CN107985665A - A kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method - Google Patents

A kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method Download PDF

Info

Publication number
CN107985665A
CN107985665A CN201711297959.6A CN201711297959A CN107985665A CN 107985665 A CN107985665 A CN 107985665A CN 201711297959 A CN201711297959 A CN 201711297959A CN 107985665 A CN107985665 A CN 107985665A
Authority
CN
China
Prior art keywords
reinforcing bar
linkage
big bag
booking
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711297959.6A
Other languages
Chinese (zh)
Other versions
CN107985665B (en
Inventor
王高华
王文浩
刘梓熠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueyang Yilida Construction Engineering Co ltd
Original Assignee
SHAOYANG GAOHUA INDUSTRY AND TRADE INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAOYANG GAOHUA INDUSTRY AND TRADE INDUSTRIAL CO LTD filed Critical SHAOYANG GAOHUA INDUSTRY AND TRADE INDUSTRIAL CO LTD
Priority to CN201711297959.6A priority Critical patent/CN107985665B/en
Priority claimed from CN201711297959.6A external-priority patent/CN107985665B/en
Publication of CN107985665A publication Critical patent/CN107985665A/en
Application granted granted Critical
Publication of CN107985665B publication Critical patent/CN107985665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B27/00Bundling particular articles presenting special problems using string, wire, or narrow tape or band; Baling fibrous material, e.g. peat, not otherwise provided for
    • B65B27/10Bundling rods, sticks, or like elongated objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F11/00Cutting wire
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B13/00Bundling articles
    • B65B13/18Details of, or auxiliary devices used in, bundling machines or bundling tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/42Arranging and feeding articles in groups by roller-ways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/56Orientating, i.e. changing the attitude of, articles, e.g. of non-uniform cross-section
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B2220/00Specific aspects of the packaging operation
    • B65B2220/16Packaging contents into primary and secondary packaging

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Package Closures (AREA)

Abstract

The invention discloses a kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method, it is made of bar cropper, reinforcing bar auxiliary flow distribution plate, reinforcing bar part flow arrangement and reinforcing bar packing apparatus;This Full-automatic continuous reinforcing bar, which shunts packing apparatus and its packaging method, can realize that full-automatic continuity reinforcement(bar) of not shutting down is packed; improve work efficiency; reduce human input, the degree of automation is high, realizes and wisp straight line wire rod is automatically tied up on wire rod rolling production line;The reinforcing bar auxiliary flow distribution plate auxiliary bar being equipped with continues to reinforcing bar part flow arrangement after being cut by bar cropper;The reinforcing bar part flow arrangement being equipped with inserts every reinforcing bar in corresponding placement plate;The reinforcing bar packing apparatus being equipped with realizes the booking of reinforcing bar to beating the process wrapped greatly;The big bag support of beating being equipped with is realized and transported when that need not shut down and can just carry out in production after one big bag is accomplished fluently;The shunting inclined plate being equipped with avoids bounce of the reinforcing bar in reinforcing bar part flow arrangement.

Description

A kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method
Technical field
The present invention relates to reinforcing bar manufacturing technology field is related to, a kind of specifically Full-automatic continuous reinforcing bar shunting packing Device and its packaging method.
Background technology
Reinforcing bar refers to that armored concrete is used and prestressed reinforced concrete steel, its cross section are circle, is sometimes band There is the square of fillet;Reinforcing bar is widely used in various building structure, particularly large-scale, heavy, light thin wall and high building structure, Reinforcing bar is primarily subjected to tension in concrete, deformed bar since the effect of rib, and concrete have larger cementitiousness, because And it can preferably bear the effect of external force.
Steel bar meter will generally pass through following process:Bar straightening, reinforcing bar dephosphorization, reinforcing bar roughing, reinforcing bar finish rolling, reinforcing bar heat Processing, bar cutting, reinforcing bar packing;Existing reinforcing bar baling press is mostly unable to continuous work, is needed after Baogang's muscle accomplishes fluently bag Shutdown bag-packaged reinforcing bar is transported after can just continue so that work efficiency it is low, it is necessary to number of workers it is also relatively more.
The content of the invention
Asking of continuously packing must be shut down the purpose of the present invention is to solve existing reinforcing bar baling press mentioned above Topic, there is provided a kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method.
The present invention, which adopts the following technical scheme that, realizes its goal of the invention:A kind of Full-automatic continuous reinforcing bar shunting packing dress Put, it is made of bar cropper 1, reinforcing bar auxiliary flow distribution plate 2, reinforcing bar part flow arrangement 3 with reinforcing bar packing apparatus 4;Auxiliary group of reinforcing bar The connection of flow distribution plate 2 is installed between bar cropper 1 and reinforcing bar part flow arrangement 3, and reinforcing bar part flow arrangement 3 is located at bar cropper 1 Left side;Reinforcing bar packing apparatus 4 is parallel to be arranged on 3 lower front of reinforcing bar part flow arrangement.
Reinforcing bar import 1-1, reinforcing bar shearing blade 1-2 and reinforcing bar outlet 1-3 are equipped with the bar cropper 1;Reinforcing bar Import 1-1 and reinforcing bar outlet 1-3 is relatively arranged on the left and right sides of bar cropper 1;Reinforcing bar shearing blade 1-2 is arranged on bar cropper 1 centre position.
Spacing straight panel 2-1, auxiliary bar delivery board 2-2, reinforcing bar input end are equipped with the reinforcing bar auxiliary flow distribution plate 2 2-3 and reinforcing bar outlet end 2-4;Spacing straight panel 2-1 is arranged on reinforcing bar auxiliary 2 posterior edges of flow distribution plate, it is a straight panel erect;It is auxiliary Reinforcing bar delivery board 2-2 is helped to be arranged on reinforcing bar auxiliary 2 forward edge of flow distribution plate, auxiliary bar delivery board 2-2 is relative to spacing straight panel 2-1 For an inclined plate so that the width of reinforcing bar input end 2-3 is less than the width of reinforcing bar outlet end 2-4, and in auxiliary bar delivery board 2-2 It is equipped with U-type groove 2-2-1, the spacing straight panel 2-1 of opening face of U-type groove 2-2-1;Reinforcing bar input end 2-3 goes out with reinforcing bar during installation Mouth 1-3 bottommosts are concordant.
The reinforcing bar part flow arrangement 3 is by shunting roller 3-1, shunting inclined plate 3-2, part flow arrangement rack 3-3, part flow arrangement Speed regulating motor rack 3-4 and part flow arrangement speed regulating motor 3-5 is formed;Shunting roller 3-1 is uniformly installed on point with shunting inclined plate 3-2 Flow on device frame 3-3, shunting inclined plate 3-2 is installed between two neighboring shunting roller 3-1;Part flow arrangement speed regulating motor rack 3-4 is arranged on anterior at left and right sides of part flow arrangement rack 3-3;Part flow arrangement speed regulating motor 3-5 is installed on part flow arrangement speed regulating motor On rack 3-4.
The shunting roller 3-1 is made of roller gear 3-1-1, roller chain 3-1-2 and flow distribution plate 3-1-3;It is described Flow distribution plate 3-1-3 by flow distribution plate installing plate 3-1-3-1 and reinforcing bar shunting support plate 3-1-3-2 form;Reinforcing bar shunts support plate 3-1-3-2 is installed on flow distribution plate installing plate 3-1-3-1 crown centers, reinforcing bar shunting support plate 3- installed in roller chain 3-1-2 1-3-2 is opening up;On two roller gear 3-1-1 of homonymy;Multiple flow distribution plate 3-1-3 pass through flow distribution plate installing plate 3-1-3- 1 is uniformly installed on the inside of two opposite roller chain 3-1-2;Reinforcing bar is equipped with the reinforcing bar shunting support plate 3-1-3-2 Second positioning part 3-1-3-2-1 and reinforcing bar the first positioning part 3-1-3-2-2, reinforcing bar the second positioning part 3-1-3-2-1 and reinforcing bar the One positioning part 3-1-3-2-2 is V-structure;The second positioning part of reinforcing bar 3-1-3-2-1 is arranged on reinforcing bar shunting support plate 3-1-3-2 Right upper portion, the first positioning part of reinforcing bar 3-1-3-2-2 are arranged on reinforcing bar shunting support plate 3-1-3-2 bottoms.
The part flow arrangement rack 3-3 is by part flow arrangement frame main body 3-3-1, reinforcing bar auxiliary flow distribution plate installing plate 3-3- 2nd, inclined plate installing plate 3-3-3, roller shaft 3-3-4, bearing block 3-3-5 compositions are shunted;And set on shunting inclined plate installing plate 3-3-3 There are the right mounting post 3-3-3-1 of two shunting inclined plates and two left mounting post 3-3-3-2 of shunting inclined plate, two shunting right installations of inclined plate Column 3-3-3-1 is installed on the right side of two left mounting post 3-3-3-2 of shunting inclined plate, the right mounting post 3-3-3-1 height of shunting inclined plate Less than the left mounting post 3-3-3-2 of shunting inclined plate, the right mounting post 3-3-3-1 of two shunting inclined plates and two shunting left mounting posts of inclined plate 3-3-3-2 top surfaces are inclined-plane, its angle of inclination is consistent with shunting inclined plate 3-2;Reinforcing bar auxiliary flow distribution plate installing plate 3-3-2, which is arranged on, to be divided Flow device frame main body 3-3-1 right side centrals;Shunting inclined plate installing plate 3-3-3 is arranged on part flow arrangement frame main body 3-3-1 tops; Roller shaft 3-3-4 is installed on bearing block 3-3-5;Bearing block 3-3-5 is installed on part flow arrangement frame main body 3-3-1 front and rear sides Top.
The shunting inclined plate 3-2 is installed between two neighboring shunting roller 3-1, and the right side of shunting inclined plate 3-2 is less than Reinforcing bar the first positioning part 3-1-3-2-2 bottommosts on the right side of shunting inclined plate 3-2 on reinforcing bar shunting support plate 3-1-3-2, shunting The left side of inclined plate 3-2 is higher than the first positioning part of reinforcing bar 3-1- on the left of shunting inclined plate 3-2 on reinforcing bar shunting support plate 3-1-3-2 3-2-2 bottommosts, the center of shunting inclined plate 3-2 are concordant with reinforcing bar the first positioning part 3-1-3-2-2 bottommosts.
The reinforcing bar packing apparatus 4 by the first packing support 4-1, the second packing support 4-2, booking device 4-3, beat Big bag apparatus 4-4, beat big bag support 4-5 compositions;First packing support 4-1 and the second packing support 4-2 are separately mounted to side by side Two adjacent flat lines on, the hookup wire residing for the first packing support 4-1 is located at the hookup wire residing for the second packing support 4-2 Rear portion;Booking device 4-3 is made of the first packing support 4-1, the second packing support 4-2 and booking linkage 4-3-1, Booking linkage 4-3-1 is installed on the side of the first packing support 4-1 and the second packing support 4-2, booking device 4-3 On side by side the two adjacent flat lines installed installed in the first packing support 4-1 and the second packing support 4-2;Beat big bag apparatus 4-4 is formed by beating big bag linkage 4-4-1 with beating big bag support 4-5, is beaten big bag linkage 4-4-1 and is propped up installed in big bag is played The side of frame 4-5;Big bag support 4-5 is beaten installed in the front portion with the first packing support 4-1 and the second packing support 4-2, with beating Big bag apparatus 4-4 is on same hookup wire.
First packing support 4-1, the second packing support 4-2 is put by supporting rod 4-1-1 and booking reinforcing bar and opened Mouth 4-1-2 compositions;Booking reinforcing bar is put opening 4-1-2 and is arranged at the top of supporting rod 4-1-1, and the booking reinforcing bar is put and opened Mouth 4-1-2 is V-structure, opening up.
The booking linkage 4-3-1 is by booking linkage gear 4-3-1-1, booking linkage chain Bar 4-3-1-2, booking linkage speed regulating motor 4-3-1-3, booking linkage rack 4-3-1-4, booking interlock Device gear installation base 4-3-1-5, booking linkage interlock plate 4-3-1-6 and booking linkage connecting rod 4-3-1-7 Composition;Booking linkage speed regulating motor 4-3-1-3 and booking linkage gear installation base 4-3-1-5 is small installed in beating At the top of bag linkage rack 4-3-1-4;Booking linkage gear 4-3-1-1 is interlocked by gear shaft installed in booking On device gear installation base 4-3-1-5, on the left of booking linkage gear installation base 4-3-1-5;Booking interlocks dress Put chain 4-3-1-2 and connect two booking linkage gear 4-3-1-1, booking linkage gear 4-3-1-1 respectively With booking linkage speed regulating motor 4-3-1-3;Booking linkage interlock plate 4-3-1-6 passes through booking linkage Connecting rod 4-3-1-7 is installed on the right side of booking linkage gear installation base 4-3-1-5.
Two booking linkage gears are equipped with the booking linkage gear installation base 4-3-1-5 tops Shaft mounting hole 4-3-1-5-1;Two booking linkage gear shaft mounting hole 4-3-1-5-1 are in same horizontal line.
It is open on the booking linkage interlock plate 4-3-1-6 equipped with booking linkage interlock plate first 4-3-1-6-1, the opening of booking linkage interlock plate second 4-3-1-6-2, booking linkage connection mounting blocks 4-3- 1-6-3;The opening 4-3-1-6-1 of the booking linkage interlock plate first and opening of booking linkage interlock plate second 4-3- 1-6-2 is arranged at the top of booking linkage interlock plate 4-3-1-6;Two booking linkage connection mounting blocks 4-3-1-6- 3 are arranged on booking linkage interlock plate 4-3-1-6 left lowers, two booking linkage connection mounting blocks 4-3-1-6- 3 in same horizontal line.
Booking linkage gear shaft mating hole 4-3- is equipped with the booking linkage connecting rod 4-3-1-7 1-7-1 is connected mounting blocks mounting hole 4-3-1-7-2 with booking linkage;Booking linkage gear shaft mating hole 4-3- 1-7-1 is arranged on booking linkage connecting rod 4-3-1-7 tops;Booking linkage connection mounting blocks mounting hole 4-3-1-7- 2 are arranged on booking linkage connecting rod 4-3-1-7 lower parts.
The big bag linkage 4-4-1 that beats is interlocked by beating big bag linkage gear installation base 4-4-1-1, playing big bag Device interlock plate 4-4-1-2, beat big bag linkage connecting rod 4-4-1-3, beat big bag linkage rack 4-4-1-4, Da great Bao Linkage speed regulating motor 4-4-1-5, beat big bag linkage chain 4-4-1-6 and beat big bag linkage gear 4-4-1-7 Composition;It is big installed in beating with beating big bag linkage gear installation base 4-4-1-1 to beat big bag linkage speed regulating motor 4-4-1-5 At the top of bag linkage rack 4-4-1-4;Big bag linkage gear 4-4-1-7 is beaten to interlock installed in big bag is played by gear shaft On device gear installation base 4-4-1-1, positioned at beating on the left of big bag linkage gear installation base 4-4-1-1;Play big bag and interlock dress Put chain 4-4-1-6 and connect two respectively and beat big bag linkage gear 4-4-1-7, beat big bag linkage gear 4-4-1-7 With beating big bag linkage speed regulating motor 4-4-1-5;Big bag linkage interlock plate 4-4-1-2 is beaten by beating big bag linkage Connecting rod 4-4-1-3, which is installed on, to be beaten on the left of big bag linkage gear installation base 4-4-1-1.
It is described beat big bag linkage interlock plate 4-4-1-2 and be equipped with beat the big opening of bag linkage interlock plate first 4- 4-1-2-1, beat the big opening of bag linkage interlock plate second 4-4-1-2-2, beat big bag linkage interlock plate opening slide 4- 4-1-2-3, beat big bag linkage interlock plate connecting rod connection mounting blocks 4-4-1-2-4;Beat big bag linkage interlock plate first Opening 4-4-1-2-1, beat big bag linkage interlock plate second and be open 4-4-1-2-2 arranged on beating big bag linkage interlock plate 4- At the top of 4-1-2, beat big bag linkage interlock plate first 4-4-1-2-1 that is open and be located at and beat big bag linkage interlock plate second and open On the right side of mouth 4-4-1-2-2;Beat big bag linkage interlock plate opening slide 4-4-1-2-3 be arranged on beat big bag linkage interlock plate First, which is open on the right side of 4-4-1-2-1 and beats big bag linkage interlock plate second, is open on the left of 4-4-1-2-2, beats big wrap and interlocks dress It is a tip to put at the top of interlock plate opening slide 4-4-1-2-3, down smoothly extends to Da great Bao linkages interlock plate first Opening 4-4-1-2-1 is open in 4-4-1-2-2 with beating big bag linkage interlock plate second;Big bag linkage is beaten for two to interlock Plate connecting rod connection mounting blocks 4-4-1-2-4, which is arranged on, beats big bag linkage interlock plate 4-4-1-2 left lowers, and two are beaten big Bao Lian Dynamic device interlock plate connection mounting blocks 4-4-1-2-4 is in same horizontal line.
The big bag linkage gear installation base 4-4-1-1 that beats beats big bag linkage gear shaft peace equipped with two Fill hole 4-4-1-1-1;Big bag linkage gear shaft mounting hole 4-4-1-1-1 is beaten for two arranged on big bag linkage gear is played to pacify Seat 4-4-1-1 tops are filled, big bag linkage gear shaft mounting hole 4-4-1-1-1 is beaten for two and is in same horizontal line.
It is described beat big bag linkage connecting rod 4-4-1-3 and be equipped with beat big bag linkage gear shaft mating hole 4-4-1- 3-1 is connected mounting blocks mounting hole 4-4-1-3-2 with beating big bag linkage interlock plate;Beat big bag linkage gear shaft mating hole 4-4-1-3-1 is arranged on and beats big bag linkage connecting rod 4-4-1-3 tops, plays big bag linkage interlock plate connection mounting blocks installation Hole 4-4-1-3-2 is arranged on and beats big bag linkage connecting rod 4-4-1-3 lower parts.
The big bag linkage connecting rod 4-4-1-3 that beats is longer than booking linkage connecting rod 4-3-1-7.
It is described beat big bag support 4-5 be equipped with beat big bag support slide 4-5-1, beat the big opening of bag support first 4-5-2, Beat big bag support second and be open 4-5-3 with beating big bag support transition arc sliding slot 4-5-4;Beat big bag support first be open 4-5-2, Beat big bag support second 4-5-3 that is open to be arranged on and beat at the top of big bag support 4-5, beat big bag support first and be open 4-5-2 arranged on beating greatly Bag support second is open on the left of 4-5-3;Big bag support slide 4-5-1 is beaten arranged on beating on the left of the big opening of bag support first 4-5-2, is beaten It is a tip at the top of big bag support slide 4-5-1, down smoothly extends to and beat in the big opening of bag support first 4-5-2;Play big bag Stent transition arc sliding slot 4-5-4 be arranged on beat big bag support first be open 4-5-2 and beat the big opening of bag support second 4-5-3 it Between, beat big bag support transition arc sliding slot 4-5-4 and be open respectively with beating big bag support first on the right side of 4-5-2 with beating big bag support the It is in smoothing junction on the left of two opening 4-5-3.
The packaging method of Full-automatic continuous reinforcing bar of the present invention shunting packing apparatus is:Reinforcing bar is from reinforcing bar import 1- Be pierced by after 1 entrance bar cropper 1 from reinforcing bar outlet 1-3 aids in flow distribution plate 2 to extend to reinforcing bar part flow arrangement 3 by reinforcing bar, when After reinforcing bar reaches and needs length, reinforcing bar shearing blade 1-2 cuts reinforcing bar, and reinforcing bar is mostly in reinforcing bar part flow arrangement 3, one Office shunts roller 3-1 and starts, pass through the phase interaction with auxiliary bar delivery board 2-2 at this time on reinforcing bar auxiliary flow distribution plate 2 With, reinforcing bar slowly fully enters reinforcing bar the first positioning part 3-1-3-2-2 of flow distribution plate 3-1-3 on reinforcing bar part flow arrangement 3, with point Flow roll wheel 3-1's continues to roll, and reinforcing bar is slowly with the second positioning part of the reinforcing bar 3-1-3-2- for moving to flow distribution plate 3-1-3 edges 1, continue to roll with shunting roller 3-1, the booking reinforcing bar that reinforcing bar is slipped on the first packing support 4-1 puts opening 4- On 1-2, start booking linkage 4- after the reinforcing bar for gathering booking reinforcing bar storing opening 4-1-2 reaches certain amount 3-1, booking linkage speed regulating motor 4-3-1-3 pass sequentially through booking linkage chain 4-3-1-2, booking interlocks Device gear 4-3-1-1, booking linkage connecting rod 4-3-1-7 driving booking linkage interlock plate 4-3-1-6 will gather The reinforcing bar for collecting booking reinforcing bar storing opening 4-1-2 is moved on the second packing support 4-2, and originally in the second packing Reinforcing bar on frame 4-2 is moved to beat on big bag support 4-5 by booking linkage interlock plate 4-3-1-6 beats big bag branch Frame first is open in 4-5-2, is interlocked when beating to start to beat to wrap greatly after reinforcing bar reaches specified quantity in the big opening of bag support first 4-5-2 Device 4-4-1, beats big bag linkage speed regulating motor 4-4-1-5 and passes sequentially through dozen big bag linkage chain 4-4-1-6, beats greatly Bag linkage gear 4-4-1-7, play big bag linkage connecting rod 4-4-1-3 driving and beat big bag linkage interlock plate 4-4-1- 2 will gather to break the reinforcing bar that is open in 4-5-2 of big bag support first and be moved to and beat big bag support second and be open in 4-5-3, beat greatly The opening of bag support first 4-5-2 is just available to pack easy to follow-up reinforcing bar, and breaks the reinforcing bar that big bag support second is open in 4-5-3 Subsequently lifting and transport can be carried out in the case of non-stop-machine.
As a result of above technical scheme, the present invention preferably realizes its goal of the invention, this Full-automatic continuous steel Muscle, which shunts packing apparatus and its packaging method, can realize that full-automatic continuity reinforcement(bar) of not shutting down is packed, and improve work efficiency, subtract Human input is lacked, the degree of automation is high, realizes and wisp straight line wire rod is automatically tied up on wire rod rolling production line;It is equipped with Reinforcing bar auxiliary flow distribution plate auxiliary bar continues to reinforcing bar part flow arrangement after being cut by bar cropper;The reinforcing bar being equipped with point Stream device inserts every reinforcing bar in corresponding placement plate;The reinforcing bar packing apparatus being equipped with realizes the booking of reinforcing bar to playing big bag Process;The big bag support of beating being equipped with is realized and transported when that need not shut down and can just carry out in production after one big bag is accomplished fluently It is defeated;The shunting inclined plate being equipped with avoids bounce of the reinforcing bar in reinforcing bar part flow arrangement.
Brief description of the drawings
Attached drawing 1 is the overall structure diagram of the present invention.
Attached drawing 2 is the structure diagram of mark 1 of the present invention.
Attached drawing 3 is the structure diagram of mark 2 of the present invention.
Attached drawing 4 is the structure diagram of mark 3 of the present invention.
Attached drawing 5 is the structure diagram of present invention mark 3-1.
Attached drawing 6 is the structure diagram of present invention mark 3-1-3.
Attached drawing 7 is the structure diagram of present invention mark 3-3.
Attached drawing 8 is the structure diagram of mark 4 of the present invention.
Attached drawing 9 is the structure diagram of present invention mark 4-1,4-2,4-3.
Attached drawing 10 is the structure diagram of present invention mark 4-3-1.
Attached drawing 11 is the structure diagram of present invention mark 4-3-1-5,4-3-1-6.
Attached drawing 12 is the structure diagram of present invention mark 4-3-1-7.
Attached drawing 13 is the structure diagram of present invention mark 4-4.
Attached drawing 14 is the structure diagram of present invention mark 4-4-1.
Attached drawing 15 is the structure diagram of present invention mark 4-4-1-1,4-4-1-2.
Attached drawing 16 is the structure diagram of present invention mark 4-4-1-3.
Attached drawing 17 is the structure diagram of present invention mark 4-5.
Reference numeral:Bar cropper 1, reinforcing bar auxiliary flow distribution plate 2, reinforcing bar part flow arrangement 3, reinforcing bar packing apparatus 4, reinforcing bar Import 1-1, reinforcing bar shearing blade 1-2, reinforcing bar outlet 1-3, spacing straight panel 2-1, auxiliary bar delivery board 2-2, U-type groove 2-2-1, steel Muscle input end 2-3, reinforcing bar outlet end 2-4, shunting roller 3-1, shunting inclined plate 3-2, part flow arrangement rack 3-3, part flow arrangement tune Speed motor rack 3-4, part flow arrangement speed regulating motor 3-5, roller gear 3-1-1, roller chain 3-1-2, flow distribution plate 3-1-3, point Flowing plate installing plate 3-1-3-1, reinforcing bar shunting support plate 3-1-3-2, the second positioning part of reinforcing bar 3-1-3-2-1, reinforcing bar first are put Portion 3-1-3-2-2, part flow arrangement frame main body 3-3-1, reinforcing bar auxiliary flow distribution plate installing plate 3-3-2, shunting inclined plate installing plate 3- 3-3, roller shaft 3-3-4, bearing block 3-3-5, the right mounting post 3-3-3-1 of shunting inclined plate, the left mounting post 3-3-3-2 of shunting inclined plate, First packing support 4-1, the second packing support 4-2, booking device 4-3, beat big bag apparatus 4-4, beat big bag support 4-5, branch Strut 4-1-1, booking reinforcing bar put opening 4-1-2, booking linkage 4-3-1, booking linkage gear 4-3- 1-1, booking linkage chain 4-3-1-2, booking linkage speed regulating motor 4-3-1-3, booking linkage machine Frame 4-3-1-4, booking linkage gear installation base 4-3-1-5, booking linkage interlock plate 4-3-1-6, booking Linkage connecting rod 4-3-1-7, booking linkage gear shaft mounting hole 4-3-1-5-1, booking linkage interlock plate First opening 4-3-1-6-1, the opening of booking linkage interlock plate second 4-3-1-6-2, booking linkage connection peace Fill block 4-3-1-6-3, booking linkage gear shaft mating hole 4-3-1-7-1, booking linkage connection mounting blocks peace Dress hole 4-3-1-7-2, beat big bag linkage 4-4-1, beat big bag linkage gear installation base 4-4-1-1, play big bag gearing Device interlock plate 4-4-1-2, beat big bag linkage connecting rod 4-4-1-3, beat big bag linkage rack 4-4-1-4, Da great Bao Linkage speed regulating motor 4-4-1-5, beat big bag linkage chain 4-4-1-6, beat big bag linkage gear 4-4-1-7, Beat big bag linkage interlock plate first be open 4-4-1-2-1, beat the big opening of bag linkage interlock plate second 4-4-1-2-2, Beat big bag linkage interlock plate opening slide 4-4-1-2-3, beat big bag linkage interlock plate connecting rod connection mounting blocks 4-4- 1-2-4, beat big bag linkage gear shaft mounting hole 4-4-1-1-1, beat big bag linkage gear shaft mating hole 4-4-1-3- 1st, big bag linkage interlock plate connection mounting blocks mounting hole 4-4-1-3-2 is beaten, big bag support slide 4-5-1 is beaten, beats big bag branch The opening of frame first 4-5-2, beat the big opening of bag support second 4-5-3, beat big bag support transition arc sliding slot 4-5-4.
Embodiment
Below in conjunction with attached drawing and embodiment, the present invention is described in detail, but not therefore by the protection model of the present invention Enclose and be limited among the scope of embodiment description.
Bar cropper 1 of the present invention refers to:The reinforcing bar shunts the main building block of packing apparatus;And on it Equipped with reinforcing bar import 1-1, reinforcing bar shearing blade 1-2, reinforcing bar outlet 1-3;Its effect is easy for cutting out required reinforcing bar;It is tied Structure is as shown in Figure 2;Its design position is as shown in mark 1 in attached drawing 1.
Reinforcing bar import 1-1 of the present invention refers to:Circular hole arranged on the right side of bar cropper 1;Its effect is easy for steel Muscle enters bar cropper 1;Its design position in attached drawing 1 as marked shown in 1-1.
Reinforcing bar shearing blade 1-2 of the present invention refers to:Shearing blade arranged on 1 centre position of bar cropper;It is acted on It is easy for cutting reinforcing bar;Its design position in attached drawing 1 as marked shown in 1-2.
Reinforcing bar outlet 1-3 of the present invention refers to:Circular hole arranged on the left side of bar cropper 1;Its effect is easy for steel Muscle enters reinforcing bar auxiliary flow distribution plate 2;Its design position in attached drawing 1 as marked shown in 1-3.
Reinforcing bar auxiliary flow distribution plate 2 of the present invention refers to:The reinforcing bar shunts the main building block of packing apparatus;And It which is provided with spacing straight panel 2-1, auxiliary bar delivery board 2-2, reinforcing bar input end 2-3, reinforcing bar outlet end 2-4;Its act on be with Reinforcing bar part flow arrangement 3 cooperates so that reinforcing bar is all introduced into reinforcing bar part flow arrangement 3;Its structure is as shown in Figure 3;It sets Position is counted as shown in mark 2 in attached drawing 1.
Spacing straight panel 2-1 of the present invention refers to:Arranged on the vertical plate of 2 rear side of reinforcing bar auxiliary flow distribution plate;Its effect is Limit position of the reinforcing bar on reinforcing bar auxiliary flow distribution plate 2;Its design position in attached drawing 3 as marked shown in 2-1.
Auxiliary bar delivery board 2-2 of the present invention refers to:U-shaped board arranged on 2 front side of reinforcing bar auxiliary flow distribution plate;And It which is provided with U-type groove 2-2-1;It is that limitation reinforcing bar can only be moved along the direction of reinforcing bar part flow arrangement 3 that it, which is acted on,;Its design position As marked in attached drawing 3 shown in 2-2.
U-type groove 2-2-1 of the present invention refers to:Groove on auxiliary bar delivery board 2-2;It is limitation steel that it, which is acted on, Muscle can only be moved along the direction of reinforcing bar part flow arrangement 3;Its design position in attached drawing 3 as marked shown in 2-2-1.
Reinforcing bar input end 2-3 of the present invention refers to:Reinforcing bar aids in the right side narrow end of flow distribution plate 2;Its effect is easy for Reinforcing bar enters reinforcing bar auxiliary flow distribution plate 2;Its design position in attached drawing 3 as marked shown in 2-3.
Reinforcing bar outlet end 2-4 of the present invention refers to:Reinforcing bar aids in the left side wide end of flow distribution plate 2;Its effect is easy for Reinforcing bar fully enters reinforcing bar part flow arrangement 3;Its design position in attached drawing 3 as marked shown in 2-4.
Reinforcing bar part flow arrangement 3 of the present invention refers to:The reinforcing bar shunts the main building block of packing apparatus;It is by dividing Flow roll wheel 3-1, shunting inclined plate 3-2, part flow arrangement rack 3-3, part flow arrangement speed regulating motor rack 3-4, part flow arrangement speed governing electricity Machine 3-5 is formed;It acts on the shunting for being to realize reinforcing bar and packs easy to follow-up;Its structure is as shown in Figure 4;Its design position is for example attached In Fig. 1 shown in mark 3.
Shunting roller 3-1 of the present invention refers to:The building block of reinforcing bar part flow arrangement 3;It is by roller gear 3-1- 1st, roller chain 3-1-2, flow distribution plate 3-1-3 are formed;Its effect is that reinforcing bar is transported to reinforcing bar packing apparatus 4;Its structure is for example attached Shown in Fig. 5;Its design position in attached drawing 4 as marked shown in 3-1.
Roller gear 3-1-1 of the present invention refers to:Shunt the building block of roller 3-1;Its effect is to pass through rotation Drive roller chain 3-1-2 rotations;Its design position in attached drawing 5 as marked shown in 3-1-1.
Roller chain 3-1-2 of the present invention refers to:Shunt the building block of roller 3-1;It is to drive shunting that it, which is acted on, Plate 3-1-3 rotates;Its design position in attached drawing 5 as marked shown in 3-1-2.
Flow distribution plate 3-1-3 of the present invention refers to:Shunt the building block of roller 3-1;It is by flow distribution plate installing plate 3- 1-3-1, reinforcing bar shunting support plate 3-1-3-2 compositions;It acts on the placement and smooth transition to reinforcing bar packing dress that are easy for reinforcing bar Put 4;Its structure is as shown in Figure 6;Its design position in attached drawing 5 as marked shown in 3-1-3.
Flow distribution plate installing plate 3-1-3-1 of the present invention refers to:The building block of flow distribution plate 3-1-3;Its effect is just In the installation of flow distribution plate 3-1-3;Its design position in attached drawing 6 as marked shown in 3-1-3-1.
Reinforcing bar shunting support plate 3-1-3-2 of the present invention refers to:The building block of flow distribution plate 3-1-3;It which is provided with The second positioning part of reinforcing bar 3-1-3-2-1, the first positioning part of reinforcing bar 3-1-3-2-2;It acts on the placement and transition for being easy for reinforcing bar; Its design position in attached drawing 6 as marked shown in 3-1-3-2.
The second positioning part of reinforcing bar 3-1-3-2-1 of the present invention refers to:On the right side of reinforcing bar shunting support plate 3-1-3-2 The V-structure on top;Its conversion for acting on before being easy for reinforcing bar from reinforcing bar part flow arrangement 3 into reinforcing bar packing apparatus 4 is placed;Its Design position in attached drawing 6 as marked shown in 3-1-3-2-1.
The first positioning part of reinforcing bar 3-1-3-2-2 of the present invention refers to:Arranged on reinforcing bar shunting support plate 3-1-3-2 bottoms V-structure;It acts on the steady placement for being easy for reinforcing bar into reinforcing bar part flow arrangement 3 after interior;In its design position such as attached drawing 6 Mark shown in 3-1-3-2-2.
Shunting inclined plate 3-2 of the present invention refers to:The building block of reinforcing bar part flow arrangement 3;Its effect is reinforcing bar is existed Flow distribution plate 3-1-3 will not beat;Its design position in attached drawing 4 as marked shown in 3-2.
Part flow arrangement rack 3-3 of the present invention refers to:The building block of reinforcing bar part flow arrangement 3;It is by part flow arrangement Frame main body 3-3-1, reinforcing bar auxiliary flow distribution plate installing plate 3-3-2, shunting inclined plate installing plate 3-3-3, roller shaft 3-3-4, bearing Seat 3-3-5 compositions;It acts on the installation for being easy for miscellaneous part;Its structure is as shown in Figure 7;In its design position such as attached drawing 4 Mark shown in 3-3.
Part flow arrangement frame main body 3-3-1 of the present invention refers to:The building block of part flow arrangement rack 3-3;It is made Flow distribution plate installing plate 3-3-2, shunting inclined plate installing plate 3-3-3, roller shaft 3-3-4, bearing block 3-3-5 are aided in reinforcing bar is easy for Installation;Its design position in attached drawing 7 as marked shown in 3-3-1.
Reinforcing bar auxiliary flow distribution plate installing plate 3-3-2 of the present invention refers to:The building block of part flow arrangement rack 3-3; It acts on the installation for being easy for reinforcing bar auxiliary flow distribution plate 2;Its design position in attached drawing 7 as marked shown in 3-3-2.
Shunting inclined plate installing plate 3-3-3 of the present invention refers to:The building block of part flow arrangement rack 3-3;And at it It is equipped with the right mounting post 3-3-3-1 of shunting inclined plate, the left mounting post 3-3-3-2 of shunting inclined plate;It, which is acted on, is easy for shunting inclined plate 3-2 Installation;Its design position in attached drawing 7 as marked shown in 3-3-3.
The shunting right mounting post 3-3-3-1 of inclined plate of the present invention refers to:Peace on shunting inclined plate installing plate 3-3-3 Fill column;It acts on the installation for being easy for shunting inclined plate 3-2;Its design position in attached drawing 7 as marked shown in 3-3-3-1.
The shunting left mounting post 3-3-3-2 of inclined plate of the present invention refers to:Peace on shunting inclined plate installing plate 3-3-3 Fill column;It acts on the installation for being easy for shunting inclined plate 3-2;Its design position in attached drawing 7 as marked shown in 3-3-3-2.
Roller shaft 3-3-4 of the present invention refers to:The building block of part flow arrangement rack 3-3;It is to drive rolling that it, which is acted on, Wheel gear 3-1-1 is rotated;Its design position in attached drawing 7 as marked shown in 3-3-4.
Bearing block 3-3-5 of the present invention refers to:The building block of part flow arrangement rack 3-3;Its effect is easy for rolling The installation of wheel shaft 3-3-4;Its design position in attached drawing 7 as marked shown in 3-3-5.
Part flow arrangement speed regulating motor rack 3-4 of the present invention refers to:The building block of reinforcing bar part flow arrangement 3;It is made With the installation for being easy for part flow arrangement speed regulating motor 3-5;Its design position in attached drawing 4 as marked shown in 3-4.
Part flow arrangement speed regulating motor 3-5 of the present invention refers to:The building block of reinforcing bar part flow arrangement 3;Its effect is Drive roller shaft 3-3-4 rotations;Its design position in attached drawing 4 as marked shown in 3-5.
Reinforcing bar packing apparatus 4 of the present invention refers to:The reinforcing bar shunts the main building block of packing apparatus;It is by One packing support 4-1, the second packing support 4-2, booking device 4-3, beat big bag apparatus 4-4, beat big bag support 4-5 composition; It is the continuous packing for realizing reinforcing bar that it, which is acted on,;Its structure is as shown in Figure 8;Its design position is as shown in mark 4 in attached drawing 1.
First packing support 4-1 of the present invention refers to:The building block of reinforcing bar packing apparatus 4;It is by supporting rod 4- 1-1, booking reinforcing bar put opening 4-1-2 compositions;It acts on being easy for stablizing when reinforcing bar is gathered into parcel for the first time and places;Its Structure is as shown in Figure 9;Its design position in attached drawing 8 as marked shown in 4-1.
Supporting rod 4-1-1 of the present invention refers to:The building block of first packing support 4-1;It functions as The supporting part of one packing support 4-1;Its design position in attached drawing 9 as marked shown in 4-1-1.
Booking reinforcing bar of the present invention is put opening 4-1-2 and is referred to:The building block of first packing support 4-1;Its Effect is easy for the placement of reinforcing bar;Its design position in attached drawing 9 as marked shown in 4-1-2.
Second packing support 4-2 of the present invention refers to:The building block of reinforcing bar packing apparatus 4;It is by supporting rod 4- 1-1, booking reinforcing bar put opening 4-1-2 compositions;It functions as a relay station before playing big bag;Its structure such as attached drawing Shown in 9;Its design position in attached drawing 8 as marked shown in 4-2.
Booking device 4-3 of the present invention refers to:The building block of reinforcing bar packing apparatus 4;It is by the first packing branch Frame 4-1, the second packing support 4-2 and booking linkage 4-3-1 are formed;Its effect is easy for reinforcing bar and beat for the first time Bag;Its structure is as shown in Figure 9;Its design position in attached drawing 8 as marked shown in 4-3.
Booking linkage 4-3-1 of the present invention refers to:The building block of booking device 4-3;It is small by beating Bag linkage gear 4-3-1-1, booking linkage chain 4-3-1-2, booking linkage speed regulating motor 4-3-1- 3rd, booking linkage rack 4-3-1-4, booking linkage gear installation base 4-3-1-5, booking linkage connect Movable plate 4-3-1-6, booking linkage connecting rod 4-3-1-7 are formed;Its effect is easy for that the first packing support 4-1 will be gathered Reinforcing bar and be moved to the second packing support 4-2, the reinforcing bar for gathering the second packing support 4-2 is moved to and beats big bag support the One opening 4-5-2;Its structure is as shown in Figure 10;Its design position in attached drawing 9 as marked shown in 4-3-1.
Booking linkage gear 4-3-1-1 of the present invention refers to:The composition portion of booking linkage 4-3-1 Part;It, which is acted on, is easy for driving booking linkage interlock plate 4-3-1-6;4-3-1- is marked in its design position such as attached drawing 10 Shown in 1.
Booking linkage chain 4-3-1-2 of the present invention refers to:The composition portion of booking linkage 4-3-1 Part;It, which is acted on, is easy for driving booking linkage gear 4-3-1-1;4-3-1-2 is marked in its design position such as attached drawing 10 It is shown.
Booking linkage speed regulating motor 4-3-1-3 of the present invention refers to:The group of booking linkage 4-3-1 Into component;It, which is acted on, is beaten by booking linkage chain 4-3-1-2 and booking linkage gear 4-3-1-1 drivings Parcel linkage interlock plate 4-3-1-6;Its design position in attached drawing 10 as marked shown in 4-3-1-3.
Booking linkage rack 4-3-1-4 of the present invention refers to:The composition portion of booking linkage 4-3-1 Part;Its effect is easy for booking linkage speed regulating motor 4-3-1-3 and booking linkage gear installation base 4-3-1-5 Installation;Its design position in attached drawing 10 as marked shown in 4-3-1-4.
Booking linkage gear installation base 4-3-1-5 of the present invention refers to:Booking linkage 4-3-1's Building block;It which is provided with booking linkage gear shaft mounting hole 4-3-1-5-1;It, which is acted on, is easy for booking gearing dress Put the installation of gear 4-3-1-1;Its structure is as shown in Figure 11;Its design position in attached drawing 10 as marked shown in 4-3-1-5.
Booking linkage gear shaft mounting hole 4-3-1-5-1 of the present invention refers to:Interlock and fill arranged on booking Put the mounting hole on gear installation base 4-3-1-5;It acts on the peace for being easy for booking linkage gear 4-3-1-1 gear shafts Dress;Its design position in attached drawing 11 as marked shown in 4-3-1-5-1.
Booking linkage interlock plate 4-3-1-6 of the present invention refers to:The composition of booking linkage 4-3-1 Component;It which is provided with the opening of booking linkage interlock plate first 4-3-1-6-1, booking linkage interlock plate second is opened Mouth 4-3-1-6-2, booking linkage connection mounting blocks 4-3-1-6-3;Its effect is easy for that the first packing branch will be gathered The reinforcing bar for gathering the second packing support 4-2 is moved to Da great Bao by the reinforcing bar of frame 4-1 with being moved to the second packing support 4-2 The opening of stent first 4-5-2;Its structure is as shown in Figure 11;Its design position in attached drawing 10 as marked shown in 4-3-1-6.
The opening of booking linkage interlock plate first 4-3-1-6-1 of the present invention refers to:Interlocked arranged on booking Opening at the top of device interlock plate 4-3-1-6;It, which is acted on, is easy for the reinforcing bar on the first packing support 4-1 being moved to the Two packing support 4-2;Its design position in attached drawing 11 as marked shown in 4-3-1-6-1.
The opening of booking linkage interlock plate second 4-3-1-6-2 of the present invention refers to:Interlocked arranged on booking Opening at the top of device interlock plate 4-3-1-6;It acts on being easy for the reinforcing bar on the second packing support 4-2 being moved to and beats The big opening of bag support first 4-5-2;Its design position in attached drawing 11 as marked shown in 4-3-1-6-2.
Booking linkage connection mounting blocks 4-3-1-6-3 of the present invention refers to:Arranged on booking linkage Mounting blocks on the left of interlock plate 4-3-1-6;It acts on the connection being easy for booking linkage connecting rod 4-3-1-7;It sets Position is counted as marked in attached drawing 11 shown in 4-3-1-6-3.
Booking linkage connecting rod 4-3-1-7 of the present invention refers to:The composition portion of booking linkage 4-3-1 Part;It which is provided with booking linkage gear shaft mating hole 4-3-1-7-1, booking linkage connection mounting blocks mounting hole 4-3-1-7-2;It, which is acted on, is easy for connection booking linkage interlock plate 4-3-1-6 and booking linkage gear 4-3- 1-1 gear shafts;Its structure is as shown in Figure 12;Its design position in attached drawing 10 as marked shown in 4-3-1-7.
Booking linkage gear shaft mating hole 4-3-1-7-1 of the present invention refers to:Interlock and fill arranged on booking Put the mating hole on connecting rod 4-3-1-7 tops;It, which is acted on, is easy for connection booking linkage gear 4-3-1-1 gear shafts;Its Design position in attached drawing 12 as marked shown in 4-3-1-7-1.
Booking linkage connection mounting blocks mounting hole 4-3-1-7-2 of the present invention refers to:Connect arranged on booking The mounting hole of dynamic device connecting rod 4-3-1-7 lower parts;It, which is acted on, is easy for connection booking linkage interlock plate 4-3-1-6 gears Axis;Its design position in attached drawing 12 as marked shown in 4-3-1-7-2.
The bag apparatus 4-4 of the present invention greatly that beats refers to:The building block of reinforcing bar packing apparatus 4;It is interlocked by playing big bag Device 4-4-1, beat big bag support 4-5 compositions;Its reinforcing bar acted on after being easy for booking subsequently carries out playing big bag;Its structure is such as Shown in attached drawing 13;Its design position in attached drawing 8 as marked shown in 4-4.
The bag linkage 4-4-1 of the present invention greatly that beats refers to:Beat the building block of big bag apparatus 4-4;It is big by beating Bag linkage gear installation base 4-4-1-1, beat big bag linkage interlock plate 4-4-1-2, beat big bag linkage connecting rod 4- 4-1-3, beat big bag linkage rack 4-4-1-4, beat big bag linkage speed regulating motor 4-4-1-5, beat big bag linkage Chain 4-4-1-6, beat big bag linkage gear 4-4-1-7 compositions;It is that will be open 4- in beating big bag support first that it, which is acted on, Reinforcing bar in 5-2, which is moved to, beats the big opening of bag support second 4-5-3;Its structure is as shown in Figure 14;Its design position such as attached drawing Marked in 13 shown in 4-4-1.
The bag linkage gear installation base 4-4-1-1 of the present invention greatly that beats refers to:Beat big bag linkage 4-4-1's Building block;And it is equipped with beats big bag linkage gear shaft mounting hole 4-4-1-1-1 on it;It, which is acted on, is easy for beating big Bao Lian The installation of dynamic device gear 4-4-1-7;Its structure is as shown in Figure 15;4-4-1-1 institutes are marked in its design position such as attached drawing 14 Show.
The bag linkage gear shaft mounting hole 4-4-1-1-1 of the present invention greatly that beats refers to:Dress is interlocked arranged on big bag is played Put the mounting hole on gear installation base 4-4-1-1;It acts on the peace for being easy for beating big bag linkage gear 4-4-1-7 gear shafts Dress;Its design position in attached drawing 15 as marked shown in 4-4-1-1-1.
The bag linkage interlock plate 4-4-1-2 of the present invention greatly that beats refers to:Beat the composition of big bag linkage 4-4-1 Component;And it is equipped with beats big bag linkage interlock plate first opening 4-4-1-2-1 on it, beats big bag linkage interlock plate the Two opening 4-4-1-2-2, beat big bag linkage interlock plate opening slide 4-4-1-2-3, beat big bag linkage interlock plate company Bar connection mounting blocks 4-4-1-2-4;It is that will beat greatly in breaking the reinforcing bar that big bag support first is open in 4-5-2 and be moved to that it, which is acted on, The opening of bag support second 4-5-3;Its structure is as shown in Figure 15;Its design position in attached drawing 14 as marked shown in 4-4-1-2.
The opening of bag linkage interlock plate first 4-4-1-2-1 of the present invention greatly that beats refers to:Interlocked arranged on big bag is played Opening on device interlock plate 4-4-1-2;It, which is acted on, is easy for breaking reinforcing bar big bag;4- is marked in its design position such as attached drawing 15 Shown in 4-1-2-1.
The opening of bag linkage interlock plate second 4-4-1-2-2 of the present invention greatly that beats refers to:Interlocked arranged on big bag is played Opening on device interlock plate 4-4-1-2;It is that the temporary transient of reinforcing bar after the completion of packing is placed that it, which is acted on, easy to subsequent transportation;It sets Position is counted as marked in attached drawing 15 shown in 4-4-1-2-2.
The bag linkage interlock plate opening slide 4-4-1-2-3 of the present invention greatly that beats refers to:Interlocked arranged on big bag is played Sliding slot on device interlock plate 4-4-1-2;Its effect is easy for reinforcing bar and slips into the opening of Da great Bao linkages interlock plate first 4- 4-1-2-1;Its design position in attached drawing 15 as marked shown in 4-4-1-2-3.
The bag linkage interlock plate connecting rod connection mounting blocks 4-4-1-2-4 of the present invention greatly that beats refers to:It is big arranged on beating Mounting blocks on bag linkage interlock plate 4-4-1-2;It acts on the company being easy for beating big bag linkage connecting rod 4-4-1-3 Connect installation;Its design position in attached drawing 15 as marked shown in 4-4-1-2-4.
The bag linkage connecting rod 4-4-1-3 of the present invention greatly that beats refers to:Beat the composition portion of big bag linkage 4-4-1 Part;And it is equipped with beats big bag linkage gear shaft mating hole 4-4-1-3-1 on it, beats big bag linkage interlock plate connection peace Fill block mounting hole 4-4-1-3-2;It acts on being easy for connecting beating big bag linkage interlock plate 4-4-1-2 and beating to wrap to interlock greatly and fills Put gear 4-4-1-7 gear shafts;Its structure is as shown in Figure 16;Its design position in attached drawing 14 as marked shown in 4-4-1-3.
The bag linkage gear shaft mating hole 4-4-1-3-1 of the present invention greatly that beats refers to:Dress is interlocked arranged on big bag is played Put the mating hole on connecting rod 4-4-1-3;It acts on the installation being easy for beating big bag linkage gear 4-4-1-7;It is designed Position in attached drawing 16 as marked shown in 4-4-1-3-1.
The bag linkage interlock plate connection mounting blocks mounting hole 4-4-1-3-2 of the present invention greatly that beats refers to:Arranged on beating Mounting hole on big bag linkage connecting rod 4-4-1-3;It, which is acted on, is easy for and beats big bag linkage interlock plate 4-4-1-2's Installation;Its design position in attached drawing 16 as marked shown in 4-4-1-3-2.
The bag linkage rack 4-4-1-4 of the present invention greatly that beats refers to:Beat the composition portion of big bag linkage 4-4-1 Part;It, which is acted on, is easy for beating big bag linkage speed regulating motor 4-4-1-5 and beats big bag linkage gear installation base 4-4-1-1 Installation;Its design position in attached drawing 14 as marked shown in 4-4-1-4.
The bag linkage speed regulating motor 4-4-1-5 of the present invention greatly that beats refers to:Beat the group of big bag linkage 4-4-1 Into component;It is to drive to beat big bag linkage gear 4-4-1-7 that it, which is acted on,;4-4-1-5 is marked in its design position such as attached drawing 14 It is shown.
The bag linkage chain 4-4-1-6 of the present invention greatly that beats refers to:Beat the composition portion of big bag linkage 4-4-1 Part;It is to drive to beat big bag linkage interlock plate 4-4-1-2 that it, which is acted on,;4-4-1-6 institutes are marked in its design position such as attached drawing 14 Show.
The bag linkage gear 4-4-1-7 of the present invention greatly that beats refers to:Beat the composition portion of big bag linkage 4-4-1 Part;It is to drive to beat big bag linkage chain 4-4-1-6 that it, which is acted on,;Its design position in attached drawing 14 as marked shown in 4-4-1-7.
The bag support 4-5 of the present invention greatly that beats refers to:The building block of reinforcing bar packing apparatus 4;It which is provided with Da great Bao Frame sliding track 4-5-1, beat the big opening of bag support first 4-5-2, beat the big opening of bag support second 4-5-3, play big bag support transition Arc chute 4-5-4;It, which is acted on, is easy for the temporary of reinforcing bar after the completion of the placement and packing of Da great Baogangs muscle;Its structure such as attached drawing Shown in 17;Its design position in attached drawing 8,13 as marked shown in 4-5.
The bag support slide 4-5-1 of the present invention greatly that beats refers to:Arranged on the slide beaten on the left of big bag support 4-5;It is made The big opening of bag support first 4-5-2 is beaten with reinforcing bar cut-in is easy for;Its design position in attached drawing 17 as marked shown in 4-5-1.
The opening of bag support first 4-5-2 of the present invention greatly that beats refers to:Arranged on the opening beaten on the left of big bag support 4-5; Its effect is easy for reinforcing bar and plays big bag;Its design position in attached drawing 17 as marked shown in 4-5-2.
The opening of bag support second 4-5-3 of the present invention greatly that beats refers to:Arranged on the opening beaten on the right side of big bag support 4-5; Its effect is to keep in the reinforcing bar for accomplishing fluently packing;Its design position in attached drawing 17 as marked shown in 4-5-3.
The bag support transition arc sliding slot 4-5-4 of the present invention greatly that beats refers to:It is open 4- arranged on big bag support first is beaten 5-2, beat at the circular sliding slopes between the big opening of bag support second 4-5-3;It, which is acted on, is easy for reinforcing bar from beating big bag support first Opening 4-5-2 arrives the transition for beating big bag support second opening 4-5-3;Its design position in attached drawing 17 as marked shown in 4-5-4.
The foregoing is merely presently preferred embodiments of the present invention, and limitation in any form is not done to the present invention, all at this Within the spirit and principle of invention, the technical spirit according to the present invention is to any simple modification made for any of the above embodiments, equivalent Change and modification, still fall within protection scope of the present invention.
Although the principle of the present invention is described in detail above in conjunction with the preferred embodiment of the present invention, this area skill Art personnel are it should be understood that above-described embodiment is only the explanation to the exemplary implementation of the present invention, not to present invention bag Restriction containing scope.Details in embodiment is simultaneously not meant to limit the scope of the invention, in the spirit without departing substantially from the present invention and In the case of scope, any equivalent transformation based on technical solution of the present invention, simple replacement etc. obviously change, and all fall within Within the scope of the present invention.

Claims (10)

1. a kind of Full-automatic continuous reinforcing bar shunts packing apparatus, it is characterized in that it is by bar cropper (1), reinforcing bar auxiliary shunting Plate (2), reinforcing bar part flow arrangement (3) and reinforcing bar packing apparatus (4) form;Auxiliary component flowing plate (2) connection of reinforcing bar is installed on reinforced shear Between off line (1) and reinforcing bar part flow arrangement (3), reinforcing bar part flow arrangement (3) is located on the left of bar cropper (1);Reinforcing bar packing dress Put that (4) are parallel to be arranged on reinforcing bar part flow arrangement (3) lower front;The bar cropper (1) be equipped with reinforcing bar import (1-1), Reinforcing bar shearing blade (1-2) and reinforcing bar outlet (1-3);Reinforcing bar import (1-1) is relatively arranged on reinforcing bar cutting with reinforcing bar outlet (1-3) At left and right sides of machine (1);Reinforcing bar shearing blade (1-2) is arranged on bar cropper (1) centre position;The reinforcing bar auxiliary flow distribution plate (2) spacing straight panel (2-1), auxiliary bar delivery board (2-2), reinforcing bar input end (2-3) and reinforcing bar outlet end (2-4) are equipped with; Spacing straight panel (2-1) is arranged on reinforcing bar auxiliary flow distribution plate (2) posterior edges, it is a straight panel erect;Auxiliary bar delivery board (2- 2) reinforcing bar auxiliary flow distribution plate (2) forward edge is arranged on, auxiliary bar delivery board (2-2) is oblique for one relative to spacing straight panel (2-1) Plate so that the width of reinforcing bar input end (2-3) is less than the width of reinforcing bar outlet end (2-4), and at auxiliary bar delivery board (2-2) It is equipped with U-type groove (2-2-1), the spacing straight panel of opening face (2-1) of U-type groove (2-2-1);Reinforcing bar input end (2-3) during installation It is concordant with reinforcing bar outlet (1-3) bottommost;The reinforcing bar part flow arrangement (3) by shunting roller (3-1), shunting inclined plate (3-2), Part flow arrangement rack (3-3), part flow arrangement speed regulating motor rack (3-4) and part flow arrangement speed regulating motor (3-5) form;Shunting rolling Wheel (3-1) is uniformly installed in part flow arrangement rack (3-3) with shunting inclined plate (3-2), and shunting inclined plate (3-2) is installed on adjacent two Between a shunting roller (3-1);Before part flow arrangement speed regulating motor rack (3-4) is arranged at left and right sides of part flow arrangement rack (3-3) Portion;Part flow arrangement speed regulating motor (3-5) is installed in part flow arrangement speed regulating motor rack (3-4);The reinforcing bar packing apparatus (4) by the first packing support (4-1), the second packing support (4-2), booking device (4-3), beat big bag apparatus (4-4), beat it is big Bag support (4-5) forms;Be separately mounted to side by side two of first packing support (4-1) and the second packing support (4-2) are adjacent On parallel lines, the hookup wire residing for the first packing support (4-1) is located at the hookup wire rear portion residing for the second packing support (4-2); Booking device (4-3) is by the first packing support (4-1), the second packing support (4-2) and booking linkage (4-3-1) group Into booking linkage (4-3-1) is installed on the side of the first packing support (4-1) and the second packing support (4-2), beats small Bag apparatus (4-3) be installed on side by side two that the first packing support (4-1) and the second packing support (4-2) are installed it is adjacent, parallel On line;Beat big bag apparatus (4-4) to be formed with beating big bag support (4-5) by beating big bag linkage (4-4-1), play big bag and interlock dress Put (4-4-1) and be installed on the side for beating big bag support (4-5);Big bag support (4-5) is beaten to be installed on and the first packing support (4-1) With the front portion of the second packing support (4-2), with beating big bag apparatus (4-4) on same hookup wire.
A kind of 2. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that the shunting Roller (3-1) is made of roller gear (3-1-1), roller chain (3-1-2) and flow distribution plate (3-1-3);Flow distribution plate (the 3- 1-3) it is made of flow distribution plate installing plate (3-1-3-1) and reinforcing bar shunting support plate (3-1-3-2);Reinforcing bar shunting support plate (3-1- 3-2) flow distribution plate installing plate (3-1-3-1) crown center, reinforcing bar shunting support plate are installed on installed in roller chain (3-1-2) (3-1-3-2) is opening up;On two roller gears (3-1-1) of homonymy;Multiple flow distribution plates (3-1-3) are installed by flow distribution plate Plate (3-1-3-1) is uniformly installed on the inside of two opposite roller chains (3-1-2);In the reinforcing bar shunting support plate (3-1- 3-2) it is equipped with the second positioning part of reinforcing bar (3-1-3-2-1) and the first positioning part of reinforcing bar (3-1-3-2-2), the second positioning part of reinforcing bar (3-1-3-2-1) and the first positioning part of reinforcing bar (3-1-3-2-2) are V-structure;The second positioning part of reinforcing bar (3-1-3-2-1) is set Support plate (3-1-3-2) right upper portion is shunted in reinforcing bar, the first positioning part of reinforcing bar (3-1-3-2-2) is arranged on reinforcing bar shunting support plate (3-1-3-2) bottom.
A kind of 3. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that the shunting Device frame (3-3) is by part flow arrangement frame main body (3-3-1), reinforcing bar auxiliary flow distribution plate installing plate (3-3-2), shunting inclined plate peace Loading board (3-3-3), roller shaft (3-3-4), bearing block (3-3-5) composition;And two are equipped with shunting inclined plate installing plate (3-3-3) A shunting right mounting post of inclined plate (3-3-3-1) and two shunting left mounting posts of inclined plate (3-3-3-2), two shunting right installations of inclined plate Column (3-3-3-1) is installed on the right side of two shunting left mounting posts of inclined plate (3-3-3-2), the right mounting post (3-3-3- of shunting inclined plate 1) it is highly oblique less than the shunting left mounting post of inclined plate (3-3-3-2), two shunting right mounting posts of inclined plate (3-3-3-1) and two shuntings The left mounting post of plate (3-3-3-2) top surface is inclined-plane, its angle of inclination is consistent with shunting inclined plate (3-2);Reinforcing bar auxiliary flow distribution plate peace Loading board (3-3-2) is arranged on part flow arrangement frame main body (3-3-1) right side central;Shunt inclined plate installing plate (3-3-3) and be arranged on shunting Device frame main body (3-3-1) top;Roller shaft (3-3-4) is installed on bearing block (3-3-5);Bearing block (3-3-5) is installed On part flow arrangement frame main body (3-3-1) front and rear sides top.
A kind of 4. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1 or 2, it is characterized in that point Flow inclined plate (3-2) to be installed between two neighboring shunting roller (3-1), the right side of shunting inclined plate (3-2) is less than the shunting inclined plate The first positioning part of reinforcing bar (3-1-3-2-2) bottommost on the right side of (3-2) in reinforcing bar shunting support plate (3-1-3-2), shunts inclined plate The left side of (3-2) is higher than the first positioning part of reinforcing bar on the left of the shunting inclined plate (3-2) in reinforcing bar shunting support plate (3-1-3-2) (3-1-3-2-2) bottommost, the center of the shunting inclined plate (3-2) are concordant with the first positioning part of reinforcing bar (3-1-3-2-2) bottommost.
A kind of 5. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that described first Packing support (4-1), the second packing support (4-2) put opening (4-1-2) group by supporting rod (4-1-1) and booking reinforcing bar Into;Booking reinforcing bar is put opening (4-1-2) and is arranged at the top of supporting rod (4-1-1), and the booking reinforcing bar puts opening (4- It is 1-2) V-structure, it is opening up.
A kind of 6. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that described beating is small Bag linkage (4-3-1) by booking linkage gear (4-3-1-1), booking linkage chain (4-3-1-2), beat Parcel linkage speed regulating motor (4-3-1-3), booking linkage rack (4-3-1-4), booking linkage gear Mounting base (4-3-1-5), booking linkage interlock plate (4-3-1-6) and booking linkage connecting rod (4-3-1-7) group Into;Booking linkage speed regulating motor (4-3-1-3) is installed on booking linkage gear installation base (4-3-1-5) and beats At the top of parcel linkage rack (4-3-1-4);Booking linkage gear (4-3-1-1) is small installed in beating by gear shaft On bag linkage gear installation base (4-3-1-5), on the left of booking linkage gear installation base (4-3-1-5);Beat Parcel linkage chain (4-3-1-2) connects two booking linkage gears (4-3-1-1) respectively, booking interlocks dress Put gear (4-3-1-1) and booking linkage speed regulating motor (4-3-1-3);Booking linkage interlock plate (4-3-1- 6) it is installed on by booking linkage connecting rod (4-3-1-7) on the right side of booking linkage gear installation base (4-3-1-5); Two booking linkage gear shafts are equipped with described booking linkage gear installation base (4-3-1-5) top to install Hole (4-3-1-5-1);Two booking linkage gear shaft mounting holes (4-3-1-5-1) are in same horizontal line;Institute The booking linkage interlock plate (4-3-1-6) stated is open (4-3-1-6- equipped with booking linkage interlock plate first 1), booking linkage interlock plate second is open (4-3-1-6-2), booking linkage connects mounting blocks (4-3-1-6- 3);Be open (4-3-1-6-1) and the booking linkage interlock plate second of booking linkage interlock plate first is open (4-3- 1-6-2) it is arranged at the top of booking linkage interlock plate (4-3-1-6);Two booking linkage connection mounting blocks (4-3- Booking linkage interlock plate (4-3-1-6) left lower 1-6-3) is arranged on, two booking linkages connect mounting blocks (4-3-1-6-3) is in same horizontal line;Booking is equipped with the booking linkage connecting rod (4-3-1-7) to connect Dynamic device gear shaft mating hole (4-3-1-7-1) is connected mounting blocks mounting hole (4-3-1-7-2) with booking linkage;Beat small Bag linkage gear shaft mating hole (4-3-1-7-1) is arranged on booking linkage connecting rod (4-3-1-7) top;Booking connects Dynamic device connection mounting blocks mounting hole (4-3-1-7-2) is arranged on booking linkage connecting rod (4-3-1-7) lower part.
A kind of 7. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that described beating is big Bag linkage (4-4-1) is by beating big bag linkage gear installation base (4-4-1-1), beating big bag linkage interlock plate (4- 4-1-2), big bag linkage connecting rod (4-4-1-3) is beaten, big bag linkage rack (4-4-1-4) is beaten, beats big bag linkage Speed regulating motor (4-4-1-5), beat big bag linkage chain (4-4-1-6) and beat big bag linkage gear (4-4-1-7) group Into;Beat big bag linkage speed regulating motor (4-4-1-5) and beat big bag linkage gear installation base (4-4-1-1) installed in beating At the top of big bag linkage rack (4-4-1-4);It is big installed in beating by gear shaft to beat big bag linkage gear (4-4-1-7) On bag linkage gear installation base (4-4-1-1), positioned at beating on the left of big bag linkage gear installation base (4-4-1-1);Beat Big bag linkage chain (4-4-1-6) connects two and beats big bag linkage gear (4-4-1-7), plays big bag gearing dress respectively Put gear (4-4-1-7) and beat big bag linkage speed regulating motor (4-4-1-5);Beat big bag linkage interlock plate (4-4-1- 2) it is installed on by beating big bag linkage connecting rod (4-4-1-3) and beats big bag linkage gear installation base (4-4-1-1) left side; It is described beat big bag linkage interlock plate (4-4-1-2) and be equipped with beat big bag linkage interlock plate first and be open (4-4-1- 2-1), big bag linkage interlock plate second is beaten to be open (4-4-1-2-2), beat big bag linkage interlock plate opening slide (4- 4-1-2-3), big bag linkage interlock plate connecting rod connection mounting blocks (4-4-1-2-4) are beaten;Beat big bag linkage interlock plate the One opening (4-4-1-2-1), beat big bag linkage interlock plate second be open (4-4-1-2-2) be arranged on and beat big bag linkage company At the top of movable plate (4-4-1-2), beat big bag linkage interlock plate first and be open (4-4-1-2-1) positioned at beating big bag linkage company Movable plate second is open on the right side of (4-4-1-2-2);Beat big bag linkage interlock plate opening slide (4-4-1-2-3) be arranged on beat greatly wrap Linkage interlock plate first is open on the right side of (4-4-1-2-1) and beats big bag linkage interlock plate second and is open (4-4-1-2- 2) left side, it is a tip to beat at the top of big bag linkage interlock plate opening slide (4-4-1-2-3), down smoothly extends to and beats greatly Bag linkage interlock plate first is open (4-4-1-2-1) and beats big bag linkage interlock plate second and is open (4-4-1-2-2) It is interior;Beat big bag linkage interlock plate connecting rod connection mounting blocks (4-4-1-2-4) and be arranged on for two and beat big bag linkage interlock plate (4-4-1-2) left lower, beats big bag linkage interlock plate connection mounting blocks (4-4-1-2-4) for two and is in same horizontal line On;The big bag linkage gear installation base (4-4-1-1) of beating plays big bag linkage gear shaft installation equipped with two Hole (4-4-1-1-1);Two beat big bag linkage gear shaft mounting hole (4-4-1-1-1) be arranged on play big bag linkage gear Mounting base (4-4-1-1) top, beats big bag linkage gear shaft mounting hole (4-4-1-1-1) for two and is in same horizontal line On;It is described beat big bag linkage connecting rod (4-4-1-3) and be equipped with beat big bag linkage gear shaft mating hole (4-4-1-3- 1) it is connected mounting blocks mounting hole (4-4-1-3-2) with beating big bag linkage interlock plate;Beat big bag linkage gear shaft adaptation Hole (4-4-1-3-1) is arranged on and beats big bag linkage connecting rod (4-4-1-3) top, plays big bag linkage interlock plate connection installation Block mounting hole (4-4-1-3-2) is arranged on and beats big bag linkage connecting rod (4-4-1-3) lower part.
A kind of 8. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 6 or 7, it is characterized in that described beats Big bag linkage connecting rod (4-4-1-3) is longer than booking linkage connecting rod (4-3-1-7).
A kind of 9. Full-automatic continuous reinforcing bar shunting packing apparatus according to claim 1, it is characterized in that described beating is big Bag support (4-5), which is equipped with and beats big bag support slide (4-5-1), beats big bag support first is open (4-5-2), beats big bag support the Two openings (4-5-3) are with beating big bag support transition arc sliding slot (4-5-4);Big bag support first is beaten to be open (4-5-2), Da great Bao Stent second be open (4-5-3) be arranged on and beat at the top of big bag support (4-5), beat big bag support first and be open (4-5-2) arranged on beating greatly Bag support second is open on the left of (4-5-3);Beat big bag support slide (4-5-1) and be arranged on and beat big bag support first and be open (4-5-2) Left side, it be a tip to beat at the top of big bag support slide (4-5-1), down smoothly extends to dozen big bag support first and is open (4-5- 2) in;Beat big bag support transition arc sliding slot (4-5-4) and be arranged on and beat big bag support first and be open (4-5-2) with beating big bag support the Between two openings (4-5-3), beat big bag support transition arc sliding slot (4-5-4) and be open (4-5- with beating big bag support first respectively 2) right side is open smooth connection on the left of (4-5-3) with beating big bag support second.
10. a kind of packaging method of Full-automatic continuous reinforcing bar shunting packing apparatus, it is characterized in that reinforcing bar is from reinforcing bar import (1-1) Be pierced by after into bar cropper (1) from reinforcing bar outlet (1-3) aids in flow distribution plate (2) to extend to reinforcing bar part flow arrangement by reinforcing bar (3), after reinforcing bar, which reaches, needs length, reinforcing bar shearing blade (1-2) cuts reinforcing bar, and reinforcing bar is mostly in reinforcing bar part flow arrangement (3) in, a part shunts roller (3-1) and starts, by being conveyed with auxiliary bar at this time on reinforcing bar auxiliary flow distribution plate (2) The interaction of plate (2-2), the reinforcing bar first that reinforcing bar slowly fully enters flow distribution plate (3-1-3) on reinforcing bar part flow arrangement (3) are put Portion (3-1-3-2-2) is put, as shunting roller (3-1) continues to roll, reinforcing bar is slowly with moving to flow distribution plate (3-1-3) side The second positioning part of reinforcing bar (3-1-3-2-1) of edge, continues to roll, reinforcing bar is slipped to the first packing with shunting roller (3-1) Booking reinforcing bar on stent (4-1) is put in opening (4-1-2), and opening (4-1-2) is put when gathering booking reinforcing bar Reinforcing bar, which reaches, starts booking linkage (4-3-1) after certain amount, booking linkage speed regulating motor (4-3-1-3) according to It is secondary to pass through booking linkage chain (4-3-1-2), booking linkage gear (4-3-1-1), booking linkage Connecting rod (4-3-1-7) driving booking linkage interlock plate (4-3-1-6) will gather booking reinforcing bar and put opening (4-1- 2) reinforcing bar is moved on the second packing support (4-2), and the reinforcing bar originally on the second packing support (4-2) is small by beating Bag linkage interlock plate (4-3-1-6) is moved to the big bag support first of beating beaten on big bag support (4-5) and is open (4-5-2) It is interior, when beat big bag support first be open (4-5-2) interior reinforcing bar reach specified quantity after start beat big bag linkage (4-4-1), Big bag linkage speed regulating motor (4-4-1-5) is beaten to pass sequentially through dozen big bag linkage chain (4-4-1-6), play big bag gearing Device gear (4-4-1-7), play the driving of big bag linkage connecting rod (4-4-1-3) and beat big bag linkage interlock plate (4-4-1- 2) it will gather to break the reinforcing bar that is open in (4-5-2) of big bag support first and be moved to and beat big bag support second and be open in (4-5-3), Beat big bag support first be open (4-5-2) be just available and pack easy to follow-up reinforcing bar, and beat big bag support second and be open (4-5-3) Interior reinforcing bar can carry out subsequently lifting and transport in the case of non-stop-machine.
CN201711297959.6A 2017-12-08 Full-automatic continuous steel bar split-flow packing device and packing method thereof Active CN107985665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711297959.6A CN107985665B (en) 2017-12-08 Full-automatic continuous steel bar split-flow packing device and packing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711297959.6A CN107985665B (en) 2017-12-08 Full-automatic continuous steel bar split-flow packing device and packing method thereof

Publications (2)

Publication Number Publication Date
CN107985665A true CN107985665A (en) 2018-05-04
CN107985665B CN107985665B (en) 2024-06-28

Family

ID=

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020067723A (en) * 2001-02-17 2002-08-24 현대하이스코 주식회사 Transfer system for automatic bind of middle diameter pipes and tubes
CN101870374A (en) * 2010-06-24 2010-10-27 江阴纳尔捷机器人有限公司 Material diversion mechanism
CN106364727A (en) * 2016-09-18 2017-02-01 天津市友发德众钢管有限公司 Automatic steel pipe packaging system
CN207644709U (en) * 2017-12-08 2018-07-24 邵阳高华工贸实业有限公司 A kind of Full-automatic continuous reinforcing bar shunting packing apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020067723A (en) * 2001-02-17 2002-08-24 현대하이스코 주식회사 Transfer system for automatic bind of middle diameter pipes and tubes
CN101870374A (en) * 2010-06-24 2010-10-27 江阴纳尔捷机器人有限公司 Material diversion mechanism
CN106364727A (en) * 2016-09-18 2017-02-01 天津市友发德众钢管有限公司 Automatic steel pipe packaging system
CN207644709U (en) * 2017-12-08 2018-07-24 邵阳高华工贸实业有限公司 A kind of Full-automatic continuous reinforcing bar shunting packing apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
秦浩;丁继业;李军;: "混凝土梁钢筋绑扎的辅助装置及其施工", 施工技术, no. 18, pages 88 - 90 *

Similar Documents

Publication Publication Date Title
CN207618648U (en) A kind of automatic destacking bale breaker
CN204173499U (en) A kind of tubing wrapping machine automatically put pipe device
CN106314855A (en) Automatic subpackage machine and method for incense sticks
CN107878836A (en) A kind of packaging facilities that rotation can be clamped to packing case
CN104986491B (en) Magic cube type multirow vertical turns round cabinet
CN204702084U (en) Magic cube type multirow vertical revolution cabinet
CN107128667A (en) A kind of full-automatic stacking apparatus of suitable different size can
CN109526331A (en) A kind of Leaf Vegetables in Liquid Culture seedling transplanting production line
CN106081218B (en) Uniformly distributed blanking type melon and fruit automatic boxing machine and packing method
CN104890914A (en) Device used for assisting bi-directional bundling of aluminum ingot stack automatic bundling machine
CN107985665A (en) A kind of Full-automatic continuous reinforcing bar shunting packing apparatus and its packaging method
CN206537964U (en) Graphene EPS cutting plates automatic stacking machines
CN109018957A (en) A kind of full-automatic food production method
CN207644709U (en) A kind of Full-automatic continuous reinforcing bar shunting packing apparatus
CN107309060A (en) A kind of iron filings cake of press system
EP1771338B1 (en) Method and device for producing packing units from at least two packs
CN206203343U (en) Oral liquid bottle automatic loading machine
CN115504211B (en) Full-automatic intelligent marinating production device
CN207090544U (en) Feeding structure is improved to tear material machine open
CN207754477U (en) A kind of full-automatic packed food sterilization production line
CN209089450U (en) A kind of jujube picker
CN207972880U (en) A kind of potato size sorting sack filling machine
DE1481026A1 (en) Method and device for conveying elongated objects, especially cigarettes
CN205734100U (en) Crawler type automatic loading and unloading device
CN209684052U (en) Batch packing apparatus for automobile valve block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 422001 Four factories in Baoqing Industrial Concentrated Area, Shuangqing District, Shaoyang City, Hunan Province

Applicant after: Hunan Gaohua New Materials Technology Co.,Ltd.

Address before: 422001 Four factories in Baoqing Industrial Concentrated Area, Shuangqing District, Shaoyang City, Hunan Province

Applicant before: SHAOYANG GAOHUA INDUSTRY AND TRADE CO.,LTD.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20240402

Address after: Unit 304, Building 1-4, Qishanyuan, Shangjie Town, Minhou County, Fuzhou City, Fujian Province, 350000

Applicant after: Lin Shangyu

Country or region after: China

Address before: 422001 Building 4, Zone 2, Baoqing Industrial Concentration Zone, Shuangqing District, Shaoyang City, Hunan Province

Applicant before: Hunan Gaohua New Materials Technology Co.,Ltd.

Country or region before: China

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240603

Address after: No. 14 Chengzhong North Road, Linxiang City, Yueyang City, Hunan Province, 414300

Applicant after: Yueyang Yilida Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Unit 304, Building 1-4, Qishanyuan, Shangjie Town, Minhou County, Fuzhou City, Fujian Province, 350000

Applicant before: Lin Shangyu

Country or region before: China

GR01 Patent grant