Resource-saving building construction method
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a resource-saving building construction method.
Background
With the acceleration of social development footsteps, the requirements of building various buildings are more and more. In the process of building construction, a large amount of concrete needs to be used, and the concrete needs to use a large amount of nonrenewable resources such as broken stones and sand, so that in the process of continuously increasing the number of buildings and the construction speed, the requirements for the two resources of broken stones and sand are increasingly large, the two resources are in shortage, and other resources are urgently needed to replace broken stones and sand to prevent the resource shortage.
Disclosure of Invention
The invention provides a resource-saving building construction method which can replace non-renewable resources by waste resources in order to overcome the defects of the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme: a building construction method for saving resources comprises the following steps:
(1) crushing the construction waste by a crushing device to obtain crushed stone, and storing 20-40% of the crushed stone for later use; 60% -80% of the broken stones are made into sand by a sand making machine;
(2) uniformly mixing the sand, the cement and the water in a mixer to obtain concrete A, and molding the concrete A into a concrete brick by injection molding;
(3) adding the crushed stone prepared in the step (1) into the residual concrete A in the step (2), and uniformly stirring the crushed stone again through a stirrer to obtain concrete B;
(4) and (3) erecting a reinforcing steel frame, building a brick wall by adopting the concrete prepared in the step (2), and then pouring concrete B into the reinforcing steel frame to obtain the wall after the concrete is solidified.
According to the invention, the broken stone is obtained by crushing the building waste, and the sand is obtained after sand making, so that the broken stone and the sand which are required to be used in concrete in the building construction process can be directly replaced, the waste of natural ecological resources caused by engineering construction is effectively reduced, the condition that the nonrenewable resources are in shortage is avoided, the natural resources are saved, and the damage to ecological balance is avoided; and the construction waste is put back to the engineering construction for use again, so that waste utilization is realized, the utilization rate of waste resources is improved, the treatment of the waste resources is effectively avoided, the cost expenditure for treating the waste resources in the engineering construction process is reduced, the engineering cost input is reduced, the construction efficiency is improved, and the engineering period is greatly shortened.
Further, the method also comprises the step (5): processing quartzite and then crushing to obtain quartz sand; then mixing the quartz sand, the sand prepared in the step (1), cement and water through a mixer to prepare mortar; the quartz sand is used as the raw material of the mortar, so that the acid resistance and the corrosion resistance of the concrete are effectively enhanced, the manufactured mortar has the characteristic of good acid corrosion resistance, the wall surface obtained by construction is not easy to fall off or be corroded, and the service life of the wall body obtained by construction is long.
Further, the method also comprises the step (6): plastering the surface of the wall by adopting the mortar prepared in the step (5), then leveling the wall by using putty, and finally coating emulsion paint on the wall; after the putty is leveled, the wall surface is leveled, so that the wall surface has good flatness, and the flatness of the wall surface is high after the emulsion paint is coated.
Further, the treatment of the quartz stone comprises the following steps:
a: washing the quartzite with clean water, draining the quartzite, and drying the quartzite by a dryer;
b, crushing the dried quartzite by using an edge runner mill, and sieving the crushed quartzite by using a 120-mesh sieve to obtain quartzite sand; part of impurities in the quartzite are effectively removed through water washing, so that the prepared quartz sand is purer, and the acid resistance is more excellent; the grinding is carried out by the edge runner mill, and the grinding wheel of the edge runner mill can be made of quartz, so that metal cannot be mixed into quartz sand in the grinding process, and the purity of finally prepared mortar is further improved.
