CN107971975A - A kind of multi-functional civil engineering iron hammer - Google Patents

A kind of multi-functional civil engineering iron hammer Download PDF

Info

Publication number
CN107971975A
CN107971975A CN201711267026.2A CN201711267026A CN107971975A CN 107971975 A CN107971975 A CN 107971975A CN 201711267026 A CN201711267026 A CN 201711267026A CN 107971975 A CN107971975 A CN 107971975A
Authority
CN
China
Prior art keywords
level
iron hammer
handle pipe
civil engineering
tup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711267026.2A
Other languages
Chinese (zh)
Inventor
滕琳
李小倩
魏飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qilu Institute of Technology
Original Assignee
Qilu Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qilu Institute of Technology filed Critical Qilu Institute of Technology
Priority to CN201711267026.2A priority Critical patent/CN107971975A/en
Publication of CN107971975A publication Critical patent/CN107971975A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25DPERCUSSIVE TOOLS
    • B25D1/00Hand hammers; Hammer heads of special shape or materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25FCOMBINATION OR MULTI-PURPOSE TOOLS NOT OTHERWISE PROVIDED FOR; DETAILS OR COMPONENTS OF PORTABLE POWER-DRIVEN TOOLS NOT PARTICULARLY RELATED TO THE OPERATIONS PERFORMED AND NOT OTHERWISE PROVIDED FOR
    • B25F1/00Combination or multi-purpose hand tools
    • B25F1/006Combination or multi-purpose hand tools with percussion tool-heads or -blades, e.g. hammers, axes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work
    • B25H7/04Devices, e.g. scribers, for marking

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Percussive Tools And Related Accessories (AREA)

Abstract

The present invention provides a kind of multi-functional civil engineering iron hammer, including connecting sleeve, replaceable hammehead structure, lengthens icking tool rod structure, hexagonal socket bolt in level-one, level-one handle pipe, hexagonal socket bolt in two level, connects rod structure, two level handle pipe, vertical survey line hammer structure and rubber antiskid set, the connecting sleeve are installed on the right side centre position of replaceable hammehead structure;Described lengthening icking tool rod structure one end is bolted connecting sleeve by hexagonal socket in level-one, and the other end is bolted level-one handle pipe by hexagonal socket in two level;Connection rod structure one end connection level-one handle pipe, other end connection two level handle pipe.The present invention has the function of nail nipping, major part hammering and microcephaly's hammering, while also has the function of to survey verticality and portray using combination easy to disassemble, can be easy to storage, and also ruling with gray line determines the expanding function of position.

Description

A kind of multi-functional civil engineering iron hammer
Technical field
The invention belongs to civil engineering technical field of tools, more particularly to a kind of multi-functional civil engineering iron hammer.
Background technology
Iron hammer is one of instrument more commonly used in civil engineering, and existing iron hammer is typically just by simple hammer body and hand Handle forms, relatively simple using function, and due to having plenty of what is be attached by voussoir etc., easily produces loosening, influence just Often use.Simultaneously because iron hammer is generally used for tapping screw, in the construction process in mixed and disorderly environment, in an unguarded moment, it is difficult to Screw is found, construction personnel just needs to look for these screws, reduces the work efficiency of construction.But existing civil engineering With iron hammer, also there is can only carry out single percussion use cannot expand using function, it is impossible to carry out relatively long distance work and not The problem of easy to store.
Therefore, a kind of multi-functional civil engineering is invented to be very necessary with iron hammer.
The content of the invention
It is existing to solve in order to solve the above technical problem, the present invention provides a kind of multi-functional civil engineering iron hammer Civil engineering cannot be expanded using function with iron hammer there is single percussion use can only be carried out, it is impossible to carry out relatively long distance The problem of working and be not easy to storage.A kind of multi-functional civil engineering iron hammer, including connecting sleeve, replaceable tup knot Structure, lengthens icking tool rod structure, hexagonal socket bolt in level-one, level-one handle pipe, and hexagonal socket bolt in two level, connects rod structure, Two level handle pipe, vertical survey line hammer structure and rubber antiskid set, the connecting sleeve are installed on the right side of replaceable hammehead structure Centre position;Described lengthening icking tool rod structure one end is bolted connecting sleeve by hexagonal socket in level-one, and the other end leads to Cross hexagonal socket in two level and be bolted level-one handle pipe;Connection rod structure one end connection level-one handle pipe, other end connection Two level handle pipe;The vertical survey line hammer structure is plugged on the right end of two level handle pipe;The rubber antiskid set is socketed in level-one On the outer wall of handle pipe, connection rod structure and two level handle pipe;The replaceable hammehead structure includes nail nipping goat's horn tup, connects spiral shell Bar, level-one stop nut, hollow iron hammer body, small head thread tup, two level caging bolt and big head thread tup, the nail nipping Goat's horn tup is welded on the upper end of connecting screw;The level-one stop nut is threaded in the top of connecting screw;It is described Connecting screw be threaded in the inside upper part of hollow iron hammer body and be fastenedly connected by level-one stop nut;Microcephaly's spiral shell The lower end of line tup and the upper end integrated setting of big head thread tup;The two level caging bolt is threaded in microcephaly's spiral shell Between line tup and big head thread tup;The lower inside that the small head thread tup is threaded in hollow iron hammer body passes through Two level caging bolt is fastenedly connected.
Preferably, the lengthening icking tool rod structure includes extension bar, knife bar, stainless steel icking tool and magnetite fixed link, institute The stainless steel icking tool screw stated is connected to the right end of knife bar;The knife bar is welded on the right end of extension bar;The magnetite is consolidated Fixed pole is welded on the left end of extension bar.
Preferably, the left end of the magnetite fixed link is adsorbed with suction iron plate.
Preferably, the extension bar includes gum sleeve, marking pen and rectangle placing groove, the rubber sleeve pipe sleeve It is connected on the outer wall centre position of extension bar;The marking pen is placed on the length that the front surface lateral mid-point of extension bar opens up Square placing groove.
Preferably, vertical survey line hammer structure includes nylon vertical line, plumb bob body, chock plug and link, the Buddhist nun Body is hammered in imperial vertical line one end system wiring into shape, and other end system connects chock plug;The link is welded on the upper middle position of chock plug.
Preferably, the inner lower of the chock plug, which is inlaid with, surveys flat water flat pearl.
Preferably, the bosom position of the plumb bob body is inlaid with vertical water flat pearl.
Preferably, the connection rod structure includes gray line wheel construction, and level-one connection screw thread bar, fastens long nut and two level Connection screw thread bar, the gray line wheel construction are installed on the left end of level-one connection screw thread bar;Fastening long nut one end spiral shell Line connects level-one connection screw thread bar, and the other end is threadedly coupled two level connection screw thread bar.
Preferably, the gray line wheel construction includes take-up pulley, wheel seat, rubber stopper, with pulverized limestone ash can, white gray line With rubber pull head, the take-up wheel shaft is connected on the inner right side of wheel seat;The rubber stopper is plugged on pulverized limestone ash can Upper inlet at;The inside left that wheel seat is connected to pulverized limestone ash can screw;Described white gray line one end System connects rubber pull head, and the other end runs through two wall of left and right with pulverized limestone ash can and is wrapped on the outer wall of take-up pulley.
Preferably, the take-up pulley includes folding handle and mounting base, and the folding hand arbor is connected on mounting base It is internal;The mounting base screw is connected to the front surface upper position of take-up pulley.
Preferably, the left end of the right side centre position of the hollow iron hammer body and connecting sleeve welding is set.
Preferably, described extension bar one end is plugged on the inner right side of connecting sleeve, and the other end is plugged on level-one handle pipe Inside left.
Preferably, the diameter of the take-up pulley is five millimeters to eight millimeters smaller than the diameter of level-one handle pipe.
Preferably, the front surface centre position of the right end of the wheel seat and level-one connection screw thread bar, which is glued, is set.
Preferably, the level-one connection screw thread bar is threaded in the inside right end of level-one handle pipe;Two cascades Connect the inside left end that threaded rod is threaded in two level handle pipe.
Preferably, the inside right end grafting of the chock plug and two level handle pipe is set.
Preferably, the suction iron plate specifically uses cuboid permanent magnet pieces.
Preferably, the folding handle is specifically using the wood handle with a word anti-skid chequer rubber sleeve.
Compared with prior art, beneficial effects of the present invention are:
1. in the present invention, the nail nipping goat's horn tup, connecting screw, level-one stop nut, hollow iron hammer body, small head thread hammer Head, the setting of two level caging bolt and big head thread tup, can be just, it can be achieved that the function of nail nipping, microcephaly's hammering and major part hammering In replacement, convenient operation.
2. in the present invention, the take-up pulley, wheel seat, rubber stopper, with pulverized limestone ash can, white gray line and rubber pull head Setting, can carry out ruling definite position work, increase its utility function.
3. in the present invention, the countershaft of the folding handle and mounting base connects setting, folding storage can be easy to.
4. in the present invention, the setting of the extension bar, can extend the decreased food of the iron hammer, easy to remote-controlled operation.
5. in the present invention, the knife bar, the setting of stainless steel icking tool and magnetite fixed link, can be convenient for portraying or Work is cut off, increases its utility function.
6. in the present invention, the suction iron plate specifically uses cuboid permanent magnet pieces, can carry out absorption small part or Person adsorbs the objects such as screw, and expansion uses function.
7. in the present invention, the nylon vertical line, plumb bob body, the setting of chock plug and link, it can be achieved that survey vertical functional, The inside of two level handle pipe can be placed it at the same time, easy to store.
8. in the present invention, the setting of the survey flat water flat pearl, it may be determined that levelness, ensures measuring accuracy.
9. in the present invention, the setting of the vertical water flat pearl, it may be determined that verticality, ensures measuring accuracy.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the structure diagram of the replaceable hammehead structure of the present invention.
Fig. 3 is the structure diagram of the lengthening icking tool rod structure of the present invention.
Fig. 4 is the structure diagram of the vertical survey line hammer structure of the present invention.
Fig. 5 is the structure diagram of the connection rod structure of the present invention.
Fig. 6 is the structure diagram of the gray line wheel construction of the present invention.
In figure:
1st, connecting sleeve;2nd, replaceable hammehead structure;21st, nail nipping goat's horn tup;22nd, connecting screw;23rd, level-one stop nut; 24th, hollow iron hammer body;25th, small head thread tup;26th, two level caging bolt;27th, big head thread tup;3rd, icking tool bar knot is lengthened Structure;31st, extension bar;311st, gum sleeve;312nd, marking pen;313rd, rectangle placing groove;32nd, knife bar;33rd, stainless steel icking tool; 34th, magnetite fixed link;341st, iron plate is inhaled;4th, hexagonal socket bolt in level-one;5th, level-one handle pipe;6th, hexagonal socket spiral shell in two level Bolt;7th, rod structure is connected;71st, gray line wheel construction;711st, take-up pulley;7111st, folding handle;7112nd, mounting base;712nd, wheel seat; 713rd, rubber stopper;714th, with pulverized limestone ash can;715th, white gray line;716th, rubber pull head;72nd, level-one connection screw thread bar;73、 Fasten long nut;74th, two level connection screw thread bar;8th, two level handle pipe;9th, vertical survey line hammer structure;91st, nylon vertical line;92nd, plumb bob Body;921st, vertical water flat pearl;93rd, chock plug;931st, flat water flat pearl is surveyed;94th, link;10th, rubber antiskid set.
Embodiment
The present invention is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 6
The present invention provides a kind of multi-functional civil engineering iron hammer, including connecting sleeve 1, and replaceable hammehead structure 2, lengthens and carve Lever structure 3, hexagonal socket bolt 4 in level-one, level-one handle pipe 5, hexagonal socket bolt 6 in two level, connects rod structure 7, two level Handle pipe 8, vertical survey line hammer structure 9 and rubber antiskid set 10, the connecting sleeve 1 is installed on the right side of replaceable hammehead structure 2 Side centre position;Described 3 one end of lengthening icking tool rod structure connects connecting sleeve 1 by hexagonal socket bolt 4 in level-one, another End connects level-one handle pipe 5 by hexagonal socket bolt 6 in two level;7 one end of connection rod structure connection level-one handle pipe 5, separately One end connection two level handle pipe 8;The vertical survey line hammer structure 9 is plugged on the right end of two level handle pipe 8;The rubber antiskid set 10 are socketed in level-one handle pipe 5, on the outer wall for connecting rod structure 7 and two level handle pipe 8;The replaceable hammehead structure 2 includes Follow closely goat's horn tup 21, connecting screw 22, level-one stop nut 23, hollow iron hammer body 24, small head thread tup 25, the spacing spiral shell of two level Bolt 26 and big head thread tup 27, the nail nipping goat's horn tup 21 are welded on the upper end of connecting screw 22;The level-one limit Position nut 23 is threaded in the top of connecting screw 22;The connecting screw 22 is threaded in the interior of hollow iron hammer body 24 Upper lateral part is fastenedly connected by level-one stop nut 23;The lower end of the small head thread tup 25 and big head thread tup 27 Upper end integrated setting;The two level caging bolt 26 be threaded in small head thread tup 25 and big head thread tup 27 it Between;The lower inside that the small head thread tup 25 is threaded in hollow iron hammer body 24 is fastened by two level caging bolt 26 Connection.
In above-described embodiment, specifically, the lengthening icking tool rod structure 3 includes extension bar 31, knife bar 32, stainless steel is carved Knife 33 and magnetite fixed link 34,33 screw of stainless steel icking tool are connected to the right end of knife bar 32;The knife bar 32 welds In the right end of extension bar 31;The magnetite fixed link 34 is welded on the left end of extension bar 31.
In above-described embodiment, specifically, the left end of the magnetite fixed link 34 is adsorbed with iron plate 341.
In above-described embodiment, specifically, the extension bar 31 includes gum sleeve 311, marking pen 312 and rectangle are put Groove 313 is put, the gum sleeve 311 is socketed in the outer wall centre position of extension bar 31;The marking pen 312, which is placed on, to be added The rectangle placing groove 313 that the front surface lateral mid-point of stock 31 opens up.
In above-described embodiment, specifically, the vertical survey line hammer structure 9 includes nylon vertical line 91, plumb bob body 92, plug First 93 and link 94,91 one end systems of nylon vertical line wiring hammer body 92, other end system connects chock plug 93;The link 94 It is welded on the upper middle position of chock plug 93.
In above-described embodiment, specifically, the inner lower of the chock plug 93, which is inlaid with, surveys flat water flat pearl 931.
In above-described embodiment, specifically, the bosom position of the plumb bob body 92 is inlaid with vertical water flat pearl 921。
In above-described embodiment, specifically, the connection rod structure 7 includes gray line wheel construction 71, level-one connection screw thread bar 72, long nut 73 and two level connection screw thread bar 74 are fastened, the gray line wheel construction 71 is installed on level-one connection screw thread bar 72 Left end;73 threaded one end of the fastening long nut connection level-one connection screw thread bar 72, the other end are threadedly coupled two level connection spiral shell Rasp bar 74.
In above-described embodiment, specifically, the gray line wheel construction 71 includes take-up pulley 711, wheel seat 712, rubber stopper 713, with pulverized limestone ash can 714, white gray line 715 and rubber pull head 716,711 axis of take-up pulley are connected on wheel seat 712 Inner right side;The rubber stopper 713 is plugged at the upper inlet with pulverized limestone ash can 714;Described carries pulverized limestone 714 screw of ash can is connected to the inside left of wheel seat 712;715 one end system of white gray line connects rubber pull head 716, another End is run through two wall of left and right with pulverized limestone ash can 714 and is wrapped on the outer wall of take-up pulley 711.
In above-described embodiment, specifically, the take-up pulley 711 includes folding handle 7111 and mounting base 7112, it is described 7111 axis of folding handle be connected on the inside of mounting base 7112;7112 screw of mounting base is being connected to take-up pulley 711 just Surface upper position.
In above-described embodiment, specifically, the right side centre position of hollow iron hammer body 24 and the left end of connecting sleeve 1 Welding is set.
In above-described embodiment, specifically, described 31 one end of extension bar is plugged on the inner right side of connecting sleeve 1, it is another End is plugged on the inside left of level-one handle pipe 5.
In above-described embodiment, specifically, five millimeters smaller than the diameter of level-one handle pipe 5 of the diameter of the take-up pulley 711 is extremely Eight millimeters.
In above-described embodiment, specifically, among the front surface of the right end of the wheel seat 712 and level-one connection screw thread bar 72 Position, which is glued, to be set.
In above-described embodiment, specifically, the inside that the level-one connection screw thread bar 72 is threaded in level-one handle pipe 5 is right End;The two level connection screw thread bar 74 is threaded in the inside left end of two level handle pipe 8.
In above-described embodiment, specifically, the inside right end grafting of the chock plug 93 and two level handle pipe 8 is set.
In above-described embodiment, specifically, the suction iron plate 341 specifically uses cuboid permanent magnet pieces.
In above-described embodiment, specifically, the folding handle 7111 is specifically used with a word anti-skid chequer rubber sleeve Wood handle.
Operation principle
In the present invention, civil engineering iron hammer has the function of nail nipping, microcephaly's hammering and major part hammering, while also has verticality Detect, portray graticule and gray line line determine position expansion use function:When wherein nail nipping works, pass through nail nipping claw hammer First 21 carry out nail nipping work, convenient operation;Microcephaly hammers and major part hammering function:Can be by loosening two level caging bolt 26, according to use demand, the use order of small head thread tup 25 and big head thread tup 27 is replaced, it is easy to operation, make When hammering work with big head thread tup 27, big head thread tup 27 need to be only threaded under the inner side of hollow iron hammer body 24 Two level caging bolt 26 is tightened in portion, and when hammering work using small head thread tup 25, small 25 screw thread of head thread tup is connected The lower inside of hollow iron hammer body 24 is connected on, tightens two level caging bolt 26;Measuring for verticality expanding function:By chock plug 93 Removed from two level handle pipe 8, haul out nylon vertical line 91 and plumb bob body 92, hold link 94, plumb bob body 92 naturally droops, i.e., It can carry out surveying verticality work, can also coordinate and survey the 931 carry out level detection of flat water flat pearl, be carried out by vertical water flat pearl 921 Verticality confirms work, ensures that detection is more accurate;Portray graticule expanding function:By hexagonal socket bolt 4 and two level in level-one Interior hexagonal socket bolt 6 loosens, and removes and lengthens icking tool rod structure 3, can carry out portraying work by stainless steel icking tool 33, pass through The setting of match mark pen 312 can accurate marking;The setting for inhaling iron plate 341 is coordinated to carry out the suction of fine pieces Echo and look for work;Gray line line determines position expanding function:By the way that rod structure 7 will be connected from level-one handle pipe 5 and two level handle pipe 8 Between unload, hold rubber pull head 716, pull to the left so that white gray line 715 is hauled out from pulverized limestone ash can 714, by It has been infected with white gray line 715 during hauling-out with the pulverized limestone in pulverized limestone ash can 714, at this time only need to be by white gray line 715 are gently pulled upwardly, and release rebound, pulverized limestone gray line is fallen, and leaves the trace of pulverized limestone on ground immediately at this time, you can really Determine horizontal level, it is easy to operation, after use, folding handle 7111 is rotated up from 90 degree in mounting base 7112, is dialled Dynamic folding handle 7111, so that take-up pulley 711 rotates, white gray line 715 is withdrawn, until rubber pull head 716 and wheel seat 712 Untill left surface is bonded;The civil engineering iron hammer combination easy to disassemble, easy to store, be provided simultaneously with it is a variety of use function, can Easy to select to use.
Using technical solutions according to the invention, or those skilled in the art is under the inspiration of technical solution of the present invention, Similar technical solution is designed, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (10)

1. a kind of multi-functional civil engineering iron hammer, it is characterised in that the multi-functional civil engineering includes connection with iron hammer Casing(1), replaceable hammehead structure(2), lengthen icking tool rod structure(3), hexagonal socket bolt in level-one(4), level-one handle pipe (5), hexagonal socket bolt in two level(6), connect rod structure(7), two level handle pipe(8), vertical survey line hammer structure(9)Prevent with rubber Sliding sleeve(10), the connecting sleeve(1)Installed in replaceable hammehead structure(2)Right side centre position;The lengthening is carved Lever structure(3)One end passes through hexagonal socket bolt in level-one(4)Connect connecting sleeve(1), the other end passes through hexagonal in two level Socket bolt(6)Connect level-one handle pipe(5);The connection rod structure(7)One end connects level-one handle pipe(5), other end connection Two level handle pipe(8);The vertical survey line hammer structure(9)It is plugged on two level handle pipe(8)Right end;The rubber antiskid set (10)It is socketed in level-one handle pipe(5), connect rod structure(7)With two level handle pipe(8)Outer wall on;The replaceable hammehead structure (2)Including nail nipping goat's horn tup(21), connecting screw(22), level-one stop nut(23), hollow iron hammer body(24), small head thread Tup(25), two level caging bolt(26)With big head thread tup(27), the nail nipping goat's horn tup(21)It is welded on connection Screw rod(22)Upper end;The level-one stop nut(23)It is threaded in connecting screw(22)Top;The connection Screw rod(22)It is threaded in hollow iron hammer body(24)Inside upper part pass through level-one stop nut(23)It is fastenedly connected;Described Small head thread tup(25)Lower end and big head thread tup(27)Upper end integrated setting;The two level caging bolt (26)It is threaded in small head thread tup(25)With big head thread tup(27)Between;The small head thread tup(25)Spiral shell Line is connected to hollow iron hammer body(24)Lower inside pass through two level caging bolt(26)It is fastenedly connected.
2. multi-functional civil engineering iron hammer as claimed in claim 1, it is characterised in that the lengthening icking tool rod structure (3)Including extension bar(31), knife bar(32), stainless steel icking tool(33)With magnetite fixed link(34), the stainless steel icking tool (33)Screw is connected to knife bar(32)Right end;The knife bar(32)It is welded on extension bar(31)Right end;The magnetite Fixed link(34)It is welded on extension bar(31)Left end.
3. multi-functional civil engineering iron hammer as claimed in claim 2, it is characterised in that the magnetite fixed link(34) Left end be adsorbed with suction iron plate(341).
4. multi-functional civil engineering iron hammer as claimed in claim 2, it is characterised in that the extension bar(31)Including Gum sleeve(311), marking pen(312)With rectangle placing groove(313), the gum sleeve(311)It is socketed in extension bar (31)Outer wall centre position;The marking pen(312)It is placed on extension bar(31)Front surface lateral mid-point open up Rectangle placing groove(313).
5. multi-functional civil engineering iron hammer as claimed in claim 1, it is characterised in that the vertical survey line hammer structure (9)Including nylon vertical line(91), plumb bob body(92), chock plug(93)And link(94), the nylon vertical line(91)One end system Body is hammered in wiring into shape(92), other end system connects chock plug(93);The link(94)It is welded on chock plug(93)Upper middle position.
6. multi-functional civil engineering iron hammer as claimed in claim 5, it is characterised in that the chock plug(93)Inside Downside, which is inlaid with, surveys flat water flat pearl(931).
7. multi-functional civil engineering iron hammer as claimed in claim 1, it is characterised in that the connection rod structure(7) Including gray line wheel construction(71), level-one connection screw thread bar(72), fasten long nut(73)With two level connection screw thread bar(74), it is described Gray line wheel construction(71)Installed in level-one connection screw thread bar(72)Left end;The fastening long nut(73)Threaded one end connects Connect level-one connection screw thread bar(72), other end threaded connection two level connection screw thread bar(74).
8. multi-functional civil engineering iron hammer as claimed in claim 7, it is characterised in that the gray line wheel construction(71) Including take-up pulley(711), wheel seat(712), rubber stopper(713), with pulverized limestone ash can(714), white gray line(715)And rubber Pull head(716), the take-up pulley(711)Axis is connected on wheel seat(712)Inner right side;The rubber stopper(713)It is plugged on With pulverized limestone ash can(714)Upper inlet at;Described carries pulverized limestone ash can(714)Screw is connected to wheel seat(712) Inside left;The white gray line(715)One end system connects rubber pull head(716), the other end, which runs through, carries pulverized limestone ash can (714)Two wall of left and right be wrapped in take-up pulley(711)Outer wall on.
9. multi-functional civil engineering iron hammer as claimed in claim 8, it is characterised in that the take-up pulley(711)Bag Include folding handle(7111)And mounting base(7112), the folding handle(7111)Axis is connected on mounting base(7112)Inside; The mounting base(7112)Screw is connected to take-up pulley(711)Front surface upper position.
10. multi-functional civil engineering iron hammer as claimed in claim 5, it is characterised in that the plumb bob body(92) Bosom position be inlaid with vertical water flat pearl(921).
CN201711267026.2A 2017-12-05 2017-12-05 A kind of multi-functional civil engineering iron hammer Pending CN107971975A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711267026.2A CN107971975A (en) 2017-12-05 2017-12-05 A kind of multi-functional civil engineering iron hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711267026.2A CN107971975A (en) 2017-12-05 2017-12-05 A kind of multi-functional civil engineering iron hammer

Publications (1)

Publication Number Publication Date
CN107971975A true CN107971975A (en) 2018-05-01

Family

ID=62009308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711267026.2A Pending CN107971975A (en) 2017-12-05 2017-12-05 A kind of multi-functional civil engineering iron hammer

Country Status (1)

Country Link
CN (1) CN107971975A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108356765A (en) * 2018-05-10 2018-08-03 广西思民科技有限公司 A kind of Multifunctional hardware hammer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2609725Y (en) * 2003-03-24 2004-04-07 缪伟杨 Carpenter's ink marker
JP2004202608A (en) * 2002-12-24 2004-07-22 Oh Industrial Co Ltd Small hammer
CN203902105U (en) * 2014-04-25 2014-10-29 宁波市鄞州永佳电机工具有限公司 Multi-purpose graver
CN204546464U (en) * 2014-12-26 2015-08-12 上海大学 Multifunctional assembled life-saving hammer
CN204748543U (en) * 2015-07-03 2015-11-11 宁波嘉丰精密铸造有限公司 Multi -functional torque spanner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004202608A (en) * 2002-12-24 2004-07-22 Oh Industrial Co Ltd Small hammer
CN2609725Y (en) * 2003-03-24 2004-04-07 缪伟杨 Carpenter's ink marker
CN203902105U (en) * 2014-04-25 2014-10-29 宁波市鄞州永佳电机工具有限公司 Multi-purpose graver
CN204546464U (en) * 2014-12-26 2015-08-12 上海大学 Multifunctional assembled life-saving hammer
CN204748543U (en) * 2015-07-03 2015-11-11 宁波嘉丰精密铸造有限公司 Multi -functional torque spanner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108356765A (en) * 2018-05-10 2018-08-03 广西思民科技有限公司 A kind of Multifunctional hardware hammer

Similar Documents

Publication Publication Date Title
CN107971975A (en) A kind of multi-functional civil engineering iron hammer
CN207850992U (en) A kind of tool convenient for subway engineering detection metope hollowing
CN204149133U (en) Multifunction geological hammer
CN208445946U (en) A kind of multi-functional building implement shovel
CN204112379U (en) Inclinometer pipe casing in supporting pile body
CN208005596U (en) Claw hammer that is adjustable and helping nail
CN207014035U (en) A kind of retarder production clamps platform with drilling auxiliary
CN205254924U (en) Outer wall decoration is hung stone material construction futilely and is used multi -functional instrument
CN207761580U (en) A kind of Portable small-bore underground boring mole
CN211285553U (en) Drill rod detection equipment
CN108356765A (en) A kind of Multifunctional hardware hammer
CN207233374U (en) A kind of adjustable manual, pedal double-purpose hangs small cymbals
CN207709937U (en) A kind of portable aluminium alloy building-material factory Special-purpose puncher
CN101658723A (en) Climbing Rock boring expansion nail
CN206360364U (en) A kind of Screw arbor with nut at both-ends sleeve pipe removal tool
CN206527707U (en) A kind of novel and multifunctional interior decoration instrument hammer
CN110906172A (en) Leakage monitoring device for gas pipeline
CN209620069U (en) Flow pore-forming tool before well-points dewatering standpipe pipe laying
CN202081657U (en) Construction casing fixing device
CN217083693U (en) A excitation device for managing canopy length detection
CN211073467U (en) Iron nail extractor
CN214604163U (en) Multifunctional construction tool shovel
CN206319836U (en) One kind probing drilling tool
CN201810236U (en) Button punching clamp of pipe column clamp used for oil field drilling
CN205842134U (en) A kind of total station tripod anti-sinking securing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501