CN107869177A - A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer and facility of regulating and storing during rainfall - Google Patents

A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer and facility of regulating and storing during rainfall Download PDF

Info

Publication number
CN107869177A
CN107869177A CN201711042794.8A CN201711042794A CN107869177A CN 107869177 A CN107869177 A CN 107869177A CN 201711042794 A CN201711042794 A CN 201711042794A CN 107869177 A CN107869177 A CN 107869177A
Authority
CN
China
Prior art keywords
section
dirty pipe
flow
rainfall
dirty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711042794.8A
Other languages
Chinese (zh)
Other versions
CN107869177B (en
Inventor
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhongke Shengyu Environment Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201711042794.8A priority Critical patent/CN107869177B/en
Publication of CN107869177A publication Critical patent/CN107869177A/en
Application granted granted Critical
Publication of CN107869177B publication Critical patent/CN107869177B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/10Dividing the first rain flush out of the stormwater flow
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/20Measuring flow in sewer systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer and facility of regulating and storing during rainfall, the method of the invention in the case where utilizing existing resource to greatest extent, pass through reasonable disposition, by water quality in each burst region it is poor, it is with serious pollution just rain be emitted into by first section of dirty pipe of each section in trunk sewer, sewage treatment plant is entered back into be handled, it is emitted into by second section of dirty pipe of each section in facility of regulating and storing, enters back into sewage treatment plant and handled.Sewage can so be reduced as far as possible to the pollution level in burst region, while cleaner rainwater is not discharged into sewage treatment plant, the load of sewage treatment plant is reduced, so that existing resource realizes optimization collocation.Water body in the region of different pollution levels is targetedly fast and effectively carried out emission treatment by the method for the present invention, so as to realize the reasonable discharge of water body.

Description

The sewage that each section is cut in dirty pipe in drainage system is controlled to import during a kind of rainfall dirty The method of water conduit tube and facility of regulating and storing
Technical field
The invention belongs to drainage system control technique field, and in particular to each is controlled in drainage system during a kind of rainfall The method that the sewage that area is cut in dirty pipe imports trunk sewer and facility of regulating and storing.
Background technology
Current social, Development of Urbanization is more and more rapider, and the area in city is increasing, and urban drainage pipe network structure is more next More complicated, the processing pressure of urban water-body processing system is increasing.
Traditional urban pipe network system is all to be responsible for a piece of very big watershed using a big rain processing system, Because watershed is excessive, time delay of the rainwater on pipeline or rainwash is not fully taken into account, causes rain at initial stage Water and later stage rainwater largely mix.For example, storage pond has been built in certain city in the area close to urban sewage treatment system, it is assumed that Urban rainwater of the M areas in storage pond 1Km, M areas is directly discharged to storage pond by pipe network, at the beginning of the city in M areas The time that phase rainwater is fully discharged into storage pond is T1.For beyond the area apart from storage pond farther out in the region, it is assumed that N Offset is 10km from the air line distance of storage pond, and the time that city initial rainwater regional N is fully discharged into storage pond is T2, from From the point of view of time length, T2 obviously will be far longer than T1.And after storage pond stores full, the rainwater exceeded begins to be automatically discharged into certainly In right water body, since storage pond be T3 to the time of natural water discharge start to collect rainwater to.During actual motion, if only Only take the rainwater emission behaviour in M areas into account, i.e. the early-stage rainwater in M areas can enter sewage disposal system by storage pond The clean rainwater of intermediary and later stages can be discharged into natural water, it is necessary to which T3 is more than T1, once exceeding T3, storage pond is immediately to certainly Right discharge into water, and now N areas flow to the rainwater of storage pond and still pollute very serious early-stage rainwater, i.e. T3 is less than T2, to Natural water discharge can undoubtedly cause very serious pollution.
If only the rainwater emission behaviour in view of N areas, i.e. T3 is more than T2, and the early-stage rainwater in that N areas can lead to Cross storage pond to enter in urban sewage treatment system, handled well.But for M areas, M areas have largely Later stage clean rainwater also storage pond discharge N area early-stage rainwater time in be discharged into municipal sewage plant, Such emission behaviour can cause very big processing pressure to urban sewage system.In addition, M areas and N areas during actual motion Pipe network be generally connection situation, due to the difference of distance, the delay effect on road, the early-stage rainwater in N areas may be tight The later stage clean rainwater in heavily contaminated M areas, also results in the unreasonable of rainwater emission behaviour.
At present, a kind of technical scheme to solve the above problems has been proposed in the prior art, i.e., by using burst at The mode of reason is repartitioned to urban pipe network system according to unit area, but for using burst processing by the way of to city During city's pipe network system is divided by unit area, in particular for the division of some old towns, in unit area It is that the trunk sewer set can not meet the emission request of rainy day sewage in the unit area in domain, in face of such situation, Sanitary sewage and rainwater under trunk sewer receiving not can only be emitted on the natural water of distal end by Storm-water sewer.At this moment just need Sewage-catching case is laid in urban pipe network system again to contain, temporarily substitute the effect of trunk sewer, alleviate trunk sewer to sewage Carrying capacity.But such pipe network system is generally applicable under fine day state, when rainwater comes, due to dirty in pipe network The disposal ability of water treatment plant is limited, and the maximum stream flow that sewage-catching case is contained is limited;When occurring for heavy rain, heavy rain, can not in time by Water body in each unit region is arranged to sewage treatment plant simultaneously, causes going out for waterlogging disaster different degrees of in each unit region It is existing.
The content of the invention
It is each in drainage system it is an object of the invention to provide being controlled during a kind of rainfall in order to improve the deficiencies in the prior art The method that the sewage that section is cut in dirty pipe imports trunk sewer and facility of regulating and storing.This method is applied to each section during rainfall and flowed into It is manageable that the sewage total amount of trunk sewer is more than trunk sewer can circulate this moment maximum stream flow and/or sewage treatment plant Maximum capacity, methods described targetedly can fast and effectively discharge the water body in the region with different pollution levels Processing.
The present invention seeks to what is be achieved through the following technical solutions:
The sewage that each section is cut in dirty pipe in drainage system is controlled to import trunk sewer and facility of regulating and storing during a kind of rainfall Method, the drainage system includes multiple sections according to region division, first section of each section dirty pipe and second section of dirt Manage, regulate and store facility and trunk sewer;First section of each section dirty pipe is connected with trunk sewer, and the of each section Two sections of dirty pipes are connected with facility of regulating and storing, and the end of the trunk sewer and facility of regulating and storing is connected with sewage treatment plant respectively;
A) when the facility of regulating and storing, which is not reaching to, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3, wherein, Q1 is Trunk sewer arranges the maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1) when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;
1-2) to the flow of second section of dirty pipe of each section without control;
2) when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are set In the flow of first section of dirty pipe of other sections, the flow sum of first section of dirty pipe of other sections is set to be equal to trunk sewer end Actual receptive maximum stream flow Q, the control method select above-mentioned steps 1-1) in one kind in (a), (b) and (c);To each The flow of second section of dirty pipe of individual section is without control;
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3,
Assuming that actually receptive maximum stream flow is Q ' for facility end of regulating and storing, if Q1 is more than or equal to Q3, Q ' takes zero, if Q1 During less than Q3, Q ' takes the minimum value in Q2 and (Q3-Q1), wherein, Q1 arranges the maximum stream flow to sewage treatment plant for trunk sewer, Q2 is that facility of regulating and storing arranges maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1 ') when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;
1-2 ') each section of control second section of dirty pipe flow, make the flow sum of second section of dirty pipe of each section Equal to the facility end actually receptive maximum stream flow Q ' that regulates and stores, the control method selects one kind in following method:
(a ') controls the flow of second section of dirty pipe of each section identical;
(b ') is controlled second section of dirt of corresponding each section in the ratio of watershed area corresponding to each section The flow of pipe;
(c ') is in second section of each section corresponding to the ratio control of the flow area of second section of dirty pipe of each section The flow of dirty pipe;
2 ') when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are set In the flow of first section of dirty pipe and second section of dirty pipe of other sections, it is equal to the flow sum of first section of dirty pipe of other sections The actual receptive maximum stream flow Q in trunk sewer end, the control method selection above-mentioned steps 1-1 ') in (a), (b) and (c) In one kind;The flow sum of second section of dirty pipe of other sections is set to be equal to facility end actually receptive maximum stream flow of regulating and storing Q ', control method selection above-mentioned steps 1-2 ') in one kind in (a '), (b ') and (c ').
According to the present invention, each corresponding to the ratio control of the flow area of first section of dirty pipe in each section The flow of first section of dirty pipe in area refers to, in the ratio of the flow area of first section of dirty pipe of each section, corresponding to distributing The flow of first section of dirty pipe of each section, and the flow sum of first section of dirty pipe of each section is equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section first and dirty pipe point is cut in corresponding each section first The ratio for the flow matched somebody with somebody is identical.
According to the present invention, each corresponding to the ratio control of the flow area of second section of dirty pipe in each section The flow of second section of dirty pipe in area refers to, in the ratio of the flow area of second section of dirty pipe of each section, corresponding to distributing The flow of second section of dirty pipe of each section, and the flow sum of second section of dirty pipe of each section is equal to Q '.
Preferably, the ratio of dirty pipe flow area is cut in each section second and dirty pipe point is cut in corresponding each section second The ratio for the flow matched somebody with somebody is identical.
According to the present invention, the ratio in watershed area corresponding to each section is come each section corresponding to controlling The flow of first section of dirty pipe refer to, in the ratio of watershed area corresponding to each section, come each corresponding to distributing The flow of first section of dirty pipe in area, and the flow sum of first section of dirty pipe of each section is equal to Q.
Preferably, the ratio of each section watershed area cuts the stream of dirty pipe distribution with corresponding each section first The ratio of amount is identical.
According to the present invention, the ratio in watershed area corresponding to each section is come each section corresponding to controlling The flow of second section of dirty pipe refer to, in the ratio of watershed area corresponding to each section, come each corresponding to distributing The flow of second section of dirty pipe in area, and the flow sum of second section of dirty pipe of each section is equal to Q '.
Preferably, the ratio of each section watershed area cuts the stream of dirty pipe distribution with corresponding each section second The ratio of amount is identical.
According to the present invention, the drainage system also includes the water conservancy switch being arranged on first section of dirty pipe of each section And/or it is arranged on second section of dirty upper water conservancy switch of pipe of each section.
According to the present invention, the drainage system also includes control system, and the control system includes the device of monitoring rainfall The control unit being connected with its signal;Water conservancy switch on first section of dirty pipe of described control unit and each section and/or Water conservancy switching signal connection on second section of dirty pipe of each section;The monitoring device is used to monitor rainfall, generation rainfall prison Signal is surveyed, the rainfall monitoring signal of generation is conveyed to control unit, control unit controls according to the rainfall monitoring signal of reception The aperture of water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switch on second section of dirty pipe of each section; Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with Water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switching signal on second section of dirty pipe of each section connect Connect;The monitoring device is used to monitor the time, generates time supervision signal, and it is single that the time supervision signal of generation is conveyed into control Member, control unit control water conservancy switch on first section of dirty pipe of each section and/or each according to the time supervision signal of reception The aperture of water conservancy switch on second section of dirty pipe of individual section.
According to the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timing Device etc..
According to the present invention, the water conservancy switch on first section of dirty pipe of each section and second section of dirty pipe of each section Separately (above opened selected from valve (ball valve, gate valve, knife gate valve, butterfly valve, lift rubber slab dam check-valves etc.), gate Formula gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.), (dam flap valve flap valve Deng) in one kind.
According to the present invention, the first rain millimeter that required collection in watershed is corresponded to according to each section sets each Area needs the first rain rainfall L1 to dam, and the just rain rainfall can be set in the control unit of the control system.
According to the present invention, the device of the monitoring rainfall is rainfall gauge, and it is arranged in section.
According to the present invention, it is whole that early-stage rainwater in watershed is corresponded to according to the rain time of early-stage rainwater and each section Footpath flows to the first rain rain time T1 for the time cut required in dirty pipe each section setting each section, during the just rain rainfall Between can be set in the control unit of the control system.
According to the present invention, the device of the monitoring time is timer, and it is arranged in section.
According to the present invention, described section of dirt, which finishes, refers to that section corresponds to the first rain millimeter of required collection in watershed and reached The first rain rainfall L1 that dams is needed to the section, and the first rain millimeter that the section corresponds to required collection in watershed can be with Selected according to factors such as weather and regions, such as can be 5-20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to needed for the dirty pipe in each section section in corresponding watershed The time wanted reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flowed to respectively The time that individual section is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
It is described not had certain limitations according to region division according to the present invention, large area can be covered, can also be covered compared with cell Domain, such as region division can be carried out by 0.04-2 square kilometres of area.One or more rain can be included in the region Water processing establishment.
According to the present invention, first section of dirty pipe of each section is connected with the rainwater treatment facility of the section.
According to the present invention, second section of dirty pipe of each section is connected with the rainwater treatment facility of the section.
According to the present invention, the rainwater treatment facility in savings facility, online treatment facility and shunting well at least It is a kind of.
The present invention also provides a kind of control system suitable for the above method, and the control system includes the dress of monitoring rainfall The control unit put and be connected with its signal;Water conservancy switch on first section of dirty pipe of described control unit and each section and/ Or the water conservancy switching signal connection on second section of dirty pipe of each section;The monitoring device is used to monitor rainfall, generates rainfall Monitoring signals, the rainfall monitoring signal of generation is conveyed to control unit, control unit is according to the rainfall monitoring signal control of reception Make on first section of dirty pipe of each section water conservancy switch and/or each section second section of dirty pipe on water conservancy switch open Degree;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with Water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switching signal on second section of dirty pipe of each section connect Connect;The monitoring device is used to monitor the time, generates time supervision signal, and it is single that the time supervision signal of generation is conveyed into control Member, control unit control water conservancy switch on first section of dirty pipe of each section and/or each according to the time supervision signal of reception The aperture of water conservancy switch on second section of dirty pipe of individual section.
According to the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timing Device etc..
Beneficial effects of the present invention:
(1) the method for the invention in the case where utilizing existing resource to greatest extent, by reasonable disposition, by each burst In region water quality it is poor, it is with serious pollution just rain be emitted into by first section of dirty pipe of each section in trunk sewer, enter back into Sewage treatment plant is handled, and is emitted into by second section of dirty pipe of each section in facility of regulating and storing, is entered back into sewage treatment plant Handled.Sewage can so be reduced as far as possible to the pollution level in burst region, while also make cleaner rainwater not Sewage treatment plant is discharged into, reduces the load of sewage treatment plant, so that existing resource realizes optimization collocation.
(2) method of the invention is directed in system same time remittance trunk sewer and facility of regulating and storing in different burst regions Sewage and rainwater pollution level it is different, reasonable distribution is carried out according to the first rain rainfall in each section or first rain time, had The water body in the region of different pollution levels is fast and effectively pointedly subjected to emission treatment, so as to realize water body Rationally discharge.
(3) in method of the invention when facility of regulating and storing reaches and accommodates the upper limit, facility of now regulating and storing can serve as a mistake Water lines use, enter the water for facility of regulating and storing and outflow regulate and store facility water quantity holding it is consistent;When facility of regulating and storing does not have When reaching the receiving upper limit, flowing into the water of second section of dirty pipe therein need not be then controlled, and more water bodys are arranged to tune Store facility.
(4) method of the invention is simple, operation is easy.
Embodiment
With reference to specific embodiment, the present invention is expanded on further.It should be understood that these embodiments are merely to illustrate the present invention Rather than limit the scope of the invention.Furthermore, it is to be understood that after content disclosed in this invention has been read, ability Field technique personnel can make various changes or modifications to the present invention, and these equivalent form of values equally fall within the protection that the present invention is limited Within the scope of.
Embodiment 1
The sewage that each section is cut in dirty pipe in drainage system is controlled to import trunk sewer and facility of regulating and storing during a kind of rainfall Method, the drainage system includes multiple sections according to region division, first section of each section dirty pipe and second section of dirt Manage, regulate and store facility and trunk sewer;First section of each section dirty pipe is connected with trunk sewer, and the of each section Two sections of dirty pipes are connected with facility of regulating and storing, and the end of the trunk sewer and facility of regulating and storing is connected with sewage treatment plant respectively;
A) when the facility of regulating and storing, which is not reaching to, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3, wherein, Q1 is Trunk sewer arranges the maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1) when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;
1-2) to the flow of second section of dirty pipe of each section without control;
2) when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are set In the flow of first section of dirty pipe of other sections, the flow sum of first section of dirty pipe of other sections is set to be equal to trunk sewer end Actual receptive maximum stream flow Q, the control method select above-mentioned steps 1-1) in one kind in (a), (b) and (c);To each The flow of second section of dirty pipe of individual section is without control;
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3,
Assuming that actually receptive maximum stream flow is Q ' for facility end of regulating and storing, if Q1 is more than or equal to Q3, Q ' takes zero, if Q1 During less than Q3, Q ' takes the minimum value in Q2 and (Q3-Q1), wherein, Q1 arranges the maximum stream flow to sewage treatment plant for trunk sewer, Q2 is that facility of regulating and storing arranges maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1 ') when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;
1-2 ') each section of control second section of dirty pipe flow, make the flow sum of second section of dirty pipe of each section Equal to the facility end actually receptive maximum stream flow Q ' that regulates and stores, the control method selects one kind in following method:
(a ') controls the flow of second section of dirty pipe of each section identical;
(b ') is controlled second section of dirt of corresponding each section in the ratio of watershed area corresponding to each section The flow of pipe;
(c ') is in second section of each section corresponding to the ratio control of the flow area of second section of dirty pipe of each section The flow of dirty pipe;
2 ') when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are set In the flow of first section of dirty pipe and second section of dirty pipe of other sections, it is equal to the flow sum of first section of dirty pipe of other sections The actual receptive maximum stream flow Q in trunk sewer end, the control method selection above-mentioned steps 1-1 ') in (a), (b) and (c) In one kind;The flow sum of second section of dirty pipe of other sections is set to be equal to facility end actually receptive maximum stream flow of regulating and storing Q ', control method selection above-mentioned steps 1-2 ') in one kind in (a '), (b ') and (c ').
In a preferred embodiment of the present invention, the ratio of the flow area of first section of dirty pipe by each section Corresponding to example control the flow of first section of dirty pipe of each section refers to, by the flow area of first section of dirty pipe of each section Ratio, come the flow of first section of dirty pipe of each section corresponding to distributing, and make first section of dirty pipe of each section flow it With equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section first and dirty pipe point is cut in corresponding each section first The ratio for the flow matched somebody with somebody is identical.
In a preferred embodiment of the present invention, the ratio of the flow area of second section of dirty pipe by each section Corresponding to example control the flow of second section of dirty pipe of each section refers to, by the flow area of second section of dirty pipe of each section Ratio, come the flow of second section of dirty pipe of each section corresponding to distributing, and make second section of dirty pipe of each section flow it With equal to Q '.
Preferably, the ratio of dirty pipe flow area is cut in each section second and dirty pipe point is cut in corresponding each section second The ratio for the flow matched somebody with somebody is identical.
In a preferred embodiment of the present invention, the ratio in watershed area corresponding to each section is come The flow of first section of dirty pipe of each section corresponding to control refers to, in the ratio of watershed area corresponding to each section, To distribute the flow of first section of dirty pipe of corresponding each section, and it is equal to the flow sum of first section of dirty pipe of each section Q。
Preferably, the ratio of each section watershed area cuts the stream of dirty pipe distribution with corresponding each section first The ratio of amount is identical.
In a preferred embodiment of the present invention, the ratio in watershed area corresponding to each section is come The flow of second section of dirty pipe of each section corresponding to control refers to, in the ratio of watershed area corresponding to each section, To distribute the flow of second section of dirty pipe of corresponding each section, and it is equal to the flow sum of second section of dirty pipe of each section Q’。
Preferably, the ratio of each section watershed area cuts the stream of dirty pipe distribution with corresponding each section second The ratio of amount is identical.
In a preferred embodiment of the present invention, the drainage system also includes be arranged on each section first section Water conservancy on dirty pipe switchs and/or is arranged on second section of dirty upper water conservancy switch of pipe of each section.
In a preferred embodiment of the present invention, the drainage system also includes control system, the control system Including the control unit for monitoring the device of rainfall and being connected with its signal;Described control unit and first section of dirty pipe of each section On water conservancy switch and/or each section second section of dirty pipe on water conservancy switching signal connection;The monitoring device is used to supervise Measure rainfall, generate rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed to control unit, control unit is according to reception Rainfall monitoring signal is controlled on the water conservancy switch on first section of dirty pipe of each section and/or second section of dirty pipe of each section The aperture of water conservancy switch;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with Water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switching signal on second section of dirty pipe of each section connect Connect;The monitoring device is used to monitor the time, generates time supervision signal, and it is single that the time supervision signal of generation is conveyed into control Member, control unit control water conservancy switch on first section of dirty pipe of each section and/or each according to the time supervision signal of reception The aperture of water conservancy switch on second section of dirty pipe of individual section.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The monitoring The device of time is selected from timer etc..
In a preferred embodiment of the present invention, first section of each section dirty pipe and the second of each section Separately selected from valve, (ball valve, gate valve, knife gate valve, butterfly valve, lift rubber slab dam only the water conservancy switch cut on dirty pipe Return valve etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate Deng), one kind in flap valve (flap valve that dams etc.).
In a preferred embodiment of the present invention, according to each section correspond to required collection in watershed just Rain millimeter sets the first rain rainfall L1 that each section needs to dam, and described just rain rainfall can be in the control list of the control system Set in member.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is rainfall gauge, and it is arranged on section It is interior.
In a preferred embodiment of the present invention, charge for remittance is corresponded to according to the rain time of early-stage rainwater and each section When early-stage rainwater whole footpath flows to the first rain rainfall for each section of time setting that each section is cut required in dirty pipe in region Between T1, it is described just rain rain time can be set in the control unit of the control system.
In a preferred embodiment of the present invention, the device of the monitoring time is timer, and it is arranged on section It is interior.
In a preferred embodiment of the present invention, described section of dirt finishes refer to that section corresponds in watershed required for The first rain millimeter collected reaches the first rain rainfall L1 that the section needs dam, and the section corresponds to required receipts in watershed The first rain millimeter of collection can be selected according to factors such as weather and regions, such as can be 5-20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to needed for the dirty pipe in each section section in corresponding watershed The time wanted reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flowed to respectively The time that individual section is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
In a preferred embodiment of the present invention, it is described not had certain limitations according to region division, it can cover larger It region, can also cover smaller area, such as region division can be carried out by 0.04-2 square kilometres of area.Can in the region With including one or more rainwater treatment facilities.
In a preferred embodiment of the present invention, first section of dirt of each section is managed at the rainwater with the section Reason facility is connected.
In a preferred embodiment of the present invention, second section of dirt of each section is managed at the rainwater with the section Reason facility is connected.
In a preferred embodiment of the present invention, the rainwater treatment facility is selected from savings facility, online processing is set At least one of apply with shunting well.
Embodiment 2
The sewage that each section is cut in dirty pipe in drainage system is controlled to import trunk sewer and facility of regulating and storing during a kind of rainfall Method, the drainage system includes multiple sections according to region division, first section of each section dirty pipe and second section of dirt Manage, regulate and store facility and trunk sewer;First section of each section dirty pipe is connected with trunk sewer, and the of each section Two sections of dirty pipes are connected with facility of regulating and storing, and the end of the trunk sewer and facility of regulating and storing is connected with sewage treatment plant respectively;
The drainage system also includes the water conservancy switch being arranged on first section of dirty pipe of each section and/or is arranged on each The upper water conservancy switch of the dirty pipe of second section of individual section;The drainage system also includes control system, and the control system includes monitoring The device of rainfall and the control unit being connected with its signal;Described control unit and the water conservancy on first section of dirty pipe of each section Water conservancy switching signal connection on switch and/or second section of dirty pipe of each section;The monitoring device is used to monitor rainfall, raw Into rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed to control unit, control unit is according to the rainfall monitoring of reception Signal controls the water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switch on second section of dirty pipe of each section Aperture;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with Water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switching signal on second section of dirty pipe of each section connect Connect;The monitoring device is used to monitor the time, generates time supervision signal, and it is single that the time supervision signal of generation is conveyed into control Member, control unit control water conservancy switch on first section of dirty pipe of each section and/or each according to the time supervision signal of reception The aperture of water conservancy switch on second section of dirty pipe of individual section;
A) when the facility of regulating and storing, which is not reaching to, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3, wherein, Q1 is Trunk sewer arranges the maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1) when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;It is i.e. that system end (i.e. trunk sewer end) is real The dirty pipe of first section of the receptive each section of maximum stream flow Q mean allocations in border, makes the stream on first section of dirty pipe of each section Measure identical, and sum is Q;For example, including three sections in certain region, then the flow of the dirty pipe of the first of these three sections section is Q/3;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to remittance corresponding to each section The ratio of aqua region area, to distribute the flow of first section of dirty pipe of corresponding each section.For example, system end (i.e. sewage Main end) actual receptive maximum stream flow is Q, system includes three sections, water catchment area corresponding to three sections The ratio of domain area is 2:1:3, then the flow-rate ratio of the dirty pipe of the first of three sections section should be 2:1:3, i.e., the first of three sections The flow for cutting dirty pipe is respectively 2Q/6, Q/6 and 3Q/6;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to the first of each section The ratio of the flow area of dirty pipe is cut, to distribute the flow of first section of dirty pipe of corresponding each section;For example, system end (i.e. trunk sewer end) actual receptive maximum stream flow is Q, and system includes three sections, the first of three sections The ratio for cutting the flow area of dirty pipe is 4:5:6, then the flow-rate ratio of the dirty pipe of the first of three sections section is 4:5:6, i.e. three pieces The flow of first section of dirty pipe in area is respectively 4Q/15,5Q/15 and 6Q/15;
1-2) to the flow of second section of dirty pipe of each section without control;
2) when dirt is cut in certain section to be finished, then water conservancy switch and the second section of dirt closed on first section of dirty pipe of corresponding section Water conservancy switch on pipe, control are arranged on the flow of first section of dirty pipe and second section of dirty pipe of other sections, make other sections The flow sum of first section of dirty pipe is equal to the actual receptive maximum stream flow Q in trunk sewer end, in the control method selection State step 1-1) in one kind in (a), (b) and (c);To the flow of second section of dirty pipe of each section without control;
For example, system includes three sections, first section, the second section and the 3rd section are designated as, when the first section When reaching the first rain rainfall L1 that the needs of setting dam, now think the first section cut it is dirty completely, close the first of the first section The water conservancy switch cut on water conservancy switch and second section of dirty pipe on dirty pipe, can actually connect to system end (i.e. trunk sewer end) The maximum stream flow Q received is redistributed, and distribution method is with step 1-1) in (a), (b) and (c);
After certain time, during the first rain rainfall L1 that needs that the second section reaches setting dam, the second section is now thought Dirty complete, to close on water conservancy switch and second section of dirty pipe on first section of dirty pipe of the second section water conservancy switch is cut, to system The actual receptive maximum stream flow Q in end (i.e. trunk sewer end) is redistributed, and distribution method is with step 1-1) in (a), And (c) (b);Above-mentioned distribution is repeated, until dirt is cut completely in all sections;
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3,
Assuming that actually receptive maximum stream flow is Q ' for facility end of regulating and storing, if Q1 is more than or equal to Q3, Q ' takes zero, if Q1 During less than Q3, Q ' takes the minimum value in Q2 and (Q3-Q1), wherein, Q1 arranges the maximum stream flow to sewage treatment plant for trunk sewer, Q2 is that facility of regulating and storing arranges maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1 ') when rainfall, the flow of first section of dirty pipe of each section is controlled, makes first section of dirty pipe of each section Flow sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one in following method Kind:
(a) control the flow of first section of dirty pipe of each section identical;It is i.e. that system end (i.e. trunk sewer end) is real The dirty pipe of first section of the receptive each section of maximum stream flow Q mean allocations in border, makes the stream on first section of dirty pipe of each section Measure identical, and sum is Q;For example, including three sections in certain region, then the flow of the dirty pipe of the first of these three sections section is Q/3;
(b) first section of each section dirty pipe corresponding to being controlled in the ratio of watershed area corresponding to each section Flow;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to remittance corresponding to each section The ratio of aqua region area, to distribute the flow of first section of dirty pipe of corresponding each section.For example, system end (i.e. sewage Main end) actual receptive maximum stream flow is Q, system includes three sections, water catchment area corresponding to three sections The ratio of domain area is 2:1:3, then the flow-rate ratio of the dirty pipe of the first of three sections section should be 2:1:3, i.e., the first of three sections The flow for cutting dirty pipe is respectively 2Q/6, Q/6 and 3Q/6;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirt The flow of pipe;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to the first of each section The ratio of the flow area of dirty pipe is cut, to distribute the flow of first section of dirty pipe of corresponding each section;For example, system end (i.e. trunk sewer end) actual receptive maximum stream flow is Q, and system includes three sections, the first of three sections The ratio for cutting the flow area of dirty pipe is 4:5:6, then the flow-rate ratio of the dirty pipe of the first of three sections section is 4:5:6, i.e. three pieces The flow of first section of dirty pipe in area is respectively 4Q/15,5Q/15 and 6Q/15;
1-2 ') each section of control second section of dirty pipe flow, make the flow sum of second section of dirty pipe of each section Equal to the facility end actually receptive maximum stream flow Q ' that regulates and stores, the control method selects one kind in following method:
(a ') controls the flow of second section of dirty pipe of each section identical;It is i.e. that system end (i.e. trunk sewer end) is real The dirty pipe of second section of the receptive each section of maximum stream flow Q mean allocations in border, makes the stream on second section of dirty pipe of each section Measure identical, and sum is Q;For example, including three sections in certain region, then the flow of the dirty pipe of the second of these three sections section is Q/3;
(b ') is controlled second section of dirt of corresponding each section in the ratio of watershed area corresponding to each section The flow of pipe;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to corresponding to each section The ratio of watershed area, to distribute the flow of second section of dirty pipe of corresponding each section.For example, system end is (i.e. dirty Water conduit tube end) actual receptive maximum stream flow is Q, system includes three sections, charge for remittance corresponding to three sections The ratio of region area is 2:1:3, then the flow-rate ratio of the dirty pipe of the second of three sections section should be 2:1:3, i.e., the of three sections The flow of two sections of dirty pipes is respectively 2Q/6, Q/6 and 3Q/6;
(c ') is in second section of each section corresponding to the ratio control of the flow area of second section of dirty pipe of each section The flow of dirty pipe;I.e. by the actual receptive maximum stream flow Q of system end (i.e. trunk sewer end) according to each section the The ratio of the flow area of two sections of dirty pipes, to distribute the flow of second section of dirty pipe of corresponding each section;For example, system end (i.e. trunk sewer end) actual receptive maximum stream flow is Q, and system includes three sections, the second of three sections The ratio for cutting the flow area of dirty pipe is 4:5:6, then the flow-rate ratio of the dirty pipe of the second of three sections section is 4:5:6, i.e. three pieces The flow of second section of dirty pipe in area is respectively 4Q/15,5Q/15 and 6Q/15;
2 ') when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are set In the flow of first section of dirty pipe and second section of dirty pipe of other sections, it is equal to the flow sum of first section of dirty pipe of other sections The actual receptive maximum stream flow Q in trunk sewer end, the control method selection above-mentioned steps 1-1 ') in (a), (b) and (c) In one kind;The flow sum of second section of dirty pipe of other sections is set to be equal to facility end actually receptive maximum stream flow of regulating and storing Q ', control method selection above-mentioned steps 1-2 ') in one kind in (a '), (b ') and (c ').
Embodiment 3
The present embodiment provides a kind of control system for being applied to embodiment 1 or the methods described of embodiment 2, the control system Including the control unit for monitoring the device of rainfall and being connected with its signal;Described control unit and first section of dirty pipe of each section On water conservancy switch and/or each section second section of dirty pipe on water conservancy switching signal connection;The monitoring device is used to supervise Measure rainfall, generate rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed to control unit, control unit is according to reception Rainfall monitoring signal is controlled on the water conservancy switch on first section of dirty pipe of each section and/or second section of dirty pipe of each section The aperture of water conservancy switch;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with Water conservancy switch on first section of dirty pipe of each section and/or the water conservancy switching signal on second section of dirty pipe of each section connect Connect;The monitoring device is used to monitor the time, generates time supervision signal, and it is single that the time supervision signal of generation is conveyed into control Member, control unit control water conservancy switch on first section of dirty pipe of each section and/or each according to the time supervision signal of reception The aperture of water conservancy switch on second section of dirty pipe of individual section.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The monitoring The device of time is selected from timer etc..
More than, embodiments of the present invention are illustrated.But the present invention is not limited to above-mentioned embodiment.It is all Within the spirit and principles in the present invention, any modification, equivalent substitution and improvements done etc., it should be included in the guarantor of the present invention Within the scope of shield.

Claims (10)

1. the sewage that each section is cut in dirty pipe in drainage system is controlled to import trunk sewer and facility of regulating and storing during a kind of rainfall Method, the drainage system include multiple sections according to region division, first section of dirt of each section is managed and second section of dirt is managed, Regulate and store facility and trunk sewer;The dirty pipe of first section of each section is connected with trunk sewer, and the second of each section Cut dirty pipe with facility of regulating and storing to be connected, the end of the trunk sewer and facility of regulating and storing is connected with sewage treatment plant respectively;
A) when the facility of regulating and storing, which is not reaching to, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3, wherein, Q1 is sewage Main arranges the maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1) when rainfall, the flow of first section of dirty pipe of each section is controlled, makes the flow of first section of dirty pipe of each section Sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one kind in following method:
(a) control the flow of first section of dirty pipe of each section identical;
(b) stream of first section of dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section Amount;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirty pipe Flow;
1-2) to the flow of second section of dirty pipe of each section without control;
2) when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are arranged on it The flow of first section of dirty pipe of his section, the flow sum of first section of dirty pipe of other sections is set to be equal to trunk sewer end reality Receptive maximum stream flow Q, the control method select above-mentioned steps 1-1) in one kind in (a), (b) and (c);It is each to other The flow of second section of dirty pipe of individual section is without control;
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that actually receptive maximum stream flow is Q for trunk sewer end, Q takes the minimum value in Q1 and Q3,
Assuming that actually receptive maximum stream flow is Q ' for facility end of regulating and storing, if Q1 is more than or equal to Q3, Q ' takes zero, if Q1 is less than During Q3, Q ' takes the minimum value in Q2 and (Q3-Q1), wherein, Q1 arranges the maximum stream flow to sewage treatment plant for trunk sewer, and Q2 is Facility of regulating and storing arranges the maximum stream flow to sewage treatment plant, and Q3 is the maximum stream flow that sewage treatment plant can handle sewage;
Methods described includes:
1-1 ') when rainfall, the flow of first section of dirty pipe of each section is controlled, makes the flow of first section of dirty pipe of each section Sum is equal to trunk sewer end actually receptive maximum stream flow Q, and the control method selects one kind in following method:
(a) control the flow of first section of dirty pipe of each section identical;
(b) stream of first section of dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section Amount;
(c) in each section first section of dirty pipe flow area ratio control corresponding to each section first section of dirty pipe Flow;
1-2 ') each section of control second section of dirty pipe flow, be equal to the flow sum of second section of dirty pipe of each section Regulate and store facility end actually receptive maximum stream flow Q ', and the control method selects one kind in following method:
(a ') controls the flow of second section of dirty pipe of each section identical;
(b ') is controlled second section of dirty pipe of corresponding each section in the ratio of watershed area corresponding to each section Flow;
(c ') is managed in second section of dirt of each section corresponding to the ratio control of the flow area of second section of dirty pipe of each section Flow;
2 ') when dirt is cut in certain section to be finished, then close first section of dirty pipe for corresponding to section and second section of dirty pipe, control are arranged on it The flow of first section of dirty pipe and second section of dirty pipe of his section, makes the flow sum of first section of dirty pipe of other sections be equal to sewage The actual receptive maximum stream flow Q in main end, the control method selection above-mentioned steps 1-1 ') in (a), (b) and (c) It is a kind of;The flow sum of second section of dirty pipe of other sections is set to be equal to the facility end actually receptive maximum stream flow Q ' that regulates and stores, Control method selection above-mentioned steps 1-2 ') in one kind in (a '), (b ') and (c ').
2. according to the method for claim 1, it is characterised in that the flow area of first section of dirty pipe by each section Ratio control corresponding to the flow of first section of dirty pipe of each section refer to, by the pipes' analysis of first section of dirty pipe of each section Long-pending ratio, to distribute the flow of first section of dirty pipe of corresponding each section, and make the stream of first section of dirty pipe of each section Amount sum is equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section first and dirty pipe distribution is cut in corresponding each section first The ratio of flow is identical.
Preferably, second of each section corresponding to the ratio control of the flow area of second section of dirty pipe in each section The flow for cutting dirty pipe refers to, in the ratio of the flow area of second section of dirty pipe of each section, to distribute corresponding each section Second section of dirty pipe flow, and the flow sum of second section of dirty pipe of each section is equal to Q '.
Preferably, the ratio of dirty pipe flow area is cut in each section second and dirty pipe distribution is cut in corresponding each section second The ratio of flow is identical.
3. method according to claim 1 or 2, it is characterised in that the watershed area as corresponding to each section Ratio refer to come the flow of first section of dirty pipe of each section corresponding to controlling, the watershed area as corresponding to each section Ratio, come the flow of first section of dirty pipe of each section corresponding to distributing, and make the flow of first section of dirty pipe of each section Sum is equal to Q.
Preferably, the flow of dirty pipe distribution is cut in the ratio of each section watershed area and corresponding each section first Ratio is identical.
Preferably, the ratio in watershed area corresponding to each section is come second section of each section corresponding to controlling The flow of dirty pipe refers to, in the ratio of watershed area corresponding to each section, to distribute the second of corresponding each section The flow of dirty pipe is cut, and the flow sum of second section of dirty pipe of each section is equal to Q '.
Preferably, the flow of dirty pipe distribution is cut in the ratio of each section watershed area and corresponding each section second Ratio is identical.
4. according to the method any one of claim 1-3, it is characterised in that the drainage system also includes being arranged on respectively Water conservancy on first section of dirty pipe of individual section switchs and/or is arranged on second section of dirty upper water conservancy switch of pipe of each section.
Preferably, the drainage system also includes control system, and the control system includes the device of monitoring rainfall and believed with it Number connection control unit;Described control unit and the water conservancy switch on first section of dirty pipe of each section and/or each section Second section of dirty pipe on water conservancy switching signal connection;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, will The rainfall monitoring signal of generation is conveyed to control unit, and control unit controls each section according to the rainfall monitoring signal of reception The aperture of water conservancy switch on first section of dirty pipe and/or the water conservancy switch on second section of dirty pipe of each section;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with it is each Water conservancy switch on first section of dirty pipe of section and/or the water conservancy switching signal connection on second section of dirty pipe of each section;Institute State monitoring device to be used to monitor the time, generate time supervision signal, the time supervision signal of generation is conveyed to control unit, control Unit processed controls water conservancy switch and/or each section on first section of dirty pipe of each section according to the time supervision signal of reception Second section of dirty pipe on water conservancy switch aperture.
5. according to the method any one of claim 1-4, it is characterised in that the device of the monitoring rainfall is selected from rainfall Meter etc.;The device of the monitoring time is selected from timer etc..
6. according to the method any one of claim 1-5, it is characterised in that first section of each section dirty pipe and Water conservancy switch on second section of dirty pipe of each section is separately selected from valve (ball valve, gate valve, knife gate valve, butterfly valve, lifting Formula rubber slab dams check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir Door, rotary weir gate etc.), one kind in flap valve (flap valve that dams etc.).
7. according to the method any one of claim 1-6, it is characterised in that described section of dirt, which finishes, refers to the corresponding remittance in section The first rain millimeter of required collection reaches the first rain rainfall L1 that the section needs dam in aqua region, and the section corresponds to charge for remittance The first rain millimeter of required collection can be selected according to factors such as weather and regions in region, such as can be 5- 20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to required in the dirty pipe in each section section in corresponding watershed Time reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flows to each The time that area is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
8. according to the method any one of claim 1-7, it is characterised in that corresponded to according to each section in watershed The first rain millimeter of required collection sets the first rain rainfall L1 that each section needs to dam, and described just rain rainfall can be in the control Set in the control unit of system processed.
Preferably, the device of the monitoring rainfall is rainfall gauge, and it is arranged in section.
Preferably, early-stage rainwater whole footpath in watershed is corresponded to according to the rain time of early-stage rainwater and each section to flow to respectively The time that individual section is cut required in dirty pipe sets the first rain rain time T1 of each section, and the just rain rain time can be Set in the control unit of the control system.
Preferably, the device of the monitoring time is timer, and it is arranged in section.
9. according to the method any one of claim 1-8, it is characterised in that described according to region division is by 0.04-2 Square kilometre area carry out region division.
Preferably, one or more rainwater treatment facilities can be included in the region.
Preferably, first section of each section dirty pipe is connected with the rainwater treatment facility of the section.
Preferably, second section of each section dirty pipe is connected with the rainwater treatment facility of the section.
Preferably, the rainwater treatment facility is selected from least one of savings facility, online treatment facility and shunting well.
10. a kind of control system suitable for method any one of claim 1-9, the control system includes monitoring rain The device of amount and the control unit being connected with its signal;Described control unit is opened with the water conservancy on first section of dirty pipe of each section Water conservancy switching signal connection on second section of dirty pipe of pass and/or each section;The monitoring device is used to monitor rainfall, generates Rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed to control unit, control unit is believed according to the rainfall monitoring of reception Water conservancy switch on first section of dirty pipe of number each section of control and/or the water conservancy switch on second section of dirty pipe of each section Aperture;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with it is each Water conservancy switch on first section of dirty pipe of section and/or the water conservancy switching signal connection on second section of dirty pipe of each section;Institute State monitoring device to be used to monitor the time, generate time supervision signal, the time supervision signal of generation is conveyed to control unit, control Unit processed controls water conservancy switch and/or each section on first section of dirty pipe of each section according to the time supervision signal of reception Second section of dirty pipe on water conservancy switch aperture.
Preferably, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timer etc..
CN201711042794.8A 2017-10-30 2017-10-30 Method for controlling sewage in sewage intercepting pipes of each area in drainage system to sink Active CN107869177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711042794.8A CN107869177B (en) 2017-10-30 2017-10-30 Method for controlling sewage in sewage intercepting pipes of each area in drainage system to sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711042794.8A CN107869177B (en) 2017-10-30 2017-10-30 Method for controlling sewage in sewage intercepting pipes of each area in drainage system to sink

Publications (2)

Publication Number Publication Date
CN107869177A true CN107869177A (en) 2018-04-03
CN107869177B CN107869177B (en) 2020-07-24

Family

ID=61753482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711042794.8A Active CN107869177B (en) 2017-10-30 2017-10-30 Method for controlling sewage in sewage intercepting pipes of each area in drainage system to sink

Country Status (1)

Country Link
CN (1) CN107869177B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593390A (en) * 2019-08-30 2019-12-20 南京艾数信息科技有限公司 Intelligent rainwater collection system based on Internet of things technology
CN111395492A (en) * 2020-03-20 2020-07-10 武汉圣禹排水***有限公司 Sewage storage method, electronic equipment used for method and controller

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005026053A2 (en) * 2003-09-04 2005-03-24 Research Foundation Of The University Of Central Florida Incorporated Smart system stormwater management and reuse technology system and method
JP4980478B1 (en) * 2011-05-10 2012-07-18 株式会社日水コン Unknown water inflow location identification device
CN203188340U (en) * 2013-02-05 2013-09-11 福州市规划设计研究院 Urban drainage system under closure-type comprehensive drainage system
CN103628560A (en) * 2013-11-29 2014-03-12 重庆大学 Flow cutoff control device with memory function and flow cutoff control method thereof
CN105544698A (en) * 2016-02-15 2016-05-04 武汉圣禹排水***有限公司 Separate system pipe network based area fragmented rainwater abandoned flow treatment system
CN105863021A (en) * 2016-04-19 2016-08-17 武汉圣禹排水***有限公司 Fragmentation closure regulation and storage discharging system
CN107190842A (en) * 2017-05-27 2017-09-22 武汉圣禹排水***有限公司 A kind of control method for shunting of accurately being removed contamination for rainwater
CN206512820U (en) * 2016-12-30 2017-09-22 武汉圣禹排水***有限公司 A kind of combined system or the rainy just unconspicuous burst of feature of mixed flow system handle exhaust system online

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005026053A2 (en) * 2003-09-04 2005-03-24 Research Foundation Of The University Of Central Florida Incorporated Smart system stormwater management and reuse technology system and method
JP4980478B1 (en) * 2011-05-10 2012-07-18 株式会社日水コン Unknown water inflow location identification device
CN203188340U (en) * 2013-02-05 2013-09-11 福州市规划设计研究院 Urban drainage system under closure-type comprehensive drainage system
CN103628560A (en) * 2013-11-29 2014-03-12 重庆大学 Flow cutoff control device with memory function and flow cutoff control method thereof
CN105544698A (en) * 2016-02-15 2016-05-04 武汉圣禹排水***有限公司 Separate system pipe network based area fragmented rainwater abandoned flow treatment system
CN105863021A (en) * 2016-04-19 2016-08-17 武汉圣禹排水***有限公司 Fragmentation closure regulation and storage discharging system
CN206512820U (en) * 2016-12-30 2017-09-22 武汉圣禹排水***有限公司 A kind of combined system or the rainy just unconspicuous burst of feature of mixed flow system handle exhaust system online
CN107190842A (en) * 2017-05-27 2017-09-22 武汉圣禹排水***有限公司 A kind of control method for shunting of accurately being removed contamination for rainwater

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593390A (en) * 2019-08-30 2019-12-20 南京艾数信息科技有限公司 Intelligent rainwater collection system based on Internet of things technology
CN111395492A (en) * 2020-03-20 2020-07-10 武汉圣禹排水***有限公司 Sewage storage method, electronic equipment used for method and controller
CN111395492B (en) * 2020-03-20 2022-06-17 武汉圣禹排水***有限公司 Sewage storage method, electronic equipment used for method and controller

Also Published As

Publication number Publication date
CN107869177B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
CN107605006B (en) Drainage system and drainage control method
CN207959445U (en) A kind of drainage system with regulate and store facility and online processing facility
CN107869177A (en) A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer and facility of regulating and storing during rainfall
CN102193562A (en) Method for controlling combined sewage overflow and urban non-point source under combined drainage system
CN103114512A (en) Intelligent control type anti-impact urban sunken playground
CN107806164A (en) A kind of road rain water shunting processing system and its control method
CN104234171B (en) Based on the arterial drainage regulating and controlling water quality system and method that pollution of area source controls
CN107620374A (en) A kind of method for controlling the sewage in drainage system to import trunk sewer during rainfall
CN2585906Y (en) Divided-flow rainwater automatic defeating device
CN207436169U (en) A kind of combined flow system pipe network system for controlling sewage and initial rainwater pollution
CN207761004U (en) A kind of shunting well with downflow weir and the drainage system including the shunting well
CN107806163A (en) A kind of method for controlling the sewage in drainage system to import trunk sewer during rainfall
CN107806162A (en) A kind of method for controlling the sewage that each shunting facility is cut in dirty pipe in drainage system to import trunk sewer during rainfall
CN107620373A (en) A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import facility of regulating and storing during rainfall
CN107859139A (en) A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import trunk sewer during rainfall
CN207760984U (en) A kind of drainage system managed with section dirt with online processing facility
CN208280275U (en) A kind of road rain water shunting processing system
CN107761904A (en) A kind of method for controlling the sewage in drainage system in each section to import trunk sewer and facility of regulating and storing during rainfall
CN107806154A (en) A kind of drainage system and water discharge control method with online treatment facility
CN107587579A (en) A kind of a drainage system and water discharge control method with section dirt pipe and rainwater treatment facility
CN107675771A (en) A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall
CN107859137A (en) A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import facility of regulating and storing during rainfall
CN107675770A (en) A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer during rainfall
CN107620372A (en) A kind of method for controlling the sewage that each shunting facility is cut in dirty pipe in drainage system to import trunk sewer during rainfall
CN107859136A (en) A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import trunk sewer during rainfall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220915

Address after: Room 1808, Building A, Phase III (South District), Independent Innovation Industrial Base, Huguang Road, Shushan District, Hefei City, Anhui Province, 230031

Patentee after: Anhui Zhongke Shengyu Environment Co.,Ltd.

Address before: 430000, No. 189, Minli North Road, Wuhan Economic and Technological Development Zone, Hubei Province

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.

TR01 Transfer of patent right