CN107957222A - Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate - Google Patents

Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate Download PDF

Info

Publication number
CN107957222A
CN107957222A CN201711217817.4A CN201711217817A CN107957222A CN 107957222 A CN107957222 A CN 107957222A CN 201711217817 A CN201711217817 A CN 201711217817A CN 107957222 A CN107957222 A CN 107957222A
Authority
CN
China
Prior art keywords
section
explosive
blasthole
stemming
generation rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711217817.4A
Other languages
Chinese (zh)
Inventor
陈明
卢文波
刘涛
严鹏
王高辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201711217817.4A priority Critical patent/CN107957222A/en
Publication of CN107957222A publication Critical patent/CN107957222A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention provides a kind of blasthole spaced loading for reducing methods of blasting toes in open generation rate and the method for ignition, it is characterised in that comprises the following steps:Step 1. is drilled with the blast hole of certain ultra-deep;Step 2. first forms first segment explosive section to 1.0~1.5 times of blasthole bottom blasthole ultra-deep length range filling explosive, and detonator is laid in the first explosive section, and detonator wire is connected upward with filament;Stemming section is formed at the top that step 3. blocks the first explosive section using stemming, and the length of stemming section is grown for 0.1~0.5 times of explosion toe burden, and filament is put down after the completion of blocking;Step 4. continues to load explosive the second explosive section of formation above stemming section, lays the detonator of explosion design section, and block;All blastholes of step 5. proper detonation.This method can significantly after the explosive charge of elongated pore bottom load action time, so as to improve the capacity usage ratio of explosive and increase the stress intensity of toe burden position rock mass, make the rock mass of chassis location fully broken, so as to reduce the generation rate of methods of blasting toes in open.

Description

Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate
Technical field
The invention belongs to engineering explosion technical field, and in particular to a kind of blasthole interval dress for reducing methods of blasting toes in open generation rate Medicine and the method for ignition.
Technical background
Emergence and constantly improve with large and medium-sized drilling machine, the application of Open Medium-depth Hole Bench Cut Blasting are more and more wider It is general.After Long-hole Bench Blasting detonates by row, often arrange rock and stirred by row toward oblique upper, due to stirring by preceding for heel row shot rock The limitation of one row, the space of its diffusion of detonating is opposite to diminish, and is subject to the clamping action of front-seat rock, and heel row rock stirs needs The resistance bigger overcome, so foundation can be left under normal circumstances.Clear up foundation and secondary blasting workload is big, influence shovel dress effect Rate, and add the generation of equipment attrition and failure, has not only been unfavorable for the safety of personnel and equipment, but influence production it is normal into OK.
The currently used method for reducing methods of blasting toes in open is the appropriate ultra-deep in drilling, and the effect of ultra-deep is reduced in powder charge The position of the heart, effectively to overcome the resistance of the bottom of the steps, avoids or reduces to stay foundation, to form smooth bottom square position, The detonation pressure that bench blasting explosive provides can generally reach the quick-fried effect except rock mass, but usually because of explosive action time not Enough do not reach purpose, so even if ultra-deep explosion, can often be left because of the quick effusion of tamper and detonation product yet Methods of blasting toes in open;Ameliorative way also is to change blasthole close coefficient or change detonating technique mostly, (referring to:Chen Jingjing, Zhao Rich deep, the strange of white jade reduces engineering practice [J] engineering explosions of Long-hole Bench Blasting foundation, 2013,19 (03) through mountain temple iron ore: 30-32.)。
Also there are many improved technologies in terms of multiple-row blasting at present, if 104374239 A of patent CN are in aperture blocking section Buffer air bag group is set, reduces plugging material dosage, prevents blasthole punching, this obstruction method trouble, worker arranges that multistage delays Air-impulse bag is time-consuming more much bigger than one whole section of stemming blocking of arrangement, and when blasthole global blowup energy is bigger than normal, quick-fried heap throwing scope is big, easily Slungshot harm is produced, when blasthole global blowup energy is less than normal, boulder yield is high, easily leaves methods of blasting toes in open;Patent CN In demolition blasting, aperture blocks section and sets water bag fill area and cement fill area 106197179 A, prevents the mistake of explosion energy It is early to leak from blasthole mouth, so as to improve capacity usage ratio, explosive specific charge, this obstruction method trouble are reduced, the set-up time is grown, And cement anchoring agent solidification must also be waited can not to improve construction efficiency.
The content of the invention
The present invention is to carry out to solve the above-mentioned problems, and it is an object of the present invention to provide a kind of reduction methods of blasting toes in open generation rate Blasthole spaced loading and the method for ignition, can quickly, convenient reduce earth material water content.
The present invention to achieve these goals, employs following scheme:
The present invention provides a kind of blasthole spaced loading for reducing methods of blasting toes in open generation rate and the method for ignition, it is characterised in that Comprise the following steps:Step 1. is drilled with the blast hole of certain ultra-deep;Step 2. first surpasses 1.0~1.5 times of blasthole bottom blasthole Deep length scope filling explosive forms first segment explosive section, and lays detonator in the first explosive section, and detonator wire is connected with filament Connect and be pulled up;Stemming section formed at the top that step 3. blocks the first explosive section using stemming, the length of stemming section for 0.1~ 0.5 times of explosion toe burden length, filament is put down after the completion of blocking;Step 4. continues to load explosive above stemming section forms the Two explosive sections, lay the detonator of explosion design section, and block;All blastholes of step 5. proper detonation.
The blasthole spaced loading provided by the present invention for reducing methods of blasting toes in open generation rate and the method for ignition, can also have this The feature of sample:In step 2, the detonator of laying is preferably MS1 sections of non-electric shock conducting tube detonators, makes of middle and upper part and base charge The quick-fried time difference is as far as possible small.
The blasthole spaced loading provided by the present invention for reducing methods of blasting toes in open generation rate and the method for ignition, can also have this The feature of sample:In step 2, the filling length of the first explosive section is 1.25 times of blasthole ultra-deep length, such best results.
The blasthole spaced loading provided by the present invention for reducing methods of blasting toes in open generation rate and the method for ignition, can also have this The feature of sample:In step 3, the filling length of stemming section is grown for 0.3 times of explosion toe burden, such best results.
The blasthole spaced loading provided by the present invention for reducing methods of blasting toes in open generation rate and the method for ignition, can also have this The feature of sample:In step 3, the density of stemming is not less than 1.8g/cm3, the coefficient of kinetic friction is not less than 0.4.The effect of invention with Effect
Compared with prior art, the beneficial effects of the present invention are:
(1) compared with traditional step ultra-deep blasting method, blasthole lower part closes on bottom hole position and adds big gun section, by blasthole bottom The explosive in portion is spaced apart with the explosive of middle and upper part, the detonator that explosion design determines section is laid in the explosive of middle and upper part, in bottom Explosive in lay detonator, bottom detonator wire is incorporated into the explosive of middle and upper part, and the energy after the explosive proper detonation of middle and upper part swashs Portion's Nonel detonator is given, so that the lower part explosive that detonates, this method can effectively block quick during the explosive charge of middle and upper part The rarefaction wave propagated to blast hole bottom hole, can significantly load be made after the explosive charge of elongated pore bottom plus the ponding of stemming section With the time, so as to improve the capacity usage ratio of explosive and increase the stress intensity of toe burden position rock mass, make chassis location Rock mass it is fully broken, substantially reduce methods of blasting toes in open generation rate;
(2) greatly reduce secondary blasting workload, and accelerate the duration, while also greatly reduce hand labor intensity, and Reduce equipment attrition and failure;
To sum up, the present invention, which has, reduces methods of blasting toes in open generation rate, accelerates the duration, reduces hand labor intensity, reduces equipment The characteristics of abrasion and failure, it can be widely applied in the domain engineering explosion such as water conservancy and hydropower, mine, traffic.
Brief description of the drawings
Fig. 1 is the structure diagram after the blast hole projectile filling in the embodiment of the present invention.
In figure, 1 is ultra-deep part, and 2 be the first explosive section, and 3 be MS1 sections of non-electric shock conducting tube detonators, and 4 be bottom detonator foot Line, 5 be that section is blocked in hole, and 6 be the second explosive section, and 7 block section to determine the detonator of section, 8 for aperture, and 9 be detonator, and 10 are Rock mass.
Embodiment
Below in conjunction with blasthole spaced loading of the attached drawing to reduction methods of blasting toes in open generation rate of the present invention and the method for ignition Specific embodiment be described in detail.
<Embodiment>
Certain mining design shoulder height 20m, bore diameter 250mm, an array pitch 10*7.5m, using explosion velocity 3500~ The emulsion of 4200m/s, blast hole stemming 6.5m, ultra-deep 1.5m, but early period work progress borehole blasting foundation generation rate compared with The problem of big, does not solve all the time.Therefore use a kind of reduction methods of blasting toes in open generation rate proposed by the invention blasthole spaced loading with The method of ignition reduces its methods of blasting toes in open generation rate.
The blasthole spaced loading that the present embodiment is provided includes the following steps with the method for ignition:
Step 1. is drilled with diameter 250mm, high the 21.5m wherein blast hole of ultra-deep 1.5m on rock mass 10.
Step 2. forms the first explosive section 2 to the emulsion of injection length 1.5m in ultra-deep part 1, and in the first explosive MS1 sections of non-electric shock conducting tube detonators 3 are laid in section 2, its detonator wire 4 is connected and is pulled up with filament.
After step 3. blasthole bottom filling explosive, blocked to form in hole blocking section 5 with stemming, the length of the blocking section 5 is 2.0m, filament is put down after the completion of blocking so that trailed detonator wire 4, which can run through, to be blocked section 5 and expose upwards.
Step 4., which continues to inject 11.5m emulsions, forms the second explosive section 6, lays MS5 sections of detonators 7, be connected to lead it is quick-fried Pipe 9;Last aperture 6.5m long is blocked to form aperture blocking section 8 with stemming.
Step 5. checks blasting circuit, all blastholes of detonating after confirmation safety.
Above example is only the illustration done to technical solution of the present invention.Reduction explosion according to the present invention The blasthole spaced loading of foundation generation rate is not merely defined in described content in the embodiment above with the method for ignition, and It is to be subject to claim limited range.What those skilled in the art of the invention were done on the basis of the embodiment appoints What is changed or supplement or equivalence replacement, all in the claimed scope of the claim of the present invention.

Claims (5)

1. a kind of blasthole spaced loading for reducing methods of blasting toes in open generation rate and the method for ignition, it is characterised in that comprise the following steps:
Step 1. is drilled with the blast hole of certain ultra-deep;
Step 2. first forms 1.0~1.5 times of blasthole ultra-deep length ranges in blasthole bottom filling explosive the first explosive section, and the Detonator is laid in one explosive section, detonator wire line is connected and is pulled up;
Stemming section is formed at the top that step 3. blocks the first explosive section using stemming, and the length of stemming section is 0.1~0.5 times of explosion Toe burden is grown, and line is put down after the completion of blocking;
Step 4. continues to load explosive the second explosive section of formation above stemming section, lays the detonator of explosion design section, and block up Plug;
All blastholes of step 5. proper detonation.
2. the blasthole spaced loading according to claim 1 for reducing methods of blasting toes in open generation rate and the method for ignition, its feature exist In:
Wherein, in step 2, the detonator of laying is MS1 sections of non-electric shock conducting tube detonators.
3. the blasthole spaced loading according to claim 1 for reducing methods of blasting toes in open generation rate and the method for ignition, its feature exist In:
Wherein, in step 2, the filling length of the first explosive section is 1.25 times of blasthole ultra-deep length.
4. the blasthole spaced loading according to claim 1 for reducing methods of blasting toes in open generation rate and the method for ignition, its feature exist In:
Wherein, in step 3, the filling length of stemming section is grown for 0.3 times of explosion toe burden.
5. the blasthole spaced loading according to claim 1 for reducing methods of blasting toes in open generation rate and the method for ignition, its feature exist In:
Wherein, in step 3, the density of stemming is not less than 1.8g/cm3, the coefficient of kinetic friction is not less than 0.4.
CN201711217817.4A 2017-11-28 2017-11-28 Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate Pending CN107957222A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711217817.4A CN107957222A (en) 2017-11-28 2017-11-28 Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711217817.4A CN107957222A (en) 2017-11-28 2017-11-28 Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate

Publications (1)

Publication Number Publication Date
CN107957222A true CN107957222A (en) 2018-04-24

Family

ID=61962478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711217817.4A Pending CN107957222A (en) 2017-11-28 2017-11-28 Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate

Country Status (1)

Country Link
CN (1) CN107957222A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109506530A (en) * 2018-12-21 2019-03-22 包头钢铁(集团)有限责任公司 A kind of opencut 24m High-bench blasting expands side structure and its side method is expanded in explosion
CN109631698A (en) * 2018-11-09 2019-04-16 北方***科技有限公司 A kind of space interval charge explosion method reducing boulder yield
CN110906822A (en) * 2019-12-19 2020-03-24 中国水利水电第七工程局有限公司 Deep hole blasting charge and detonation method for reducing root bottom based on digital detonator
CN111207639A (en) * 2020-03-20 2020-05-29 本钢板材股份有限公司 Method for overcoming large chassis line resistance through deep hole blasting of strip mine
CN111238328A (en) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method
CN111895872A (en) * 2020-08-28 2020-11-06 长安大学 In-hole charging structure for controlling blasting root bottom and construction method thereof
CN114111483A (en) * 2021-11-30 2022-03-01 广州铁路投资建设集团有限公司 Can reduce demolition unit of deep basal pit stone square blasting bold rate
CN114526649A (en) * 2021-12-16 2022-05-24 江睿 Preparation method of simple ammonium nitrate fuel oil explosive for drilling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1235269A (en) * 1998-05-09 1999-11-17 蔡清海 Sectional separate explosion in a hole
CN105444633A (en) * 2015-11-18 2016-03-30 西北矿冶研究院 Bench blasting charge structure capable of reducing block rate of blast hole blocking section
CN105651127A (en) * 2016-01-28 2016-06-08 中钢集团马鞍山矿山研究院有限公司 Charge system for advance rock breaking of surface mine
CN106440981A (en) * 2016-11-28 2017-02-22 广东省冶金建筑设计研究院 Deep hole blasting method for increasing bulky productivity of joint fracture developed granite mine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1235269A (en) * 1998-05-09 1999-11-17 蔡清海 Sectional separate explosion in a hole
CN105444633A (en) * 2015-11-18 2016-03-30 西北矿冶研究院 Bench blasting charge structure capable of reducing block rate of blast hole blocking section
CN105651127A (en) * 2016-01-28 2016-06-08 中钢集团马鞍山矿山研究院有限公司 Charge system for advance rock breaking of surface mine
CN106440981A (en) * 2016-11-28 2017-02-22 广东省冶金建筑设计研究院 Deep hole blasting method for increasing bulky productivity of joint fracture developed granite mine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗开军: "孔内孔间微差***间隔时间的合理选择", 《金属矿山》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109631698A (en) * 2018-11-09 2019-04-16 北方***科技有限公司 A kind of space interval charge explosion method reducing boulder yield
CN109506530A (en) * 2018-12-21 2019-03-22 包头钢铁(集团)有限责任公司 A kind of opencut 24m High-bench blasting expands side structure and its side method is expanded in explosion
CN110906822A (en) * 2019-12-19 2020-03-24 中国水利水电第七工程局有限公司 Deep hole blasting charge and detonation method for reducing root bottom based on digital detonator
CN111238328A (en) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method
CN111238328B (en) * 2020-03-02 2022-08-02 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method
CN111207639A (en) * 2020-03-20 2020-05-29 本钢板材股份有限公司 Method for overcoming large chassis line resistance through deep hole blasting of strip mine
CN111895872A (en) * 2020-08-28 2020-11-06 长安大学 In-hole charging structure for controlling blasting root bottom and construction method thereof
CN111895872B (en) * 2020-08-28 2022-08-19 长安大学 In-hole charging structure for controlling blasting root bottom and construction method thereof
CN114111483A (en) * 2021-11-30 2022-03-01 广州铁路投资建设集团有限公司 Can reduce demolition unit of deep basal pit stone square blasting bold rate
CN114526649A (en) * 2021-12-16 2022-05-24 江睿 Preparation method of simple ammonium nitrate fuel oil explosive for drilling

Similar Documents

Publication Publication Date Title
CN107957222A (en) Reduce blasthole spaced loading and the method for ignition of methods of blasting toes in open generation rate
CN105571419B (en) Blasting method capable of effectively reducing blasting boulder yield of surface mine
CN108661643B (en) It a kind of coal working face end adopts return channel and cuts top release shield lane method
CN105333778B (en) Medium-deep hole large-section composite cut blasting structure and method
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN105874299B (en) It is provided with the charge tube of air gap and the rock blasting construction method using this charge tube
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN107355229B (en) The construction method of deep hole smooth surface Tunnel Blasting system and the tunnel
CN104154830B (en) Medium-length hole blasting method for underground mining
CN103940309A (en) Underground-blasting shaft forming method
CN106767212B (en) A kind of two-region undercut blast hole arrangement and its explosion well completion method of application
CN101864961B (en) Method for actively preventing and controlling rock burst
CN109506529A (en) A kind of compound Cut Blasting method
CN105737699B (en) A kind of IV~V grade of country rock top bar deep hole secondary blasting Rapid Excavation method of double track tunnel
CN107339920B (en) The method of superdeep holes presplit blasting
CN106440981B (en) Improve the deep hole blasting method of bulk yield in developmental joint fissure granite mine
CN104358580B (en) The major part jet perforating tubular type grouted anchor bar of a kind of ribmet skeleton and construction method
CN108036684A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.7-1.9m
CN104482816A (en) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN108643924B (en) A kind of pressure relief method in high stress country rock tunnel
CN102817633A (en) Device for draining gas by deep hole crack control blasting and precracking method
CN106121644B (en) The water-filling pressure-bearing unloading pressure by blasting of cellular structure and supporting reinforcement are crosslinked based on drilling in coal and rock plane
CN209230424U (en) A kind of compound burn cut
CN106288989B (en) A kind of blasting hole with water powder charge and obstruction method
CN107288606A (en) A kind of method of artificial construction hot dry rock heat reservori

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication