CN107975056A - The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient - Google Patents

The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient Download PDF

Info

Publication number
CN107975056A
CN107975056A CN201711365447.9A CN201711365447A CN107975056A CN 107975056 A CN107975056 A CN 107975056A CN 201711365447 A CN201711365447 A CN 201711365447A CN 107975056 A CN107975056 A CN 107975056A
Authority
CN
China
Prior art keywords
pile
stop curtain
bored
stake
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711365447.9A
Other languages
Chinese (zh)
Inventor
王洋
陈向荣
林百顺
吴铭
袁晨曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711365447.9A priority Critical patent/CN107975056A/en
Publication of CN107975056A publication Critical patent/CN107975056A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient, including step:One:Tentatively judge cast-in-place concrete pile " expansion neck " situation;Two:Treat that bored concrete pile reaches more than the 70% of design strength and carries out churning water-stop curtain pile driving construction at adjacent bored concrete pile circle center line connecting midpoint;Three:For cast-in-place concrete pile " expansion neck " serious pile body, preliminary depth, the degree for judging concrete serious " expansion neck ";Four:Surveying setting-out, draws two adjacent bored concrete pile circle center line connecting midpoints toward 1/4~1/3 bored concrete pile radius distance point of outer shifting on the outside of foundation pit;Five:Drilling machine draws hole, deeper 30~50cm than design stake bottom absolute altitude;Six:Carry out churning water-stop curtain pile driving construction.The present invention is applicable in wide, and water-stop curtain stake intercepts water etc. in basement process, improvement of soil nature, sealing and is widely used.

Description

The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient
Technical field
The present invention relates to a kind of water-stop curtain stake piling technique, and specifically Bored Pile Filling Coefficient is excessive causes sealing Curtain pile is difficult to the processing method of pile.
Background technology
In general, foundation pit enclosure stake, based on cast-in-place concrete pile, pore-forming mode generally impacts drilled as holes, churning driven Pore-forming etc., for the higher area of level of ground water, excavation of foundation pit also needs to matching operation water-stop curtain stake(High-pressure rotary jet grouting pile, SMW Engineering method stake etc.).But for artificial earth fill, manually fill out gravelly soil, sandy soil, silt and gravel, cobble geological stratification for, due to Rotary digging drilled as holes or impact drilled as holes need to take mud to carry out retaining wall operation, cause the presence of different degrees of collapse in work progress Hole phenomenon so that bored concrete pile pile body fullness coefficient is excessive, pile body diameter it is bigger than design diameter go out many so that concrete fill Stake clear spacing reduction even adjacent two to be noted to be connected, the follow-up high-pressure spiral jetting diaphragm stake pore-forming that carries out needs geological drilling rig to draw hole, into Hole difficulty and cost are very high, and directly acting on due to concrete, and high-pressure rotary-spray pressure is difficult by concrete disintegrating, is hardly formed Effective water-stop curtain pile body, water-stagnating effect are difficult to ensure that so that the security risk such as excavation of foundation pit stage leakage, piping, quicksand is big Width improves.
The content of the invention
It is contemplated that the defects of overcoming the prior art, there is provided a kind of Bored Pile Filling Coefficient is excessive to cause water-stop curtain stake It is difficult to the processing method of pile, pile body clear spacing is too small caused by solution cast-in-place concrete pile fullness coefficient is excessive, water-stop curtain The problem that pile body is difficult to effective pore-forming and quality is difficult to ensure that.
In order to solve the above-mentioned technical problem, the present invention is realized in:
The excessive processing method for causing water-stop curtain stake to be difficult to pile of a kind of Bored Pile Filling Coefficient, it is characterised in that it is included such as Lower step:
Step 1:According to foundation pit enclosure stake clear spacing, geological mapping report data, site operation concrete fullness coefficient actual number It is worth size, tentatively judges cast-in-place concrete pile " expansion neck " situation;
Step 2:Treat that bored concrete pile reaches more than the 70% of design strength, according to design drawing at adjacent bored concrete pile circle center line connecting midpoint Carry out churning water-stop curtain pile driving construction;
Step 3:For cast-in-place concrete pile " expansion neck " serious pile body, it may appear that churning machinery drilling is difficult or can not creep into Situation, preliminary depth, the degree for judging concrete seriously " expansion neck ";
Step 4:Surveying setting-out, draws two adjacent bored concrete pile circle center line connecting midpoints toward 1/4~1/3 bored concrete pile of outer shifting on the outside of foundation pit Radius distance point;
Step 5:Geological drilling rig, which is carried out, in the point position described in step 4 draws hole, it is deeper 30~50cm than design stake bottom absolute altitude;
Step 6:After the completion of drawing hole, rotary churning pile machine is displaced to bore position, lowering drill pipes, carry out churning water-stop curtain stake and apply Work.
The excessive processing method for causing water-stop curtain stake to be difficult to pile of the Bored Pile Filling Coefficient, it is characterised in that: Concrete fullness coefficient according to claim 1 belongs to normal less than 1.2.
The excessive processing method for causing water-stop curtain stake to be difficult to pile of the Bored Pile Filling Coefficient, it is characterised in that: Drilling machine described in step 5, which draws hole, can combine casing progress.
The excessive processing method for causing water-stop curtain stake to be difficult to pile of the Bored Pile Filling Coefficient, it is characterised in that: Rubble, sand, powder land floor are filled out, it is necessary to carry out panelling construction with reference to casing for easy collapse hole.
The excessive processing method for causing water-stop curtain stake to be difficult to pile of the Bored Pile Filling Coefficient, it is characterised in that: If being carried out according to step 5 during drawing hole, concrete column is not found, and can omit step 5 draws hole work, directly in step Four point position carries out water-stop curtain pile driving construction.
The beneficial effects of the invention are as follows:It is applicable in wide, water-stop curtain stake the side such as intercepts water in basement process, improvement of soil nature, sealing Face is widely used, and under easy collapse hole geological conditions, which has a clear superiority, simple and practical, machinery used, equipment, material It is that construction site is existing, draws materials, is easy to process.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is conventional foundation pit enclosure stake schematic diagram.
Fig. 2 is local pile body " expansion neck " schematic diagram.
Fig. 3 moves schematic diagram in vitro for sealing curtain pile.
Embodiment
A kind of excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient, it includes following step Suddenly:
As shown in Figure 1, 2:Step 1:Filled according to foundation pit enclosure stake clear spacing, geological mapping report data, site operation concrete It is full of coefficient actual numerical value size, concrete fullness coefficient belongs to normal less than 1.2, tentatively judges cast-in-place concrete pile 1 " expansion neck " Situation;
Step 2:Treat that bored concrete pile reaches more than the 70% of design strength, according to design drawing at adjacent bored concrete pile circle center line connecting midpoint Carry out churning water-stop curtain pile driving construction;
Step 3:For cast-in-place concrete pile " expansion neck " serious pile body, it may appear that churning machinery drilling is difficult or can not creep into Situation, preliminary depth, the degree for judging concrete seriously " expansion neck ";
As shown in Figure 3:Step 4:Surveying setting-out, draw two adjacent bored concrete pile circle center line connecting midpoints toward it is outer on the outside of foundation pit move 1/4~ 1/3 bored concrete pile radius distance point;
Step 5:Geological drilling rig, which is carried out, in the point position described in step 4 draws hole, it is deeper 30~50cm than design stake bottom absolute altitude;Drilling machine draws Hole can combine casing and carry out;
Step 6:After the completion of drawing hole, rotary churning pile machine is displaced to bore position, lowering drill pipes, carry out churning water-stop curtain stake and apply Work.
Rubble, sand, powder land floor are filled out, it is necessary to carry out panelling construction with reference to casing for easy collapse hole.
If being carried out according to step 5 during drawing hole, concrete column is not found, and can omit step 5 draws hole work, directly The point position progress water-stop curtain stake 2 for being connected on step 4 is constructed.

Claims (5)

1. the excessive processing method for causing water-stop curtain stake to be difficult to pile of a kind of Bored Pile Filling Coefficient, it is characterised in that it includes Following steps:
Step 1:According to foundation pit enclosure stake clear spacing, geological mapping report data, site operation concrete fullness coefficient actual number It is worth size, tentatively judges cast-in-place concrete pile " expansion neck " situation;
Step 2:Treat that bored concrete pile reaches more than the 70% of design strength, according to design drawing at adjacent bored concrete pile circle center line connecting midpoint Carry out churning water-stop curtain pile driving construction;
Step 3:For cast-in-place concrete pile " expansion neck " serious pile body, it may appear that churning machinery drilling is difficult or can not creep into Situation, preliminary depth, the degree for judging concrete seriously " expansion neck ";
Step 4:Surveying setting-out, draws two adjacent bored concrete pile circle center line connecting midpoints toward 1/4~1/3 bored concrete pile of outer shifting on the outside of foundation pit Radius distance point;
Step 5:Geological drilling rig, which is carried out, in the point position described in step 4 draws hole, it is deeper 30~50cm than design stake bottom absolute altitude;
Step 6:After the completion of drawing hole, rotary churning pile machine is displaced to bore position, lowering drill pipes, carry out churning water-stop curtain stake and apply Work.
2. the excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient according to claim 1, It is characterized in that:Concrete fullness coefficient according to claim 1 belongs to normal less than 1.2.
3. the excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient according to claim 2, It is characterized in that:Drilling machine described in step 5, which draws hole, can combine casing progress.
4. the excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient according to claim 3, It is characterized in that:Rubble, sand, powder land floor are filled out, it is necessary to carry out panelling construction with reference to casing for easy collapse hole.
5. the excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient according to claim 4, It is characterized in that:If being carried out according to step 5 during drawing hole, concrete column is not found, and can omit step 5 draws hole work Make, directly carry out water-stop curtain pile driving construction in the point position of step 4.
CN201711365447.9A 2017-12-18 2017-12-18 The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient Pending CN107975056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711365447.9A CN107975056A (en) 2017-12-18 2017-12-18 The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711365447.9A CN107975056A (en) 2017-12-18 2017-12-18 The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient

Publications (1)

Publication Number Publication Date
CN107975056A true CN107975056A (en) 2018-05-01

Family

ID=62006730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711365447.9A Pending CN107975056A (en) 2017-12-18 2017-12-18 The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient

Country Status (1)

Country Link
CN (1) CN107975056A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681336A (en) * 2020-12-23 2021-04-20 江苏东合南岩土科技股份有限公司 Construction method of plastic sleeve secant pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101255689A (en) * 2008-03-12 2008-09-03 何世鸣 Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof
CN102286981A (en) * 2011-07-15 2011-12-21 深圳市鸿荣轩建设工程有限公司 Waterproof curtain and construction method thereof
CN105350544A (en) * 2015-09-25 2016-02-24 中国建筑第八工程局有限公司 Waterproof curtain used for stone-contained area and construction method thereof
CN205776260U (en) * 2016-07-06 2016-12-07 昆明军龙岩土工程有限公司 The foundation pit enclosure structure of concentric construction drill bored concrete pile in tri-axes deep mixing water-seal pile
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101255689A (en) * 2008-03-12 2008-09-03 何世鸣 Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof
CN102286981A (en) * 2011-07-15 2011-12-21 深圳市鸿荣轩建设工程有限公司 Waterproof curtain and construction method thereof
CN105350544A (en) * 2015-09-25 2016-02-24 中国建筑第八工程局有限公司 Waterproof curtain used for stone-contained area and construction method thereof
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN205776260U (en) * 2016-07-06 2016-12-07 昆明军龙岩土工程有限公司 The foundation pit enclosure structure of concentric construction drill bored concrete pile in tri-axes deep mixing water-seal pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681336A (en) * 2020-12-23 2021-04-20 江苏东合南岩土科技股份有限公司 Construction method of plastic sleeve secant pile
WO2022134232A1 (en) * 2020-12-23 2022-06-30 江苏东合南岩土科技股份有限公司 Plastic casing secant pile construction method

Similar Documents

Publication Publication Date Title
CN102286984A (en) Water-stop curtain and construction method thereof
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN105970918A (en) Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition
CN103046931A (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN111472346A (en) Construction method for reinforcing soil around pile body of cast-in-place pile
CN108842802A (en) Piles in Karst Region base construction method
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN203584301U (en) Hole guide equipment
CN109944600A (en) Shield receiving end reinforced construction method
CN109208594B (en) Treatment method for steel casing sinking meeting boulder, steel casing structure and drilled pile
CN105019913A (en) Base rock uplift region shielding tool-changing in-situ reinforcement method
CN110241836A (en) A kind of construction method of embedding rock water-stop curtain
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN103114602B (en) Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method
CN206090565U (en) Concrete pile's construction equipment
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN107975056A (en) The excessive processing method for causing water-stop curtain stake to be difficult to pile of Bored Pile Filling Coefficient
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels
CN106337418A (en) Supporting structure and supporting method of deep foundation pit in narrow area
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN205314093U (en) Foundation pit supporting structure of pile
CN113202123A (en) Construction method for treating high-span section strong karst filling and curtain seepage-proofing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501