CN107881302A - A kind of processing strip method of energy stabilised quality - Google Patents

A kind of processing strip method of energy stabilised quality Download PDF

Info

Publication number
CN107881302A
CN107881302A CN201711460200.5A CN201711460200A CN107881302A CN 107881302 A CN107881302 A CN 107881302A CN 201711460200 A CN201711460200 A CN 201711460200A CN 107881302 A CN107881302 A CN 107881302A
Authority
CN
China
Prior art keywords
annealing furnace
warming
temperature
incubated
roll bending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711460200.5A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Bai Sheng Technology Co Ltd
Original Assignee
Wuhan Bai Sheng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Bai Sheng Technology Co Ltd filed Critical Wuhan Bai Sheng Technology Co Ltd
Priority to CN201711460200.5A priority Critical patent/CN107881302A/en
Publication of CN107881302A publication Critical patent/CN107881302A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B1/24Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
    • B21B1/26Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by hot-rolling, e.g. Steckel hot mill
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0007Cutting or shearing the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B38/00Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/02Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of sheets
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • C21D1/32Soft annealing, e.g. spheroidising
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0247Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the heat treatment
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • C21D9/54Furnaces for treating strips or wire
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23GCLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
    • C23G1/00Cleaning or pickling metallic material with solutions or molten salts
    • C23G1/02Cleaning or pickling metallic material with solutions or molten salts with acid solutions
    • C23G1/08Iron or steel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2201/00Special rolling modes
    • B21B2201/06Thermomechanical rolling

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Metal Rolling (AREA)

Abstract

The present invention relates to a kind of processing strip method of energy stabilised quality, comprise the following steps:Choose the hot-rolled coil that the trade mark is BJS15C;First time longitudinal shearing slitting is carried out using the first big splitting production line, slitting roll bending is made;The slitting roll bending that first time longitudinal shearing slitting is obtained carries out pickling, and pickling roll bending is made;The pickling roll bending that pickling obtains is rolled, and rolling roll bending is made;Rolling rolling roll bending is subjected to spheroidizing, and spheroidizing roll bending is made;The spheroidizing roll bending that spheroidizing is obtained carries out finish rolling, and finish rolling roll bending is made;The finish rolling roll bending that finish rolling is obtained carries out second of longitudinal shearing slitting, and slitting roll bending is made;Packaging and storage.The beneficial effects of the invention are as follows:Can stabilized product quality, raise labour productivity.

Description

A kind of processing strip method of energy stabilised quality
Technical field
The present invention relates to strip to produce and process technical field, more particularly to a kind of processing strip method of energy stabilised quality.
Background technology
It is well known that strip is a kind of narrow and long steel plate in order to adapt to different industrial department needs and produce.Strip Coiled supply, have the advantages that dimensional accuracy is high, surface quality is good, is easy to process, saves material, be widely used in production welding steel Pipe, makees the fields such as the blank of cold-rolled forming section.
Influenceed by the method for current working hot-rolled strip, its strip quality produced is not sufficiently stable, and is being produced During easily there is defective work, cause whole production efficiency than relatively low.
The content of the invention
The technical problems to be solved by the invention be to provide it is a kind of can stabilized product quality, raise labour productivity plus The method of work hot-strip.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of processing strip method of energy stabilised quality, bag Include following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and pickling roll bending is made;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 0.5h-3h is incubated after being warming up to 260 DEG C, its Annealing furnace is warming up to 400 DEG C, and be warming up to by secondary, annealing furnace after insulation 0.5h-3h at a temperature of 260 DEG C in 1h-4h 1h-3h is incubated after 400 DEG C, again, after annealing furnace is incubated 1h-3h at a temperature of 400 DEG C, annealing furnace is heated up in 1h-4h To 580 DEG C, and 0.5h-3h is incubated after being warming up to 580 DEG C, the 4th, after annealing furnace is incubated 0.5h-3h at a temperature of 580 DEG C, Annealing furnace is warming up to 670 DEG C in 1h-4h, and 0.5h-3h is incubated after being warming up to 670 DEG C, the 5th, annealing furnace is at 670 DEG C At a temperature of be incubated 0.5h-3h after, annealing furnace is warming up to 680 DEG C to 700 DEG C in 1h-4h, and be warming up to 680 DEG C extremely It is incubated 8h-16h after 700 DEG C, the 6th, after annealing furnace is incubated 8h-16h at a temperature of 680 DEG C to 700 DEG C, using furnace cooling Mode the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C, the 7th, by the way of furnace cooling by annealing furnace Temperature be down to 600 DEG C after, to annealing furnace change that cover is air-cooled, and the temperature of annealing furnace is down to 280 DEG C by 600 DEG C, the 8th, The temperature of annealing furnace is down to 280 DEG C, by the way of water cooling, the temperature of annealing furnace is down to 80 DEG C by 280 DEG C, finally, is gone out Stove, spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
The beneficial effects of the invention are as follows:By to rolling roll bending carry out spheroidizing when, by whole spheroidizing process Some stages are divided into, and effectively control heating-up time, soaking time and the temperature in each stage in each stage, so as to So that the product quality produced is stable, product qualification rate gets a promotion, so as to further improve labor productivity.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, in the step 3, when carrying out pickling, the minus tolerance of the thickness before and after soft annealing roll bending pickling is less than 0.15mm, the quantity of descaling bath are two, and the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, two descaling baths Pickling concentration is respectively 18%-22%, 15%-18%, and the sour position in two descaling baths is 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber is 11 to 13, and the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, the cleaning speed of pickling lines is 5m/min to 15m/min.
It is using above-mentioned further beneficial effect:Roll bending caused oxidation during soft annealing can effectively be removed Skin, avoid influenceing following process.
Further, in the step 5, in spheroidizing, annealing furnace is warming up to 260 DEG C at full speed, and be warming up to 0.6h-1.4h is incubated after 260 DEG C;Annealing furnace is after insulation 0.6h-1.4h at a temperature of 260 DEG C, by annealing furnace in 1.2h-3.5h 400 DEG C are inside warming up to, and 1.2h-2.5h is incubated after being warming up to 400 DEG C;Annealing furnace is incubated 1.2h- at a temperature of 400 DEG C After 2.5h, annealing furnace is warming up to 580 DEG C in 1.2h-3.5h, and 0.6h-1.4h is incubated after being warming up to 580 DEG C;Annealing furnace After insulation 0.6h-1.4h at a temperature of 580 DEG C, annealing furnace is warming up to 670 DEG C in 1.2h-3.5h, and be warming up to 670 0.6h-1.4h is incubated after DEG C;Annealing furnace is after insulation 0.6h-1.4h at a temperature of 670 DEG C, by annealing furnace in 1.2h-3.5h 680 DEG C to 700 DEG C are warming up to, and 9h-15h is incubated after being warming up to 680 DEG C to 700 DEG C;Annealing furnace is at 680 DEG C to 700 DEG C At a temperature of be incubated 9h-15h after, the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C by the way of furnace cooling.
Further, in spheroidizing, annealing furnace is warming up to 260 DEG C at full speed, and be incubated after being warming up to 260 DEG C 0.8h-1.2h;Annealing furnace is warming up to 400 by annealing furnace after insulation 0.8h-1.2h at a temperature of 260 DEG C in 1.6h-2.5h DEG C, and it is incubated 1.5h-2.2h after being warming up to 400 DEG C;Annealing furnace will anneal after insulation 1.5h-2.2h at a temperature of 400 DEG C Stove is warming up to 580 DEG C in 1.6h-2.5h, and is incubated 0.8h-1.2h after being warming up to 580 DEG C;Temperature of the annealing furnace at 580 DEG C After lower insulation 0.8h-1.2h, annealing furnace is warming up to 670 DEG C in 1.6h-2.5h, and 0.8h- is incubated after being warming up to 670 DEG C 1.2h;Annealing furnace is warming up to 680 DEG C extremely by annealing furnace after insulation 0.8h-1.2h at a temperature of 670 DEG C in 1.6h-2.5h 700 DEG C, and it is incubated 11h-13h after being warming up to 680 DEG C to 700 DEG C;Annealing furnace is incubated at a temperature of 680 DEG C to 700 DEG C After 11h-13h, the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C by the way of furnace cooling.
Further, in spheroidizing, annealing furnace is warming up to 260 DEG C at full speed, and 1h is incubated after being warming up to 260 DEG C; Annealing furnace is warming up to 400 DEG C, and be incubated after being warming up to 400 DEG C by annealing furnace after insulation 1h at a temperature of 260 DEG C in 2h 2h;Annealing furnace is warming up to 580 DEG C by annealing furnace after insulation 2h at a temperature of 400 DEG C in 2h, and after being warming up to 580 DEG C It is incubated 1h;Annealing furnace is warming up to 670 DEG C, and be warming up to 670 by annealing furnace after insulation 1h at a temperature of 580 DEG C in 2h 1h is incubated after DEG C;After annealing furnace is incubated 1h at a temperature of 670 DEG C, annealing furnace is warming up to 680 DEG C to 700 DEG C in 2h, and 12h is incubated after being warming up to 680 DEG C to 700 DEG C;Annealing furnace is after insulation 12h at a temperature of 680 DEG C to 700 DEG C, using with stove The temperature of annealing furnace is down to 600 DEG C by the mode of cooling by 680 DEG C to 700 DEG C.
