CN107881891A - A kind of soft soil roadbed construction method of municipal administration - Google Patents
A kind of soft soil roadbed construction method of municipal administration Download PDFInfo
- Publication number
- CN107881891A CN107881891A CN201711262968.1A CN201711262968A CN107881891A CN 107881891 A CN107881891 A CN 107881891A CN 201711262968 A CN201711262968 A CN 201711262968A CN 107881891 A CN107881891 A CN 107881891A
- Authority
- CN
- China
- Prior art keywords
- soft soil
- concrete
- construction method
- bed course
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C21/00—Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Soil Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of soft soil roadbed construction method of municipal administration,Including Soft Soil Layer,Basic unit's groove is provided with the top of the Soft Soil Layer,Basic unit's bottom land end is extended in Soft Soil Layer,It is bottom-up in basic unit's groove to be disposed with hard stratum,Bed course,Concrete strengthening layer and diaphragm,The concrete strengthening layer is provided with the cross reinforcing that a row uniformly arranges and the vertical strengthening ribs that a row uniformly arranges,The cross reinforcing bottom is provided with load bearing support muscle,The load bearing support muscle runs through concrete strengthening layer,Bed course and hard stratum,And extend in Soft Soil Layer,The present invention to soft soil roadbed by carrying out distributed back-up coat setting,Improve the bearing capacity of roadbed,And roadbed is set to be not easy and cave in,Improve the service life of roadbed,And when injecting concrete,Concrete and addition coagulator of each back-up coat from varying strength,So as to effectively raise the quality of roadbed,And this construction method is simple,Easily implement.
Description
Technical field
The present invention relates to a kind of soft soil roadbed technical field of construction of municipal administration, more particularly to a kind of municipal administration is soft soil roadbed to be applied
Work method.
Background technology
The complicated component of weak soil, contain the Chemical Genesis such as substantial amounts of carbonate and evaporite material and humic soil chip etc.
Biogenesis material, soft scholar are usually to deposit to form in flowing water environment, with silt particle and obvious stratification are presented, area
Otherness is larger, soft soil roadbed mainly to have following several respects feature:It is soft soil roadbed that there is the spy that water content is higher, hole is bigger
Point;Weak soil has obvious structural;With obvious rheological characteristic;Compressibility is high, bad hydraulic permeability;Shear strength is very low.
Road is built in soft clay area, the problems such as road settlement deforms often occurs, the use of road is had a strong impact on, and
And huge economic loss is therefore caused, or even irreparable consequence is caused, in recent years, with expanding economy, city rule
Mould constantly expands, and the urban road that China is completed and built at present, the roadbed in many regions is soft soil roadbed, Soft Soil Layer
Thicker, distributed more widely, soft soil roadbed processing work turns into the emphasis of road construction research, generally, soft soil roadbed to city road
The adverse effect on road is mainly due to soft soil roadbed shearing strength deficiency, it is difficult to the load action of road surface transmission is born, in lotus
It is soft soil roadbed under load effect to produce locally or globally failure by shear, so as to produce road surface embankment landslide, unstability, cause road
The destruction of structure sheaf, therefore, it is necessary to solve the above problems to invent a kind of soft soil roadbed construction method of municipal administration.
The content of the invention
It is an object of the invention to provide a kind of soft soil roadbed construction method of municipal administration, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the present invention provides following technical scheme:A kind of soft soil roadbed construction method of municipal administration, including
Soft Soil Layer, the Soft Soil Layer top are provided with basic unit's groove, and basic unit's bottom land end is extended in Soft Soil Layer, in basic unit's groove certainly
It is disposed with hard stratum, bed course, concrete strengthening layer and diaphragm upwards down, it is equal that the concrete strengthening layer is provided with a row
The vertical strengthening ribs that the cross reinforcing of even arrangement and a row uniformly arrange, the cross reinforcing bottom are provided with load bearing support
Muscle, the load bearing support muscle runs through concrete strengthening layer, bed course and hard stratum, and extends in Soft Soil Layer, the bed course both sides
Top is provided with breast boards, and the breast boards side is provided with limiting plate, and described limiting plate one end is extended in Soft Soil Layer;
The construction method installation following steps are carried out:
Step 1:Grooving flattens:Grooving is carried out with digging machine on Soft Soil Layer, and after grooving terminates, enters walking along the street with road roller
The flat processing of face pressure;
Step 2:The processing of pre-buried and bed course:It is pre-buried some with vertical strengthening ribs in hard stratum after pressing, and vertically add
Strengthening tendons bottom extends in Soft Soil Layer and fixed, and then tentatively pours into concrete to pan soil layer surface;
Step 3:Breast boards and reinforcement arrangement:It is artificial to carry out breast boards arrangement and add when mat surface concrete layer solidifies
Strengthening tendons is arranged;
Step 4:Back-up coat is set:After reinforcement and breast boards arrange, a certain amount of concrete stirring is poured into bed course
Liquid;
Step 5:Manually smooth out with the fingers gentle protection:After concrete stirring liquid injection terminates, manually progress surface is smoothed out with the fingers flat, after smoothing out with the fingers flat,
In concrete stirring liquid surface laying diaphragm.
