lap joint is:When precast concrete produces, shaping is reserved by pre-buried connection reinforcing bar in component Hole, is longitudinally arranged ring-type stirrup, hole inner cavity passes through grouting and exhaust duct aperture in pre-buried connection reinforcing bar and reserved forming hole border Prefabricated components surface is connected to, component is identical with the mounting process of sleeve grouting connecting elements when engineering site is installed and connected, The connection reinforcing bar stretched out in substructure is inserted into the preformed hole of corresponding steel bar connector of this precast concrete, is sealed After blocking up reserved grouting seam between hole end surface or component, mix performance and meet the special of JGJ 1-2014 tables 4.2.3 requirements Grouting material pours into preformed hole, until the gap between connection bar connecting and reserved hole wall is filled with, from the pulp of component surface Good grouting and slurry outlet are blocked after the outflow of hole, on component all connectors grouting finish, after grouting material hardening, each jointing The interior grouting material poured into is combined closely with the connection reinforcing bar being inserted into and reserved hole wall, i.e., by precast concrete and lower junction Structure links together.Grouting connection construction technique of the connector in component erecting bed is identical with sleeve grouting jointing, because This is examined there is also the problem of connector grouting plumpness detection although the connector can use the methods of ultrasonic wave or ray Survey, but the problem of due to property easy to detect and testing cost, it is main using going out to component surface using seldom in Practical Project The method of the plumpness observation of grouting material judges the grouting material plumpness quality of connector in slurry pore, with above-mentioned sleeve grouting connector It is equally possible the problem of detection erroneous judgement occur.
The content of the invention
The present invention proposes a kind of detection method of vertical reinforcement grouting jointing grouting material plumpness, it be by using A kind of special measurement device being made of insulation measurement instrument and metal measurement line, in precast concrete grouting construction Before, the pulp pore insertion connector inner cavity by one end of the metal detection line of special measurement device through grouting connector top, separately One end is extended to outside prefabricated components surface from pulp pipeline, is in the milk after connection construction, is surveyed using insulation measurement instrument Each grouting connector is guided in the metal measurement line and grouting duct of component surface by pulp pore in amount precast concrete Resistance value between grouting material, is determined at the metal measurement line end of connector inner cavity with the presence or absence of grouting with resistance value measurement result Material, and then judge the method for grouting plumpness quality in connector.
The present invention provides a kind of grouting material plumpness detection method, vertical reinforcement preferably in a kind of precast concrete The grouting material plumpness detection method of sleeve grouting connector, grouting material plumpness is measured using special measurement device, described special Measuring device includes metal detection line (60) and electric resistance measuring apparatus (1), and one end of metal detection line (60) passes through sleeve pulp Hole (7) and insertion sleeve (4) inner cavity, the other end are reached outside the precast concrete surface, electric resistance measuring apparatus (1) are surveyed Between grouting material (12) in the other end of amount metal detection line (60) and the grouting pore (6) on precast concrete surface Resistance value, during such as measurement result below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, such as measurement knot When fruit is more than predetermined resistance, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that the side Method comprises the following steps that:
(1) before sleeve (4) grouting construction of precast concrete (13), by the metal detection line of special measurement device (60) one end by grout outlet (9), through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, metal detection line (60) it is another End is reached outside prefabricated components surface, then carries out grouting construction, after grouting, sleeve is connected to precast concrete surface Pulp pore (5) and grouting pore (6) are blocked with closeouts (16), in a period of time after grouting material initial set, are removed out Starch the closeouts (16) in pore (5) and grouting pore (6);
(2) electric resistance measuring apparatus of special measurement device is used, by the two poles of the earth measurement line gauge head (3) point of electric resistance measuring apparatus Do not connect with the grouting material surface in the other end and grouting pore (6) of the metal detection line (60) of same sleeve grouting connector Touch, the hardening in the measurement line gauge head (3) at the two poles of the earth and the other end metal of the metal detection line (60) and grouting pore (6) Under conditions of grouting material surface contacts at the same time, start electric resistance measuring apparatus (1) and carry out resistance measurement, measurement result is in predetermined resistance When value is following, then it is assumed that the grouting material of sleeve grouting connector is full, and when being more than predetermined resistance such as measurement result, then judging should Grouting material (12) is discontinuous or not full in sleeve grouting connector, then it is assumed that the grouting material plumpness of sleeve grouting connector is not met Quality requirement.It is preferred that vertical reinforcement sleeve grouting connector, the grouting of vertical reinforcement sleeve are provided with precast concrete (13) Connector includes sleeve (4), connection reinforcing bar (11), grout outlet (9) and grout pipe (10);Connection reinforcing bar (11) is partly located at sleeve (4) in, sleeve (4) top is provided with slurry outlet (7), and sleeve (4) lower part is provided with grout hole (8), grout outlet (9) and grout pipe (10) there is pulp pore (5) and grouting pore (6) respectively, pulp pore (5) is located on precast concrete (13) surface Portion, grouting pore (6) are located at precast concrete (13) surface lower portions, and grout outlet (9) extend into precast concrete (13) slurry outlet (7) in and unicom sleeve (4) top, grout pipe (10) is extend into precast concrete (13) and unicom The grout hole (8) of sleeve (4) lower part, grouting material (12) is poured into sleeve from grout pipe (10), so that grouting material (12) is distributed In in grout pipe (10), sleeve (4) and grout outlet (9).
The present invention provides a kind of grouting material plumpness detection method, is preferably vertical reinforcement in a kind of precast concrete The grouting material plumpness detection method of sleeve grouting connector, is provided only with slurry outlet in preferably a kind of precast concrete again Vertical reinforcement sleeve grouting connector grouting material plumpness detection method, using special measurement device measurement grouting material it is full Degree, the special measurement device include the first metal detection line (60), the second metal detection line (23) and electric resistance measuring apparatus (1), one end of the first metal detection line (60) reaches institute through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, the other end State outside prefabricated components surface, electric resistance measuring apparatus (1) measures the other end of first metal detection line (60) and is embedded in the set The resistance value between the second metal detection line (23) in the grouting material of cylinder grouting connector bottom, if measurement result is in predetermined resistance When following, then it is assumed that the grouting material of sleeve grouting connector is full, when being more than predetermined resistance such as measurement result, then it is assumed that sleeve The grouting material plumpness of grouting connector does not meet quality requirement.It is preferred that the method comprises the following steps that:
(1) vertical reinforcement sleeve pre-buried in precast concrete grouting connector, which employs, is provided only with slurry outlet (7) Sleeve (4), before the connection construction that is in the milk, with unicom chamber sealing material (18) by precast concrete bottom water flush joint border into During row sealing, each or part second metal detection line of pre-plugged (23) only below the sleeve (4) of slurry outlet (5), second Metal detection line (23) one end is located at unicom intracavitary close to sleeve (4) bottom, and is not contacted with connection reinforcing bar (11), the second metal The other end of detection line (23) is located at unicom chamber sealing material (18) outside, meanwhile, it is inserted into by the grout outlet (9) on sleeve (4) top First metal detection line (60), one end of first metal detection line (60) enter through upper cartridge slurry outlet (7) Barrel bore, the other end are drawn out to outside 13 surface of precast concrete from the grout outlet (9) of sleeve, then carry out grouting and apply Work;After grouting, the pulp pore (5) that sleeve is connected to precast concrete surface is blocked with closeouts (16), in grouting material In a period of time after initial set, the closeouts (16) in pulp pore (5) are removed;
(2) electric resistance measuring apparatus (1) is used, the two poles of the earth measurement line gauge head of electric resistance measuring apparatus is filled with same sleeve respectively The other end of first metal detection line (60) and another end in contact of the second metal detection line (23) of connector are starched, two Under conditions of the measurement line gauge head of pole and the metal surface of the first and second metal detection lines (60,23) contact at the same time, start electricity Hinder measuring device and carry out resistance measurement, when measurement result is below predetermined resistance, then it is assumed that the grouting of sleeve grouting connector Expect full, when being more than predetermined resistance such as measurement result, then judge that grouting material (12) is discontinuously or not in sleeve grouting connector Full, i.e. the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that the sleeve of only slurry outlet (7) is adopted With unicom chamber grouting construction process.It is preferred that the pre-buried sleeve (4) for being provided only with slurry outlet (7) in precast concrete (13);Set Cylinder (4) is located at the arranged on left and right sides of precast concrete (13), or sleeve (4) is along precast concrete (13) border It is distributed border;Concentration grouting duct (22) is provided between the top of precast concrete (13) and sleeve (4), or Concentration grouting duct (22) is provided with the unicom chamber of precast concrete (13) lower part, it is described to concentrate grouting duct (22) Unicom chamber described in unicom, unicom chamber are located at the bottom of sleeve (4), and unicom chamber is sealed using unicom chamber sealing material (18).It is preferred that Vertical reinforcement sleeve grouting connector is arranged on precast concrete (13) arranged on left and right sides, or the grouting of vertical reinforcement sleeve connects Head is distributed along precast concrete (13) border.It is preferred that grouting duct (22) is concentrated to be located at precast concrete (13) Top, and positioned at vertical reinforcement sleeve grouting connector between.It is preferred that each vertical reinforcement sleeve grouting connector includes sleeve (4), reinforcing bar (11) and grout outlet (9) are connected;Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with out Starch hole (7), sleeve (4) bottom unicom unicom chamber, grout outlet (9) has pulp pore (5), and pulp pore (5) is positioned at prefabricated mixed Solidifying soil component (13) surface top, grout outlet (9) extend into going out in precast concrete (13) and unicom sleeve (4) top Starch hole (7), grouting material (12) is poured into out of grouting duct (22), grouting material (12) enters unicom along concentration grouting duct (22) Chamber, and the opening from sleeve (4) bottom is entered in sleeve, and grouting material (12) is distributed in unicom chamber, sleeve (4) and pulp Manage in (9).