Further, in the step (5), the temperature of the mixer is maintained at 65-70 ℃, the pressure is maintained at 1-1.2mpa, and the mixing time is 30-40 min; after multiple experiments, when the temperature is lower than 65 ℃, the pressure is lower than 1mpa, and the mixing time is lower than 30min, the finally obtained mortar is difficult to reach a viscous colloid shape, the prepared mortar has poor performance, the acid corrosion resistance can only reach 60% of that of quartzite, and the corrosion resistance of the finally prepared concrete is greatly influenced; when the temperature is higher than 70 ℃, the pressure is higher than 1.2mpa, and the mixing time is higher than 40min, experiments show that even if the reaction continues, the mixing degree and the performance of the quartz stone mortar are in a slow state, and basically no improvement exists, so that the excessive reaction only causes the waste of energy; only when the temperature is maintained at 65-70 ℃, the pressure is maintained at 1-1.2mpa, and the mixing time is 30-40min, the best performance of the finally obtained mortar can be ensured under the condition of the most appropriate energy consumption.
Furthermore, the crushing device comprises a first crushing chamber, a second crushing chamber, a first discharging part and a second discharging part, wherein the first crushing chamber and the second crushing chamber are communicated with each other; the first ejection of compact portion of leading to is equipped with filter, with this filter matched with vibration piece and be used for will piling up the waste material eduction gear of the first ejection of compact portion of the material of filtering outwards discharging. According to the invention, through the arrangement of the waste discharging device, materials screened and filtered on the filtering element can be automatically discharged outwards, and cannot be accumulated on the filtering element to block the filtering element, so that the normal operation of equipment is ensured, the failure rate is low, and the service life is long; need not the manual work and clear up the material of piling up on filtering the piece, the reduction of very big degree workman's work load, what have reduced simultaneously piles up that the material is handled consuming time, effectively improves work efficiency.
Furthermore, a cavity is arranged on the side wall of one side of the first discharging part, a waste discharging port is arranged on the side wall of the first discharging part corresponding to the opposite side of the cavity, one end of the filter element penetrates into the cavity, and the other end of the filter element penetrates into the waste discharging port; accessible cavity bottom supports the both ends of filtering the piece to the condition that shifts appears when piling up too much material on preventing to filter, avoids equipment to break down.
Furthermore, the waste discharge device comprises a plugging piece matched with the waste discharge port, two movable pieces arranged on the plugging piece and a driving piece matched with the movable pieces; the two movable pieces are respectively arranged on the left side wall and the right side wall of the plugging piece; when the materials need to be discharged, the movable piece can move along the driving piece, so that the plugging piece is driven to leave the waste discharge port, the waste discharge port is opened, and the waste materials can be discharged outwards.
Furthermore, the driving piece comprises two extending parts arranged on the outer wall of the first discharging part, a first driving rail arranged on the side wall of the waste discharging port and a second driving rail arranged on the extending parts; when the plugging piece moves outwards, the movable piece can move downwards along the extending part, so that the plugging piece is driven to move downwards, one end of the filter piece is driven to move downwards, the filter piece is obliquely arranged in the first discharging part, and materials accumulated at the upper end of the filter piece can roll down along the oblique angle of the filter piece, so that the materials are automatically discharged from the waste discharging port; the vibrating piece can drive the filter piece to rotate in the discharging process, so that the materials are discharged more smoothly.
Furthermore, one end of the filter element penetrating into the waste material outlet is connected with the plugging element through a connecting element.
Furthermore, the connecting piece is made of flexible materials, and an elastic section which can stretch under the action of external force is arranged on the connecting piece; one end of the connecting piece is connected with the filtering piece through a first connecting structure, and the other end of the connecting piece is connected with the plugging piece through a second connecting structure; when the shutoff piece outwards removed, the elasticity section will be elongated to filter the position of piece and can not take place to remove, avoid appearing filtering the outside removal of piece and deviate from the cavity, and then filter the condition that the piece tip dropped downwards, avoid equipment to break down or damage, reduce the maintenance rate, prolong the life of equipment.
Furthermore, the first connecting structure comprises a limiting part arranged on the filter piece, a limiting opening arranged on the connecting piece and matched with the limiting part, and a limiting part detachably arranged on the limiting part, wherein a limiting pressing part matched with the connecting piece is arranged on the limiting part; when the connecting piece is sleeved on the filtering piece, the limiting part is clamped into the limiting opening, so that the first heavy limiting is realized, and the connecting piece is effectively prevented from being separated from the filtering piece; when the limiting piece is connected to the limiting part, the limiting piece can effectively prevent the limiting opening from being separated from the limiting part, and secondary limiting is realized; meanwhile, the limiting pressing part can be pressed onto the connecting piece, so that the possibility that the connecting piece is separated from the filtering piece is further reduced, and the third limiting is realized; under the triple limiting effect, the plugging piece is ensured to move outwards, so that the connection between the connecting piece and the filter piece cannot be separated when the connecting piece is stretched.
Furthermore, the second connecting structure comprises a connecting part arranged on the plugging part, a positioning part arranged on the connecting part, a positioning opening arranged on the connecting part and matched with the positioning part, and a positioning part detachably arranged on the positioning part, wherein a positioning pressing part matched with the connecting part is arranged on the positioning part; when the connecting piece is sleeved on the connecting part, the positioning part is clamped into the positioning opening, so that first repositioning is realized, and the connecting piece is effectively prevented from being separated from the connecting part; when the positioning piece is connected to the positioning part, the positioning piece can effectively prevent the positioning opening from being separated from the positioning part, and second repositioning is realized; meanwhile, the positioning pressing part can be pressed onto the connecting piece, so that the possibility that the connecting piece is separated from the connecting part is further reduced, and the third positioning is realized; under the action of triple positioning, the plugging piece is ensured to move outwards, so that the connection between the connecting piece and the connecting part cannot be separated when the connecting piece is stretched.
Furthermore, the second driving rail is arranged in an L-shaped structure and is connected with the first driving rail, so that the moving of the moving part is ensured to be smooth, and the situations of blockage and the like can be avoided.
Furthermore, a baffle plate and a support piece are detachably connected to the plugging piece, the baffle plate is arranged above the connecting part, and the support piece is arranged below the connecting part; the baffle can protect the connecting piece, prevents that accumulational material from taking place to destroy connecting piece and first, second connection structure when rolling off the discharge.
In conclusion, the invention has the following beneficial effects: the broken stone and the sand are directly obtained by using the construction waste, so that the waste of natural ecological resources caused by engineering construction is effectively reduced; and the construction waste is put back to the engineering construction for use again, so that the waste utilization is realized, the utilization rate of waste resources is improved, the treatment of the waste resources is effectively avoided, the investment of engineering cost is reduced, and the engineering period is shortened.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged view at B in fig. 1.
Fig. 3 is an enlarged view of fig. 2 at D.
Fig. 4 is a side view of the case of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
Example 1
A building construction method for saving resources comprises the following steps: (1) taking construction waste materials such as waste concrete blocks, bricks and the like, and then crushing the construction waste materials by a crushing device to obtain blocky crushed stones; then storing 20% of the crushed stones, and manufacturing 80% of the crushed stones into sand through a sand making machine for later preparation and use of concrete or mortar; (2) putting the sand prepared in the preparation step, cement and water into a stirrer, starting the stirrer to uniformly mix the materials, and finally preparing concrete A; wherein the sand, cement and water are put in 100kg, 50kg and 100 kg; then, the concrete A is injected into a mould of the brick block, and a concrete brick can be obtained after the concrete is solidified; (3) after the concrete A is poured into the concrete brick, a part of the concrete A is remained; adding the crushed stone prepared in the step (1) into the residual concrete A in the step (2), and uniformly stirring the concrete A and the crushed stone again through a stirrer to obtain concrete B; (4) after the concrete B is prepared, erecting a reinforcing steel bar frame at a position where a wall body needs to be built on site, building a brick wall outside the reinforcing steel bar frame by adopting the concrete bricks prepared in the step (2), then pouring the concrete B into the reinforcing steel bar frame, and obtaining the wall body after the concrete is solidified; (5) then, quartz is taken for processing and then crushed to obtain quartz sand, and specifically, the quartz processing comprises the following steps: a: washing the quartzite with clean water, draining the quartzite, and drying the quartzite by a dryer; b, crushing the dried quartzite by using an edge runner mill, and sieving the crushed quartzite by using a 120-mesh sieve to obtain quartzite sand; putting the quartz sand, the sand prepared in the step (1), cement and water into a mixer, wherein the adding ratio of the quartz sand to the cement to the water is respectively 50kg, 100kg, 150kg and 150 kg; starting the mixer, maintaining the temperature and the pressure of the mixer at 65 ℃ and 1mpa, and mixing for 30min to obtain mortar after mixing the materials; (6) and (5) plastering the surface of the wall by adopting the mortar prepared in the step (5), leveling the wall by using putty, and finally coating emulsion paint on the wall to finish the processing of the wall.
As shown in fig. 1-4, the crushing device comprises a first crushing chamber 1, a second crushing chamber 2, a first discharging part 3 arranged at the lower part of the first crushing chamber and a second discharging part 4 arranged at the lower part of the second crushing chamber which are communicated with each other; the first discharging part 3 is connected with an inlet at the upper part of the second crushing chamber 2, so that the first crushing chamber 1 is communicated with the second crushing chamber 2; the first discharge through part is provided with a filter part 5, a vibrating part 6 and a waste discharge device 7, the filter part 5 is a grid plate, and the size of grids of the grid plate is determined according to the size of materials needing to be screened, and the size is not limited specifically; the vibrating element 6 is a vibration exciter directly purchased from the market, a stainless steel ball is fixedly connected to an output shaft of the vibration exciter, a spherical cavity matched with the stainless steel ball is arranged at one end of the grid plate, the stainless steel ball is arranged behind the spherical cavity, the vibrating element is connected with the filtering element, and when the vibrating element works, the filtering element can be driven to vibrate; meanwhile, the stainless steel ball can roll in the spherical cavity, so that the filter piece can swing relative to the stainless steel ball by a movement angle; further, a cavity 31 is formed in the side wall of one side of the first discharging part 3, the vibrating part is arranged in the cavity, and one end of the filtering part 5 penetrates into the cavity 31 and is connected with the vibrating part; a waste discharge port 32 is arranged on the side wall of the first discharge part corresponding to the opposite side of the cavity 31, the height of the waste discharge port 32 is larger than the thickness of the filter element, and the other end of the filter element penetrates into the waste discharge port 32.
Specifically, the waste discharging device 7 is used for discharging materials accumulated on the filter member to the outside of a first discharging portion, the waste discharging device 7 comprises a plugging member 71 matched with the waste discharging port, two movable members 72 arranged on the plugging member and a driving member 73 matched with the movable members, the movable members are stators of linear motors, the driving member is a stator of the linear motor, the rotors can move along the positioning, specifically, the two movable members 72 are respectively arranged on the left side wall and the right side wall of the plugging member 71, the driving member 73 comprises two extending portions, a first driving rail 732 and a second driving rail 733, the two extending portions 731 are arranged on the outer wall of the first discharging portion and are formed by directly extending the outer wall of the first discharging portion to the outside, the lower portions of the extending portions are located at the lower portions of the waste discharging port, the first driving rail 732 is arranged at the lower portions of the side wall of the waste discharging port 32, the second driving rail 733 is arranged on the extending portions, and preferably, the second driving rail 733 is arranged in an inverted 733L-shaped structure, and the upper portion of the second driving rail is connected with the first driving rail 732.
Preferably, the end of the filter element 5 penetrating into the waste outlet 32 is connected to the blocking element 71 by a connecting element 51; the connecting piece 51 is made of a flexible material, preferably rubber; the connecting piece 51 is provided with an elastic section 511 which can stretch under the action of external force, and specifically, the elastic section is arranged in a wave shape and is directly formed when the connecting piece is subjected to injection molding; in order to prevent the connecting piece 51 from being detached from the filter and the blocking piece, a first connecting structure and a second connecting structure are provided; one end of the connecting piece 51 is connected with the filter piece 5 through a first connecting structure, and the other end is connected with the plugging piece 71 through a second connecting structure.
Specifically, the first connecting structure includes a limiting portion 81, a limiting opening, and a limiting member 83, the limiting portion 81 is disposed on the filtering member and is a strip-shaped convex portion formed by directly extending outward from the upper surface and the lower surface of the end portion of the filtering member; the limiting openings are two strip-shaped openings arranged on the connecting piece, and the positions of the limiting openings correspond to the positions of the strip-shaped convex parts; the limiting member 83 is connected with the limiting part through a screw, so that the limiting member can be detached relative to the limiting part; the limiting member 83 is a strip-shaped plate, and the width of the plate is greater than that of the limiting portion; preferably, two limiting pressing portions 831 are disposed on the lower surface of the limiting member 83, the two limiting pressing portions 831 are respectively formed by protruding portions formed by extending the left end and the right end of the limiting member 83 downward, and when the limiting member is connected to the limiting portions, the two limiting pressing portions 831 can be respectively pressed onto the connecting member, so that the connecting member and the filtering member are firmly connected.
The second connecting structure comprises a connecting part 91, a positioning part 92, a positioning opening and a positioning part 94, wherein the connecting part 91 is arranged on the plugging piece and is a convex part formed by inward extension of the inner wall of the plugging piece; the positioning part 92 is arranged on the connecting part 91 and is a strip-shaped convex part formed by directly extending outwards from the upper surface and the lower surface of the end part of the connecting part 91; the positioning openings are two strip-shaped openings arranged on the connecting piece, and the positions of the positioning openings correspond to the positions of the strip-shaped convex parts; the positioning member 94 is connected to the positioning portion by a screw, so as to be detachable with respect to the positioning portion; the positioning element 94 is a strip-shaped plate, and the width of the plate is greater than that of the positioning part; preferably, two positioning pressing portions 941 are disposed on the lower surface of the positioning member 94, the two positioning pressing portions 941 are respectively formed by protruding portions formed by extending the left end and the right end of the positioning member 94 downwards, and when the positioning member is connected to the positioning portion, the two positioning pressing portions 941 can be respectively pressed onto the connecting member, so that the connecting member and the plugging member are firmly connected.
In order to prevent the connecting piece from being damaged by the rolled materials, a baffle 711 and a supporting piece 712 are arranged on the plugging piece 71, the baffle 711 is arranged above the connecting part 91, and the supporting piece 712 is arranged below the connecting part 91; the baffle 711 and the support 712 are detachably connected with the blocking piece through screws.
A first crushing device 11 is arranged in the first crushing chamber, and the first crushing device 11 is a crushing structure in a jaw crusher, specifically a structure disclosed in the prior art, such as chinese patent CN107262198A, and is not described again; the crushing indoor second breaker 21 that is equipped with of second, this second breaker include two sets of broken subassemblies, and every broken subassembly of group all includes two fluted rollers and links to each other respectively with two fluted rollers 211 and be used for driving the driven driving piece of fluted roller 211, the driving piece is the motor that directly purchases on the market and obtain.
Specifically, when the construction waste is crushed, the waste is thrown into the first crushing chamber, is crushed into small pieces of materials, then falls onto the filtering member, the vibrating member drives the filtering member to vibrate, the materials are filtered, the materials meeting the crushing specification of the second crushing device fall into the second crushing chamber to be crushed, and finally are discharged outwards from the second discharging part; when the materials on the filter screen are too much and need to be discharged outwards; starting the linear motor, wherein the moving part moves outwards along the first driving rail, the blocking part moves outwards and moves out of the waste discharge port, and the elastic section is stretched; and then the movable part moves along the second driving rail to drive the plugging member to move downwards, the filtering member inclines, the taken material rolls off from the filtering member, and the taken material is discharged outwards from the waste material discharge port.
Example 2
A building construction method for saving resources comprises the following steps: (1) taking construction waste materials such as waste concrete blocks, bricks and the like, and then crushing the construction waste materials by a crushing device to obtain blocky crushed stones; then storing 40% of the crushed stones, and manufacturing 60% of the crushed stones into sand through a sand making machine for later preparation and use of concrete or mortar; (2) putting the sand prepared in the preparation step, cement and water into a stirrer, starting the stirrer to uniformly mix the materials, and finally preparing concrete A; wherein the sand, cement and water are put in 100kg, 50kg and 100 kg; then, the concrete A is injected into a mould of the brick block, and a concrete brick can be obtained after the concrete is solidified; (3) after the concrete A is poured into the concrete brick, a part of the concrete A is remained; adding the crushed stone prepared in the step (1) into the residual concrete A in the step (2), and uniformly stirring the concrete A and the crushed stone again through a stirrer to obtain concrete B; (4) after the concrete B is prepared, erecting a reinforcing steel bar frame at a position where a wall body needs to be built on site, building a brick wall outside the reinforcing steel bar frame by adopting the concrete bricks prepared in the step (2), then pouring the concrete B into the reinforcing steel bar frame, and obtaining the wall body after the concrete is solidified; (5) then, quartz is taken for processing and then crushed to obtain quartz sand, and specifically, the quartz processing comprises the following steps: a: washing the quartzite with clean water, draining the quartzite, and drying the quartzite by a dryer; b, crushing the dried quartzite by using an edge runner mill, and sieving the crushed quartzite by using a 120-mesh sieve to obtain quartzite sand; putting the quartz sand, the sand prepared in the step (1), cement and water into a mixer, wherein the adding ratio of the quartz sand to the cement to the water is respectively 50kg, 100kg, 150kg and 150 kg; starting the mixer, maintaining the temperature and the pressure of the mixer at 70 ℃ and 1.2mpa, and mixing for 40min to obtain the mortar after mixing the materials; (6) and (5) plastering the surface of the wall by adopting the mortar prepared in the step (5), leveling the wall by using putty, and finally coating emulsion paint on the wall to finish the processing of the wall.
The structure of the crushing device is the same as that of embodiment 1, and thus, the description thereof is omitted.
Example 3
A building construction method for saving resources comprises the following steps: (1) taking construction waste materials such as waste concrete blocks, bricks and the like, and then crushing the construction waste materials by a crushing device to obtain blocky crushed stones; then storing 30% of the broken stones, and manufacturing 70% of the broken stones into sand through a sand making machine for later preparation and use of concrete or mortar; (2) putting the sand prepared in the preparation step, cement and water into a stirrer, starting the stirrer to uniformly mix the materials, and finally preparing concrete A; wherein the sand, cement and water are put in 100kg, 50kg and 100 kg; then, the concrete A is injected into a mould of the brick block, and a concrete brick can be obtained after the concrete is solidified; (3) after the concrete A is poured into the concrete brick, a part of the concrete A is remained; adding the crushed stone prepared in the step (1) into the residual concrete A in the step (2), and uniformly stirring the concrete A and the crushed stone again through a stirrer to obtain concrete B; (4) after the concrete B is prepared, erecting a reinforcing steel bar frame at a position where a wall body needs to be built on site, building a brick wall outside the reinforcing steel bar frame by adopting the concrete bricks prepared in the step (2), then pouring the concrete B into the reinforcing steel bar frame, and obtaining the wall body after the concrete is solidified; (5) then, quartz is taken for processing and then crushed to obtain quartz sand, and specifically, the quartz processing comprises the following steps: a: washing the quartzite with clean water, draining the quartzite, and drying the quartzite by a dryer; b, crushing the dried quartzite by using an edge runner mill, and sieving the crushed quartzite by using a 120-mesh sieve to obtain quartzite sand; putting the quartz sand, the sand prepared in the step (1), cement and water into a mixer, wherein the adding ratio of the quartz sand to the cement to the water is respectively 50kg, 100kg, 150kg and 150 kg; starting the mixer, maintaining the temperature and the pressure of the mixer at 68 ℃ and 1.2mpa for 35min, and mixing the materials to obtain mortar; (6) and (5) plastering the surface of the wall by adopting the mortar prepared in the step (5), leveling the wall by using putty, and finally coating emulsion paint on the wall to finish the processing of the wall.
The structure of the crushing device is the same as that of embodiment 1, and thus, the description thereof is omitted.
It is to be understood that the described embodiments are merely a few embodiments of the invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.