CN107893242A - The disconnection method of aluminium electroloysis central gangway bus - Google Patents
The disconnection method of aluminium electroloysis central gangway bus Download PDFInfo
- Publication number
- CN107893242A CN107893242A CN201711122082.7A CN201711122082A CN107893242A CN 107893242 A CN107893242 A CN 107893242A CN 201711122082 A CN201711122082 A CN 201711122082A CN 107893242 A CN107893242 A CN 107893242A
- Authority
- CN
- China
- Prior art keywords
- bus
- short
- corridor
- aluminium electroloysis
- circuit block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
- C25C3/16—Electric current supply devices, e.g. bus bars
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Installation Of Bus-Bars (AREA)
Abstract
A kind of disconnection method of aluminium electroloysis central gangway bus, short-circuit block is entangled using insulator respectively in one end of every group of corridor bus, then insulation board is inserted between short-circuit block.This method can be effectively saved corridor bus dismounting and set-up time by the way of insulating on the spot, at least save more than half labour and time, while can reduce the probability of accident generation, improve processing emergency certainty.
Description
Technical field
The invention belongs to the construction technology of aluminium cell, more particularly to a kind of disconnection side of aluminium electroloysis central gangway bus
Method.
Background technology
A potroom is generally divided into several areas in aluminium electroloysis industry, i.e. a workshop is divided into several sections, often
There is the electrolytic cell of respective numbers in individual area, the step mode between each electrolytic cell is series connection;In order that each electrolytic cell and power
Loop can be formed between room, the trend of electric current is:One, two, three area → the second in power house → the first workshop
Workshop three, two, one area → power house, so to make each electrolytic cell and power house form loop, by two workshops
Build side by side.
For newly-built and electrolytic cell that is resuming production, in order to produce in advance without when two workshops are all electric
Solution groove produces together after possessing operation condition, and its way is to set up passage bus between each area in each workshop, when two
When the electrolytic cell in the area of workshop one possesses operation condition, the passage bus between an area and 2nd area is connected, makes power house, first car
The areas of Jian mono-, second workshop one area form loop;When 2nd area in two workshops possess operation condition, 2nd area of connection and 3rd area
Between passage bus, simultaneously switch off the passage bus between an area and 2nd area, such power house, the first workshop one, 2nd area,
Two workshops one, 2nd area form loop.
Certainly it is not only the disconnection and connection that newly-built and electrolytic cell that is resuming production has passage bus, when electrolytic cell goes out
Also the disconnection and connection of passage bus can be related to during existing accident.
Above-mentioned passage bus is the corridor bus 1 that the present invention will refer to (with reference to figure 1);Connection status be bolt
6 are directly connected to, and mode is that the bolt at both ends is all removed used by short-circuit block 3 and corridor bus 1.This mode has at 2 points
Problem:
1st, when the short-circuit busbar of corridor bus need to be removed, it is necessary to first electrolytic cell running current is disconnected, and running current
Turn-off time, (a series of ask occurred in the case of cold more than half an hour in run channel no more than half an hour
Topic), so only the time of half an hour removes short-circuit busbar;But short-circuit busbar typically has 4 at one --- 5 groups, one group has
32 sets of bolts, short-circuit busbar shares 128 at one --- 160 sets of bolts need to remove, and often cover bolt length 800 --- 1000mm it
Between, every group of short-circuit busbar deadweight is 1.3t or so, so the time is all very urgent whenever corridor bus to be removed, staff
It is often in a rush, and once removed one group remaining must remove, must not interrupt.
2nd, the deadweight of every group of short-circuit busbar is typically in 1.3t or so, disassemble it is rear it is very bad have bad luck because corridor bus
It is to be located at potroom passage underground, it is impossible to be open to traffic, and surrounding has building to stop, it is necessary to expend manpower thing very big again
Power.If the electrolytic cell beyond corridor bus herein need to be isolated by running into emergency, the power off time of half an hour is not
The installation again of short-circuit busbar can be met.
The content of the invention
The purpose of the present invention, which is that, overcomes above-mentioned the deficiencies in the prior art, and provides in a kind of aluminium electroloysis
Between corridor bus disconnection method, this method using can be effectively saved by the way of insulating on the spot corridor bus remove and installation when
Between, more than half labour and time are at least saved, while the probability of accident generation can be reduced, improve processing emergency
Certainty.
As above conceive, the technical solution adopted in the present invention is:A kind of disconnection method of aluminium electroloysis central gangway bus, its
It is characterised by:Short-circuit block is entangled using insulator respectively in one end of every group of corridor bus, then insulation is inserted between short-circuit block
Plate.
The insulation values of above-mentioned insulator are more than 1000M Ω.
The present invention has the advantage that and good effect:
1st, when removing corridor bus, the bolt of corridor bus half herein need to be only removed, is torn open equivalent to half is saved
Except the time.
2nd, because short-circuit busbar is also in original place, if it need to reconnect corridor bus and short-circuit busbar, need to only take out absolutely
Edge body, installation bolt, avoid during this and have bad luck, install and remove short-circuit busbar again, more existing method exists
Manpower, half is saved on the time.
3rd, because the middle part of short-circuit busbar has ductility for aluminium soft ribbons, therefore the present invention completely cuts off passageway with insulator
One end of bus, in the case of so fixing at one end, the other end can left and right adjusting.
Brief description of the drawings
Fig. 1 is corridor bus schematic diagram;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the schematic diagram of insulating sleeve 1;
Fig. 4 is Fig. 3 A direction views;
Fig. 5 is the schematic diagram of insulating sleeve 2;
Fig. 6 is Fig. 5 B direction views;
Fig. 7 is insulation board schematic diagram;
Fig. 8 is Fig. 7 C direction views.
In figure, 1. corridor bus, 2. bus connecting plates, 3. short-circuit blocks, 4. short-circuit blocks, 5. soft ribbons, 6. bolts, 7. insulation sleeves
The cylinder insulation board of 1,8. insulating sleeve 2,9..
Embodiment
The present invention is illustrated below in conjunction with the accompanying drawings.
A kind of disconnection method of aluminium electroloysis central gangway bus, every group of corridor bus configuration insulating sleeve 1 (7), insulation sleeve
(9) the three kinds of insulators in cylinder 2 (8) and insulation board.When corridor bus need to be disconnected, corridor bus one end therein is opened, is somewhat divided
Short-circuit block (3) and (4) are opened, short-circuit block (4) is entangled with insulating sleeve 1 (7), then short-circuit block (3) is entangled with insulating sleeve 2 (8), most
Inserted afterwards with insulation board between short-circuit block (3) and (4).During to reconnect short-circuit block (3) and (4), only these three need to be taken out
Insulator, then reinstall.
Why the present invention can consider one end with insulator isolation corridor bus, and reason is the pars intermedia of short-circuit busbar
Position has ductility for aluminium soft ribbons (5), and in the case of fixing at one end, the other end can left and right adjusting.
The present invention by the method that insulate on the spot at least saved in existing method more than half labour and when
Between.And corridor bus is removed and the saving of set-up time can also reduce the probability of accident generation, improve processing emergency
Certainty.
Claims (2)
- A kind of 1. disconnection method of aluminium electroloysis central gangway bus, it is characterised in that:In one end of every group of corridor bus using exhausted Edge body entangles short-circuit block respectively, then insulation board is inserted between short-circuit block.
- 2. the disconnection method of aluminium electroloysis central gangway according to claim 1 bus, it is characterised in that:Above-mentioned insulator Insulation values are more than 1000M Ω.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711122082.7A CN107893242A (en) | 2017-11-14 | 2017-11-14 | The disconnection method of aluminium electroloysis central gangway bus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711122082.7A CN107893242A (en) | 2017-11-14 | 2017-11-14 | The disconnection method of aluminium electroloysis central gangway bus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107893242A true CN107893242A (en) | 2018-04-10 |
Family
ID=61804369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711122082.7A Pending CN107893242A (en) | 2017-11-14 | 2017-11-14 | The disconnection method of aluminium electroloysis central gangway bus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107893242A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113755898A (en) * | 2021-08-31 | 2021-12-07 | 赵忠扬 | Rapid corridor bus short-circuit system and method for aluminum electrolysis series |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1749437A (en) * | 2005-08-30 | 2006-03-22 | 河南中孚实业股份有限公司 | Method for randomly large scale repair and welding electrolytic bath under no cut-off condition of aluminium electrolytic series |
CN201154992Y (en) * | 2007-12-19 | 2008-11-26 | 贵阳铝镁设计研究院 | Side-inserting space-adjusting insulation board |
CN101603185A (en) * | 2008-06-11 | 2009-12-16 | 贵阳铝镁设计研究院 | A kind of short circuit of corridor bus or turn-off method and syndeton |
CN201924089U (en) * | 2010-08-25 | 2011-08-10 | 贵阳铝镁设计研究院有限公司 | Aluminum electrolysis cell emergency short circuit power outage device |
CN203270060U (en) * | 2013-04-27 | 2013-11-06 | 湖南中大冶金设计有限公司 | Corridor generatrix short-circuit device for aluminium electrolysis cell |
-
2017
- 2017-11-14 CN CN201711122082.7A patent/CN107893242A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1749437A (en) * | 2005-08-30 | 2006-03-22 | 河南中孚实业股份有限公司 | Method for randomly large scale repair and welding electrolytic bath under no cut-off condition of aluminium electrolytic series |
CN201154992Y (en) * | 2007-12-19 | 2008-11-26 | 贵阳铝镁设计研究院 | Side-inserting space-adjusting insulation board |
CN101603185A (en) * | 2008-06-11 | 2009-12-16 | 贵阳铝镁设计研究院 | A kind of short circuit of corridor bus or turn-off method and syndeton |
CN201924089U (en) * | 2010-08-25 | 2011-08-10 | 贵阳铝镁设计研究院有限公司 | Aluminum electrolysis cell emergency short circuit power outage device |
CN203270060U (en) * | 2013-04-27 | 2013-11-06 | 湖南中大冶金设计有限公司 | Corridor generatrix short-circuit device for aluminium electrolysis cell |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113755898A (en) * | 2021-08-31 | 2021-12-07 | 赵忠扬 | Rapid corridor bus short-circuit system and method for aluminum electrolysis series |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106374380A (en) | GIS bus spare interval power-uninterrupted extension function module and extension method | |
CN103368081A (en) | Main electrical connection of double-bus disconnecting link section | |
CN103746314A (en) | Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line | |
CN104347964A (en) | Conductive cable connecting device | |
CN103904564B (en) | High-voltage distribution device with double breakers used for single bus segmentation and application thereof | |
CN106515458A (en) | Method and system for controlling high-voltage isolating switches of electric locomotive group | |
CN107893242A (en) | The disconnection method of aluminium electroloysis central gangway bus | |
CN208939526U (en) | It is a kind of based on three across carbon fiber composite core wire backup wire clamp | |
CN205159966U (en) | Cable pipe | |
CN201036041Y (en) | Copper bar insulation structure | |
CN112977482B (en) | Straddle type monorail vehicle | |
CN205283127U (en) | Topological structure of multi-loop high-voltage direct-current shared grounding electrode | |
CN201951278U (en) | All-subsection shunt-wound power supply system for contact net of electrified railway traction power supply system | |
CN203367775U (en) | Duplicate-busbar disconnecting switch segmented electric main connection wire | |
CN207895922U (en) | A kind of ground wire deicing insulation suspension string | |
CN206364435U (en) | GIS buses standby spacing does not have a power failure enlarging functional module | |
CN206678832U (en) | A kind of electric railway subregion connects powered construction | |
CN210380157U (en) | High-protection jack box | |
CN203895965U (en) | Line-side circuit capable of protecting electric locomotive high voltage transformer | |
CN110137854B (en) | Power transmission line important crossing design method capable of realizing rapid first-aid repair | |
CN103904602B (en) | Electric line is abandoned line and is protected lever apparatus and abandon the installation method of line guarantor's lever apparatus | |
CN208461463U (en) | Rail traffic online tri-station isolating switch and monitoring system | |
CN206546995U (en) | A kind of bus duct connector | |
CN212476918U (en) | Disconnecting device of passageway bus and passageway bus comprising same | |
CN215528552U (en) | Industrial low-voltage bus structure convenient to connect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180410 |