The present invention provides a kind of grouting material plumpness detection method, is preferably vertical reinforcement in a kind of precast concrete The grouting material plumpness detection method of constraint slurry anchor lap joint, grouting material plumpness is measured using special measurement device, described Special measurement device includes metal detection line (60) and electric resistance measuring apparatus (1), and one end of metal detection line (60) passes through connector Slurry outlet (7) enters connector reserving hole channel (25) inner cavity, and the other end is reached outside the prefabricated components surface, resistance measurement dress Measurement is put by the electricity between the grouting material in the grouting pore (6) on the metal detection line (60) and precast concrete surface Resistance value, when measurement result is below predetermined resistance, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, such as measurement knot When fruit is more than predetermined resistance, then it is assumed that the grouting material plumpness of constraint slurry anchor lap joint does not meet quality requirement.It is preferred that The method comprises the following steps that:
(1) before the reinforced binding slurry anchor overlap joint connection grouting construction of precast concrete, by the gold of special measurement device Belong to one end of detection line (60) by grout outlet (9), and enter connector slurry outlet (7), so as to be inserted into connector reserving hole channel (25) inner cavity, the other end is drawn out to prefabricated components surface grout outlet (9) outside, after grouting, the constraint slurry anchor lap joint Top pulp pore (5) and lower part grouting pore (10) are blocked with closeouts (16), a period of time after grouting material initial set It is interior, remove the closeouts (16) of top pulp pore (5) and lower part grouting pore (10);
(2) electric resistance measuring apparatus of special measurement device is used, by the two poles of the earth measurement line gauge head difference of electric resistance measuring apparatus With the grouting in the other end and grouting pore (10) of the metal detection line (60) of same reinforced binding slurry anchor lap joint Expect surface contact, the grouting of hardening in the measurement line gauge head at the two poles of the earth and the metal of metal detection line (60) and grouting pore (10) Expect surface at the same time contact under conditions of, start electric resistance measuring apparatus (1) carry out resistance measurement, measurement result predetermined resistance with When lower, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, and when being more than predetermined resistance such as measurement result, then judging should Grouting material (12) is discontinuous or not full in constraint slurry anchor lap joint, i.e. the grouting material plumpness of the slurry anchor lap joint is not inconsistent Close quality requirement.It is preferred that being provided with vertical reinforcement constraint slurry anchor lap joint in precast concrete (13), vertical reinforcement is about Beam slurry anchor lap joint includes constraint reinforcing bar (24), reserving hole channel (25), top overlap joint connection reinforcing bar (26), lower part overlap joint connection Reinforcing bar (26);Lower part overlap joint connection reinforcing bar (26) partly overlaps connection reinforcing bar (26) in reserving hole channel (25), and with top Partly overlap;Reinforcing bar (24) is constrained respectively positioned at the periphery of overlap joint connection reinforcing bar (26) lap, reserving hole channel (25) top Connector slurry outlet (7) and lower connector grout hole (8) connect grout outlet (9) and grout pipe (10), grout outlet (9) and grouting respectively Manage (10) has pulp pore (5) and grouting pore (6) respectively, and grout outlet (9) is extend into precast concrete (13) simultaneously Unicom reserving hole channel (25), grout pipe (10) is extend into precast concrete (13) and unicom reserving hole channel (25), from filling Slurry pipe (10) pours into grouting material (12) into reserving hole channel (25), so that grouting material (12) is distributed in grout pipe (10), preformed hole In road (25) and grout outlet (9).
The present invention provides a kind of grouting material plumpness detection device, is preferably vertical reinforcement in a kind of precast concrete The grouting material plumpness detection device of sleeve grouting connector, it includes special measurement device, for detecting grouting material plumpness, The special measurement device includes metal detection line (60) and electric resistance measuring apparatus (1), and one end of metal detection line (60) passes through Sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, the other end are reached outside the prefabricated components surface, electric resistance measuring apparatus (1) Measurement line connect filling in the other end of metal detection line (60) and the grouting pore (6) on precast concrete surface respectively The surface of slurry (12), to measure the grouting pore (6) of the other end of metal detection line (60) and precast concrete surface Resistance value between interior grouting material (12), during such as measurement result below predetermined resistance, then it is assumed that the sleeve is in the milk connector Grouting material it is full, when being more than predetermined resistance such as measurement result, then it is assumed that sleeve grouting connector grouting material plumpness be not inconsistent Close quality requirement.It is preferred that one end of metal detection line (60) is by grout outlet (9), through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, metal detection line (60) other end are reached outside prefabricated components surface.It is preferred that set in precast concrete (13) Vertical reinforcement sleeve grouting connector is equipped with, vertical reinforcement sleeve grouting connector includes sleeve (4), connection reinforcing bar (11), grout outlet (9) and grout pipe (10);Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with slurry outlet (7), sleeve (4) lower part is provided with grout hole (8), and grout outlet (9) and grout pipe (10) have pulp pore (5) and grouting pore (6) respectively, Pulp pore (5) is located at precast concrete (13) surface top, and grouting pore (6) is located at precast concrete (13) table Face lower part, grout outlet (9) extend into the slurry outlet (7) in precast concrete (13) and unicom sleeve (4) top, grout pipe (10) grout hole (8) of in precast concrete (13) and unicom sleeve (4) lower part is extend into, from grout pipe (10) to sleeve Grouting material (12) is inside poured into, so that grouting material (12) is distributed in grout pipe (10), sleeve (4) and grout outlet (9).
The present invention provides a kind of grouting material plumpness detection device, is preferably vertical reinforcement in a kind of precast concrete The grouting material plumpness detection device of sleeve grouting connector, is provided only with slurry outlet in preferably a kind of precast concrete again Vertical reinforcement sleeve grouting connector grouting material plumpness detection device, including special measurement device measurement, with detect grouting Expect plumpness, the special measurement device includes the first metal detection line (60), the second metal detection line (23) and resistance measurement Device (1), one end of the first metal detection line (60) pass through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, and the other end stretches out To outside the prefabricated components surface, the measurement line of electric resistance measuring apparatus (1) connects first metal detection line (60) respectively The other end and the second metal detection line (23) being embedded in the grouting material of sleeve grouting connector bottom, to measure first metal Between the other end of detection line (60) and the second metal detection line (23) being embedded in the grouting material of sleeve grouting connector bottom Resistance value, during such as measurement result below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, such as measurement knot When fruit is more than predetermined resistance, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that Mei Gehuo There was only the second metal detection line of pre-plugged (23), the second metal detection line (23) one below the sleeve (4) of slurry outlet (5) in part End is located at unicom intracavitary close to sleeve (4) bottom and is not contacted with connection reinforcing bar (11), the second metal detection line (23) it is another End is located at unicom chamber sealing material (18) outside, meanwhile, first metal detection is inserted into by the grout outlet (9) on sleeve (4) top Line (60), one end of first metal detection line (60) enter barrel bore through upper cartridge slurry outlet (7), the other end from The grout outlet (9) of sleeve is drawn out to outside precast concrete (13) surface.It is preferred that only the sleeve of slurry outlet (7) is using connection Cavity grouting construction process.It is preferred that the pre-buried sleeve (4) for being provided only with slurry outlet (7) in precast concrete (13);Sleeve (4) it is located at the arranged on left and right sides of precast concrete (13), or sleeve (4) divides along precast concrete (13) border Cloth border;Concentration grouting duct (22), Huo Zhe are provided between the top of precast concrete (13) and sleeve (4) Concentration grouting duct (22) is provided with the unicom chamber of precast concrete (13) lower part, it is described to concentrate grouting duct (22) connection Lead to the unicom chamber, unicom chamber is located at the bottom of sleeve (4), and unicom chamber is sealed using unicom chamber sealing material (18).It is it is preferred that perpendicular Precast concrete (13) arranged on left and right sides, or vertical reinforcement sleeve grouting connector are arranged on to reinforced bar sleeve grouting connector It is distributed along precast concrete (13) border.It is preferred that grouting duct (22) is concentrated to be located at precast concrete (13) Top, and between vertical reinforcement sleeve grouting connector.It is preferred that each vertical reinforcement sleeve grouting connector includes sleeve (4), reinforcing bar (11) and grout outlet (9) are connected;Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with out Starch hole (7), sleeve (4) bottom unicom unicom chamber, grout outlet (9) has pulp pore (5), and pulp pore (5) is positioned at prefabricated mixed Solidifying soil component (13) surface top, grout outlet (9) extend into going out in precast concrete (13) and unicom sleeve (4) top Starch hole (7), grouting material (12) is poured into out of grouting duct (22), grouting material (12) enters unicom along concentration grouting duct (22) Chamber, and the opening from sleeve (4) bottom is entered in sleeve, and grouting material (12) is distributed in unicom chamber, sleeve (4) and pulp Manage in (9).
The present invention provides a kind of grouting material plumpness of vertical reinforcement constraint slurry anchor lap joint in precast concrete Detection device, it includes special measurement device, and for measuring grouting material plumpness, the special measurement device is visited including metal Survey line (60) and electric resistance measuring apparatus (1), one end of metal detection line (60) enter connector through connector slurry outlet (7) and reserve Duct (25) inner cavity, the other end are reached outside the prefabricated components surface, and the measurement line of electric resistance measuring apparatus connects the metal The surface of the other end of line (60) and the grouting material (12) in the grouting pore (6) on precast concrete surface is detected, to survey Measure between the grouting material in the other end of the metal detection line (60) and the grouting pore (6) on precast concrete surface Resistance value, when measurement result is below predetermined resistance, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, such as measures When being as a result more than predetermined resistance, then it is assumed that the grouting material plumpness of constraint slurry anchor lap joint does not meet quality requirement.It is excellent Choosing, one end of metal detection line (60) enter connector slurry outlet (7) by grout outlet (9), are reserved so as to be inserted into connector Duct (25) inner cavity, the other end are drawn out to prefabricated components surface grout outlet (9) outside.It is preferred that set in precast concrete (13) Vertical reinforcement constraint slurry anchor lap joint is equipped with, vertical reinforcement constraint slurry anchor lap joint includes constraint reinforcing bar (24), preformed hole Road (25), top overlap joint connection reinforcing bar (26), lower part overlap joint connection reinforcing bar (26);Lower part overlap joint connection reinforcing bar (26) is partly located at In reserving hole channel (25), and overlap connection reinforcing bar (26) with top and partly overlap;Reinforcing bar (24) is constrained respectively positioned at overlap joint connection The periphery of reinforcing bar (26) lap, reserving hole channel (25) upper connection slurry outlet (7) and lower connector grout hole (8) connect respectively Grout outlet (9) and grout pipe (10) are connect, grout outlet (9) and grout pipe (10) have pulp pore (5) and grouting pore respectively (6), grout outlet (9) extend into precast concrete (13) simultaneously unicom reserving hole channel (25), and grout pipe (10) extend into pre- The interior simultaneously unicom reserving hole channel (25) of concrete component (13) processed, it is interior from grout pipe (10) to reserving hole channel (25) to pour into grouting material (12), so that grouting material (12) is distributed in grout pipe (10), reserving hole channel (25) and grout outlet (9).
Wherein, the definite method of the predetermined resistance is as follows:Use the grouting material identical with grouting material in the connector Pour in the end of the first metal measurement line (60) with insulating sheath, use the grouting material identical with grouting material in the connector It is filled into the plastic round tube (21) suitable with grout pipe (10) internal diameter, makes the first metal measurement line (60) end surface attachment one Layer grouting material (12), after forming the continuous grouting material column (28) consistent with bore in plastic tube (21), in the grouting material In conductive time range, the first metal measurement line (60) surface is measured respectively using the electric resistance measuring apparatus (1) Between 2 points of grouting material (12) setpoint distance of upper attachment, and between 2 points of grouting material column (28) both ends furthest apart Resistance value when obtain respective maximum, the sum of two maximums be predetermined resistance.It is preferred that the predetermined resistance Value is one or more;It is preferred that the interval in time of measuring test coupon grouting material (12) presetting period of the predetermined resistance It is basically identical when being detected with actual connector plumpness during construction;When environment temperature during predetermined resistance measurement and construction Actual connector plumpness detection when it is basically identical.