Further, in spheroidizing, need to do detonation experiment before being heated up, it is ensured that the purity of hydrogen in ammonia destruction furnace; In whole heating and insulating process, the difference of actual temperature value and process warm angle value is less than 15 DEG C.
Further, in whole heating and insulating process, the difference of actual temperature value and process warm angle value is less than 15 DEG C.
It is using above-mentioned further beneficial effect:The stability of spheroidizing roll bending quality can effectively be ensured.
Further, in the step 6, before finish rolling is carried out, ball that need to be first with metallographic microscope to soft annealing roll bending Rate is detected, and carries out finish rolling by qualified annealing roll bending is detected.
Further,, need to be first with universal testing machine and hardometer before second of longitudinal shearing slitting is carried out in the step 8 The hardness of finish rolling roll bending is detected, and acceptability limit Wei≤160HV of the hardness number of finish rolling roll bending.
Further, acceptability limit Wei≤140HV of the hardness number of finish rolling roll bending.
It is using above-mentioned further beneficial effect:The parameter in production technology can be adjusted in time according to detection data Value, it is ensured that the quality of production.
Brief description of the drawings
Fig. 1 be working hot-rolled strip of the present invention method in spheroidizing curve map.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
Embodiment one:As shown in figure 1, a kind of processing strip method of energy stabilised quality, comprises the following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, is processed in order to facilitate subsequent handling, hot-rolled coil is in slitting, width side To reserved 0.5mm or so surplus, the thickness tolerance of hot-rolled coil should meet GB/T709 regulation, convexity requirement:Thickness Less than or equal to 3.0mm, convexity is less than or equal to 40 μm;Thickness is 3mm to 8.0mm, and convexity is less than or equal to 60 μm, and thickness is more than 8.0mm, convexity are less than or equal to 100 μm, and hot-rolled coil surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, hot rolling Roll bending must not have a layering, and surface allows to have slight pit within thickness deviation scope half and local deep pit, minute bubbles, light Micro- scuffing and roll impression;Hot-rolled coil neat in edge, without zigzag, and in slitting blade datum end face bounce should be small In equal to 0.06mm, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and in pickling, the minus tolerance of the thickness before and after roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is Pickling roll bending is made to 15m/min in 5m/min;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made, wherein, the thickness for rolling roll bending is 4mm to 5mm;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 0.5h is incubated after being warming up to 260 DEG C, secondly, moved back Annealing furnace is warming up to 400 DEG C, and be incubated after being warming up to 400 DEG C by stove after insulation 0.5h at a temperature of 260 DEG C in 1h 1h, again, after annealing furnace is incubated 1h at a temperature of 400 DEG C, annealing furnace is warming up to 580 DEG C in 1h, and be warming up to 580 It is incubated 0.5h after DEG C, the 4th, after annealing furnace is incubated 0.5h at a temperature of 580 DEG C, annealing furnace is warming up to 670 DEG C in 1h, And 0.5h is incubated after being warming up to 670 DEG C, and the 5th, after annealing furnace is incubated 0.5h at a temperature of 670 DEG C, by annealing furnace in 1h 680 DEG C to 700 DEG C are warming up to, and 8h is incubated after being warming up to 680 DEG C to 700 DEG C, the 6th, annealing furnace is at 680 DEG C to 700 DEG C At a temperature of be incubated 8h after, the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C by the way of furnace cooling, the 7th, After the temperature of annealing furnace is down into 600 DEG C by the way of furnace cooling, it is air-cooled to annealing furnace change cover, and by annealing furnace Temperature be down to 280 DEG C by 600 DEG C, the 8th, the temperature of annealing furnace is down to 280 DEG C, by the way of water cooling, by annealing furnace Temperature is down to 80 DEG C by 280 DEG C, finally, comes out of the stove, and spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
Embodiment two:As shown in figure 1, a kind of processing strip method of energy stabilised quality, comprises the following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, is processed in order to facilitate subsequent handling, hot-rolled coil is in slitting, width side To reserved 0.5mm or so surplus, the thickness tolerance of hot-rolled coil should meet GB/T709 regulation, convexity requirement:Thickness Less than or equal to 3.0mm, convexity is less than or equal to 40 μm;Thickness is 3mm to 8.0mm, and convexity is less than or equal to 60 μm, and thickness is more than 8.0mm, convexity are less than or equal to 100 μm, and hot-rolled coil surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, hot rolling Roll bending must not have a layering, and surface allows to have slight pit within thickness deviation scope half and local deep pit, minute bubbles, light Micro- scuffing and roll impression;Hot-rolled coil neat in edge, without zigzag, and in slitting blade datum end face bounce should be small In equal to 0.06mm, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and in pickling, the minus tolerance of the thickness before and after roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is Pickling roll bending is made to 15m/min in 5m/min;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made, wherein, the thickness for rolling roll bending is 4mm to 5mm;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 0.8h is incubated after being warming up to 260 DEG C, secondly, moved back Annealing furnace is warming up to 400 DEG C, and protected after being warming up to 400 DEG C by stove after insulation 0.8h at a temperature of 260 DEG C in 1.6h Warm 1.5h, again, after annealing furnace is incubated 1.5h at a temperature of 400 DEG C, annealing furnace is warming up to 580 DEG C in 1.6h, and It is incubated 0.8h after being warming up to 580 DEG C, the 4th, after annealing furnace is incubated 0.8h at a temperature of 580 DEG C, annealing furnace is risen in 1.6h Temperature and is incubated 0.8h to 670 DEG C after being warming up to 670 DEG C, and the 5th, after annealing furnace is incubated 0.8h at a temperature of 670 DEG C, will move back Stove is warming up to 680 DEG C to 700 DEG C in 1.6h, and 11h is incubated after being warming up to 680 DEG C to 700 DEG C, and the 6th, annealing furnace exists After being incubated 11h at a temperature of 680 DEG C to 700 DEG C, by the temperature of annealing furnace by 680 DEG C to 700 DEG C by the way of furnace cooling It is down to 600 DEG C, the 7th, after the temperature of annealing furnace is down into 600 DEG C by the way of furnace cooling, annealing furnace is carried out to change cover It is air-cooled, and the temperature of annealing furnace is down to 280 DEG C by 600 DEG C, the 8th, the temperature of annealing furnace is down to 280 DEG C, using water cooling Mode, the temperature of annealing furnace is down to 80 DEG C by 280 DEG C, finally, come out of the stove, spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
Embodiment three:As shown in figure 1, a kind of processing strip method of energy stabilised quality, comprises the following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, is processed in order to facilitate subsequent handling, hot-rolled coil is in slitting, width side To reserved 0.5mm or so surplus, the thickness tolerance of hot-rolled coil should meet GB/T709 regulation, convexity requirement:Thickness Less than or equal to 3.0mm, convexity is less than or equal to 40 μm;Thickness is 3mm to 8.0mm, and convexity is less than or equal to 60 μm, and thickness is more than 8.0mm, convexity are less than or equal to 100 μm, and hot-rolled coil surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, hot rolling Roll bending must not have a layering, and surface allows to have slight pit within thickness deviation scope half and local deep pit, minute bubbles, light Micro- scuffing and roll impression;Hot-rolled coil neat in edge, without zigzag, and in slitting blade datum end face bounce should be small In equal to 0.06mm, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and in pickling, the minus tolerance of the thickness before and after roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is Pickling roll bending is made to 15m/min in 5m/min;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made, wherein, the thickness for rolling roll bending is 4mm to 5mm;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 1.2h is incubated after being warming up to 260 DEG C, secondly, moved back Annealing furnace is warming up to 400 DEG C, and protected after being warming up to 400 DEG C by stove after insulation 1.2h at a temperature of 260 DEG C in 2.5h Warm 2.2h, again, after annealing furnace is incubated 2.2h at a temperature of 400 DEG C, annealing furnace is warming up to 580 DEG C in 2.5h, and It is incubated 1.2h after being warming up to 580 DEG C, the 4th, after annealing furnace is incubated 1.2h at a temperature of 580 DEG C, annealing furnace is risen in 2.5h Temperature and is incubated 1.2h to 670 DEG C after being warming up to 670 DEG C, and the 5th, after annealing furnace is incubated 1.2h at a temperature of 670 DEG C, will move back Stove is warming up to 680 DEG C to 700 DEG C in 2.5h, and 13h is incubated after being warming up to 680 DEG C to 700 DEG C, and the 6th, annealing furnace exists After being incubated 13h at a temperature of 680 DEG C to 700 DEG C, by the temperature of annealing furnace by 680 DEG C to 700 DEG C by the way of furnace cooling It is down to 600 DEG C, the 7th, after the temperature of annealing furnace is down into 600 DEG C by the way of furnace cooling, annealing furnace is carried out to change cover It is air-cooled, and the temperature of annealing furnace is down to 280 DEG C by 600 DEG C, the 8th, the temperature of annealing furnace is down to 280 DEG C, using water cooling Mode, the temperature of annealing furnace is down to 80 DEG C by 280 DEG C, finally, come out of the stove, spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
Example IV:As shown in figure 1, a kind of processing strip method of energy stabilised quality, comprises the following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, is processed in order to facilitate subsequent handling, hot-rolled coil is in slitting, width side To reserved 0.5mm or so surplus, the thickness tolerance of hot-rolled coil should meet GB/T709 regulation, convexity requirement:Thickness Less than or equal to 3.0mm, convexity is less than or equal to 40 μm;Thickness is 3mm to 8.0mm, and convexity is less than or equal to 60 μm, and thickness is more than 8.0mm, convexity are less than or equal to 100 μm, and hot-rolled coil surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, hot rolling Roll bending must not have a layering, and surface allows to have slight pit within thickness deviation scope half and local deep pit, minute bubbles, light Micro- scuffing and roll impression;Hot-rolled coil neat in edge, without zigzag, and in slitting blade datum end face bounce should be small In equal to 0.06mm, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and in pickling, the minus tolerance of the thickness before and after roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is Pickling roll bending is made to 15m/min in 5m/min;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made, wherein, the thickness for rolling roll bending is 4mm to 5mm;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 3h is incubated after being warming up to 260 DEG C, secondly, annealed Annealing furnace is warming up to 400 DEG C by stove after insulation 3h at a temperature of 260 DEG C in 4h, and is incubated 3h after being warming up to 400 DEG C, Again, annealing furnace is warming up to 580 DEG C, and be warming up to 580 DEG C by annealing furnace after insulation 3h at a temperature of 400 DEG C in 4h After be incubated 3h, the 4th, after annealing furnace is incubated 3h at a temperature of 580 DEG C, annealing furnace is warming up to 670 DEG C in 4h, and rising Temperature is to being incubated 3h after 670 DEG C, and the 5th, after annealing furnace is incubated 3h at a temperature of 670 DEG C, annealing furnace is warming up to 680 in 4h DEG C to 700 DEG C, and 16h is incubated after being warming up to 680 DEG C to 700 DEG C, the 6th, annealing furnace protects at a temperature of 680 DEG C to 700 DEG C After warm 16h, the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C by the way of furnace cooling, the 7th, using with After the temperature of annealing furnace is down to 600 DEG C by the mode of stove cooling, to annealing furnace change that cover is air-cooled, and by the temperature of annealing furnace by 600 DEG C are down to 280 DEG C, the 8th, the temperature of annealing furnace is down to 280 DEG C, by the way of water cooling, by the temperature of annealing furnace by 280 DEG C are down to 80 DEG C, finally, are come out of the stove, and spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
Embodiment five:As shown in figure 1, a kind of processing strip method of energy stabilised quality, comprises the following steps:
Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
Step 2: first time longitudinal shearing slitting, the hot-rolled coil got ready in step 1 is transported into first by row device for hoisting First time longitudinal shearing slitting is carried out on big splitting production line, is processed in order to facilitate subsequent handling, hot-rolled coil is in slitting, width side To reserved 0.5mm or so surplus, the thickness tolerance of hot-rolled coil should meet GB/T709 regulation, convexity requirement:Thickness Less than or equal to 3.0mm, convexity is less than or equal to 40 μm;Thickness is 3mm to 8.0mm, and convexity is less than or equal to 60 μm, and thickness is more than 8.0mm, convexity are less than or equal to 100 μm, and hot-rolled coil surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, hot rolling Roll bending must not have a layering, and surface allows to have slight pit within thickness deviation scope half and local deep pit, minute bubbles, light Micro- scuffing and roll impression;Hot-rolled coil neat in edge, without zigzag, and in slitting blade datum end face bounce should be small In equal to 0.06mm, and slitting roll bending is made;
Step 3: pickling, slitting roll bending that first time longitudinal shearing slitting obtains be transported into pickling by row device for hoisting produced Pickling is carried out on line, and in pickling, the minus tolerance of the thickness before and after roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is Pickling roll bending is made to 15m/min in 5m/min;
Step 4: roll, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting and rolled System, and rolling roll bending is made, wherein, the thickness for rolling roll bending is 4mm to 5mm;
Step 5: spheroidizing, rolling rolling roll bending is transported into annealing furnace/ammonia destruction furnace by row device for hoisting Interior carry out spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 1h is incubated after being warming up to 260 DEG C, secondly, annealed Annealing furnace is warming up to 400 DEG C by stove after insulation 1h at a temperature of 260 DEG C in 2h, and is incubated 2h after being warming up to 400 DEG C, Again, annealing furnace is warming up to 580 DEG C, and be warming up to 580 DEG C by annealing furnace after insulation 2h at a temperature of 400 DEG C in 2h After be incubated 1h, the 4th, after annealing furnace is incubated 1h at a temperature of 580 DEG C, annealing furnace is warming up to 670 DEG C in 2h, and rising Temperature is to being incubated 1h after 670 DEG C, and the 5th, after annealing furnace is incubated 1h at a temperature of 670 DEG C, annealing furnace is warming up to 680 in 2h DEG C to 700 DEG C, and 12h is incubated after being warming up to 680 DEG C to 700 DEG C, the 6th, annealing furnace protects at a temperature of 680 DEG C to 700 DEG C After warm 12h, the temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C by the way of furnace cooling, the 7th, using with After the temperature of annealing furnace is down to 600 DEG C by the mode of stove cooling, to annealing furnace change that cover is air-cooled, and by the temperature of annealing furnace by 600 DEG C are down to 280 DEG C, the 8th, the temperature of annealing furnace is down to 280 DEG C, by the way of water cooling, by the temperature of annealing furnace by 280 DEG C are down to 80 DEG C, finally, are come out of the stove, and spheroidizing roll bending is made;
Step 6: finish rolling, the spheroidizing roll bending that spheroidizing obtains being transported to by row device for hoisting and rolls production line Upper carry out finish rolling, and finish rolling roll bending is made;
Step 7: second of longitudinal shearing slitting, the finish rolling roll bending that finish rolling obtains is transported into small banding machine by row device for hoisting Second of longitudinal shearing slitting of upper progress, and slitting roll bending is made;
Step 8: packaging and storage, using baling press carrying out packing bag to the slitting roll bending obtained by second of longitudinal shearing slitting Dress.
In the present invention, it is preferred to the technical scheme of embodiment five, according to the thickness of corresponding rolling roll bending, is formulated specific The operating process of spheroidizing, so as to effectively control the stability for the product quality produced, and the performance of product, when When the thickness of rolling roll bending changes, the operating process of spheroidizing is also required to change.
Need to do detonation experiment before being heated up, it is ensured that the purity of hydrogen in ammonia destruction furnace;Heat up and be incubated entirely Cheng Zhong, the difference of actual temperature value and process warm angle value are less than 15 DEG C.
Before finish rolling is carried out, the Oxygen potential of soft annealing roll bending need to be detected first with metallographic microscope, and will inspection Survey qualified annealing roll bending and carry out finish rolling.
Before second of longitudinal shearing slitting is carried out, the hardness of finish rolling roll bending need to be carried out first with universal testing machine and hardometer Detection, and acceptability limit Wei≤140HV of the hardness number of finish rolling roll bending, after hardness determination is qualified, finish rolling roll bending is carried out Metallographic detects, and wherein metallographic testing result information only refers to, and hardness is qualified, and to treat as metallographic qualified.
In spheroidizing, need to do detonation experiment before being heated up, it is ensured that the purity of hydrogen in ammonia destruction furnace;Entirely rising In temperature and insulating process, the difference of actual temperature value and process warm angle value is less than 15 DEG C, and actual temperature value is measured by thermocouple, inspection The frequency of survey is 1 time/1h, in addition, can suitably increase insulation platform in temperature-rise period, to meet theoretical raising speed.
When carrying out second of longitudinal shearing slitting need on slitting roll bending antirust oil;When carrying out the second longitudinal shearing slitting, hot rolling Roll bending surface must not have bubble, crackle, scab, stick up skin, drawing crack and be mingled with, and hot-rolled coil must not have layering, and surface allows have thickness Slight pit and local deep pit, minute bubbles, slight scuffing and the roll impression spent within margin of tolerance half;Hot rolled coil edges of boards Edge is neat, without zigzag, and the bounce of blade datum end face should be less than or equal to 0.06mm.
When being rolled, resulting rolling roll bending surface is without sticking up skin, pit, pit, yellow rust, scale, scuffing, template It is straight;Edge:Without plucking, broken side.The surface for the slitting roll bending that second of longitudinal shearing slitting obtains is without sticking up skin, pit, pit, water Rust, scuffing, Huang becomes rusty, imprinted, plate shape is straight, edge is without broken side;Needed when carrying out second of longitudinal shearing slitting toward on slitting roll bending Antirust oil.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changed, replacing and modification.

Claims (10)

  1. A kind of 1. processing strip method of energy stabilised quality, it is characterised in that comprise the following steps:
    Step 1: the hot-rolled coil that preparing raw material, the selection trade mark are BJS15C;
    Step 2: first time longitudinal shearing slitting, that by row device for hoisting the hot-rolled coil got ready in step 1 is transported into first is big vertical Progress first time longitudinal shearing slitting on production line is cut, and slitting roll bending is made;
    Step 3: pickling, the slitting roll bending that first time longitudinal shearing slitting obtains is transported on pickling lines by row device for hoisting Pickling is carried out, and pickling roll bending is made;
    Step 4: rolling, the pickling roll bending that pickling obtains is transported on production line of rolling mill by row device for hoisting rolled, and Rolling roll bending is made;
    Step 5: spheroidizing, rolling rolling roll bending is transported in annealing furnace/ammonia destruction furnace by row device for hoisting Row spheroidizing, 260 DEG C are warming up at full speed first, by annealing furnace, and 0.5h-3h is incubated after being warming up to 260 DEG C, secondly, moved back Annealing furnace is warming up to 400 DEG C, and be warming up to 400 DEG C by stove after insulation 0.5h-3h at a temperature of 260 DEG C in 1h-4h After be incubated 1h-3h, again, after annealing furnace is incubated 1h-3h at a temperature of 400 DEG C, annealing furnace is warming up to 580 in 1h-4h DEG C, and 0.5h-3h is incubated after being warming up to 580 DEG C, the 4th, after annealing furnace is incubated 0.5h-3h at a temperature of 580 DEG C, will move back Stove is warming up to 670 DEG C in 1h-4h, and 0.5h-3h is incubated after being warming up to 670 DEG C, and the 5th, temperature of the annealing furnace at 670 DEG C After the lower insulation 0.5h-0.8h of degree, annealing furnace is warming up to 680 DEG C to 700 DEG C in 1.6h-4h, and be warming up to 680 DEG C extremely It is incubated 11h-16h after 700 DEG C, the 6th, after annealing furnace is incubated 11h-16h at a temperature of 680 DEG C to 700 DEG C, using cold with stove The temperature of annealing furnace is down to 600 DEG C by mode but by 680 DEG C to 700 DEG C, and the 7th, will annealing by the way of furnace cooling After the temperature of stove is down to 600 DEG C, to annealing furnace change that cover is air-cooled, and the temperature of annealing furnace is down to 280 DEG C by 600 DEG C, 8th, the temperature of annealing furnace is down to 280 DEG C, by the way of water cooling, the temperature of annealing furnace is down to 80 DEG C by 280 DEG C, last, Come out of the stove, spheroidizing roll bending is made;
    Step 6: finish rolling, spheroidizing roll bending that spheroidizing obtains to be transported to by row device for hoisting to roll production line enterprising Row finish rolling, and finish rolling roll bending is made;
    Step 7: second of longitudinal shearing slitting, that by row device for hoisting finish rolling roll bending that finish rolling obtains is transported into small banding machine is enterprising Second of longitudinal shearing slitting of row, and slitting roll bending is made;
    Step 8: packaging and storage, using baling press carrying out packing packaging to the slitting roll bending obtained by second of longitudinal shearing slitting.
  2. A kind of 2. processing strip method of energy stabilised quality according to claim 1, it is characterised in that the step 3 In, when carrying out pickling, the minus tolerance of the thickness before and after soft annealing roll bending pickling is less than 0.15mm, and the quantity of descaling bath is two Individual, the quantity of deactivation slot is one, and the quantity of neutralization chamber is one, the pickling concentration of two descaling baths be respectively 18%-22%, 15%-18%, the sour position in two descaling baths are 380mm to 420mm, and acid liquor temperature is 53 DEG C to 72 DEG C, the pH value of neutralization chamber For 11 to 13, the pH value of deactivation slot is 7 to 8, and the temperature value of deactivation slot is 38 DEG C to 51 DEG C, and the cleaning speed of pickling lines is 5m/min to 15m/min.
  3. A kind of 3. processing strip method of energy stabilised quality according to claim 1, it is characterised in that the step 5 In, in spheroidizing, annealing furnace is warming up to 260 DEG C at full speed, and 0.6h-1.4h is incubated after being warming up to 260 DEG C;Annealing furnace After insulation 0.6h-1.4h at a temperature of 260 DEG C, annealing furnace is warming up to 400 DEG C in 1.2h-3.5h, and be warming up to 400 1.2h-2.5h is incubated after DEG C;Annealing furnace is after insulation 1.2h-2.5h at a temperature of 400 DEG C, by annealing furnace in 1.2h-3.5h 580 DEG C are warming up to, and 0.6h-1.4h is incubated after being warming up to 580 DEG C;Annealing furnace is incubated 0.6h-1.4h at a temperature of 580 DEG C Afterwards, annealing furnace is warming up to 670 DEG C in 1.2h-3.5h, and 0.6h-1.4h is incubated after being warming up to 670 DEG C;Annealing furnace exists After being incubated 0.6h-1.4h at a temperature of 670 DEG C, annealing furnace is warming up to 680 DEG C to 700 DEG C in 1.2h-3.5h, and heating up 9h-15h is incubated after to 680 DEG C to 700 DEG C;Annealing furnace is after insulation 9h-15h at a temperature of 680 DEG C to 700 DEG C, using with stove The temperature of annealing furnace is down to 600 DEG C by the mode of cooling by 680 DEG C to 700 DEG C.
  4. 4. the processing strip method of a kind of energy stabilised quality according to claim 3, it is characterised in that in spheroidizing When, annealing furnace is warming up to 260 DEG C at full speed, and 0.8h-1.2h is incubated after being warming up to 260 DEG C;Temperature of the annealing furnace at 260 DEG C After lower insulation 0.8h-1.2h, annealing furnace is warming up to 400 DEG C in 1.6h-2.5h, and 1.5h- is incubated after being warming up to 400 DEG C 2.2h;After annealing furnace is incubated 1.5h-2.2h at a temperature of 400 DEG C, annealing furnace is warming up to 580 DEG C in 1.6h-2.5h, and 0.8h-1.2h is incubated after being warming up to 580 DEG C;Annealing furnace exists annealing furnace after insulation 0.8h-1.2h at a temperature of 580 DEG C 670 DEG C are warming up in 1.6h-2.5h, and 0.8h-1.2h is incubated after being warming up to 670 DEG C;Annealing furnace is protected at a temperature of 670 DEG C After warm 0.8h-1.2h, annealing furnace is warming up to 680 DEG C to 700 DEG C in 1.6h-2.5h, and be warming up to 680 DEG C to 700 DEG C After be incubated 11h-13h;Annealing furnace, will by the way of furnace cooling after insulation 11h-13h at a temperature of 680 DEG C to 700 DEG C The temperature of annealing furnace is down to 600 DEG C by 680 DEG C to 700 DEG C.
  5. 5. the processing strip method of a kind of energy stabilised quality according to claim 4, it is characterised in that in spheroidizing When, annealing furnace is warming up to 260 DEG C at full speed, and 1h is incubated after being warming up to 260 DEG C;Annealing furnace is incubated at a temperature of 260 DEG C After 1h, annealing furnace is warming up to 400 DEG C in 2h, and 2h is incubated after being warming up to 400 DEG C;Annealing furnace is at a temperature of 400 DEG C After being incubated 2h, annealing furnace is warming up to 580 DEG C in 2h, and 1h is incubated after being warming up to 580 DEG C;Temperature of the annealing furnace at 580 DEG C After the lower insulation 1h of degree, annealing furnace is warming up to 670 DEG C in 2h, and 1h is incubated after being warming up to 670 DEG C;Annealing furnace is at 670 DEG C At a temperature of be incubated 1h after, annealing furnace is warming up to 680 DEG C to 700 DEG C in 2h, and protected after being warming up to 680 DEG C to 700 DEG C Warm 12h;Annealing furnace is after insulation 12h at a temperature of 680 DEG C to 700 DEG C, by the temperature of annealing furnace by the way of furnace cooling 600 DEG C are down to by 680 DEG C to 700 DEG C.
  6. A kind of 6. processing strip method of energy stabilised quality according to claim 1 or 3 or 4 or 5, it is characterised in that Need to do detonation experiment before being heated up, it is ensured that the purity of hydrogen in ammonia destruction furnace;In whole heating and insulating process, actual temperature The difference of angle value and process warm angle value is less than 20 DEG C.
  7. 7. it is according to claim 6 it is a kind of can stabilised quality processing strip method, it is characterised in that in whole heating and In insulating process, the difference of actual temperature value and process warm angle value is less than 15 DEG C.
  8. A kind of 8. processing strip method of energy stabilised quality according to claim 1, it is characterised in that the step 6 In, before finish rolling is carried out, the Oxygen potential of soft annealing roll bending need to be detected first with metallographic microscope, and will detect it is qualified Annealing roll bending carry out finish rolling.
  9. A kind of 9. processing strip method of energy stabilised quality according to claim 1, it is characterised in that the step 8 In, before second of longitudinal shearing slitting is carried out, the hardness of finish rolling roll bending need to be detected first with universal testing machine and hardometer, And acceptability limit Wei≤160HV of the hardness number of finish rolling roll bending.
  10. 10. the processing strip method of a kind of energy stabilised quality according to claim 9, it is characterised in that finish rolling roll bending Acceptability limit Wei≤140HV of hardness number.
CN201711460200.5A 2016-08-29 2016-08-29 A kind of processing strip method of energy stabilised quality Pending CN107881302A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711460200.5A CN107881302A (en) 2016-08-29 2016-08-29 A kind of processing strip method of energy stabilised quality

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711460200.5A CN107881302A (en) 2016-08-29 2016-08-29 A kind of processing strip method of energy stabilised quality
CN201610753612.7A CN106140812B (en) 2016-08-29 2016-08-29 A kind of method of working hot-rolled strip

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610753612.7A Division CN106140812B (en) 2016-08-29 2016-08-29 A kind of method of working hot-rolled strip

Publications (1)

Publication Number Publication Date
CN107881302A true CN107881302A (en) 2018-04-06

Family

ID=57344952

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201711460188.8A Active CN108193027B (en) 2016-08-29 2016-08-29 A kind of method of high efficiency working hot-rolled strip
CN201711460200.5A Pending CN107881302A (en) 2016-08-29 2016-08-29 A kind of processing strip method of energy stabilised quality
CN201610753612.7A Active CN106140812B (en) 2016-08-29 2016-08-29 A kind of method of working hot-rolled strip

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201711460188.8A Active CN108193027B (en) 2016-08-29 2016-08-29 A kind of method of high efficiency working hot-rolled strip

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610753612.7A Active CN106140812B (en) 2016-08-29 2016-08-29 A kind of method of working hot-rolled strip

Country Status (1)

Country Link
CN (3) CN108193027B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108165729A (en) * 2017-12-22 2018-06-15 湖北大帆金属制品有限公司 A kind of reciprocating annealing process of novel cold rolling strip bell furnace
CN107881303A (en) * 2017-12-30 2018-04-06 江苏创泰特钢制品有限公司 Steel annealing process
CN108311540A (en) * 2018-02-26 2018-07-24 包头钢铁(集团)有限责任公司 Steel production method, steel production system and computer readable storage medium
CN111893264A (en) * 2020-08-13 2020-11-06 无锡市城南带钢有限公司 Production process of precision strip steel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1709597A (en) * 2005-07-22 2005-12-21 濮德兴 High-precision very-thin special-wide cold-rolled steel band and its working process
CN1861389A (en) * 2006-06-13 2006-11-15 无锡市永鑫精密钢带厂 High precision composite nickel steel band and its prodn. technique
CN101307378A (en) * 2008-07-03 2008-11-19 山西太钢不锈钢股份有限公司 Spheroidizing annealing process for medium carbon steel plate in bell furnace
JP4299435B2 (en) * 2000-04-05 2009-07-22 新日本製鐵株式会社 Manufacturing method of hot-rolled steel sheet
CN101845601A (en) * 2009-03-26 2010-09-29 上海祝桥金属冲压延有限公司 Ultrahigh strength cold rolled steel strip for automobile seat
CN105274308A (en) * 2015-10-27 2016-01-27 江苏丰东热技术股份有限公司 Vacuum isothermal spheroidizing process for automobile engine cam
CN105567948A (en) * 2015-12-31 2016-05-11 江苏创泰特钢制品有限公司 Spheroidizing annealing temperature control process of cold-rolled steel coil

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5050433B2 (en) * 2005-10-05 2012-10-17 Jfeスチール株式会社 Method for producing extremely soft high carbon hot-rolled steel sheet
JP5392857B2 (en) * 2011-01-24 2014-01-22 日新製鋼株式会社 Manufacturing method for medium and high carbon steel sheets with excellent machinability
CN103014261B (en) * 2012-11-27 2015-04-08 大连经济技术开发区圣洁真空技术开发有限公司 Link plate balling and annealing technology
CN103014265A (en) * 2012-11-27 2013-04-03 大连经济技术开发区圣洁真空技术开发有限公司 Spheroidizing annealing process for bearing steel
CN105200308B (en) * 2014-05-28 2017-05-31 宝山钢铁股份有限公司 Fine steel and its governor motion fine parts manufacture method
CN105234171B (en) * 2015-09-17 2017-11-07 武汉钢铁江北集团精密带钢有限公司 A kind of 4B cold rolled precisions steel band and its manufacture method
CN105543461A (en) * 2015-12-30 2016-05-04 苏州翔楼金属制品有限公司 Thermal treatment process for cold-rolled steel strip S50C for automobile flywheel disc

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4299435B2 (en) * 2000-04-05 2009-07-22 新日本製鐵株式会社 Manufacturing method of hot-rolled steel sheet
CN1709597A (en) * 2005-07-22 2005-12-21 濮德兴 High-precision very-thin special-wide cold-rolled steel band and its working process
CN1861389A (en) * 2006-06-13 2006-11-15 无锡市永鑫精密钢带厂 High precision composite nickel steel band and its prodn. technique
CN101307378A (en) * 2008-07-03 2008-11-19 山西太钢不锈钢股份有限公司 Spheroidizing annealing process for medium carbon steel plate in bell furnace
CN101845601A (en) * 2009-03-26 2010-09-29 上海祝桥金属冲压延有限公司 Ultrahigh strength cold rolled steel strip for automobile seat
CN105274308A (en) * 2015-10-27 2016-01-27 江苏丰东热技术股份有限公司 Vacuum isothermal spheroidizing process for automobile engine cam
CN105567948A (en) * 2015-12-31 2016-05-11 江苏创泰特钢制品有限公司 Spheroidizing annealing temperature control process of cold-rolled steel coil

Also Published As

Publication number Publication date
CN108193027B (en) 2019-08-23
CN108193027A (en) 2018-06-22
CN106140812B (en) 2018-10-09
CN106140812A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106086350B (en) A kind of processing technology of strip
CN108193027B (en) A kind of method of high efficiency working hot-rolled strip
RU2746876C1 (en) System and method for continuous production of cold-rolled stainless steel sheets
CN101386124B (en) Medium and heavy plate production technique and special production line thereof
CN105689392B (en) A kind of very thin enamel cold-rolled strip production method
CN102658294B (en) The very thin steel band of toy industry mild steel precision cold-rolled, its process and uses thereof
CN102653839B (en) Low-temperature continuous-annealing interstitial-free atom cold-rolled steel plate and production method thereof
CN106544485B (en) The manufacturing method of thin slab continuous casting and rolling great surface quality medium and high carbon steel
CN109082607A (en) Non-oriented silicon steel and hot continuous rolling production method thereof
CN108906888A (en) Stainless-steel cold-rolling strip production equipment
CN104099493A (en) Production technology for medical TA3 sheet materials
CN104745935A (en) Production method for cold-rolled steel sheet with excellent stamping property
CN104531964A (en) Production method of high performance duplex stainless steel hot rolled coil
CN103215422A (en) Method for plastically producing thin stainless steel cold-rolled plates by utilizing hot-rolled steel bands
CN109261717A (en) Rolling method for improving edge quality of product in cold-rolled silicon steel production
CN107649522A (en) Surface quality of hot rolled steel coils control method
CN113695403A (en) Endless rolling method based on temperature uniform control
CN107893155A (en) Method for eliminating surface color difference defect of phosphorus-containing high-strength IF steel
CN104017971A (en) Transverse cold rolling method for improving surface wrinkling of ferritic stainless steel
CN113578962B (en) Production method of ultrathin cold-rolled steel strip for clothes
CN106853461A (en) A kind of hot rolled steel plate production system
CN106834906B (en) Production method of ultra-low carbon steel
CN101591725B (en) Production technology for strip steel
CN109926458A (en) A kind of Thin Strip Steel that sea surface oil slick is stable and its production method
CN116460139B (en) Ultrathin high-magnetic-induction oriented silicon steel and rolling method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180406