CN107993000A - The method of construction main flat face dynamic coordinate management based on BIM - Google Patents
The method of construction main flat face dynamic coordinate management based on BIM Download PDFInfo
- Publication number
- CN107993000A CN107993000A CN201711204392.3A CN201711204392A CN107993000A CN 107993000 A CN107993000 A CN 107993000A CN 201711204392 A CN201711204392 A CN 201711204392A CN 107993000 A CN107993000 A CN 107993000A
- Authority
- CN
- China
- Prior art keywords
- construction
- bim
- flat face
- main flat
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 126
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000012545 processing Methods 0.000 claims abstract description 4
- 230000008569 process Effects 0.000 claims description 7
- 230000004044 response Effects 0.000 claims description 6
- 238000012800 visualization Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 description 17
- 238000005516 engineering process Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 230000008859 change Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 101710091102 Probable cinnamyl alcohol dehydrogenase 2 Proteins 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000009049 secondary transport Effects 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Computer Graphics (AREA)
- Geometry (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to the method for the construction main flat face dynamic coordinate management based on BIM, including:A. the required data information of the construction main flat face arrangement of each construction stage is collected, establishes the BIM models race storehouse of construction horizontal layout;B. the field management flow in the construction main flat face based on BIM is worked out;C. general contracting unit establishes the construction site BIM models of different construction stages;D. construction main flat face arrangement is formulated according to the actual conditions of BIM models and construction site;E. the construction site BIM models of each construction stage are utilized, gather the real time video data of construction site, real-time task are received by internet issue and mobile terminal, and task processing information is fed back by Field Force.The present invention, which realizes, to be carried out each stage of constructing efficiently, rationally, dynamically to arrange each effectively function of plane and usage time, also achieve and construction site is dynamically managed in real time, the work efficiency that construction site plane is coordinated is greatly improved, has dramatically speeded up construction speed.
Description
Technical field
Concretely it is the side of the construction main flat face dynamic coordinate management based on BIM the present invention relates to execution management method therefor
Method.
Background technology
Construction plane coordinated management is the important component in General Construction Contract Management, is basis and the premise of project construction.
Rational planning and coordinate scheme just can reduce security risk at the beginning of project starts from source, be to facilitate subsequent construction pipe
The important way manage, reduce cost, improved Project Benefit.
Static construction plane coordinated management under conventional two-dimensional pattern is all often site technology director according to scene
CAD 2 d plane pictures are stacked and checked, and combination on-site actual situations and construction experience determine Layout and draw two dimension
Layout drawing, is based on two-dimensional arrangement figure progress communication exchange with each professional subcontractor and determines final scheme.This mode is in face of multiple
The related specifications such as miscellaneous surrounding enviroment, large scale equipment mobile route, the type selecting of group's tower and preferred arrangement and security against fire civilization
Just there is significant limitation during the problems such as degree of understanding and efficiency are linked up between accordance, and each side.
Meanwhile construction site activity is the process of a dynamic change in itself, construction site to the demand of material installation, can
Place space utilized etc. is also to change with continuous promote of project construction, it is this generally use without reference to project into
Spend the static arrangement scheme carried out, it is more likely that become discomfort answers the demand of project construction, it is also difficult to coordinates each subpackage for applying
The construction demand of work plane different phase, ultimately results in the planning again that must be carried out to whole construction site layout scheme repeatedly.
So necessarily put into more human and material resources and carried and removed work, therefore not only cause substantial amounts of economic loss, together
When be greatly reduced the construction period.
Therefore, to a certain extent cannot be complete by plane coordinated management method of constructing under conventional two-dimensional pattern
Meets the needs of constructing now.
The content of the invention
The present invention provides a kind of method of the construction main flat face dynamic coordinate management based on BIM, by BIM technology to applying
Work scene general layout carries out threedimensional model establishment, and each stage of constructing is carried out efficiently, rationally, dynamically to arrange each effectively plane
Function and usage time, ensure that engineering high quality is completed.
The method of construction main flat face dynamic coordinate management of the invention based on BIM, including:
A. the influence factor according to involved by each construction stage, collects the required data information of construction main flat face arrangement,
By BIM (Building Information Modelling) software, (such as Autodesk Revit, wide connection reach modelling
Software, skechup etc.) establish construction horizontal layout BIM models race storehouse;
B. always wrapped according to project and divided the work with the existing organizational structure of subpackage and personnel, work out the construction main flat face based on BIM
Field management flow;
C. general contracting unit establishes different construction ranks according to construction each stage and each professional subpackage to the demand in construction main flat face
The construction site BIM models of section;
D. general contracting unit formulates construction main flat face arrangement according to the actual conditions of BIM models and construction site;
E. general contracting unit utilizes the construction site BIM models of each construction stage, gathers the real time video data of construction site,
The arrangement information of real-time task is received by the mobile terminal of internet issue and construction site, and interconnection is passed through by Field Force
Net feedback task processing information.
By using BIM technology, general contracting unit can consider and each professional subpackage of each stage that arranges to construct is to total flat
The demand in face, effectively reduction arrangement is unreasonable, does not meet the occurrence of specification, quick to site layout project scheme rationality
Assessment.And general contracting unit can also be made each participant of project to each construction area by the interaction of BIM models and build item
Mesh preparation has practical understanding, lays the foundation for subsequent construction, effectively increases construction efficiency and quality.
Further, the field management flow includes flow chart and explanatory note in stepb, makes process description
It is apparent understandable.
Further, in step C, construction main flat face placement information of the general contracting unit in step A, by the dynamic of construction
Process is divided into some construction stages, and the demand of each construction stage general layout is provided by each professional subpackage, and described in invocation step A
BIM models race storehouse, the construction site model of each construction stage is established by BIM softwares.
Further, in step D general contracting unit according to the visualization functions of BIM models to the actual conditions of construction site into
Row analysis.
Further, general contracting unit obtains the quantities of each construction stage by the statistical functions of BIM models in step D,
Quantities report is formed, and judges whether cost meets the requirements.
On this basis, step E includes carrying out Quick Response Code management to equipment, and to the entry/exit field situation of the equipment
The barcode scanning registration of Quick Response Code is carried out, the information after barcode scanning grade is fed back into BIM models, for reflecting the demand feelings of construction site
Condition.
The method of construction main flat face dynamic coordinate management of the invention based on BIM, always puts down construction site by BIM technology
Face carries out threedimensional model establishment, realizes the function of carrying out efficiently, rationally, dynamically arranging each effectively plane to each stage of constructing
Effect and usage time, also achieve and construction site are dynamically managed in real time, are greatly improved what construction site plane was coordinated
Work efficiency, has dramatically speeded up construction speed.
Embodiment with reference to embodiments, is described in further detail the above of the present invention again.
But the scope that this should not be interpreted as to the above-mentioned theme of the present invention is only limitted to following example.Think not departing from the above-mentioned technology of the present invention
In the case of thinking, the various replacements or change made according to ordinary skill knowledge and customary means, should all be included in this hair
In bright scope.
Embodiment
The method of construction main flat face dynamic coordinate management of the invention based on BIM, including:
A. according to the site topography of each construction stage, existing building facility, surrounding enviroment, construction area, temporary road, face
When facility, machining area, material stockyard, face near water influence that electricity, construction machinery, safety construction facility etc. related to because
Element, by BIM (Building Information Modelling) software, (such as Autodesk Revit, wide connection reach model
Design software, skechup etc.) establish the BIM models race storehouse of construction horizontal layout, and with construction site information, such as plan file,
Report, GIS data, electronic map etc., construction drawing design drawing, construction drawing design model or Deepen Design model of constructing are surveyed in ground,
Construction site planning, construction equipment type selecting, tower crane type selecting, the tentative programme for facing electricity etc. near water, as construction main flat face cloth
The foundation put;
B. always wrapped according to project and divided the work with the existing organizational structure of subpackage and personnel, work out the construction main flat face based on BIM
Field management flow, field management flow includes flow chart and explanatory note, makes process description apparent understandable;
C. construction main flat face placement information of the general contracting unit in step A, the dynamic process of construction is divided into some
Construction stage, the demand of each construction stage general layout, and the BIM models race storehouse described in invocation step A are provided by each professional subpackage,
By corresponding BIM softwares, (such as Autodesk Revit, wide connection reach the three-dimensional construction planning of three-dimensional place deploying software, the BIM that sips tea
Software) establish the construction site model of each construction stage;
D. general contracting unit formulates construction main flat face arrangement according to the actual conditions of BIM models and construction site, wherein
The actual conditions of construction site can be analyzed according to the visualization function of BIM models, the system of BIM models can also be passed through
The quantities of gain-of-function each construction stage is counted, forms quantities report, and judge whether cost meets the requirements.To site layout project
After the rationality assessment of scheme and modification and perfection, whole D CAD layout drawing is extracted from BIM models and each component is detailed
Construct way figure, guiding construction.Then construction main flat face arrangement is examined by supervisor and developer, after modification and perfection
Form final scheme;
E. general contracting unit utilizes the construction site BIM models of each construction stage, gathers the real time video data of construction site,
The arrangement information of real-time task is received by the mobile terminal of internet issue and construction site, and interconnection is passed through by Field Force
Net feedback task processing information.Which includes carrying out Quick Response Code management to equipment, and to the entry/exit field situation of the equipment into
The barcode scanning registration of row Quick Response Code, feeds back to BIM models, for reflecting the demand feelings of construction site by the information after barcode scanning grade
Condition.It is rationally efficient to arrange task by directly managing and controlling to construction site, avoid the two of material and construction member
Secondary transport and repeated vertical transport, shorten the material transportation time.
Claims (6)
1. the method for the construction main flat face dynamic coordinate management based on BIM, its feature include:
A. the influence factor according to involved by each construction stage, collects the required data information of construction main flat face arrangement, passes through
BIM softwares establish the BIM models race storehouse of construction horizontal layout;
B. always wrapped according to project and divided the work with the existing organizational structure of subpackage and personnel, work out showing for the construction main flat face based on BIM
Field management process;
C. general contracting unit establishes the different construction stages according to construction each stage and each professional subpackage to the demand in construction main flat face
Construction site BIM models;
D. general contracting unit formulates construction main flat face arrangement according to the actual conditions of BIM models and construction site;
E. general contracting unit utilizes the construction site BIM models of each construction stage, gathers the real time video data of construction site, passes through
Internet is issued and the mobile terminal of construction site receives the arrangement information of real-time task, and anti-by internet by Field Force
Present task processing information.
2. the method for the construction main flat face dynamic coordinate management based on BIM as claimed in claim 1, it is characterized in that:In step B
Described in field management flow include flow chart and explanatory note.
3. the method for the construction main flat face dynamic coordinate management based on BIM as claimed in claim 1, it is characterized in that:Step C
In, construction main flat face placement information of the general contracting unit in step A, some construction ranks are divided into by the dynamic process of construction
Section, the demand of each construction stage general layout, and the BIM models race storehouse described in invocation step A are provided by each professional subpackage, is passed through
BIM softwares establish the construction site model of each construction stage.
4. the method for the construction main flat face dynamic coordinate management based on BIM as claimed in claim 1, it is characterized in that:In step D
General contracting unit analyzes the actual conditions of construction site according to the visualization function of BIM models.
5. the method for the construction main flat face dynamic coordinate management based on BIM as claimed in claim 1, it is characterized in that:In step D
General contracting unit obtains the quantities of each construction stage by the statistical function of BIM models, forms quantities report, and judge cost
Whether meet the requirements.
6. the method for the construction main flat face dynamic coordinate management based on BIM as described in one of claim 1 to 5, it is characterized in that:
Step E includes carrying out equipment Quick Response Code management, and the barcode scanning of the entry/exit field situation progress Quick Response Code of the equipment is stepped on
Note, feeds back to BIM models, for reflecting the conditions of demand of construction site by the information after barcode scanning grade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711204392.3A CN107993000A (en) | 2017-11-27 | 2017-11-27 | The method of construction main flat face dynamic coordinate management based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711204392.3A CN107993000A (en) | 2017-11-27 | 2017-11-27 | The method of construction main flat face dynamic coordinate management based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107993000A true CN107993000A (en) | 2018-05-04 |
Family
ID=62033130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711204392.3A Pending CN107993000A (en) | 2017-11-27 | 2017-11-27 | The method of construction main flat face dynamic coordinate management based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107993000A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108875167A (en) * | 2018-06-04 | 2018-11-23 | 中国十七冶集团有限公司 | A kind of construction site three dimensional arrangement optimization method based on BIM technology |
CN109086490A (en) * | 2018-07-04 | 2018-12-25 | 中国二十冶集团有限公司 | A kind of tower crane type selecting method for arranging of the assembled engineering based on BIM technology |
CN109492875A (en) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | Construction site role's management-control method based on BIM |
CN109816263A (en) * | 2019-02-01 | 2019-05-28 | 南通四建集团有限公司 | A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision |
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
CN110941867A (en) * | 2019-11-07 | 2020-03-31 | 广东龙越建筑工程有限公司 | Construction method of standardized site layout based on BIM |
CN111125820A (en) * | 2019-12-16 | 2020-05-08 | 福建建工集团有限责任公司 | BIM + GIS-based construction site space virtual construction method |
CN111210199A (en) * | 2020-01-03 | 2020-05-29 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111443885A (en) * | 2020-05-14 | 2020-07-24 | 河北建设集团股份有限公司 | Interactive construction site plane arrangement system and arrangement method |
CN112115535A (en) * | 2020-09-09 | 2020-12-22 | 中国五冶集团有限公司 | Construction general plan dynamic simulation arrangement method based on BIM and photography technology |
CN112381522A (en) * | 2020-11-24 | 2021-02-19 | 正太集团有限公司 | BIM-based site layout dynamic management and control method and system |
CN112465390A (en) * | 2020-12-10 | 2021-03-09 | 中铁一局集团第二工程有限公司 | BIM-based subway station construction progress management method |
CN113189621A (en) * | 2021-05-10 | 2021-07-30 | 中建三局集团华南有限公司 | Construction plane transportation management tool based on BIM and big dipper |
CN114722473A (en) * | 2022-04-18 | 2022-07-08 | 国网北京市电力公司 | Construction site arrangement method, device, equipment and medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484524A (en) * | 2014-12-09 | 2015-04-01 | 张家驰 | Method and system based on BIM (building information modeling) simulation model and in-site construction interaction |
CN106951583A (en) * | 2017-02-08 | 2017-07-14 | 中国建筑第八工程局有限公司 | Based on method of the BIM technology to job site monitoring camera virtual arrangement |
-
2017
- 2017-11-27 CN CN201711204392.3A patent/CN107993000A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484524A (en) * | 2014-12-09 | 2015-04-01 | 张家驰 | Method and system based on BIM (building information modeling) simulation model and in-site construction interaction |
CN106951583A (en) * | 2017-02-08 | 2017-07-14 | 中国建筑第八工程局有限公司 | Based on method of the BIM technology to job site monitoring camera virtual arrangement |
Non-Patent Citations (1)
Title |
---|
杜卉: "BIM技术在总承包单位工程管理中的应用研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108875167A (en) * | 2018-06-04 | 2018-11-23 | 中国十七冶集团有限公司 | A kind of construction site three dimensional arrangement optimization method based on BIM technology |
CN109086490A (en) * | 2018-07-04 | 2018-12-25 | 中国二十冶集团有限公司 | A kind of tower crane type selecting method for arranging of the assembled engineering based on BIM technology |
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
CN109492875A (en) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | Construction site role's management-control method based on BIM |
CN109816263A (en) * | 2019-02-01 | 2019-05-28 | 南通四建集团有限公司 | A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision |
CN110941867A (en) * | 2019-11-07 | 2020-03-31 | 广东龙越建筑工程有限公司 | Construction method of standardized site layout based on BIM |
CN111125820A (en) * | 2019-12-16 | 2020-05-08 | 福建建工集团有限责任公司 | BIM + GIS-based construction site space virtual construction method |
CN111125820B (en) * | 2019-12-16 | 2023-06-02 | 福建建工集团有限责任公司 | BIM+GIS-based construction site space virtual construction method |
CN111210199B (en) * | 2020-01-03 | 2022-06-07 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111210199A (en) * | 2020-01-03 | 2020-05-29 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111443885A (en) * | 2020-05-14 | 2020-07-24 | 河北建设集团股份有限公司 | Interactive construction site plane arrangement system and arrangement method |
CN112115535A (en) * | 2020-09-09 | 2020-12-22 | 中国五冶集团有限公司 | Construction general plan dynamic simulation arrangement method based on BIM and photography technology |
CN112381522A (en) * | 2020-11-24 | 2021-02-19 | 正太集团有限公司 | BIM-based site layout dynamic management and control method and system |
CN112465390A (en) * | 2020-12-10 | 2021-03-09 | 中铁一局集团第二工程有限公司 | BIM-based subway station construction progress management method |
CN113189621A (en) * | 2021-05-10 | 2021-07-30 | 中建三局集团华南有限公司 | Construction plane transportation management tool based on BIM and big dipper |
CN114722473A (en) * | 2022-04-18 | 2022-07-08 | 国网北京市电力公司 | Construction site arrangement method, device, equipment and medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107993000A (en) | The method of construction main flat face dynamic coordinate management based on BIM | |
Elbeltagi et al. | Integrated visualized time control system for repetitive construction projects | |
Jupp | 4D BIM for environmental planning and management | |
CN109557934B (en) | Unmanned aerial vehicle cruise control method and device based on fabricated building platform | |
Chen et al. | A framework for an automated and integrated project scheduling and management system | |
Getuli et al. | A BIM-based construction supply chain framework for monitoring progress and coordination of site activities | |
CN111861358A (en) | Building information integration platform based on BIM technology | |
CN104468778B (en) | A kind of cloud manufacturing execution system and its manufacture execution method based on cloud service | |
CN103984333A (en) | Monitoring and management system for power plant | |
WO2020056669A1 (en) | Control method and apparatus for unmanned aerial vehicle cruise based on prefabricated building platform | |
CN109558412A (en) | The data growing method and device of assembled architecture construct platform | |
CN106910009A (en) | Construction manpower management system based on BIM technology and its method for manpower management of constructing | |
CN109559069A (en) | Production management method, apparatus and terminal device based on assembled architecture platform | |
CN111223178B (en) | Three-dimensional model application method and system for nuclear power engineering modularization construction | |
Yu et al. | RIOMS: An intelligent system for operation and maintenance of urban roads using spatio-temporal data in smart cities | |
CN108564347A (en) | Overhaul whole process management system and lean inspection base | |
KR20160041281A (en) | Construction work management system based on BIM and management method of the same | |
CN109522661A (en) | A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system | |
Fernandes | Advantages and disadvantages of BIM platforms on construction site | |
CN109389358A (en) | Project management system and method based on GIS | |
CN110717685A (en) | Building material management system and method | |
CN109559070A (en) | The equipment production information management method and device of assembled architecture platform | |
CN110019435A (en) | Data processing method and system based on assembled architecture platform | |
CN113610389A (en) | Prefabricated part production quality management system based on BIM and RFID | |
Laurini et al. | Technology 4.0 for buildings management: from building site to the interactive building book |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180504 |
|
RJ01 | Rejection of invention patent application after publication |