Wherein, the setpoint distance of the grouting material (12) of the first metal measurement line (60) surface attachment is the precast concrete Enter the connection reinforcing bar (11) and sleeve (4) or reserving hole channel (25) inner wall radial direction of sleeve (4) or reserving hole channel (25) in component The maximum in gap, the perfusion length (L) of continuous grouting material column (28) are greater than or equal to the precast concrete (13) The length maximum of nipple grout pipe (10).Alternatively, grouting material (12) of the first metal measurement line (60) surface attachment are set Set a distance is the interior connection reinforcing bar (11) and sleeve (4) for entering sleeve (4) or reserving hole channel (25) of the precast concrete Or the maximum of reserving hole channel (25) inner wall radial clearance, the perfusion length (L) of continuous grouting material column (28) are greater than or equal to The bottom of any sleeve (4) and the second metal measurement line of unicom intracavitary pre-plugged in the precast concrete (13) (23) between termination air line distance maximum.
Wherein, described a period of time is in the conductive time range of grouting material used in the connector, preferably For 36-168 after grouting material initial set it is small when it is interior, it is interior when 72-120 is small preferably after grouting material initial set again.It is preferred that the resistance is surveyed It is preferably resistance measurement instrument to measure device, again preferably megameter or universal meter.It is preferred that the sleeve (4) be by structural steel, Stainless steel, cast iron, cast steel, FRP or CFRP materials are made;The grouting material (12) for not complete aquation when it is conductive, and Do not have the grouting material of electric conductivity after complete aquation.It is preferred that the slurry outlet (7) be connected with grout outlet (9) connector (19), go out Slurry pipe (9) is made by the good nonmetallic materials of insulation performance.It is preferred that, it is preferable that the predetermined resistance is 100-3000M Ω, is preferably 100-1500M Ω, again preferably 500M Ω, 800M Ω, 1000M Ω, 1500M Ω, 2000M Ω, 2500M Ω Or 2800M Ω.It is preferred that the metal detection line (60) in the slurry outlet on special measurement device insertion connector top be with The electric wire of insulating sheath.It is preferred that the special measurement device is inserted into outside the metal detection line end in the slurry outlet on connector top Be cased with surface it is smooth and made of insulating materials orbicule (61).It is preferred that as measurement result be more than predetermined resistance when, then sentence The metal detection line end periphery broken in the insertion slurry outlet does not have grouting material or grouting material not full, determines whether this Grouting material (12) is discontinuous or not full in connector, i.e., the grouting material plumpness of described connector does not meet quality requirement.
The present invention technical principle be:When grouting material is full in vertical reinforcement grouting connector in precast concrete, Grouting material in barrel bore or lap joint reserving hole and sleeve or lap joint should be into and out of grouting material at slurry hole Being full of, continuous, grouting material is cement-based material, and moisture content is not fully absorbed by hydrated reaction of cement inside it after its hardening There is certain conductive capability before, air and vacuum have insulation performance, when pre- using a kind of insulation measurement instrument measurement The metal that each sleeve grouting connector or constraint slurry anchor lap joint inner cavity is drawn in concrete component processed measures line with being connected to Component surface grouting duct in grouting material between resistance value when, certain resistance value can be obtained, therefore can measure The connector of resistance, you can be judged as in connector that grouting material is full, otherwise to be not full.
Not having to any position of precast concrete is judged to sleeve grouting material plumpness quality by this method Destroy, method is simple, highly practical, fast and reliable, can solve prefabricated concrete structure prefabricated post, the vertical steel in dry wall The Non-Destructive Testing of muscle sleeve grouting jointing grouting material plumpness judges problem.
Brief description of the drawings
Fig. 1 is that the grouting material plumpness measuring device connection of vertical reinforcement sleeve grouting connector in precast concrete is shown It is intended to;
Fig. 2 is vertical reinforcement sleeve grouting connector schematic diagram in the precast concrete with closeouts;
Fig. 3 is that the grouting material of vertical reinforcement sleeve grouting connector in the precast concrete with air or vacuum chamber is satisfied Full scale measuring device connection diagram;
Fig. 4 is vertical reinforcement in the precast concrete with air or vacuum chamber and unicom grouting chamber sealing material The grouting material plumpness measuring device connection diagram of sleeve grouting connector;
Fig. 5 is to be in the milk with air or vacuum chamber and unicom in another precast concrete of chamber sealing material vertically The grouting material plumpness measuring device connection diagram of reinforced bar sleeve grouting connector;
Fig. 6 a and Fig. 6 b are the measuring device connection diagram of measurement predetermined resistance;
Fig. 7 a are that the grouting material for the vertical reinforcement sleeve grouting connector that slurry outlet is provided only with precast concrete is full Spend detection device connection diagram;
Fig. 7 b are the grouting for the vertical reinforcement sleeve grouting connector that slurry outlet is provided only with another precast concrete Expect plumpness detection device connection diagram;
Fig. 8 is that the grouting material plumpness detection device of vertical reinforcement constraint slurry anchor lap joint in precast concrete connects Connect schematic diagram.
Embodiment
Such as Fig. 1-Fig. 8, wherein
1- electric resistance measuring apparatus, 2- electric resistance measuring apparatus measurement line, 3- measurement line gauge heads, 4- sleeves, 5- component surfaces Pulp pore, the grouting pore of 6- component surfaces, 7- sleeve slurry outlets, 8- sleeve grout holes, 9- grout outlets, 10- grout pipes, 11- connection reinforcing bars, 12- grouting materials, 13- precast concretes, 14- sit slurry, 15- lower structures, 16- closeouts, 17- Air or vacuum chamber, 18- unicom grouting chamber sealing material, 19- sleeve pulp connectors, 20- sleeves grouting connector, 21- plastics circle Pipe, 22- concentrate grouting duct, 23- connectors bottom metal detection line, 24- constraint reinforcing bars, 25- reserving hole channels, 26- overlap joint connections Reinforcing bar, 28- grouting material tapes, 60- connectors upper metal detection line, 61- insulating materials orbicules
Embodiment 1
As shown in Figs. 1-5, the present invention provides a kind of grouting material plumpness detection device, is preferably a kind of precast concrete structure The grouting material plumpness detection device of vertical reinforcement sleeve grouting connector in part, it includes special measurement device, for detection Grouting material plumpness, the special measurement device include metal detection line 60 and electric resistance measuring apparatus 1, and the one of metal detection line 60 End is reached outside the prefabricated components surface through sleeve slurry outlet 7 and 4 inner cavity of insertion sleeve, the other end, electric resistance measuring apparatus 1 Measurement line connect the other end of metal detection line 60 and the grouting material in the grouting pore 6 on precast concrete surface respectively 12 surface, to measure the other end of metal detection line 60 and the grouting material in the grouting pore 6 on precast concrete surface Resistance value between 12, during such as measurement result below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, When being more than predetermined resistance such as measurement result, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is excellent Choosing, one end of metal detection line 60 is by grout outlet 9, through sleeve slurry outlet 7 and 4 inner cavity of insertion sleeve, metal detection line 60 The other end is reached outside prefabricated components surface.Vertical reinforcement sleeve grouting connector is provided with precast concrete 13, vertically Reinforced bar sleeve grouting connector includes sleeve 4, connection reinforcing bar 11, grout outlet 9 and grout pipe 10;11 part of connection reinforcing bar is located at sleeve In 4,4 top of sleeve is provided with slurry outlet 7, and 4 lower part of sleeve is provided with grout hole 8, and grout outlet 9 and grout pipe 10 have respectively Pore 5 and grouting pore 6 are starched, pulp pore 5 is located at 13 surface top of precast concrete, and grouting pore 6 is positioned at prefabricated mixed Solidifying soil 13 surface lower portions of component, grout outlet 9 extend into the slurry outlet 7 in precast concrete 13 and 4 top of unicom sleeve, fill Slurry pipe 10 extend into the grout hole 8 of in precast concrete 13 and 4 lower part of unicom sleeve, is poured into from grout pipe 10 into sleeve Grouting material 12, so that grouting material 12 is distributed in grout pipe 10, sleeve 4 and grout outlet 9.
The detection method of the present invention is specific as follows:
A kind of detection method of the grouting material plumpness of vertical reinforcement grouting connector, specific steps in precast concrete It is as follows:
(1) as shown in Fig. 1~Fig. 5, using a kind of special measurement device, the measuring device includes 60 He of metal detection line Electric resistance measuring apparatus 1, after metal detection line 60 is inserted into barrel bore by sleeve slurry outlet, then carries out grouting construction, when prefabricated After the sleeve grouting connection of concrete component 13, interior grouting material is still conductive when 36-168 is small after grouting material initial set When, remove the sleeve slurry outlet 7 on 4 top of sleeve and the sleeve grout hole 8 of lower part is connected to 13 outer surface of precast concrete Pulp pore 5 and grouting pore 6 closeouts 16;
(2) electric resistance measuring apparatus 1 of special measurement device is used, by the gauge head of the two poles of the earth measurement line 2 of electric resistance measuring apparatus 1 3 are drawn out to the other end of the metal detection line 60 on precast concrete surface with same sleeve grouting connector grout outlet respectively Head and grouting pore in 12 surface of grouting material contact, the two poles of the earth measurement line 2 gauge head 3 be drawn out to precast concrete Under conditions of 12 surface of grouting material of hardening contacts at the same time in the metal and grouting pore of metal detection line 60 on surface, start Electric resistance measuring apparatus 1 carries out resistance measurement, when measurement result is below predetermined resistance, then it is assumed that the filling of sleeve grouting connector Slurry is full, when being more than predetermined resistance such as measurement result, then judge the sleeve grouting connector in metal detection line 60 it is another The grouting material plumpness of no grouting material at end, the i.e. sleeve grouting connector does not meet quality requirement.When the grouting of 4 inner cavity of sleeve When slurry face does not reach the lower edge of slurry outlet 7,4 inner cavity top of sleeve and grout outlet 9 manage in there is air or vacuum chamber 17 (air or vacuum chamber 17 are illustrated in Fig. 3-5 respectively, since air and vacuum chamber 17 have insulation performance, resistance is surveyed at this time The measurement result of amount device 1 is more than predetermined resistance, then judges the filling of grouting material 12 and pulp pipeline in sleeve grouting connector Slurry 12 is discontinuous, i.e. the grouting material plumpness of sleeve grouting connector does not meet quality requirement;When in 9 longer region of grout outlet 12 thickness of grouting material when being less than 1/3 bore, the moisture content volatilization of the region grouting material 12 is fast, causes resistance to dramatically increase, this When electric resistance measuring apparatus 1 measurement result be more than predetermined resistance, it is believed that it is seriously not full that grouting material occurs in channel interior Situation, 4 inner cavity grouting material of sleeve is not also equally full, therefore assert that the grouting material plumpness of sleeve grouting connector does not meet matter Amount requires.The electric resistance measuring apparatus 1 is resistance measurement instrument.The circle of circumference one of the grouting material 12 of 4 lower part of Fig. 4 middle sleeves uses Unicom grouting chamber sealing material 18 is sealed.The circle of circumference one of the grouting material 12 of Fig. 5 middle sleeves 4 is using unicom grouting chamber sealing Material 18 is sealed.The sleeve of Fig. 5 also has a sleeve grouting connector 20 and sleeve pulp connector 19, sleeve pulp connector 19 with The slurry outlet 7 that 4 top of sleeve is set connects, and sleeve grouting connector 20 is connected with the grout hole 8 of 4 lower part of sleeve, grout outlet 9 and filling Starch pipe 10 and distinguish branch sleeve pulp connector 19 and sleeve grouting connector 20;As shown in Figure 5, it is preferable that the slurry outlet 7 of sleeve 4 with The sleeve pulp connector 19 that grout outlet 9 connects is made of the good nonmetallic materials of insulation performance.The connector 20 it is preferred that sleeve is in the milk It is made of the good nonmetallic materials of insulation performance.
The electric resistance measuring apparatus 1 is resistance measurement instrument.
Metal detection line 60 in the slurry outlet on the special measurement device insertion connector top is with insulating sheath Electric wire.
The metal detection line 60, be cased with outside the end of connector inner cavity surface it is smooth and made of insulating materials sphere 61。
Embodiment 2
A kind of grouting material plumpness detection device as shown in Fig. 7 a, Fig. 7 b, is preferably to be erected in a kind of precast concrete To the grouting material plumpness detection device of reinforced bar sleeve grouting connector, it is provided only with again in preferably a kind of precast concrete The grouting material plumpness detection device of the vertical reinforcement sleeve grouting connector of slurry outlet, including special measurement device measurement, with inspection Grouting material plumpness is surveyed, the special measurement device includes the first metal detection line 60, the second metal detection line 23 and resistance and surveys Device 1 is measured, through sleeve slurry outlet 7 and 4 inner cavity of insertion sleeve, the other end reaches described for one end of the first metal detection line 60 Outside prefabricated components surface, the measurement line of electric resistance measuring apparatus 1 connects the other end of first metal detection line 60 with burying respectively The second metal detection line 23 in the grouting material of sleeve grouting connector bottom, to measure the another of first metal detection line 60 Resistance value between one end and the second metal detection line 23 being embedded in the grouting material of sleeve grouting connector bottom, such as measurement result When below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, as measurement result is more than predetermined resistance When, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that each or part only has slurry outlet 5 4 the second metal detection line of lower section pre-plugged 23 of sleeve, 23 one end of the second metal detection line is located at unicom intracavitary close to sleeve 4 Bottom and with connection reinforcing bar 11 do not contact, the other end of the second metal detection line 23 is located at outside unicom chamber sealing material 18, meanwhile, First metal detection line 60 is inserted into by the grout outlet 9 on 4 top of sleeve, one end of first metal detection line 60 passes through set Cylinder top slurry outlet 7 enters barrel bore, and the other end is drawn out to outside 13 surface of precast concrete from the grout outlet 9 of sleeve.
Such as Fig. 7 a, shown in 7b, the pre-buried sleeve 4 for being provided only with slurry outlet 7 in precast concrete 13;Unicom chamber is positioned at pre- The lower part of concrete component 13 processed, and positioned at the lower part of sleeve 4;Sleeve 4 be arranged on precast concrete 13 top or Person is arranged at the unicom chamber of 13 lower part of precast concrete;Concentrate unicom chamber sleeve described in grouting 22 unicom of duct, unicom Chamber is sealed using unicom chamber sealing material 18.It is preferred that vertical reinforcement sleeve grouting connector be arranged on precast concrete 13 it is left, Right both sides, or vertical reinforcement sleeve grouting connector are distributed (shown in Fig. 7 a) along 13 border of precast concrete.It is preferred that collection Middle grouting duct 22 is located at the top of precast concrete 13, and (Fig. 7 a between vertical reinforcement sleeve grouting connector It is shown);Or concentration grouting duct 22, the concentration grout hole are provided with the unicom chamber of 13 lower part of precast concrete Unicom chamber described in 22 unicom of road (shown in Fig. 7 b).Such as Fig. 7 a, shown in 7b, each vertical reinforcement sleeve grouting connector include sleeve 4, Connect reinforcing bar 11 and grout outlet 9;11 part of connection reinforcing bar is located in sleeve 4, and 4 top of sleeve is provided with slurry outlet 7,4 bottom of sleeve Portion's unicom unicom chamber, grout outlet 9 have pulp pore 5, and pulp pore 5 is located at 13 surface top of precast concrete, pulp Pipe 9 extend into the slurry outlet 7 in precast concrete 13 and 4 top of unicom sleeve, and grouting material is poured into out of grouting duct 22 12, grouting material 12 enters unicom chamber along concentration grouting duct 22, and the opening from 4 bottom of sleeve is entered in sleeve, and makes Grouting material 12 is distributed in unicom chamber, sleeve 4 and grout outlet 9.
The grouting material plumpness detection side of another precast concrete vertical reinforcement sleeve grouting connector of the present invention Method, comprises the following steps that:
1st, as shown in fig. 7, vertical reinforcement sleeve grouting connector pre-buried in precast concrete 13 is employed and is provided only with The sleeve 4 of the sleeve 4 of slurry outlet, only slurry outlet uses unicom chamber grouting construction process;Before the connection construction that is in the milk, unicom is used Chamber sealing material 18 carries out the horizontal joint border that 13 bottom of precast concrete and the upper surface of lower structures 15 are formed Sealing, at each one piece-root grafting head bottom metal of pre-plugged detection line 23, connector bottom only below the sleeve 4 of slurry outlet during sealing One end of portion's metal detection line 23 is located at unicom intracavitary and is set close to 4 bottom of sleeve, the other end of connector bottom metal detection line 23 Outside unicom chamber sealing material 18;Meanwhile another metal of special measurement device is inserted into by the pulp duct 5 on 4 top of sleeve Detect line 60, one end of the metal detection line 60 enters barrel bore through 4 top slurry outlet 7 of sleeve, and the other end is from sleeve 4 Grout outlet 9 be drawn out to outside the outer surface of precast concrete 13, then carry out grouting connection construction, sleeve grouting connection is applied Man-hour, the pulp pore 5 that 4 top slurry outlet 7 of sleeve is connected to 13 outer surface of precast concrete are blocked with closeouts 16, 36 after 12 initial set of grouting material it is interior still conductive when small when, remove the closeouts 16 of pulp pore 5;
2nd, using electric resistance measuring apparatus 1, the two poles of the earth measurement line gauge head of electric resistance measuring apparatus 1 is in the milk with same sleeve respectively Connector grout outlet is drawn out to another termination of the metal detection line 60 on precast concrete surface and by the sleeve bottom The connector bottom metal detection line 23 being connected to outside sealing material contacts, in 3 and two metal detection of gauge head of the measurement line 2 at the two poles of the earth Under conditions of the metal surface of line contacts at the same time, start electric resistance measuring apparatus and carry out resistance measurement, measurement result is in predetermined resistance When value is following, then it is assumed that the grouting material of sleeve grouting connector is full, and when being more than predetermined resistance such as measurement result, then judging should The end perimeter of metal detection line 60 does not have the grouting material of grouting material, i.e. sleeve grouting connector in sleeve grouting connector slurry outlet Plumpness does not meet quality requirement.
The electric resistance measuring apparatus 1 is megameter.
Embodiment 3
As shown in figure 8, the grouting material plumpness of anchor lap joint is starched in vertical reinforcement constraint in a kind of precast concrete Detection device, it includes special measurement device, and for measuring grouting material plumpness, the special measurement device is visited including metal Survey line 60 and electric resistance measuring apparatus 1, one end of metal detection line 60 are entered in connector reserving hole channel 25 through connector slurry outlet 7 Chamber, the other end are reached outside the prefabricated components surface, and the measurement line of electric resistance measuring apparatus connects the metal detection line 60 The surface of the other end and the grouting material 12 in the grouting pore 6 on precast concrete surface, to measure the metal detection line The resistance value between grouting material in 60 other end and the grouting pore 6 on precast concrete surface, measurement result is pre- When determining below resistance value, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, as measurement result is more than predetermined resistance When, then it is assumed that the grouting material plumpness of constraint slurry anchor lap joint does not meet quality requirement.It is preferred that the one of metal detection line 60 End passes through grout outlet 9, and enters connector slurry outlet 7, so as to be inserted into 25 inner cavity of connector reserving hole channel, the other end is drawn out to pre- Outside component surface grout outlet 9 processed.It is preferred that being provided with vertical reinforcement constraint slurry anchor lap joint in precast concrete 13, erect Include constraint reinforcing bar 24, reserving hole channel 25, top overlap joint connection reinforcing bar 26, lower part overlap joint to reinforced binding slurry anchor lap joint to connect Connect reinforcing bar 26;Lower part 26 part of overlap joint connection reinforcing bar is located in reserving hole channel 25, and overlaps 26 part of connection reinforcing bar weight with top It is folded;Reinforcing bar 24 is constrained respectively positioned at the periphery of overlap joint connection 26 lap of reinforcing bar, 25 upper connection slurry outlet of reserving hole channel, 7 He Lower connector grout hole 8 connects grout outlet 9 and grout pipe 10 respectively, and grout outlet 9 and grout pipe 10 have 5 He of pulp pore respectively Be in the milk pore 6, and grout outlet 9 is extend into precast concrete 13 and unicom reserving hole channel 25, and grout pipe 10 extend into prefabricated The interior simultaneously unicom reserving hole channel 25 of concrete component 13, pours into grouting material 12 into reserving hole channel 25, so that grouting from grout pipe 10 Material 12 is distributed in grout pipe 10, reserving hole channel 25 and grout outlet 9.