Preferably, grooving depth is arranged between 20cm-30cm in step 1.
Preferably, cushion thickness is arranged between 5cm-8cm in step 2, and vertical strengthening ribs top is pre- apart from bed course top
Staying height, concrete uses C15 standard concretes between 7cm-10cm, and according to its component and the mass fraction of each component
For cement:Stone:Gravel:Water:Coagulator=1:4:2:0.6:0.02 match ratio.
Preferably, the breast boards in step 3 is the smooth wooden boards in surface, the earth-retaining plate thickness be 2cm-4cm it
Between, the breast boards is highly between 40cm-50cm.
Preferably, the concrete stirring liquid employed in step 4 is arranged to C25 standard concretes, and according to its component
And the mass fraction of each component is cement:Stone:Gravel:Water:Coagulator=1:1.7:1:0.4:0.01 match ratio.
Preferably, antifreeze is also contained in the C25 standard concretes, and its component accounts for the match ratio of mixed liquor and is
0.008。
Preferably, also contain later maintenance in step 5, when concrete tentatively solidifies, raise diaphragm every three days,
And sprinkled water toward concrete surface, after this process is until carry out 3-4 times, remove diaphragm.
The technique effect and advantage of the present invention:The present invention is carried by carrying out distributed back-up coat setting to soft soil roadbed
The high bearing capacity of roadbed, and roadbed is not easy and is caved in, the service life of roadbed is improved, and in injection concrete
When, each back-up coat selects the concrete and addition coagulator of varying strength, so as to effectively raise the quality of roadbed, and
This construction method is simple, easily implements.
Brief description of the drawings
Fig. 1 is road structure schematic diagram of the present invention.
Figure:1 Soft Soil Layer, 2 basic unit's grooves, 3 hard stratums, 4 bed courses, 5 concrete strengthening layers, 6 diaphragms, 7 cross reinforcings, 8
Vertical strengthening ribs, 9 load bearing support muscle, 10 breast boards, 11 limiting plates.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments, is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
A kind of soft soil roadbed construction method of municipal administration according to Fig. 1, including Soft Soil Layer 1, the top of Soft Soil Layer 1 are set
Basic unit's groove 2 is equipped with, the bottom of basic unit's groove 2 is extended in Soft Soil Layer 1, bottom-up in basic unit's groove 2 to be disposed with firmly
Soil layer 3, bed course 4, concrete strengthening layer 5 and diaphragm 6, the concrete strengthening layer 5 are provided with the transverse direction that a row uniformly arranges
The vertical strengthening ribs 8 that the row of reinforcement 7 and one uniformly arranges, the bottom of cross reinforcing 7 is provided with load bearing support muscle 9, described
Load bearing support muscle 9 runs through concrete strengthening layer 5, bed course 4 and hard stratum 3, and extends in Soft Soil Layer 1, the both sides of bed course 4 top
End is provided with breast boards 10, and the side of breast boards 10 is provided with limiting plate 11, and described one end of limiting plate 11 extends to Soft Soil Layer 1
It is interior.
During hot environment:
A kind of soft soil roadbed construction method of municipal administration, specific preparation process are as follows:
Step 1:Groove flattens:Grooving is carried out with digging machine on Soft Soil Layer 1, institute's grooving depth is arranged between 20cm-30cm, and
And after grooving terminates, road surface pressing processing is carried out with road roller;
Step 2:Pre-buried and bed course 4 is handled:It is pre-buried some with vertical strengthening ribs 8 in hard stratum 3 after pressing, and erect
Extended to the bottom of reinforcement 8 in Soft Soil Layer 1 fixed, the thickness of bed course 4 is arranged between 5cm-8cm, the top of vertical strengthening ribs 8 away from
From the reserved height in the top of bed course 4 between 7cm-10cm, then tentatively pour into using C15 standard concretes, and according to its group
Divide and the mass fraction of each component is cement:Stone:Gravel:Water:Coagulator=1:4:2:0.6:0.02 match ratio pours into pan soil
3 surface of layer;
Step 3:Breast boards 10 and reinforcement arrangement:It is artificial to carry out the cloth of breast boards 10 when the surface concrete layer of bed course 4 solidifies
Put and arranged with reinforcement, selected breast boards 10 is the smooth wooden boards in surface, and the thickness of breast boards 10 is 2cm-4cm
Between, the height of breast boards 10 avoids the weak soil pollution concrete solution in Soft Soil Layer 1 between 40cm-50cm, so as to
Roadbed is impacted;
Step 4:Back-up coat is set:After reinforcement and breast boards 10 arrange, a certain amount of C25 standards are poured into bed course 4
Concrete, and be cement according to the mass fraction of its component and each component:Stone:Gravel:Water:Coagulator=1:1.7:1:
0.4:0.01 match ratio concrete stirring liquid;
Step 5:Manually smooth out with the fingers gentle protection:After concrete stirring liquid injection terminates, manually progress surface is smoothed out with the fingers flat, after smoothing out with the fingers flat,
In concrete stirring liquid surface laying diaphragm 6, when concrete tentatively solidifies, diaphragm 6 is raised every three days, and it is past mixed
Coagulate native surface to be sprinkled water, avoid in solidification, water deficient in concrete, cause to crack, so as to influence the quality of roadbed,
After this process is until carry out 3-4 times, diaphragm 6 is removed, so as to reach the purpose of the present invention.
During high/low temperature temperature environment:
A kind of soft soil roadbed construction method of municipal administration, specific preparation process are as follows:
Step 1:Groove flattens:Grooving is carried out with digging machine on Soft Soil Layer 1, institute's grooving depth is arranged between 20cm-30cm, and
And after grooving terminates, road surface pressing processing is carried out with road roller;
Step 2:Pre-buried and bed course 4 is handled:It is pre-buried some with vertical strengthening ribs 8 in hard stratum 3 after pressing, and erect
Extended to the bottom of reinforcement 8 in Soft Soil Layer 1 fixed, the thickness of bed course 4 is arranged between 5cm-8cm, the top of vertical strengthening ribs 8 away from
From the reserved height in the top of bed course 4 between 7cm-10cm, then tentatively pour into using C15 standard concretes, and according to its group
Divide and the mass fraction of each component is cement:Stone:Gravel:Water:Coagulator=1:4:2:0.6:0.02 match ratio pours into pan soil
3 surface of layer;
Step 3:Breast boards 10 and reinforcement arrangement:It is artificial to carry out the cloth of breast boards 10 when the surface concrete layer of bed course 4 solidifies
Put and arranged with reinforcement, selected breast boards 10 is the smooth wooden boards in surface, and the thickness of breast boards 10 is 2cm-4cm
Between, the height of breast boards 10 avoids the weak soil pollution concrete solution in Soft Soil Layer 1 between 40cm-50cm, so as to
Roadbed is impacted;
Step 4:Back-up coat is set:After reinforcement and breast boards 10 arrange, a certain amount of C25 standards are poured into bed course 4
Concrete, and be cement according to the mass fraction of its component and each component:Stone:Gravel:Water:Coagulator:Antifreeze=1:
1.7:1:0.4:0.01:0.008 match ratio concrete stirring liquid, the addition of antifreeze, is avoided in arctic weather, low temperature
Frostbite is caused to concrete;
Step 5:Manually smooth out with the fingers gentle protection:After concrete stirring liquid injection terminates, manually progress surface is smoothed out with the fingers flat, after smoothing out with the fingers flat,
In concrete stirring liquid surface laying diaphragm 6, when concrete tentatively solidifies, diaphragm 6 is raised every three days, and it is past mixed
Coagulate native surface to be sprinkled water, avoid in solidification, water deficient in concrete, cause to crack, so as to influence the quality of roadbed,
After this process is until carry out 3-4 times, diaphragm 6 is removed, so as to reach the purpose of the present invention.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention,
Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used
To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic,
Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's
Within protection domain.
Claims (7)
- A kind of 1. soft soil roadbed construction method of municipal administration, it is characterised in that:Including Soft Soil Layer(1), the Soft Soil Layer(1)Top is set It is equipped with basic unit's groove(2), basic unit's groove(2)Bottom extends to Soft Soil Layer(1)It is interior, basic unit's groove(2)It is interior it is bottom-up successively It is provided with hard stratum(3), bed course(4), concrete strengthening layer(5)And diaphragm(6), the concrete strengthening layer(5)It is provided with The cross reinforcing that one row uniformly arranges(7)The vertical strengthening ribs uniformly arranged with a row(8), the cross reinforcing(7)Bottom End is provided with load bearing support muscle(9), the load bearing support muscle(9)Through concrete strengthening layer(5), bed course(4)And hard stratum (3), and extend to Soft Soil Layer(1)It is interior, the bed course(4)Both sides top is provided with breast boards(10), the breast boards(10)One Side is provided with limiting plate(11), the limiting plate(11)One end extends to Soft Soil Layer(1)It is interior;The construction method installation following steps are carried out:Step 1:Grooving flattens:In Soft Soil Layer(1)On with digging machine carry out grooving, and after grooving terminates, carried out with road roller Road surface pressing processing;Step 2:Pre-buried and bed course(4)Processing:Hard stratum after pressing(3)It is interior pre-buried some with vertical strengthening ribs(8), And vertical strengthening ribs(8)Bottom extends to Soft Soil Layer(1)Interior fixation, concrete is then tentatively poured into hard stratum(3)Surface;Step 3:Breast boards(10)Arranged with reinforcement:Work as bed course(4)When surface concrete layer solidifies, breast boards is manually carried out (10)Arrangement and reinforcement arrangement;Step 4:Back-up coat is set:When reinforcement and breast boards(10)After arranging, to bed course(4)Inside pour into a certain amount of mixed Solidifying soil stirring liquid;Step 5:Manually smooth out with the fingers gentle protection:After concrete stirring liquid injection terminates, manually progress surface is smoothed out with the fingers flat, after smoothing out with the fingers flat, In concrete stirring liquid surface laying diaphragm(6).
- A kind of 2. soft soil roadbed construction method of municipal administration according to claim 1, it is characterised in that:Grooving is deep in step 1 Degree is arranged between 20cm-30cm.
- A kind of 3. soft soil roadbed construction method of municipal administration according to claim 1, it is characterised in that:Bed course in step 2 (4)Thickness is arranged between 5cm-8cm, vertical strengthening ribs(8)Top is apart from bed course(4)The reserved height in top for 7cm-10cm it Between, concrete uses C15 standard concretes, and is cement according to the mass fraction of its component and each component:Stone:Gravel: Water:Coagulator=1:4:2:0.6:0.02 match ratio.
- A kind of 4. soft soil roadbed construction method of municipal administration according to claim 1, it is characterised in that:Earth-retaining in step 3 Plate(10)For the wooden boards that surface is smooth, the breast boards(10)Thickness is between 2cm-4cm, the breast boards(10)Highly Between 40cm-50cm.
- A kind of 5. soft soil roadbed construction method of municipal administration according to claim 1, it is characterised in that:Employed in step 4 Concrete stirring liquid be arranged to C25 standard concretes, and be cement according to the mass fraction of its component and each component:Stone Son:Gravel:Water:Coagulator=1:1.7:1:0.4:0.01 match ratio.
- A kind of 6. soft soil roadbed construction method of municipal administration according to claim 1 or 5, it is characterised in that:The C25 standards Also contain antifreeze in concrete, and it is 0.008 that its component, which accounts for the match ratio of mixed liquor,.
- A kind of 7. soft soil roadbed construction method of municipal administration according to claim 1, it is characterised in that:Also contain in step 5 Later maintenance, when concrete tentatively solidifies, diaphragm is raised every three days(6), and sprinkled water toward concrete surface, this After process is until carry out 3-4 times, diaphragm is removed(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711262968.1A CN107881891A (en) | 2017-12-04 | 2017-12-04 | A kind of soft soil roadbed construction method of municipal administration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711262968.1A CN107881891A (en) | 2017-12-04 | 2017-12-04 | A kind of soft soil roadbed construction method of municipal administration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107881891A true CN107881891A (en) | 2018-04-06 |
Family
ID=61773090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711262968.1A Pending CN107881891A (en) | 2017-12-04 | 2017-12-04 | A kind of soft soil roadbed construction method of municipal administration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107881891A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109183539A (en) * | 2018-09-05 | 2019-01-11 | 辽宁工程技术大学 | A kind of soft soil roadbed construction method |
CN109295821A (en) * | 2018-09-27 | 2019-02-01 | 王默 | A kind of subgrade road reinforcing support construction |
CN109577124A (en) * | 2018-12-27 | 2019-04-05 | 舜元建设(集团)有限公司 | Roadbed reinforcement means on the spot under a kind of saturated soft soil geological conditions |
CN110331713A (en) * | 2019-05-31 | 2019-10-15 | 浙江振升建设有限公司 | A kind of reinforcement of foundation for soft ground |
CN110735373A (en) * | 2019-10-09 | 2020-01-31 | 北京夏都水利工程有限公司 | field road construction method |
CN112813756A (en) * | 2019-11-18 | 2021-05-18 | 浙江金业建设有限公司 | Roadbed based on municipal soft soil and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0121003A1 (en) * | 1983-03-31 | 1984-10-10 | Sosrohadikoesoemo, Soearto, Ir. R. Ng. | Ground plate |
NL2003159C2 (en) * | 2009-07-09 | 2011-01-12 | Dijk Maasland B V Van | METHOD FOR RENOVATING A ROAD CONSTRUCTION |
CN106120523A (en) * | 2016-07-05 | 2016-11-16 | 河海大学 | A kind of integrated application stake and vertical earth working material process the construction method of highway soft foundation |
CN106592363A (en) * | 2016-11-29 | 2017-04-26 | 昆山顶牛市政建设有限公司 | Construction method for municipal soft soil roadbed |
-
2017
- 2017-12-04 CN CN201711262968.1A patent/CN107881891A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0121003A1 (en) * | 1983-03-31 | 1984-10-10 | Sosrohadikoesoemo, Soearto, Ir. R. Ng. | Ground plate |
NL2003159C2 (en) * | 2009-07-09 | 2011-01-12 | Dijk Maasland B V Van | METHOD FOR RENOVATING A ROAD CONSTRUCTION |
CN106120523A (en) * | 2016-07-05 | 2016-11-16 | 河海大学 | A kind of integrated application stake and vertical earth working material process the construction method of highway soft foundation |
CN106592363A (en) * | 2016-11-29 | 2017-04-26 | 昆山顶牛市政建设有限公司 | Construction method for municipal soft soil roadbed |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109183539A (en) * | 2018-09-05 | 2019-01-11 | 辽宁工程技术大学 | A kind of soft soil roadbed construction method |
CN109295821A (en) * | 2018-09-27 | 2019-02-01 | 王默 | A kind of subgrade road reinforcing support construction |
CN109295821B (en) * | 2018-09-27 | 2021-05-14 | 王默 | Soft foundation road reinforcing and supporting structure |
CN109577124A (en) * | 2018-12-27 | 2019-04-05 | 舜元建设(集团)有限公司 | Roadbed reinforcement means on the spot under a kind of saturated soft soil geological conditions |
CN110331713A (en) * | 2019-05-31 | 2019-10-15 | 浙江振升建设有限公司 | A kind of reinforcement of foundation for soft ground |
CN110735373A (en) * | 2019-10-09 | 2020-01-31 | 北京夏都水利工程有限公司 | field road construction method |
CN112813756A (en) * | 2019-11-18 | 2021-05-18 | 浙江金业建设有限公司 | Roadbed based on municipal soft soil and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107881891A (en) | A kind of soft soil roadbed construction method of municipal administration | |
CN101368383B (en) | Method for treating soft soil roadbed by artificial composite crust layer | |
CN102296507B (en) | Treatment method of subgrade cracks | |
CN100439600C (en) | Treatment method of newly built high way railway engineering soft foundation | |
CN105155510B (en) | Method capable of carrying out microorganism solidifying and crusting on super soft foundation surface and matching device | |
CN109736291A (en) | One kind owing consolidation and blows on the base of alluvial plain that biological cement is reinforcing road bed and its construction method | |
CN105586818A (en) | Light foam layer for widening roadbed of road and construction process of light foam layer | |
CN107805987A (en) | The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section | |
CN107700435A (en) | The cementing rock-fill dams of rock-fill concrete core-wall and its construction method | |
CN101487254A (en) | Construction method of vibrating immersed tube gravel slip-casting pile | |
CN101250868A (en) | Precipitation prepressing association motivation induration deep densification method | |
CN106560559B (en) | A kind of leakage preventing structure and construction method for city river | |
WO2019007176A1 (en) | Foam light soil railway subgrade structure and construction method | |
CN108442724B (en) | Earthen site crack repairing method | |
CN106592363B (en) | A kind of construction method that municipal administration is soft soil roadbed | |
CN104674842B (en) | Solidified earth barricade and constructional method thereof | |
CN103061224A (en) | Method for thawing and strengthening permafrost foundations by quicklime-sand piles | |
CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
CN206015452U (en) | A kind of Municipal Road Engineering roadbed | |
CN107724364A (en) | A kind of construction technology of soft soil foundation | |
CN213772779U (en) | Concrete road surface structure permeates water | |
CN207452609U (en) | A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section | |
CN104790282B (en) | A kind of road surface with soft subgrade whitewashing processing means | |
CN104499394B (en) | A kind of zero padding black cotton regur soil roadbed Treatment Methods | |
CN207878440U (en) | A kind of reinforcement composite foundation structure suitable for soft soil foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |