CN208445946U - A kind of multi-functional building implement shovel - Google Patents

A kind of multi-functional building implement shovel Download PDF

Info

Publication number
CN208445946U
CN208445946U CN201820409945.2U CN201820409945U CN208445946U CN 208445946 U CN208445946 U CN 208445946U CN 201820409945 U CN201820409945 U CN 201820409945U CN 208445946 U CN208445946 U CN 208445946U
Authority
CN
China
Prior art keywords
shovel
head
gripping tube
functional building
extension pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820409945.2U
Other languages
Chinese (zh)
Inventor
张先龙
陈旭
丁齐国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN201820409945.2U priority Critical patent/CN208445946U/en
Application granted granted Critical
Publication of CN208445946U publication Critical patent/CN208445946U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a kind of multi-functional building implement shovel, including gripping tube, extension pipe, silica gel sheath, adjust bolt, graduated scale, horizontal bead, spare connecting rope structure, stone crushing head structure is built, handle, mounting head and adjustable shovel structure, the extension pipe are plugged on the inside upper part of gripping tube;The adjusting bolt thread is connected to the right side junction of gripping tube and extension pipe;The graduated scale is glued on the left of the front surface of gripping tube;The horizontal bead is glued to the front surface middle position of gripping tube.The utility model sawtooth is provided with the right side of shovel head, is conducive to conveniently play dissection to building object, and then increase and use function;Broken drill bit specifically uses tapered ledge aiguille, is conducive to conveniently play crushing function to building object;Wirerope one end is connect with pull ring, and the other end is wrapped on spring wrap axis, is conducive to the convenient object that will build when in use and is intertwined.

Description

A kind of multi-functional building implement shovel
Technical field
The utility model belongs to building implement technical field more particularly to a kind of multi-functional building implement shovel.
Background technique
The a part of architectural engineering as municipal works, it is more and more important in the process of urban construction.Wherein city Greenbelt Developing can't do without some building implements at a huge industry in urban afforestation process, wherein building shovel is just It is one of common tool.In architectural process, need to shovel sandstone or cement.
Chinese Patent Application No. is 201620685164.7, and a kind of entitled building implement shovel of innovation and creation solves So construction worker needs spare various types of building shovels in plantation, this just brings inconvenience to construction worker.Its Drip irrigation device is that have one to have externally threaded first connector in the first shovel head, has on the handle and joint screw thread connects The locking nut connect, the locking nut circumferentially rotates and circumferential limit is on handle, and one end of the handle is provided with a company Connector, the connector include a polygon column, and the connector is provided with polygon hollow tube compatible with polygon column;Also The second shovel head including having the second connector, second connector are detachably connected by a location structure and the realization of polygon column It connects.
But existing building implement shovel is there is also use the function of shovel head is poor, does not have and plays drilling to building object Crushing function and do not have the problem of function of playing connecting rope.
Therefore, a kind of multi-functional building implement shovel is invented to be very necessary.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of multi-functional building implement shovel, existing to solve Building implement shovel shovel head use function it is poor, do not have that building object is played to drill and crushing function and do not have and play connection The problem of function of rope.A kind of multi-functional building implement shovel, including gripping tube, extension pipe, silica gel sheath, adjusting bolt, graduated scale, Horizontal bead, spare connecting rope structure build stone crushing head structure, handle, mounting head and adjustable shovel structure, the lengthening Pipe is plugged on the inside upper part of gripping tube;The adjusting bolt thread is connected to the right side junction of gripping tube and extension pipe;It is described Graduated scale be glued on the left of the front surface of gripping tube;The horizontal bead is glued to the front surface middle position of gripping tube;Described Spare connecting rope structure welding not portion under gripping tube;The building stone crushing head structure welding is in spare connecting rope The lower part of structure;The handle is welded on the lower part of building stone crushing head structure;The mounting head is welded on extension pipe Upper end;The adjustable shovel structure is mounted on the upper end of mounting head;The spare connecting rope structure includes installing frame, bullet Spring winds axis, and wirerope, pull ring, screwed pipe and nut cap, the spring wrap axis axis connect in the bosom position of installing frame; The pull ring is mounted on the lower part of wirerope;The screwed pipe is welded on the lower part of installing frame;The nut cap screw thread connects Connect the outer lower portion in screwed pipe.
Preferably, the building stone crushing head structure includes fixed block, protective cover, threaded block and broken drill bit, institute The protective cover stated is threaded in the outer lower portion of threaded block;The threaded block is welded on the lower part of fixed block;Described is broken Broken drill bit welding Ei is in the lower end of threaded block.
Preferably, the adjustable shovel structure includes shovel head, cutter, card slot, sawtooth, mounting plate and bolt and nut, institute The cutter stated are provided with the left side of shovel head;The card slot is provided with the lower left quarter of shovel head;The mounting plate is welded on shovel At left and right sides of the middle and lower part of head.
Preferably, the sawtooth is provided with the right side of shovel head.
Preferably, the broken drill bit specifically uses tapered ledge aiguille.
Preferably, described wirerope one end is connect with pull ring, and the other end is wrapped on spring wrap axis.
Preferably, the lower outside of the handle is also socketed with the silicagel pad with latticed anti-skid chequer.
Preferably, the silica gel sheath is socketed in the junction of gripping tube and extension pipe.
Preferably, the silicon shovel head is mounted on the upper end of extension pipe by bolt and nut through mounting plate and mounting head.
Compared with prior art, the utility model has the following beneficial effects:
1. in the utility model, the sawtooth is provided with the right side of shovel head, is conducive to convenient play to building object and cuts The effect of cutting, and then increase and use function.
2. in the utility model, the broken drill bit specifically uses tapered ledge aiguille, it is convenient to building to be conducive to Object plays crushing function.
3. in the utility model, described wirerope one end is connect with pull ring, and the other end is wrapped on spring wrap axis, have Building object is intertwined when in use conducive to convenient.
4. in the utility model, the lower outside of the handle is also socketed with the silicagel pad with latticed anti-skid chequer, Be conducive to improve antiskid effect when user holds.
5. in the utility model, the silica gel sheath is socketed in the junction of gripping tube and extension pipe, it is beneficial to prevent use When dust or rainwater enter at the gap of gripping tube and extension pipe, and then improve sealing effect.
6. in the utility model, the shovel head is mounted on extension pipe through mounting plate and mounting head by bolt and nut Upper end, is conducive to facilitate angle of the shovel head on extension pipe is adjusted according to use demand.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the spare connecting rope structure of the utility model.
Fig. 3 is the structural schematic diagram of the building stone crushing head structure of the utility model.
Fig. 4 is the structural schematic diagram of the adjustable shovel structure of the utility model.
In figure:
1, gripping tube;2, extension pipe;3, silica gel sheath;4, bolt is adjusted;5, graduated scale;6, horizontal bead;7, spare connecting rope Structure;71, installing frame;72, spring wrap axis;73, wirerope;74, pull ring;75, screwed pipe;76, nut cap;8, building stone is broken Broken header structure;81, fixed block;82, protective cover;83, threaded block;84, it is crushed drill bit;9, handle;91, latticed anti-skid chequer is had Silicagel pad;10, mounting head;11, adjustable shovel structure;111, shovel head;112, cutter;113, card slot;114, sawtooth;115, pacify Loading board;116, bolt and nut.
Specific embodiment
The utility model is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 4
The utility model provides a kind of multi-functional building implement shovel, including gripping tube 1, extension pipe 2, silica gel sheath 3 adjust spiral shell Bolt 4, graduated scale 5, horizontal bead 6, spare connecting rope structure 7 build stone crushing head structure 8, handle 9, mounting head 10 and can Shovel structure 11 is adjusted, the extension pipe 2 is plugged on the inside upper part of gripping tube 1;The adjusting bolt 4 is threaded in gripping tube 1 With the right side junction of extension pipe 2;The graduated scale 5 is glued on the left of the front surface of gripping tube 1;The horizontal bead 6 is glued In the front surface middle position of gripping tube 1;The spare connecting rope structure 7 is welded under gripping tube 1 not portion;The building Stone is crushed the lower part that header structure 8 is welded on spare connecting rope structure 7;The handle 9 is welded on building stone crushing head The lower part of structure 8;The mounting head 10 is welded on the upper end of extension pipe 2;The adjustable shovel structure 11 is mounted on mounting head 10 upper end;The spare connecting rope structure 7 includes installing frame 71, spring wrap axis 72, wirerope 73, pull ring 74, spiral shell Line pipe 75 and nut cap 76,72 axis of spring wrap axis connect in the bosom position of installing frame 71;The pull ring 74 is pacified Mounted in the lower part of wirerope 73;The screwed pipe 75 is welded on the lower part of installing frame 71;The nut cap 76 is threaded in The outer lower portion of screwed pipe 75.
In above-described embodiment, specifically, the building stone crushing head structure 8 includes fixed block 81, protective cover 82, spiral shell Line seat 83 and broken drill bit 84, the protective cover 82 are threaded in the outer lower portion of threaded block 83;The threaded block 83 It is welded on the lower part of fixed block 81;The broken drill bit 84 welds Ei in the lower end of threaded block 83.
In above-described embodiment, specifically, the adjustable shovel structure 11 include shovel head 111, cutter 112, card slot 113, Sawtooth 114, mounting plate 115 and bolt and nut 116, the cutter 112 are provided with the left side of shovel head 111;The card slot 113 are provided with the lower left quarter of shovel head 111;The mounting plate 115 is welded at left and right sides of the middle and lower part of shovel head 111.
In above-described embodiment, specifically, the sawtooth 114 is provided with the right side of shovel head 111.
In above-described embodiment, specifically, the broken drill bit 84 specifically uses tapered ledge aiguille.
In above-described embodiment, specifically, described 73 one end of wirerope is connect with pull ring 74, the other end is wrapped in spring and twines On axis 72.
In above-described embodiment, specifically, the lower outside of the handle 9 is also socketed with the silicon with latticed anti-skid chequer Rubber mat 91.
In above-described embodiment, specifically, the silica gel sheath 3 is socketed in the junction of gripping tube 1 Yu extension pipe 2.
In above-described embodiment, specifically, the silicon shovel head 111 runs through mounting plate 115 and mounting head by bolt and nut 116 10 are mounted on the upper end of extension pipe 2.
Working principle
The utility model during the work time, adjusts shovel head 111 using bolt and nut 116 according to use demand first and is pacifying The angle on head 10 is filled, the length that extension pipe 2 is plugged in gripping tube 1 is then adjusted, and consolidated using bolt 4 is adjusted It is fixed, then can be according to the actual situation using broken 84 pairs of building objects of drill bit into broken, or utilize wirerope 73 by building Part is intertwined, and when in use, detect or using horizontal bead 6 to building to required building using graduated scale 5 Levelness detected.
Using technical solution described in the utility model or those skilled in the art in technical solutions of the utility model Under inspiration, similar technical solution is designed, and reaches above-mentioned technical effect, is the protection model for falling into the utility model It encloses.

Claims (9)

1. a kind of multi-functional building implement shovel, which is characterized in that the multi-functional building implement shovel, including gripping tube (1) lengthen It manages (2), silica gel sheath (3), adjusts bolt (4), graduated scale (5), horizontal bead (6), spare connecting rope structure (7), build stone Broken header structure (8), handle (9), mounting head (10) and adjustable shovel structure (11), the extension pipe (2) are plugged on gripping tube (1) Inside upper part;The adjusting bolt (4) is threaded in the right side junction of gripping tube (1) Yu extension pipe (2);The quarter Degree ruler (5) is glued on the left of the front surface of gripping tube (1);The horizontal bead (6) is glued to the front surface interposition of gripping tube (1) It sets;The spare connecting rope structure (7) is welded under gripping tube (1) not portion;The building stone crushing head structure (8) It is welded on the lower part of spare connecting rope structure (7);The handle (9) is welded under building stone crushing head structure (8) Portion;The mounting head (10) is welded on the upper end of extension pipe (2);The adjustable shovel structure (11) is mounted on mounting head (10) Upper end;The spare connecting rope structure (7) includes installing frame (71), spring wrap axis (72), wirerope (73), pull ring (74), screwed pipe (75) and nut cap (76), described spring wrap axis (72) axis connect in the bosom position of installing frame (71); The pull ring (74) is mounted on the lower part of wirerope (73);The screwed pipe (75) is welded on the lower part of installing frame (71); The nut cap (76) is threaded in the outer lower portion of screwed pipe (75).
2. multi-functional building implement shovel as described in claim 1, which is characterized in that the building stone crushing head structure It (8) include fixed block (81), protective cover (82), threaded block (83) and broken drill bit (84), the protective cover (82) screw thread connects Connect the outer lower portion in threaded block (83);The threaded block (83) is welded on the lower part of fixed block (81);The broken brill Lower end of head (84) the welding Ei in threaded block (83).
3. multi-functional building implement shovel as described in claim 1, which is characterized in that the adjustable shovel structure (11) includes Shovel head (111), cutter (112), card slot (113), sawtooth (114), mounting plate (115) and bolt and nut (116), described cuts Cutter (112) is provided with the left side of shovel head (111);The card slot (113) is provided with the lower left quarter of shovel head (111);Described Mounting plate (115) is welded at left and right sides of the middle and lower part of shovel head (111).
4. multi-functional building implement shovel as claimed in claim 3, which is characterized in that the sawtooth (114) is provided with shovel The right side of head (111).
5. multi-functional building implement shovel as claimed in claim 2, which is characterized in that the broken drill bit (84) is specifically adopted With tapered ledge aiguille.
6. multi-functional building implement shovel as described in claim 1, which is characterized in that described wirerope (73) one end and drawing Ring (74) connection, the other end are wrapped on spring wrap axis (72).
7. multi-functional building implement shovel as described in claim 1, which is characterized in that the lower outside of the handle (9) Also it is socketed with the silicagel pad (91) with latticed anti-skid chequer.
8. multi-functional building implement shovel as described in claim 1, which is characterized in that the silica gel sheath (3) is socketed in gripping tube (1) with the junction of extension pipe (2).
9. multi-functional building implement shovel as claimed in claim 3, which is characterized in that the shovel head (111) passes through bolt spiral shell Female (116) are mounted on the upper end of extension pipe (2) through mounting plate (115) and mounting head (10).
CN201820409945.2U 2018-03-26 2018-03-26 A kind of multi-functional building implement shovel Expired - Fee Related CN208445946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820409945.2U CN208445946U (en) 2018-03-26 2018-03-26 A kind of multi-functional building implement shovel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820409945.2U CN208445946U (en) 2018-03-26 2018-03-26 A kind of multi-functional building implement shovel

Publications (1)

Publication Number Publication Date
CN208445946U true CN208445946U (en) 2019-02-01

Family

ID=65156873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820409945.2U Expired - Fee Related CN208445946U (en) 2018-03-26 2018-03-26 A kind of multi-functional building implement shovel

Country Status (1)

Country Link
CN (1) CN208445946U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958069A (en) * 2019-04-24 2019-07-02 邢彦超 A kind of portable multi-function bridge maintenance tool
CN111827378A (en) * 2020-07-22 2020-10-27 山东鼎鲁建筑有限公司 Multifunctional tool shovel for building construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958069A (en) * 2019-04-24 2019-07-02 邢彦超 A kind of portable multi-function bridge maintenance tool
CN111827378A (en) * 2020-07-22 2020-10-27 山东鼎鲁建筑有限公司 Multifunctional tool shovel for building construction

Similar Documents

Publication Publication Date Title
CN208445946U (en) A kind of multi-functional building implement shovel
CN208202486U (en) A kind of construction site ceramic tile U.S. seam device
CN206728754U (en) A kind of grape climbing frame of greenhouse gardening
CN203875382U (en) Bonded rebar drilling device
CN207476116U (en) A kind of multifunctional novel spades for building
CN105755938A (en) A handheld bush hammer
CN211597713U (en) Height adjusting tool for support base
CN111648734B (en) Frame water spray connector for anchoring drilling machine
CN206481558U (en) A kind of Multifunctional construction tool shovel
CN110014525A (en) A kind of ceramic tile cutting clamper quickly accommodated
CN209603997U (en) Handheld pneumatic rock drill is used in a kind of exploitation of marble
CN203811415U (en) Damping type soil collector
CN206335166U (en) Roof perforate specific purpose tool
CN206608108U (en) A kind of Assembled punch for water conservancy construction
CN206616829U (en) A kind of claying knife for building
CN206745768U (en) A kind of multifunctional fire-fighting instrument
CN208773656U (en) Fireman's axe is used in a kind of rescue
CN110506565A (en) A kind of tree planting auxiliary stand that can be quickly fixed
CN210566017U (en) Portable adjustable acupuncture point physiotherapy chip
CN204782924U (en) Gun drilling sleeve pipe check valve for grouting behind shaft and drift lining
CN207892531U (en) Multi-functional water conservancy Counterboring apparatus
CN219241304U (en) Scaffold cross bar joint
CN209011172U (en) A kind of road construction spade
CN217460198U (en) Novel concrete floor construction device
CN213392008U (en) Regulating part for water drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

CF01 Termination of patent right due to non-payment of annual fee