A kind of grouting material of vertical reinforcement constraint slurry anchor lap joint is full in a kind of precast concrete of the present invention Detection method is spent, is comprised the following steps that:
1st, before the vertical reinforcement constraint slurry anchor lap joint grouting connection construction of precast concrete 13, by connector top Pulp duct 9 be inserted into special measurement device metal detection line 60, one end of the metal detection line 60 passes through connector top Slurry outlet enters 25 inner cavity of reserving hole channel, and the other end is drawn out to outside prefabricated components surface from grout outlet, then carries out grouting connection Construction;After grouting, the pulp pore 5 and grouting pore 6 on precast concrete surface are connected to by constraint slurry anchor lap joint Blocked with closeouts 16, it is interior when 72-120 is small after 12 initial set of grouting material, remove pulp pore and the closure being in the milk in pore Part 16;
2nd, as shown in figure 8, using electric resistance measuring apparatus 1, the gauge head 3 of the two poles of the earth measurement line 2 of electric resistance measuring apparatus 1 is distinguished The metal detection line 60 on anchor lap joint top is starched with same constraint and is connected to the grout pipe on 13 surface of precast concrete 12 surface of grouting material contact in hole 6, in the metal detection line of the gauge head 3 and constraint slurry anchor lap joint of the measurement line 2 at the two poles of the earth 60 termination metals and grouting pore 6 in hardening 12 surface of grouting material at the same time contact under conditions of, start electric resistance measuring apparatus 1 into Row resistance measurement, when measurement result is below predetermined resistance, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, such as When measurement result is more than predetermined resistance, then judge at the other end of metal detection line 60 and pre- in constraint slurry anchor lap joint Box out 25 upper end does not have a grouting material, and the linkage section of 25 top of reserving hole channel and grout outlet 9, should there are air or vacuum chamber 17 The grouting material plumpness of slurry anchor lap joint does not meet quality requirement.
The electric resistance measuring apparatus 1 is universal meter.
The predetermined resistance value measurement method of embodiment 1-3 is as follows:As shown in figures 6 a and 6b, the predetermined resistance is to make Length is poured in more than or equal to the length of the sleeve 4 of either connector in component and grouting duct with the grouting material 12 of the connector In the plastic round tube of one interior walls be smooth of the sum of 10 length, and form the continuous grouting material band that maximum gauge is no more than 2.36mm After bar 28, in the conductive time range of the grouting material 12, the grouting material is measured using the electric resistance measuring apparatus 1 The maximum obtained during resistance value between 2 points of 28 both ends furthest apart of tape.
As shown in figures 6 a and 6b, poured using the grouting material identical with grouting material in the connector with insulating sheath First metal measures the end of line 60, is filled into and 10 internal diameter of grout pipe using the grouting material identical with grouting material in the connector In suitable plastic round tube 21, the first metal 60 end surface of measurement line is adhered to one layer of grouting material 12, formed in plastic tube 21 After the continuous grouting material column 28 consistent with bore, in the conductive time range of the grouting material, using described Between electric resistance measuring apparatus 1 measures at 2 points of 12 setpoint distance of grouting material adhered on 60 surface of the first metal measurement line respectively, And respective maximum is obtained during resistance value between 2 points of 28 both ends furthest apart of grouting material column, two maximums The sum of value is predetermined resistance.It is preferred that the predetermined resistance is one or more;It is preferred that the survey of the predetermined resistance Actual connector plumpness when measuring interval and the construction in 12 presetting period of time gap sample grouting material is basically identical when detecting;Institute Actual connector plumpness when stating environment temperature when predetermined resistance measures and construction is basically identical when detecting.First metal is surveyed The setpoint distance for measuring the grouting material 12 of 60 surface attachment of line enters sleeve 4 or reserving hole channel 25 for the precast concrete is interior Connection reinforcing bar 11 and 25 inner wall radial clearance of sleeve 4 or reserving hole channel maximum, the perfusion length of continuous grouting material column 28 Spend the length maximum that L is greater than or equal to the 13 nipple grout pipe 10 of precast concrete.Alternatively, the first metal measures The setpoint distance of the grouting material 12 of 60 surface attachment of line is to enter sleeve 4 or reserving hole channel 25 in the precast concrete Connect reinforcing bar 11 and the maximum of 25 inner wall radial clearance of sleeve 4 or reserving hole channel, the perfusion length L of continuous grouting material column 28 Surveyed more than or equal to the second metal of the bottom of any sleeve 4 in the precast concrete 13 and unicom intracavitary pre-plugged The maximum of air line distance between 23 termination of amount line.
The sleeve is made of structural steel, stainless steel, cast iron, cast steel, FRP or CFRP materials;The grouting material is not It is conductive during complete aquation, and do not have the grouting material of electric conductivity after aquation completely.Grout outlet grouting material is in barrel bore Pulpous state grouting material mixture can flow back to barrel bore when declining, but leftover slurry can be attached to pulp connector bottom and pulp connects At head and sleeve connection, metal measurement line sheath appearance also adheres to one layer of grouting material with above-mentioned reason, such as the grouting of these attachments Material and the inner wall of sleeve 4 take connection and conductive, may be measured with certain resistance value although barrel bore grouting material is not full Path, therefore predetermined resistance needs to consider the grouting material resistance value of these adhesions, is failed to judge with reducing.
Since conductivity of the different manufacturers grouting material product in hydration process is variant, in scene temperature and prefabricated components Environment also grouting material hydration reaction speed has been influenced, therefore predetermined electrical resistance value needs use site grouting material to make at the scene The detection sample and continuous grouting material column (28) of first metal measurement line (60) cross cut end (of a beam) attachment grouting (12), to determine inspection Insulation resistance preset value during survey, finally to judge quality.

Claims (9)

1. a kind of grouting material plumpness detection method, vertical reinforcement sleeve grouting connector preferably in a kind of precast concrete Grouting material plumpness detection method, measure grouting material plumpness using special measurement device, the special measurement device includes Set through sleeve slurry outlet (7) and is inserted into metal detection line (60) and electric resistance measuring apparatus (1), one end of metal detection line (60) Cylinder (4) inner cavity, the other end are reached outside the precast concrete surface, electric resistance measuring apparatus (1) measurement metal detection line (60) the resistance value between the grouting material (12) in the other end and the grouting pore (6) on precast concrete surface, is such as surveyed When measuring result below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, makes a reservation for as measurement result is more than During resistance value, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that the specific step of the method It is rapid as follows:
(1) before sleeve (4) grouting construction of precast concrete (13), by the metal detection line (60) of special measurement device One end is by grout outlet (9), and through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, metal detection line (60) other end stretches out To outside prefabricated components surface, grouting construction is then carried out, after grouting, sleeve is connected to the grout outlet on precast concrete surface Hole (5) and grouting pore (6) are blocked with closeouts (16), in a period of time after grouting material initial set, remove pulp pore (5) and the closeouts (16) in grouting pore (6);
(2) use the electric resistance measuring apparatus of special measurement device, by the two poles of the earth of electric resistance measuring apparatus measurement line gauge head (3) respectively with Grouting material surface contact in the other end and grouting pore (6) of the metal detection line (60) of same sleeve grouting connector, The filling of hardening in the measurement line gauge head (3) at the two poles of the earth and the other end metal of the metal detection line (60) and grouting pore (6) Under conditions of pulp surface contacts at the same time, start electric resistance measuring apparatus (1) and carry out resistance measurement, measurement result is in predetermined resistance When following, then it is assumed that the grouting material of sleeve grouting connector is full, when being more than predetermined resistance such as measurement result, then judges the set Grouting material (12) is discontinuous or not full in cylinder grouting connector, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet matter Amount requires.It is preferred that being provided with vertical reinforcement sleeve grouting connector in precast concrete (13), the grouting of vertical reinforcement sleeve connects Head includes sleeve (4), connection reinforcing bar (11), grout outlet (9) and grout pipe (10);Connection reinforcing bar (11) is partly located at sleeve (4) Interior, sleeve (4) top is provided with slurry outlet (7), and sleeve (4) lower part is provided with grout hole (8), grout outlet (9) and grout pipe (10) there is pulp pore (5) and grouting pore (6) respectively, pulp pore (5) is located on precast concrete (13) surface Portion, grouting pore (6) are located at precast concrete (13) surface lower portions, and grout outlet (9) extend into precast concrete (13) slurry outlet (7) in and unicom sleeve (4) top, grout pipe (10) is extend into precast concrete (13) and unicom The grout hole (8) of sleeve (4) lower part, grouting material (12) is poured into sleeve from grout pipe (10), so that grouting material (12) is distributed In in grout pipe (10), sleeve (4) and grout outlet (9).
2. a kind of grouting material plumpness detection method, is preferably vertical reinforcement sleeve grouting connector in a kind of precast concrete Grouting material plumpness detection method, the vertical reinforcement set of slurry outlet is provided only with preferably a kind of precast concrete again The grouting material plumpness detection method of cylinder grouting connector, grouting material plumpness, the special survey are measured using special measurement device Amount device includes the first metal detection line (60), the second metal detection line (23) and electric resistance measuring apparatus (1), the first metal detection One end of line (60) reaches the prefabricated components surface through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, the other end Outside, electric resistance measuring apparatus (1) measures the other end of first metal detection line (60) and is embedded in sleeve grouting connector bottom The resistance value between the second metal detection line (23) in grouting material, during such as measurement result below predetermined resistance, then it is assumed that The grouting material of sleeve grouting connector is full, when being more than predetermined resistance such as measurement result, then it is assumed that the filling of sleeve grouting connector Slurry plumpness does not meet quality requirement.It is preferred that the method comprises the following steps that:
(1) vertical reinforcement sleeve pre-buried in precast concrete grouting connector employs the sleeve for being provided only with slurry outlet (7) (4), before the connection construction that is in the milk, precast concrete bottom water flush joint border carried out with unicom chamber sealing material (18) close Feng Shi, each or part only have the second metal detection line of pre-plugged (23), the second metal below the sleeve (4) of slurry outlet (5) Detection line (23) one end is located at unicom intracavitary close to sleeve (4) bottom, and is not contacted with connection reinforcing bar (11), the second metal detection The other end of line (23) is located at unicom chamber sealing material (18) outside, meanwhile, as described in grout outlet (9) insertion on sleeve (4) top First metal detection line (60), one end of first metal detection line (60) enter sleeve through upper cartridge slurry outlet (7) Inner cavity, the other end are drawn out to outside 13 surface of precast concrete from the grout outlet (9) of sleeve, then carry out grouting construction;Fill After slurry, the pulp pore (5) that sleeve is connected to precast concrete surface is blocked with closeouts (16), after grouting material initial set A period of time in, remove the closeouts (16) in pulp pore (5);
(2) electric resistance measuring apparatus (1) is used, the two poles of the earth measurement line gauge head of electric resistance measuring apparatus is connect with the grouting of same sleeve respectively The other end of first metal detection line (60) and another end in contact of the second metal detection line (23) of head, at the two poles of the earth Under conditions of the metal surface contact at the same time for measuring line gauge head and the first and second metal detection lines (60,23), start resistance and survey Measure device and carry out resistance measurement, when measurement result is below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is satisfied It is full, when being more than predetermined resistance such as measurement result, then judge that grouting material (12) is discontinuous or not full in sleeve grouting connector, That is the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that only the sleeve of slurry outlet (7) uses unicom Chamber grouting construction process.It is preferred that the pre-buried sleeve (4) for being provided only with slurry outlet (7) in precast concrete (13);Sleeve (4) Arranged on left and right sides positioned at precast concrete (13), or sleeve (4) are distributed week along precast concrete (13) border Circle;Concentration grouting duct (22) is provided between the top of precast concrete (13) and sleeve (4), or prefabricated Concentration grouting duct (22) is provided with the unicom chamber of concrete component (13) lower part, it is described to concentrate grouting duct (22) unicom institute Unicom chamber is stated, unicom chamber is located at the bottom of sleeve (4), and unicom chamber is sealed using unicom chamber sealing material (18).It is preferred that vertical steel Muscle sleeve grouting connector is arranged on precast concrete (13) arranged on left and right sides, or vertical reinforcement sleeve be in the milk connector along Precast concrete (13) border is distributed.It is preferred that concentration grouting duct (22) is located at the top of precast concrete (13), And between vertical reinforcement sleeve grouting connector.It is preferred that each vertical reinforcement sleeve grouting connector includes sleeve (4), connects Connect reinforcing bar (11) and grout outlet (9);Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with slurry outlet (7), sleeve (4) bottom unicom unicom chamber, grout outlet (9) have pulp pore (5), and pulp pore (5) is located at precast concrete Component (13) surface top, grout outlet (9) extend into the slurry outlet in precast concrete (13) and unicom sleeve (4) top (7), grouting material (12) is poured into out of grouting duct (22), grouting material (12) enters unicom chamber along concentration grouting duct (22), And the opening from sleeve (4) bottom is entered in sleeve, and grouting material (12) is set to be distributed in unicom chamber, sleeve (4) and grout outlet (9) in.
3. a kind of grouting material plumpness detection method, is preferably vertical reinforcement constraint slurry anchor overlap joint in a kind of precast concrete The grouting material plumpness detection method of connector, grouting material plumpness, the special measurement device are measured using special measurement device Including metal detection line (60) and electric resistance measuring apparatus (1), one end of metal detection line (60) enters through connector slurry outlet (7) To connector reserving hole channel (25) inner cavity, the other end is reached outside the prefabricated components surface, and electric resistance measuring apparatus is measured by described The resistance value between grouting material in the grouting pore (6) on metal detection line (60) and precast concrete surface, measurement knot When fruit is below predetermined resistance, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, makes a reservation for as measurement result is more than During resistance value, then it is assumed that the grouting material plumpness of constraint slurry anchor lap joint does not meet quality requirement.It is preferred that the method Comprise the following steps that:
(1) before the reinforced binding slurry anchor overlap joint connection grouting construction of precast concrete, the metal of special measurement device is visited One end of survey line (60) enters connector slurry outlet (7) by grout outlet (9), so as to be inserted into connector reserving hole channel (25) Inner cavity, the other end is drawn out to prefabricated components surface grout outlet (9) outside, after grouting, the constraint slurry anchor lap joint top Pulp pore (5) and lower part grouting pore (10) are blocked with closeouts (16), in a period of time after grouting material initial set, are taken Lower top pulp pore (5) and the closeouts (16) of lower part grouting pore (10);
(2) use the electric resistance measuring apparatus of special measurement device, by the two poles of the earth of electric resistance measuring apparatus measurement line gauge head respectively with together Grouting material table in the other end and grouting pore (10) of the metal detection line (60) of one reinforced binding slurry anchor lap joint Face contacts, the grouting material table of hardening in the measurement line gauge head at the two poles of the earth and the metal of metal detection line (60) and grouting pore (10) Under conditions of face contacts at the same time, start electric resistance measuring apparatus (1) and carry out resistance measurement, measurement result is below predetermined resistance When, then it is assumed that the grouting material of constraint slurry anchor lap joint is full, when being more than predetermined resistance such as measurement result, then judges this about Grouting material (12) is discontinuous or not full in beam slurry anchor lap joint, i.e. the grouting material plumpness of the slurry anchor lap joint is not met Quality requirement.It is preferred that vertical reinforcement constraint slurry anchor lap joint, vertical reinforcement constraint are provided with precast concrete (13) Starching anchor lap joint includes constraint reinforcing bar (24), reserving hole channel (25), top overlap joint connection reinforcing bar (26), lower part overlap joint connection steel Muscle (26);Lower part overlap joint connection reinforcing bar (26) partly overlaps connection reinforcing bar (26) portion in reserving hole channel (25), and with top Divide overlapping;Reinforcing bar (24) is constrained respectively positioned at the periphery of overlap joint connection reinforcing bar (26) lap, and reserving hole channel (25) top connects Head slurry outlet (7) and lower connector grout hole (8) connect grout outlet (9) and grout pipe (10), grout outlet (9) and grout pipe respectively (10) there is pulp pore (5) and grouting pore (6) respectively, grout outlet (9) extend into precast concrete (13) in parallel Logical reserving hole channel (25), grout pipe (10) is extend into precast concrete (13) and unicom reserving hole channel (25), from grouting Pipe (10) pours into grouting material (12) into reserving hole channel (25), so that grouting material (12) is distributed in grout pipe (10), reserving hole channel (25) and in grout outlet (9).
4. a kind of grouting material plumpness detection device, is preferably vertical reinforcement sleeve grouting connector in a kind of precast concrete Grouting material plumpness detection device, it includes special measurement device, for detect grouting material plumpness, the special measurement Device includes metal detection line (60) and electric resistance measuring apparatus (1), and one end of metal detection line (60) passes through sleeve slurry outlet (7) And insertion sleeve (4) inner cavity, the other end are reached outside the prefabricated components surface, the measurement line difference of electric resistance measuring apparatus (1) Connect the table of the other end of metal detection line (60) and the grouting material (12) in the grouting pore (6) on precast concrete surface Face, to measure the other end of metal detection line (60) and the grouting material in the grouting pore (6) on precast concrete surface (12) resistance value between, during such as measurement result below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is satisfied It is full, when being more than predetermined resistance such as measurement result, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement. It is preferred that one end of metal detection line (60) is by grout outlet (9), it is golden through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity Belong to detection line (60) other end to reach outside prefabricated components surface.It is preferred that it is provided with vertical steel in precast concrete (13) Muscle sleeve grouting connector, vertical reinforcement sleeve grouting connector include sleeve (4), connection reinforcing bar (11), grout outlet (9) and grout pipe (10);Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with slurry outlet (7), and sleeve (4) lower part is set There is grout hole (8), grout outlet (9) and grout pipe (10) have pulp pore (5) and grouting pore (6), pulp pore (5) respectively Positioned at precast concrete (13) surface top, grouting pore (6) is located at precast concrete (13) surface lower portions, pulp Pipe (9) extend into the slurry outlet (7) in precast concrete (13) and unicom sleeve (4) top, and grout pipe (10) is extend into The grout hole (8) of in precast concrete (13) and unicom sleeve (4) lower part, grouting is poured into sleeve from grout pipe (10) Expect (12), so that grouting material (12) is distributed in grout pipe (10), sleeve (4) and grout outlet (9).
5. a kind of grouting material plumpness detection device, is preferably vertical reinforcement sleeve grouting connector in a kind of precast concrete Grouting material plumpness detection device, the vertical reinforcement set of slurry outlet is provided only with preferably a kind of precast concrete again The grouting material plumpness detection device of cylinder grouting connector, including special measurement device measurement, it is described to detect grouting material plumpness Special measurement device includes the first metal detection line (60), the second metal detection line (23) and electric resistance measuring apparatus (1), the first gold medal The one end for belonging to detection line (60) reaches the prefabricated components through sleeve slurry outlet (7) and insertion sleeve (4) inner cavity, the other end Outside surface, the measurement line of electric resistance measuring apparatus (1) connects the other end of first metal detection line (60) and is embedded in this respectively The second metal detection line (23) in the grouting material of sleeve grouting connector bottom, to measure the another of first metal detection line (60) Resistance value between one end and the second metal detection line (23) being embedded in the grouting material of sleeve grouting connector bottom, such as measurement knot When fruit is below predetermined resistance, then it is assumed that the grouting material of sleeve grouting connector is full, as measurement result is more than predetermined resistance During value, then it is assumed that the grouting material plumpness of sleeve grouting connector does not meet quality requirement.It is preferred that each or part only has slurry outlet (5) the second metal detection line of pre-plugged (23) below sleeve (4), the second metal detection line (23) one end is located at unicom intracavitary Do not contacted close to sleeve (4) bottom and with connection reinforcing bar (11), it is close that the other end of the second metal detection line (23) is located at unicom chamber Closure material (18) outside, meanwhile, first metal detection line (60) is inserted into by the grout outlet (9) on sleeve (4) top, described first One end of metal detection line (60) enters barrel bore, grout outlet (9) of the other end from sleeve through upper cartridge slurry outlet (7) It is drawn out to outside precast concrete (13) surface.It is preferred that only the sleeve of slurry outlet (7) uses unicom chamber grouting construction work Skill.It is preferred that the pre-buried sleeve (4) for being provided only with slurry outlet (7) in precast concrete (13);Sleeve (4) is located at concrete The arranged on left and right sides of native component (13), or sleeve (4) are distributed border along precast concrete (13) border;Prefabricated mixed Concentration grouting duct (22) is provided between the top of solidifying soil component (13) and sleeve (4), or in precast concrete (13) concentration grouting duct (22) is provided with the unicom chamber of lower part, it is described to concentrate unicom chamber described in grouting duct (22) unicom, Unicom chamber is located at the bottom of sleeve (4), and unicom chamber is sealed using unicom chamber sealing material (18).It is preferred that vertical reinforcement sleeve fills Slurry connector is arranged on precast concrete (13) arranged on left and right sides, or vertical reinforcement sleeve is in the milk connector along concrete Native component (13) border distribution.It is preferred that concentrating grouting duct (22) to be located at the top of precast concrete (13), and it is located at Between vertical reinforcement sleeve grouting connector.It is preferred that each vertical reinforcement sleeve grouting connector includes sleeve (4), connection reinforcing bar (11) and grout outlet (9);Reinforcing bar (11) is connected partly in sleeve (4), sleeve (4) top is provided with slurry outlet (7), sleeve (4) bottom unicom unicom chamber, grout outlet (9) have pulp pore (5), and pulp pore (5) is located at precast concrete (13) Surface top, grout outlet (9) extend into the slurry outlet (7) in precast concrete (13) and unicom sleeve (4) top, from filling Grouting material (12) is poured into slurry duct (22), and grouting material (12) is along concentrating grouting duct (22) to enter unicom chamber, and from sleeve (4) opening of bottom is entered in sleeve, and grouting material (12) is distributed in unicom chamber, sleeve (4) and grout outlet (9).
6. a kind of grouting material plumpness detection device, is preferably vertical reinforcement constraint slurry anchor overlap joint in a kind of precast concrete The grouting material plumpness detection device of connector, it includes special measurement device, described special for measuring grouting material plumpness Measuring device includes metal detection line (60) and electric resistance measuring apparatus (1), and one end of metal detection line (60) passes through connector pulp Hole (7) enters connector reserving hole channel (25) inner cavity, and the other end is reached outside the prefabricated components surface, electric resistance measuring apparatus Measure the other end of the line connection metal detection line (60) and the grouting in the grouting pore (6) on precast concrete surface The surface of (12) is expected, to measure the grouting pore of the other end of the metal detection line (60) and precast concrete surface (6) resistance value between grouting material in, when measurement result is below predetermined resistance, then it is assumed that anchor lap joint is starched in the constraint Grouting material it is full, when being more than predetermined resistance such as measurement result, then it is assumed that the constraint slurry anchor lap joint grouting material it is full Degree does not meet quality requirement.It is preferred that one end of metal detection line (60) is by grout outlet (9), and enter connector slurry outlet (7), so as to be inserted into connector reserving hole channel (25) inner cavity, the other end is drawn out to prefabricated components surface grout outlet (9) outside.It is preferred that Vertical reinforcement constraint slurry anchor lap joint, vertical reinforcement constraint slurry anchor lap joint bag are provided with precast concrete (13) Include constraint reinforcing bar (24), reserving hole channel (25), top overlap joint connection reinforcing bar (26), lower part overlap joint connection reinforcing bar (26);Take lower part Reinforcing bar (26) is connect in succession partly in reserving hole channel (25), and is overlapped connection reinforcing bar (26) with top and partly overlapped;Constrain steel Muscle (24) respectively positioned at overlap joint connection reinforcing bar (26) lap periphery, reserving hole channel (25) upper connection slurry outlet (7) and Lower connector grout hole (8) connects grout outlet (9) and grout pipe (10) respectively, and grout outlet (9) and grout pipe (10) have respectively Pulp pore (5) and grouting pore (6), grout outlet (9) is extend into precast concrete (13) and unicom reserving hole channel (25), grout pipe (10) is extend into precast concrete (13) and unicom reserving hole channel (25), from grout pipe (10) to pre- Boxing out, (25) are interior to pour into grouting material (12), so that grouting material (12) is distributed in grout pipe (10), reserving hole channel (25) and pulp Manage in (9).
7. the method or apparatus as described in one of claim 1-6, it is characterised in that the definite method of the predetermined resistance is such as Under:Poured using the grouting material identical with grouting material in the connector at the end of the first metal measurement line (60) with insulating sheath Portion, the plastic round tube (21) suitable with grout pipe (10) internal diameter is filled into using the grouting material identical with grouting material in the connector It is interior, the first metal measurement line (60) end surface is adhered to one layer of grouting material (12), formed and bore one in plastic tube (21) After the continuous grouting material column (28) caused, in the conductive time range of the grouting material, the resistance measurement is used Between device (1) measures at 2 points of grouting material (12) setpoint distance adhered on the first metal measurement line (60) surface respectively, with And respective maximum is obtained during resistance value between 2 points of grouting material column (28) both ends furthest apart, two maximums The sum of value is predetermined resistance.It is preferred that the predetermined resistance is one or more;It is preferred that the survey of the predetermined resistance Actual connector plumpness when measuring interval and the construction in time gap sample grouting material (12) presetting period is basically identical when detecting; Actual connector plumpness when environment temperature during predetermined resistance measurement and construction is basically identical when detecting.
8. the method for claim 7 or device, it is characterised in that the first metal measures the grouting of line (60) surface attachment The setpoint distance for expecting (12) is the interior connection reinforcing bar (11) for entering sleeve (4) or reserving hole channel (25) of the precast concrete It is big with sleeve (4) or the maximum of reserving hole channel (25) inner wall radial clearance, the perfusion length (L) of continuous grouting material column (28) In or equal to precast concrete (13) the nipple grout pipe (10) length maximum.Alternatively, the first metal measures The setpoint distance of the grouting material (12) of line (60) surface attachment enters sleeve (4) or preformed hole for the precast concrete is interior The connection reinforcing bar (11) in road (25) and sleeve (4) or the maximum of reserving hole channel (25) inner wall radial clearance, be continuously in the milk stock column The perfusion length (L) of bar (28) is greater than or equal to the bottom of any sleeve (4) and unicom in the precast concrete (13) The maximum of air line distance between the second metal measurement line (23) termination of intracavitary pre-plugged.
9. the method or apparatus as described in one of claim 1-8, it is characterised in that described a period of time is made by the connector It is interior when preferably 36-168 is small after grouting material initial set in the conductive time range of grouting material, it is preferably to fill again It is interior when 72-120 is small after slurry initial set.It is preferred that the electric resistance measuring apparatus is preferably resistance measurement instrument, it is preferably megaohm again Table or universal meter.It is preferred that the sleeve (4) is made of structural steel, stainless steel, cast iron, cast steel, FRP or CFRP materials;It is described Grouting material (12) for not complete aquation when it is conductive, and do not have the grouting material of electric conductivity after aquation completely.It is it is preferred that described Connector (19) that slurry outlet (7) is connected with grout outlet (9), grout outlet (9) are made by the good nonmetallic materials of insulation performance. It is preferred that, it is preferable that the predetermined resistance is 100-3000M Ω, is preferably 100-1500M Ω, again preferably 500M Ω, 800M Ω, 1000M Ω, 1500M Ω, 2000M Ω, 2500M Ω or 2800M Ω.It is preferred that on the special measurement device insertion connector Metal detection line (60) in the slurry outlet in portion is the electric wire with insulating sheath.It is preferred that the special measurement device insertion connects Head top slurry outlet in metal detection line end overcoat have surface it is smooth and made of insulating materials orbicule (61).It is excellent Choosing, when being more than predetermined resistance such as measurement result, then judges that the metal detection line end periphery in the insertion slurry outlet does not have There are grouting material or grouting material not full, determine whether that grouting material (12) is discontinuous or not full in the connector, i.e., described connector Grouting material plumpness do not meet quality requirement.
CN201711475080.6A 2017-12-29 2017-12-29 A kind of method and apparatus being detected using metal detection line to grouting material plumpness Pending CN108037158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711475080.6A CN108037158A (en) 2017-12-29 2017-12-29 A kind of method and apparatus being detected using metal detection line to grouting material plumpness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711475080.6A CN108037158A (en) 2017-12-29 2017-12-29 A kind of method and apparatus being detected using metal detection line to grouting material plumpness

Publications (1)

Publication Number Publication Date
CN108037158A true CN108037158A (en) 2018-05-15

Family

ID=62098096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711475080.6A Pending CN108037158A (en) 2017-12-29 2017-12-29 A kind of method and apparatus being detected using metal detection line to grouting material plumpness

Country Status (1)

Country Link
CN (1) CN108037158A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108801345A (en) * 2018-06-04 2018-11-13 广东省建筑科学研究院集团股份有限公司 The tandem sleeve grouting detection structures and methods of vertical prefabricated components
CN108801346A (en) * 2018-06-04 2018-11-13 广东省建筑科学研究院集团股份有限公司 The parallel sleeve grouting detection structures and methods of vertical prefabricated components
CN108802110A (en) * 2018-05-31 2018-11-13 宁波联城住工科技有限公司 Detection device and its detection method for measuring grout sleeve Grouted density
CN108827825A (en) * 2018-05-30 2018-11-16 广州建设工程质量安全检测中心有限公司 Grouting material compactness inspection system and detection method in a kind of reinforced bar sleeve
CN109374689A (en) * 2018-12-25 2019-02-22 中冶建筑研究总院有限公司 The device and method that grouting material plumpness is detected in a kind of pair of precast concrete
CN109387141A (en) * 2018-11-13 2019-02-26 中建安装工程有限公司 A kind of full grout sleeve anchorage length of steel bar detection device
CN109799283A (en) * 2019-01-16 2019-05-24 昆山市建设工程质量检测中心 A kind of method of quick judgement prefabricated concrete structure middle sleeve grouting full weight
CN109959683A (en) * 2019-04-18 2019-07-02 南通大学 A kind of detection method of sleeve Grouted density quality
CN110208329A (en) * 2019-06-24 2019-09-06 徐豫青 A kind of sleeve Grouted density detection method and device
CN110424571A (en) * 2019-07-29 2019-11-08 上海建工二建集团有限公司 Grouting sleeve wall structure and quality detection method thereof
CN110687165A (en) * 2019-10-15 2020-01-14 中北大学 Same-condition grouting sleeve test piece device and plumpness detection method
CN111983201A (en) * 2020-08-04 2020-11-24 上海建工集团股份有限公司 Electromagnetic type sleeve grouting construction stage slurry filling plumpness detection device and method
CN112014548A (en) * 2020-08-04 2020-12-01 上海建工集团股份有限公司 Slurry filling fullness detection device and method in mechanical sleeve grouting construction stage
CN113466294A (en) * 2021-06-15 2021-10-01 北京建筑大学 Slurry fullness detection equipment

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0245116A2 (en) * 1986-05-08 1987-11-11 Berger, Jenson and Nicholson Limited Apparatus and method for measuring resistivity
JPH06212708A (en) * 1993-01-13 1994-08-02 Kumagai Gumi Co Ltd Detecting method for filling ability of joint filling agent in concrete structure
JPH07145613A (en) * 1993-11-24 1995-06-06 Kumagai Gumi Co Ltd Method of detecting charged condition of filler in tunnel grouting and measuring instrument for the detection
JP2000230915A (en) * 1999-02-10 2000-08-22 Sumitomo Constr Co Ltd Apparatus and method for inspecting filling properties of grout
CN1837802A (en) * 2005-03-21 2006-09-27 陈彦平 Electrical resistivity survey method for monitoring construction quality of reinforce concrete and prestressed concrete
JP2009281102A (en) * 2008-05-26 2009-12-03 Takenaka Komuten Co Ltd Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same
CN102269725A (en) * 2011-05-10 2011-12-07 交通运输部公路科学研究所 Device and method for testing concrete pouring uniformity and compactness
CN103216044A (en) * 2012-01-20 2013-07-24 中冶建筑研究总院有限公司 Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
JP2014021010A (en) * 2012-07-20 2014-02-03 Ohbayashi Corp Filling detection apparatus for detecting filling of filling hardener, and method for checking filling
JP2014021009A (en) * 2012-07-20 2014-02-03 Ohbayashi Corp Filling detection apparatus for detecting filling of filling hardener, and method for checking filling
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
JP2015078490A (en) * 2013-10-15 2015-04-23 株式会社大林組 Method of confirming filling state of filler filling joint part of pc member
CN105019606A (en) * 2015-08-02 2015-11-04 长安大学 Precast concrete unit steel bar grouting connecting piece and connecting method
EP2947456A1 (en) * 2014-05-22 2015-11-25 Zensor BVBA Method for using a sensor for concrete monitoring, and method for positioning said sensor
CN105201148A (en) * 2014-06-26 2015-12-30 北京市建筑工程研究院有限责任公司 Split-type steel bar-sleeve semi-grouting joint
CN105223344A (en) * 2015-10-19 2016-01-06 北京智博联科技股份有限公司 A kind of method and detector detecting prefabricated concrete structure reinforced bar sleeve grouting plumpness
CN105298134A (en) * 2015-11-13 2016-02-03 中国建筑股份有限公司 Independent-grouting-opening-free reinforcing steel bar grouting connecting sleeve, system and construction method
CN105317168A (en) * 2014-06-26 2016-02-10 北京市建筑工程研究院有限责任公司 Split-type steel bar sleeve full-grouting joint
CN106124569A (en) * 2016-08-30 2016-11-16 北京智博联科技股份有限公司 A kind of for measuring the reinforced bar sleeve grouting probe of plumpness and method
CN106198641A (en) * 2016-08-30 2016-12-07 北京智博联科技股份有限公司 The probe of resistivity of media in measurement prefabricated concrete structure reinforced bar sleeve
CN106760224A (en) * 2016-11-25 2017-05-31 北京汇丰鸿信科技有限公司 One kind grouting shrinkage compensation process
CN106769441A (en) * 2016-11-15 2017-05-31 中国建筑科学研究院 Method for detecting solid strength and construction quality of grouting material for grouting connection of steel bar sleeve
CN208091964U (en) * 2017-12-29 2018-11-13 中冶建筑研究总院有限公司 A kind of device that grouting material plumpness is detected using metal detection line

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0245116A2 (en) * 1986-05-08 1987-11-11 Berger, Jenson and Nicholson Limited Apparatus and method for measuring resistivity
JPH06212708A (en) * 1993-01-13 1994-08-02 Kumagai Gumi Co Ltd Detecting method for filling ability of joint filling agent in concrete structure
JPH07145613A (en) * 1993-11-24 1995-06-06 Kumagai Gumi Co Ltd Method of detecting charged condition of filler in tunnel grouting and measuring instrument for the detection
JP2000230915A (en) * 1999-02-10 2000-08-22 Sumitomo Constr Co Ltd Apparatus and method for inspecting filling properties of grout
CN1837802A (en) * 2005-03-21 2006-09-27 陈彦平 Electrical resistivity survey method for monitoring construction quality of reinforce concrete and prestressed concrete
JP2009281102A (en) * 2008-05-26 2009-12-03 Takenaka Komuten Co Ltd Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same
CN102269725A (en) * 2011-05-10 2011-12-07 交通运输部公路科学研究所 Device and method for testing concrete pouring uniformity and compactness
CN103216044A (en) * 2012-01-20 2013-07-24 中冶建筑研究总院有限公司 Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
JP2014021010A (en) * 2012-07-20 2014-02-03 Ohbayashi Corp Filling detection apparatus for detecting filling of filling hardener, and method for checking filling
JP2014021009A (en) * 2012-07-20 2014-02-03 Ohbayashi Corp Filling detection apparatus for detecting filling of filling hardener, and method for checking filling
JP2015078490A (en) * 2013-10-15 2015-04-23 株式会社大林組 Method of confirming filling state of filler filling joint part of pc member
EP2947456A1 (en) * 2014-05-22 2015-11-25 Zensor BVBA Method for using a sensor for concrete monitoring, and method for positioning said sensor
CN105201148A (en) * 2014-06-26 2015-12-30 北京市建筑工程研究院有限责任公司 Split-type steel bar-sleeve semi-grouting joint
CN105317168A (en) * 2014-06-26 2016-02-10 北京市建筑工程研究院有限责任公司 Split-type steel bar sleeve full-grouting joint
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
CN105019606A (en) * 2015-08-02 2015-11-04 长安大学 Precast concrete unit steel bar grouting connecting piece and connecting method
CN105223344A (en) * 2015-10-19 2016-01-06 北京智博联科技股份有限公司 A kind of method and detector detecting prefabricated concrete structure reinforced bar sleeve grouting plumpness
CN105298134A (en) * 2015-11-13 2016-02-03 中国建筑股份有限公司 Independent-grouting-opening-free reinforcing steel bar grouting connecting sleeve, system and construction method
CN106124569A (en) * 2016-08-30 2016-11-16 北京智博联科技股份有限公司 A kind of for measuring the reinforced bar sleeve grouting probe of plumpness and method
CN106198641A (en) * 2016-08-30 2016-12-07 北京智博联科技股份有限公司 The probe of resistivity of media in measurement prefabricated concrete structure reinforced bar sleeve
CN106769441A (en) * 2016-11-15 2017-05-31 中国建筑科学研究院 Method for detecting solid strength and construction quality of grouting material for grouting connection of steel bar sleeve
CN106760224A (en) * 2016-11-25 2017-05-31 北京汇丰鸿信科技有限公司 One kind grouting shrinkage compensation process
CN208091964U (en) * 2017-12-29 2018-11-13 中冶建筑研究总院有限公司 A kind of device that grouting material plumpness is detected using metal detection line

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
王卓琳 等: "钢筋浆锚搭接连接灌浆密实度检测方法试验研究", 施工技术, vol. 46, no. 17, pages 15 - 19 *
王爱军;: "钢筋灌浆直螺纹连接技术及应用", 建筑机械化, no. 1 *
秦珩;钱冠龙;: "钢筋套筒灌浆连接施工质量控制措施", 施工技术, no. 14, pages 113 - 117 *
钱冠龙;: "PC构件用水泥灌浆直螺纹钢筋接头", 住宅产业, no. 06 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108827825B (en) * 2018-05-30 2021-11-12 广州建设工程质量安全检测中心有限公司 System and method for detecting compactness of grouting material in steel bar sleeve
CN108827825A (en) * 2018-05-30 2018-11-16 广州建设工程质量安全检测中心有限公司 Grouting material compactness inspection system and detection method in a kind of reinforced bar sleeve
CN108802110A (en) * 2018-05-31 2018-11-13 宁波联城住工科技有限公司 Detection device and its detection method for measuring grout sleeve Grouted density
CN108801346A (en) * 2018-06-04 2018-11-13 广东省建筑科学研究院集团股份有限公司 The parallel sleeve grouting detection structures and methods of vertical prefabricated components
CN108801345B (en) * 2018-06-04 2024-02-09 广东省建科建筑设计院有限公司 Tandem sleeve grouting detection structure and method for vertical prefabricated parts
CN108801345A (en) * 2018-06-04 2018-11-13 广东省建筑科学研究院集团股份有限公司 The tandem sleeve grouting detection structures and methods of vertical prefabricated components
CN108801346B (en) * 2018-06-04 2024-02-06 广东省建科建筑设计院有限公司 Parallel sleeve grouting detection structure and method for vertical prefabricated parts
CN109387141A (en) * 2018-11-13 2019-02-26 中建安装工程有限公司 A kind of full grout sleeve anchorage length of steel bar detection device
CN109387141B (en) * 2018-11-13 2024-03-08 中建安装工程有限公司 Full grouting sleeve steel bar anchoring length detection device
CN109374689A (en) * 2018-12-25 2019-02-22 中冶建筑研究总院有限公司 The device and method that grouting material plumpness is detected in a kind of pair of precast concrete
CN109374689B (en) * 2018-12-25 2024-04-05 中冶建筑研究总院有限公司 Device and method for detecting filling material fullness in precast concrete member
CN109799283B (en) * 2019-01-16 2019-09-03 昆山市建设工程质量检测中心 A kind of method of quick judgement prefabricated concrete structure middle sleeve grouting full weight
CN109799283A (en) * 2019-01-16 2019-05-24 昆山市建设工程质量检测中心 A kind of method of quick judgement prefabricated concrete structure middle sleeve grouting full weight
CN109959683A (en) * 2019-04-18 2019-07-02 南通大学 A kind of detection method of sleeve Grouted density quality
CN110208329A (en) * 2019-06-24 2019-09-06 徐豫青 A kind of sleeve Grouted density detection method and device
CN110424571A (en) * 2019-07-29 2019-11-08 上海建工二建集团有限公司 Grouting sleeve wall structure and quality detection method thereof
CN110687165A (en) * 2019-10-15 2020-01-14 中北大学 Same-condition grouting sleeve test piece device and plumpness detection method
CN111983201A (en) * 2020-08-04 2020-11-24 上海建工集团股份有限公司 Electromagnetic type sleeve grouting construction stage slurry filling plumpness detection device and method
CN112014548A (en) * 2020-08-04 2020-12-01 上海建工集团股份有限公司 Slurry filling fullness detection device and method in mechanical sleeve grouting construction stage
CN113466294A (en) * 2021-06-15 2021-10-01 北京建筑大学 Slurry fullness detection equipment

Similar Documents

Publication Publication Date Title
CN108037158A (en) A kind of method and apparatus being detected using metal detection line to grouting material plumpness
CN108051480A (en) A kind of grouting material plumpness detection method and device and grout sleeve
CN107991348A (en) A kind of grouting material plumpness detection method and device
CN208076437U (en) A kind of grouting material plumpness detection device, the detection device and grout sleeve for connecting reinforcing bar
CN208091964U (en) A kind of device that grouting material plumpness is detected using metal detection line
CN106501495B (en) The detection device and detection method of grouting material compactness in a kind of sleeve
CN104807497B (en) Immersed tube tunnel construction monitoring system and construction technology thereof
CN107478512A (en) A kind of detection means and detection method of sleeve grouting quality
CN107131862B (en) Rock-fill dam panel deformation monitoring device and construction method
CN108277926B (en) Slurry anchor connection part grouting plumpness detection method with detection hole
CN104374680B (en) Slip casting diffusion test device and its test method
CN103215975B (en) Inbuilt method for distributed type sensing cable in foundation pile
CN206038341U (en) Test device of simulation tunnel internal water pressure
CN109959683A (en) A kind of detection method of sleeve Grouted density quality
CN108593721A (en) Method and device for detecting whether full grouting sleeve is full by resistance method
CN109856143A (en) A method of detection prefabricated concrete structure sleeve grouting quality
CN105275024B (en) Defective Big-Diameter Rock-Embedded Pile vertical bearing capacity detection and the method reinforced
CN108801345A (en) The tandem sleeve grouting detection structures and methods of vertical prefabricated components
CN208091963U (en) A kind of grouting material plumpness detection device
CN111122605B (en) Method for detecting fullness of grouting sleeve by adopting endoscope method
CN210032352U (en) Steel bar sleeve with grouting quality monitoring device
CN108678036A (en) The detecting system installation method of the lateral soil pressure of bored concrete pile
CN105780825B (en) A kind of pile foundation construction environmental Kuznets Curves and evaluation method based on autobalanced detection experiment
CN105424485A (en) Concrete filled steel tube arch grouting test system and test method
CN216246231U (en) Quantitative measuring device for grouting fullness of sleeve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination