CN107933570A - A kind of station site type forming method and its forming apparatus - Google Patents
A kind of station site type forming method and its forming apparatus Download PDFInfo
- Publication number
- CN107933570A CN107933570A CN201710950279.3A CN201710950279A CN107933570A CN 107933570 A CN107933570 A CN 107933570A CN 201710950279 A CN201710950279 A CN 201710950279A CN 107933570 A CN107933570 A CN 107933570A
- Authority
- CN
- China
- Prior art keywords
- station
- operation process
- item
- operating location
- site type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The present invention relates to a kind of station site type forming method, it includes the following steps:S1, by operating location generation unit produce some first item columns for including operating location information, passes through operation process generation unit and produces some second item columns for including operation process information;S2, show the first item column and second item column in display unit;S3, the quantity on the adjustment first item column and/or position, and/or, quantity and/or the position on the second item column are adjusted, is consequently formed some different types of station site types, shows the operation process and operating location of train AT STATION.It can simplify in design to the research process of station site type, improve terminal design work efficiency.
Description
Technical field
The present invention relates to station and yard design field, and in particular to a kind of station site type forming method and its forming apparatus.
Background technology
The it is proposed of site type in traditional Station Design, it is main to consider engineering economy and Transportation Organization demand, code requirement or
The site type recommended in correlation technique data is enumerated definite.Without logical relation between the various site types enumerated, also relevance.It is this to enumerate
Mode is poor to site type bandwagon effect, easily omits site type.
At present, with expanding economy, not only need to consider engineering in Station Design and transport factor to station site type
Influence, it is also necessary to consider influence of the special installation (such as entrucking (unload) equipment etc.) to yard arrangement.Site type has been not limited to
Traditional type, becomes varied, and traditional enumeration method is difficult in adapt to the differentiation demand of site type.
The content of the invention
The present invention for it is above-mentioned in the prior art the defects of, there is provided it is a kind of to simplify research to station site type in design
Process, improves the station site type forming method and its forming apparatus of design work efficiency.
The present invention is as follows to solve the technical solution that above-mentioned technical problem is provided:
On the one hand, there is provided a kind of station site type forming method, it includes the following steps:
S1, by operating location generation unit produce some first item columns for including operating location information, passes through work
Industry process generation unit produces some second item columns for including operation process information;
S2, show the first item column and second item column in display unit;
S3, the quantity on the adjustment first item column and/or position, and/or, adjust the quantity on the second item column
And/or position, some different types of station site types are consequently formed, with showing train operation process AT STATION and operation
Point.
Preferably, in step S2 and/or S3, the first item column intersects with second item column.
Preferably, further included in step S2 and/or S3:According to default operation process order, symbol is directed toward using first
Some second item columns are directed toward successively, thus embody default operation process order.
Preferably, further included in step S2 and/or S3:If some station tracks arranged side by side, are adopted involved in the operation process
With file arrangement between second some station tracks arranged side by side of direction symbolic indication or set draught line to be attached, and embody the row
Shift direction of the car between different station tracks.
Preferably, further included in step S2 and/or S3:If some parking lots arranged side by side, are adopted involved in the operation process
With file arrangement between second some parking lots arranged side by side of direction symbolic indication or interconnection is set to be attached or set shunting neck
It is attached, and embodies shift direction of the train between different parking lots.
On the other hand, a kind of station site type forming apparatus for realizing above-mentioned forming method is also provided, it includes:
Operating location generation unit, it is used to produce some first item columns for including operating location information;Operation
Journey generation unit, it is used to produce some second item columns for including operation process information;
Display unit, it shows the first item column and second item column;
And adjustment unit, it is used for the quantity and/or the position that adjust the first item column, and/or, adjustment described the
The quantity on two project columns and/or position, are consequently formed some different types of station site types, show the operation of train AT STATION
Journey and operating location.
Preferably, further include:
First input unit, it connects the operating location generation unit, for into the operating location generation unit
Input the operating location information;
And second input unit, it connects described operation process generation unit, single for being produced to the operation process
The operation process information is inputted in member.
Effect caused by technical solution of the present invention:
The present invention conveniently, efficiently (can unload each parking lot in station, entrucking) equipment component units module, pass through
Rational logical relation, adjusts each intermodule mutual alignment, develops out other site types, to meet to include some particular tissues (such as
With coaling-base etc.) including transportation demand, simplify in design to the research process of station site type, improve design work efficiency.
Brief description of the drawings
Fig. 1 is the basic site type train work flow chart in embodiment one;
Fig. 2 is the basic site type figure in embodiment one;
Fig. 3 is the differentiation site type train work flow chart in embodiment one;
Fig. 4 is the differentiation site type figure in embodiment one;
Fig. 5 is the structure chart of the station site type forming apparatus in embodiment two.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Embodiment one:
The station site type forming method of the present invention, which can be formed, to be included the following steps:
S1, by operating location generation unit produce some first item columns for including operating location information, passes through work
Industry process generation unit produces some second item columns for including operation process information;
S2, as shown in Figure 1, in the display unit (such as display) the display first item column (i.e. " work in Fig. 1
Industry place " column) and second item column (i.e. " job title " column in Fig. 1), it is preferred that the first item column and Section 2
Mesh column intersects, and thus establishes basic site type train work flow chart (such as tippler (passing through formula)+fast quantification as shown in Figure 1
The basic site type train work flow chart of loading system), and basic site type figure as shown in Figure 2 is further established according to Fig. 1
(such as basic site type figure of tippler (passing through formula)+quickly ration loading system);
Meanwhile in step s 2, according to default operation process order, it is (hollow in such as Fig. 1 to be directed toward symbol using first
Arrow) some second item columns are directed toward successively, default operation process order is thus embodied, such as the operation process in Fig. 1
Order is followed successively by:Train arrival-train turn over preceding inspection-train unload-train turn over after check and sweeper bottom-car team turn line-row
Car entrucking-row inspection is pending, sets out;
By forming above-mentioned basic site type train work flow chart and basic site type figure, can Dynamic Announce train AT STATION
The flow of operation process and operating location, can be easy to find out the pass of round-trip traveling or dog-ear traveling in train work from figure
Key point, develops easy to follow-up site type.
S3, the quantity on the adjustment first item column and/or position, and/or, adjust the quantity on the second item column
And/or position, some different types of station site types are consequently formed, are showed under different station site types, the operation of train AT STATION
Process and operating location.In the present embodiment, the adjustment includes passing through hardware, and such as mouse is clicked on, mobile mode increases
Subtract the quantity on first item column and/or second item column, and the position on adjustment first item column and/or second item column;Such as
Shown in Fig. 3, it reduces " shunting neck " in first item column on the basis of Fig. 1, reduces " the car team in second item column
Turn line ", and have adjusted the position of " the train entrucking " in the second item column;
Further, it is directed toward symbol (the hollow arrow in such as Fig. 3 according to default operation process order, adjustment described first
Head) some second item columns are directed toward successively, default operation process order is thus embodied, as the operation process in Fig. 3 is suitable
Sequence is followed successively by:Train arrival-train turn over preceding inspection-train unload-train is checked after turning over and sweeper bottom-train entrucking-row inspection
It is pending, set out, thus Fig. 1 is evolved into differentiation site type train work flow chart (such as tippler (passing through formula)+fast shown in Fig. 3
Fast ration loading system develops site type train work flow chart), and differentiation as shown in Figure 4 is further established according to Fig. 3
Site type figure (tippler (passing through formula)+fixed ration loading system develops site type figure);
Above-mentioned differentiation method causes under identical technological requirement, and rational logic can be established between each site type and is closed
System, avoids omission scheme, while the comparison being convenient between different site type schemes.
Further, such as Fig. 1, shown in 3, if carrying out operation in simple a station or a parking lot, step S2 and/
Or (i.e. one of S2, S3 include, or include in S2, S3, similarly hereinafter) is further included in S3:It is if some involved in the operation process
Station track arranged side by side, then be directed toward symbol (such as Fig. 1, the lateral arrows in 3) using second and represent file between some station tracks arranged side by side
Arrangement sets draught line to be attached, and embodies shift direction of the train between different station tracks;
If carrying out operation in the complicated station with multiple parking lots, further included in step S2 and/or S3:If the work
Some parking lots arranged side by side involved in industry process, then be directed toward symbol (such as Fig. 1, the lateral arrows in 3) if representing dry doubling using second
File arrangement or setting interconnection are attached or set shunting neck to be attached between the parking lot of row, and embody the train and exist
Shift direction between different parking lots.
In the station operation flow chart, the second direction symbol between each station track or between each parking lot shows its phase
To relation or connection mode, to determine station site type and line facility, while it is specific to be easy to use personnel to rapidly find out
Key point in technological requirement Train operation process chart, the realization developed easy to station site type.
Embodiment two:
As shown in figure 5, the present embodiment additionally provides a kind of station site type forming apparatus for realizing above-mentioned forming method, it is wrapped
Include:
Operating location generation unit 1, it is used to produce some first item columns for including operating location information;
Operation process generation unit 2, it is used to produce some second item columns for including operation process information;
Display unit 3, it shows the first item column and second item column;
And adjustment unit 4, it is used for the quantity and/or the position that adjust the first item column, and/or, described in adjustment
The quantity on second item column and/or position, are consequently formed some different types of station site types, show the operation of train AT STATION
Process and operating location.
Preferably, further include:
First input unit 5, it connects described operating location generation unit 1, for the operating location generation unit
The middle input operating location information;
And second input unit 6, it connects described operation process generation unit 2, for being produced to the operation process
The operation process information is inputted in unit.
Technical characteristic in above-described embodiment one, two can be combined, and the technical solution being composed belongs to
Protection scope of the present invention.
In conclusion site type forming method in station provided by the invention and its forming apparatus provide just for optimization station arrangement
Prompt approach.Under the premise of selected handling facilities, it determines to meet Transportation Organization and technological process need according to elemental operation flow
The each parking lot wanted, studies position relationship and elemental operation flow chart between each parking lot, optimizes job stream on this basis
Journey, changes or merges part yard equipment, so as to develop out new arranging graphic.Has the following advantages:
1. highlight convenient, intuitively design concept, complicated operation process clear performance in the form of " operation process chart "
Train (such as match somebody with somebody coaling-base) AT STATION in the sequence of operation and operating location relation;
2. on the basis of basic layout shape, derive other site types using the mode of arrangement, do not omit valuable station
Type;
3. station (such as matching somebody with somebody coaling-base) the arrangement atlas completed, can conveniently design, improve design effect;
4. proposing the evaluation criterion of station (such as matching somebody with somebody coaling-base) site type, reference frame is provided for scheme comparison.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention.
Claims (7)
1. a kind of station site type forming method, it is characterised in that include the following steps:
S1, by operating location generation unit produce some first item columns for including operating location information, passes through operation
Journey generation unit produces some second item columns for including operation process information;
S2, show the first item column and second item column in display unit;
S3, the quantity on the adjustment first item column and/or position, and/or, adjust the second item column quantity and/or
Position, is consequently formed some different types of station site types, shows the operation process and operating location of train AT STATION.
2. site type forming method in station as claimed in claim 1, it is characterised in that in step S2 and/or S3, the Section 1
Intersect with second item column on mesh column.
3. site type forming method in station as claimed in claim 1, it is characterised in that further included in step S2 and/or S3:According to
Default operation process order, is directed toward some second item columns using the first direction symbol, thus embodies default successively
Operation process order.
4. site type forming method in station as claimed in claim 3, it is characterised in that further included in step S2 and/or S3:If institute
Some station tracks arranged side by side involved in operation process are stated, then using file cloth between second some station tracks arranged side by side of direction symbolic indication
Put or set draught line to be attached, and embody shift direction of the train between different station tracks.
5. site type forming method in station as claimed in claim 3, it is characterised in that further included in step S2 and/or S3:If institute
Some parking lots arranged side by side involved in operation process are stated, then using file cloth between second some parking lots arranged side by side of direction symbolic indication
Put or set interconnection to be attached or set shunting neck to be attached, and embody transfer of the train between different parking lots
Direction.
A kind of 6. station site type forming apparatus realized such as claim 1-5 any one of them forming methods, it is characterised in that
Including:
Operating location generation unit, it is used to produce some first item columns for including operating location information;
Operation process generation unit, it is used to produce some second item columns for including operation process information;
Display unit, it shows the first item column and second item column;
And adjustment unit, it is used for the quantity and/or the position that adjust the first item column, and/or, adjust the Section 2
The quantity on mesh column and/or position, are consequently formed some different types of station site types, show the operation process of train AT STATION with
And operating location.
7. site type forming apparatus in station as claimed in claim 6, it is characterised in that further include:
First input unit, it connects the operating location generation unit, for being inputted into the operating location generation unit
The operating location information;
And second input unit, it connects described operation process generation unit, for into the operation process generation unit
Input the operation process information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710950279.3A CN107933570A (en) | 2017-10-13 | 2017-10-13 | A kind of station site type forming method and its forming apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710950279.3A CN107933570A (en) | 2017-10-13 | 2017-10-13 | A kind of station site type forming method and its forming apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107933570A true CN107933570A (en) | 2018-04-20 |
Family
ID=61935233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710950279.3A Pending CN107933570A (en) | 2017-10-13 | 2017-10-13 | A kind of station site type forming method and its forming apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107933570A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0933276A1 (en) * | 1998-01-28 | 1999-08-04 | Roger Le Garrec | Railroad/highway network for the transport of trucks |
CN101535942A (en) * | 2005-03-14 | 2009-09-16 | 通用电气公司 | A system and method for railyard planning |
CN106218671A (en) * | 2016-09-06 | 2016-12-14 | 兰州铁路局 | The control method of station train travel operation and device |
-
2017
- 2017-10-13 CN CN201710950279.3A patent/CN107933570A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0933276A1 (en) * | 1998-01-28 | 1999-08-04 | Roger Le Garrec | Railroad/highway network for the transport of trucks |
CN101535942A (en) * | 2005-03-14 | 2009-09-16 | 通用电气公司 | A system and method for railyard planning |
CN106218671A (en) * | 2016-09-06 | 2016-12-14 | 兰州铁路局 | The control method of station train travel operation and device |
Non-Patent Citations (3)
Title |
---|
奚文媛: "铁路技术站作业流程与站型关系的探讨", 《中国铁道学会运输委员会第十四届站场与枢纽学术年会论文集》 * |
奚文媛: "铁路技术站作业流程与站型关系的探讨", 《铁道运输与经济》 * |
李智伟,高海杰,奚文媛: "配煤站车站站型方案探讨", 《高速铁路技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Giacco et al. | Short-term rail rolling stock rostering and maintenance scheduling | |
CN102194162A (en) | Method for realizing automatic drawing of running chart of magnetic-levitation train | |
CN104477215B (en) | Vehicle operating drawing drawing method and system | |
CN107933570A (en) | A kind of station site type forming method and its forming apparatus | |
Li et al. | Optimal track utilization in electric multiple unit maintenance depots | |
CN205203003U (en) | System for turn back before realizing urban rail transit station | |
CN203534527U (en) | Train component size information detection system | |
CN100567062C (en) | The method and system of Work train circulation assistance | |
Li et al. | The train fueling cost minimization problem with fuzzy fuel prices | |
Bao-hua et al. | Progress of operational resources sharing methods for urban rail networks | |
Li et al. | A two-stage stochastic programming model for rail-truck intermodal network design with uncertain customer demand | |
CN104574028B (en) | Judge different GPS whether with the movement of same car method | |
Guo et al. | Model of Wagons’ Placing‐In and Taking‐Out Problem in a Railway Station and Its Heuristic Algorithm | |
JP2013193539A (en) | Method and device for creating test pattern of train operation control system | |
CN203528516U (en) | Double-direction train image collecting and controlling device | |
CN104008050B (en) | A kind of system and method automatically generating interface pattern experimental test sequence | |
CN103198370A (en) | Method and device of automatic schedule information processing of periodic use and maintenance schedules of bullet trains | |
Jafarian-Moghaddam et al. | An effective improvement to main non-periodic train scheduling models by a new headway definition | |
Zhao et al. | Calculation of carrying capacity at high-speed railway stations based on route selection | |
Yun-qiang et al. | Uncertain bi-level programming model for vehicle allocation problem of bus lines | |
CN104835447B (en) | A kind of LED display device and its display methods | |
Guang-zheng et al. | Optimization of convergence based on the coordination of train departure time in the subway transfer station | |
Zhong-li et al. | Geometry constraints-based method for visual rail track extraction | |
Peng | Optimization of rolling stock distribution and routing problem for the first train of urban rail transit | |
Yu-han et al. | Modelization and Resolution of Ride-sharing Problem with Spatiotemporal Thermo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |