CN107675771A - A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall - Google Patents
A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall Download PDFInfo
- Publication number
- CN107675771A CN107675771A CN201711042426.3A CN201711042426A CN107675771A CN 107675771 A CN107675771 A CN 107675771A CN 201711042426 A CN201711042426 A CN 201711042426A CN 107675771 A CN107675771 A CN 107675771A
- Authority
- CN
- China
- Prior art keywords
- section
- dirty pipe
- flow
- rainfall
- facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
- E03F7/02—Shut-off devices
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F2201/00—Details, devices or methods not otherwise provided for
- E03F2201/10—Dividing the first rain flush out of the stormwater flow
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F2201/00—Details, devices or methods not otherwise provided for
- E03F2201/20—Measuring flow in sewer systems
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall, methods described in the case where utilizing existing resource to greatest extent, pass through reasonable disposition, by water quality in each burst region is poor, with serious pollution just rain is emitted into facility of regulating and storing by section dirty pipe being connected with rainwater pipeline, sewage discharge in the sewage pipe being connected with plumbing drain simultaneously enters back into sewage treatment plant and handled into facility of regulating and storing.The sewage come from by reasonably distributing in the sewage pipe being connected with plumbing drain and the sewage cut in dirty pipe being connected with rainwater pipeline enter the amount for facility of regulating and storing, sewage is reduced as far as possible to the pollution level in burst region, cleaner rainwater is also set to be not discharged into sewage treatment plant simultaneously, the load of sewage treatment plant is reduced, so that existing resource realizes optimization collocation.
Description
Technical field
The invention belongs to drainage system control technique field, and in particular to each is controlled in drainage system during a kind of rainfall
The method that sewage in area's rainwater pipeline and plumbing drain imports facility of regulating and storing.
Background technology
Current social, Development of Urbanization is more and more rapider, and the area in city is increasing, and urban drainage pipe network structure is more next
More complicated, the processing pressure of urban water-body processing system is increasing.
Traditional urban pipe network system is all to be responsible for a piece of very big watershed using a big rain processing system,
Because watershed is excessive, time delay of the rainwater on pipeline or rainwash is not fully taken into account, causes rain at initial stage
Water and later stage rainwater largely mix.For example, storage pond has been built in certain city in the area close to urban sewage treatment system, it is assumed that
Urban rainwater of the M areas in storage pond 1Km, M areas is directly discharged to storage pond by pipe network, at the beginning of the city in M areas
The time that phase rainwater is fully discharged into storage pond is T1.For beyond the area apart from storage pond farther out in the region, it is assumed that N
Offset is 10km from the air line distance of storage pond, and the time that city initial rainwater regional N is fully discharged into storage pond is T2, from
From the point of view of time length, T2 obviously will be far longer than T1.And after storage pond stores full, the rainwater exceeded begins to be automatically discharged into certainly
In right water body, since storage pond be T3 to the time of natural water discharge start to collect rainwater to.During actual motion, if only
Only take the rainwater emission behaviour in M areas into account, i.e. the early-stage rainwater in M areas can enter sewage disposal system by storage pond
The clean rainwater of intermediary and later stages can be discharged into natural water, it is necessary to which T3 is more than T1, once exceeding T3, storage pond is immediately to certainly
Right discharge into water, and now N areas flow to the rainwater of storage pond and still pollute very serious early-stage rainwater, i.e. T3 is less than T2, to
Natural water discharge can undoubtedly cause very serious pollution.
If only the rainwater emission behaviour in view of N areas, i.e. T3 is more than T2, and the early-stage rainwater in that N areas can lead to
Cross storage pond to enter in urban sewage treatment system, handled well.But for M areas, M areas have largely
Later stage clean rainwater also storage pond discharge N area early-stage rainwater time in be discharged into municipal sewage plant,
Such emission behaviour can cause very big processing pressure to urban sewage system.In addition, M areas and N areas during actual motion
Pipe network be generally connection situation, due to the difference of distance, the delay effect on road, the early-stage rainwater in N areas may be tight
The later stage clean rainwater in heavily contaminated M areas, also results in the unreasonable of rainwater emission behaviour.And for having to be discharged into sewage
The flow that sanitary sewage in the plumbing drain for the treatment of plant can be discharged into sewage treatment plant certainly will be restricted, if waterlogging occurs
Phenomenon, then the pollution in region is greatly improved.
At present, a kind of technical scheme to solve the above problems has been proposed in the prior art, i.e., by using burst at
The mode of reason is repartitioned to urban pipe network system according to unit area, but for using burst processing by the way of to city
During city's pipe network system is divided by unit area, in particular for the division of some old towns, in unit area
It is facility of not regulating and storing in domain, in face of such situation, sanitary sewage and rainwater can only be emitted on distal end by Storm-water sewer
Natural water.At this moment just need to lay sewage-catching case culvert in urban pipe network system again, temporarily substitute the effect for facility of regulating and storing.
But such pipe network system is generally applicable under fine day state, when rainwater comes, due to sewage treatment plant in pipe network
Disposal ability is limited, and the maximum stream flow that sewage-catching case is contained is limited;, can not be in time by each unit region when occurring for heavy rain, heavy rain
Interior water body is arranged to sewage treatment plant simultaneously, causes the appearance of waterlogging disaster different degrees of in each unit region.
The content of the invention
It is each in drainage system it is an object of the invention to provide being controlled during a kind of rainfall in order to improve the deficiencies in the prior art
The method that sewage in section rainwater pipeline and plumbing drain imports facility of regulating and storing.This method is applied to each section stream during rainfall
The sewage total amount for entering facility of regulating and storing is more than and regulates and stores maximum stream flow that facility can circulate this moment and/or sewage treatment plant can be handled
Maximum capacity, methods described targetedly can fast and effectively arrange the water body in the region with different pollution levels
Put processing.
The present invention seeks to what is be achieved through the following technical solutions:
Control the sewage remittance in drainage system in each section rainwater pipeline and plumbing drain to regulate and store during a kind of rainfall to set
The method applied, the drainage system include according to region division multiple sections, the rainwater pipeline and plumbing drain of each section,
What is be connected with rainwater pipeline cuts dirty pipe, the sewage pipe being connected with plumbing drain and facility of regulating and storing;Described section of dirty pipe, sewage pipe
It is connected respectively with facility of regulating and storing, the drainage system end (end for facility of regulating and storing) is connected with sewage treatment plant;
A) the facility of regulating and storing be not reaching to accommodate the upper limit when, to each section cut dirty pipe flow without control
System, when dirt is cut in certain section to be finished, then that closes corresponding section cuts dirty pipe;And/or
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that the maximum stream flow of the actual receptive rainwater of system end (facility end of regulating and storing) is Q, then Q takes (Q1-
Q3) and the minimum value in (Q2-Q3), wherein, Q1 is the maximum stream flow that sewage treatment plant can handle sewage, and Q2 is facility of regulating and storing
The maximum stream flow to sewage treatment plant is arranged, Q3 is the flow of sewage pipe;
Methods described includes:
1) when rainfall, the flow for cutting dirty pipe of each section is controlled, the flow for the facility end that makes to regulate and store is equal to Q, described
Control method selects one kind in following method:
(a) control the flow for cutting dirty pipe of each section identical;
(b) stream for cutting dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section
Amount;
(c) in the stream for cutting dirty pipe of each section corresponding to the ratio control of the flow area for cutting dirty pipe of each section
Amount;
2) when dirt is cut in certain section to be finished, then section dirty pipe of corresponding section is closed, it is dirty that control is arranged on cutting for other sections
The flow of pipe, the flow for the facility end that makes to regulate and store are equal to Q, and the control method selects above-mentioned steps 1) in (a), (b) and (c)
One kind.
According to the present invention, each section corresponding to the ratio control of the flow area for cutting dirty pipe in each section
The flow for cutting dirty pipe refers to, in the ratio of the flow area for cutting dirty pipe of each section, to distribute cutting for corresponding each section
The flow of dirty pipe, and the flow sum for cutting dirty pipe of each section is equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section and the flow of dirty pipe distribution is cut in corresponding each section
Ratio it is identical.
According to the present invention, the ratio in watershed area corresponding to each section is come each section corresponding to controlling
The flow for cutting dirty pipe refer to, in the ratio of watershed area corresponding to each section, come each section corresponding to distributing
The flow of dirty pipe is cut, and the flow sum for cutting dirty pipe of each section is equal to Q.
Preferably, the ratio of watershed area corresponding to each section cuts dirty pipe distribution with corresponding each section
The ratio of flow is identical.
According to the present invention, the facility of regulating and storing includes storage pond, box culvert of regulating and storing, sewage-catching case culvert, deep tunnel or shallow tunnel etc..
According to the present invention, the drainage system also includes the water conservancy switch cut on dirty pipe for being arranged on each section.
According to the present invention, the drainage system also includes control system, and the control system includes the device of monitoring rainfall
The control unit being connected with its signal;Described control unit is connected with the water conservancy switching signal cut on dirty pipe of each section;
The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed into control unit,
Control unit controls the aperture of the water conservancy switch cut on dirty pipe of each section according to the rainfall monitoring signal of reception;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with
The water conservancy switching signal connection cut on dirty pipe of each section;The monitoring device is used to monitor time, generation time supervision letter
Number, the time supervision signal of generation is conveyed to control unit, control unit controls each according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe of section.
According to the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timing
Device etc..
According to the present invention, the water conservancy cut on the dirty pipe switch of each section is separately selected from valve (ball valve, lock
Valve, knife gate valve, butterfly valve, lift rubber slab dam check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate
One kind in (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.), flap valve (flap valve that dams etc.).
According to the present invention, the first rain millimeter that required collection in watershed is corresponded to according to each section sets each
Area needs the first rain rainfall L1 to dam, and the just rain rainfall can be set in the control unit of the control system.
According to the present invention, the device of the monitoring rainfall is rainfall gauge, and it is arranged in section.
According to the present invention, it is whole that early-stage rainwater in watershed is corresponded to according to the rain time of early-stage rainwater and each section
Footpath flows to the first rain rain time T1 for the time cut required in dirty pipe each section setting each section, during the just rain rainfall
Between can be set in the control unit of the control system.
According to the present invention, the device of the monitoring time is timer, and it is arranged in section.
According to the present invention, described section of dirt, which finishes, refers to that section corresponds to the first rain millimeter of required collection in watershed and reached
The first rain rainfall L1 that dams is needed to the section, and the first rain millimeter that the section corresponds to required collection in watershed can be with
Selected according to factors such as weather and regions, such as can be 5-20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to needed for the dirty pipe in each section section in corresponding watershed
The time wanted reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flowed to respectively
The time that individual section is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
It is described not had certain limitations according to region division according to the present invention, large area can be covered, can also be covered compared with cell
Domain, such as region division can be carried out by 0.04-2 square kilometres of area.One or more rain can be included in the region
Water processing establishment.
According to the present invention, the dirty pipe that cuts of each section passes through the rainwater treatment facility with the section and rainwater pipeline phase
Even.
According to the present invention, the rainwater treatment facility in savings facility, online treatment facility and shunting well at least
It is a kind of.
The present invention also provides a kind of control system suitable for the above method, and the control system includes the dress of monitoring rainfall
The control unit put and be connected with its signal;Described control unit and the water conservancy switching signal cut on dirty pipe of each section connect
Connect;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, and it is single that the rainfall monitoring signal of generation is conveyed into control
Member, control unit control the aperture of the water conservancy switch cut on dirty pipe of each section according to the rainfall monitoring signal of reception;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with
The water conservancy switching signal connection cut on dirty pipe of each section;The monitoring device is used to monitor time, generation time supervision letter
Number, the time supervision signal of generation is conveyed to control unit, control unit controls each according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe of section.
According to the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timing
Device etc..
Beneficial effects of the present invention:
(1) the method for the invention in the case where utilizing existing resource to greatest extent, by reasonable disposition, by each burst
Water quality is poor in region, with serious pollution just rain is emitted into facility of regulating and storing by section dirty pipe being connected with rainwater pipeline, simultaneously
Sewage discharge in the sewage pipe being connected with plumbing drain enters back into sewage treatment plant and handled into facility of regulating and storing.It is logical
Cross in the rational section dirty pipe for distributing and coming from the sewage in the sewage pipe being connected with plumbing drain and being connected with rainwater pipeline
Sewage enters the amount for facility of regulating and storing, and sewage is reduced as far as possible to the pollution level in burst region, while also make cleaner rain
Water is not discharged into sewage treatment plant, reduces the load of sewage treatment plant, so that existing resource realizes optimization collocation.
(2) method of the invention imports the sewage for facility of regulating and storing (especially for the same time in different burst regions in system
Sanitary sewage in its sewage pipe for referring to be connected with plumbing drain and the early-stage rainwater cut in dirty pipe being connected with rainwater pipeline)
It is different with the pollution level of rainwater, reasonable distribution is carried out according to the first rain rainfall in each section or first rain time, targetedly
Water body in region with different pollution levels is fast and effectively carried out emission treatment by ground, so as to realize the reasonable row of water body
Put.
(3) method of the invention is simple, operation is easy.
Embodiment
With reference to specific embodiment, the present invention is expanded on further.It should be understood that these embodiments are merely to illustrate the present invention
Rather than limit the scope of the invention.Furthermore, it is to be understood that after content disclosed in this invention has been read, ability
Field technique personnel can make various changes or modifications to the present invention, and these equivalent form of values equally fall within the protection that the present invention is limited
Within the scope of.
Embodiment 1
Control the sewage remittance in drainage system in each section rainwater pipeline and plumbing drain to regulate and store during a kind of rainfall to set
The method applied, the drainage system include according to region division multiple sections, the rainwater pipeline and plumbing drain of each section,
What is be connected with rainwater pipeline cuts dirty pipe, the sewage pipe being connected with plumbing drain and facility of regulating and storing;Described section of dirty pipe, sewage pipe
It is connected respectively with facility of regulating and storing, the drainage system end (end for facility of regulating and storing) is connected with sewage treatment plant;
A) the facility of regulating and storing be not reaching to accommodate the upper limit when, to each section cut dirty pipe flow without control
System, when dirt is cut in certain section to be finished, then that closes corresponding section cuts dirty pipe;And/or
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that the maximum stream flow of the actual receptive rainwater of system end (facility end of regulating and storing) is Q, then Q takes (Q1-
Q3) and the minimum value in (Q2-Q3), wherein, Q1 is the maximum stream flow that sewage treatment plant can handle sewage, and Q2 is facility of regulating and storing
What is be connected with sewage treatment plant cuts the maximum stream flow of dirty pipe, and Q3 is the flow of sewage pipe;
Methods described includes:
1) when rainfall, the flow for cutting dirty pipe of each section is controlled, the flow for the facility end that makes to regulate and store is equal to Q, described
Control method selects one kind in following method:
(a) control the flow for cutting dirty pipe of each section identical;
(b) stream for cutting dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section
Amount;
(c) in the stream for cutting dirty pipe of each section corresponding to the ratio control of the flow area for cutting dirty pipe of each section
Amount;
2) when dirt is cut in certain section to be finished, then section dirty pipe of corresponding section is closed, it is dirty that control is arranged on cutting for other sections
The flow of pipe, the flow for the facility end that makes to regulate and store are equal to Q, and the control method selects above-mentioned steps 1) in (a), (b) and (c)
One kind.
In a preferred embodiment of the present invention, the ratio control of the flow area for cutting dirty pipe in each section
The flow for cutting dirty pipe of each section corresponding to system refers to, in the ratio of the flow area for cutting dirty pipe of each section, to distribute
The flow of dirty pipe is cut in corresponding each section, and the flow sum for cutting dirty pipe of each section is equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section and the flow of dirty pipe distribution is cut in corresponding each section
Ratio it is identical.
In a preferred embodiment of the present invention, the ratio in watershed area corresponding to each section is come
The flow for cutting dirty pipe of each section corresponding to control refers to, in the ratio of watershed area corresponding to each section, to divide
The flow of dirty pipe is cut with corresponding each section, and the flow sum for cutting dirty pipe of each section is equal to Q.
Preferably, the ratio of watershed area corresponding to each section cuts dirty pipe distribution with corresponding each section
The ratio of flow is identical.
In a preferred embodiment of the present invention, the facility of regulating and storing includes storage pond, box culvert of regulating and storing, sewage-catching case
Culvert, deep tunnel or shallow tunnel etc..
In a preferred embodiment of the present invention, the drainage system also includes section dirty pipe for being arranged on each section
On water conservancy switch.
In a preferred embodiment of the present invention, the drainage system also includes control system, the control system
Including the control unit for monitoring the device of rainfall and being connected with its signal;Described control unit is cut on dirty pipe with each section
Water conservancy switching signal connects;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, and the rainfall monitoring of generation is believed
Control unit number is conveyed to, control unit controls the water conservancy cut on dirty pipe of each section to open according to the rainfall monitoring signal of reception
The aperture of pass;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with
The water conservancy switching signal connection cut on dirty pipe of each section;The monitoring device is used to monitor time, generation time supervision letter
Number, the time supervision signal of generation is conveyed to control unit, control unit controls each according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe of section.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The monitoring
The device of time is selected from timer etc..
In a preferred embodiment of the present invention, the water conservancy cut on dirty pipe of each section switchs independently
Ground be selected from valve (ball valve, gate valve, knife gate valve, butterfly valve, lift rubber slab dam check-valves etc.), gate (upper open type gate, under
Open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.), one in flap valve (flap valve that dams etc.)
Kind.
In a preferred embodiment of the present invention, according to each section correspond to required collection in watershed just
Rain millimeter sets the first rain rainfall L1 that each section needs to dam, and described just rain rainfall can be in the control list of the control system
Set in member.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is rainfall gauge, and it is arranged on section
It is interior.
In a preferred embodiment of the present invention, charge for remittance is corresponded to according to the rain time of early-stage rainwater and each section
When early-stage rainwater whole footpath flows to the first rain rainfall for each section of time setting that each section is cut required in dirty pipe in region
Between T1, it is described just rain rain time can be set in the control unit of the control system.
In a preferred embodiment of the present invention, the device of the monitoring time is timer, and it is arranged on section
It is interior.
In a preferred embodiment of the present invention, described section of dirt finishes refer to that section corresponds in watershed required for
The first rain millimeter collected reaches the first rain rainfall L1 that the section needs dam, and the section corresponds to required receipts in watershed
The first rain millimeter of collection can be selected according to factors such as weather and regions, such as can be 5-20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to needed for the dirty pipe in each section section in corresponding watershed
The time wanted reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flowed to respectively
The time that individual section is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
In a preferred embodiment of the present invention, it is described not had certain limitations according to region division, it can cover larger
It region, can also cover smaller area, such as region division can be carried out by 0.04-2 square kilometres of area.Can in the region
With including one or more rainwater treatment facilities.
In a preferred embodiment of the present invention, each section cut dirty pipe by the rainwater with the section at
Reason facility is connected with rainwater pipeline.
In a preferred embodiment of the present invention, the rainwater treatment facility is selected from savings facility, online processing is set
At least one of apply with shunting well.
Embodiment 2
Control the sewage remittance in drainage system in each section rainwater pipeline and plumbing drain to regulate and store during a kind of rainfall to set
The method applied, the drainage system include according to region division multiple sections, the rainwater pipeline and plumbing drain of each section,
What is be connected with rainwater pipeline cuts dirty pipe, the sewage pipe being connected with plumbing drain and facility of regulating and storing;Described section of dirty pipe, sewage pipe
It is connected respectively with facility of regulating and storing, the drainage system end (end for facility of regulating and storing) is connected with sewage treatment plant;
The drainage system also includes the water conservancy switch cut on dirty pipe for being arranged on each section;
The drainage system also includes control system, and the control system includes the device of monitoring rainfall and connected with its signal
The control unit connect;Described control unit is connected with the water conservancy switching signal cut on dirty pipe of each section;The monitoring device
For monitoring rainfall, generate rainfall monitoring signal, the rainfall monitoring signal of generation be conveyed to control unit, control unit according to
The rainfall monitoring signal of reception controls the aperture of the water conservancy switch cut on dirty pipe of each section;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with
The water conservancy switching signal connection cut on dirty pipe of each section;The monitoring device is used to monitor time, generation time supervision letter
Number, the time supervision signal of generation is conveyed to control unit, control unit controls each according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe of section;
A) the facility of regulating and storing be not reaching to accommodate the upper limit when, to each section cut dirty pipe flow without control
System, when dirt is cut in certain section to be finished, then that closes corresponding section cuts dirt,;And/or
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that the maximum stream flow of the actual receptive rainwater of system end (facility end of regulating and storing) is Q, then Q takes (Q1-
Q3) and the minimum value in (Q2-Q3), wherein, Q1 is the maximum stream flow that sewage treatment plant can handle sewage, and Q2 is facility of regulating and storing
The maximum stream flow to sewage treatment plant is arranged, Q3 is the flow of sewage pipe;
Methods described includes:
1) when rainfall, the flow for cutting dirty pipe of each section is controlled, makes flow sum for cutting dirty pipe of each section etc.
In the maximum stream flow Q of the actual receptive rainwater of system end (facility end of regulating and storing), the control method selection such as lower section
One kind in method:
(a) control the flow for cutting dirty pipe of each section identical;I.e. by system end (facility end of regulating and storing) actual energy
Dirty pipe is cut in each section of maximum stream flow Q mean allocations of the rainwater of receiving, makes the flow cut on dirty pipe of each section identical,
And sum is Q;For example, including three sections in certain region, then the flow for cutting dirty pipe of these three sections is Q/3;
(b) stream for cutting dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section
Amount;I.e. by the maximum stream flow Q of the actual receptive rainwater of system end (facility end of regulating and storing) according to corresponding to each section
The ratio of watershed area, to distribute the flow for cutting dirty pipe of corresponding each section.For example, system end (is regulated and stored and set
Apply end) maximum stream flow of actual receptive rainwater be Q, system includes three sections, the corresponding remittance in three sections
The ratio of aqua region area is 2:1:3, then the flow-rate ratio for cutting dirty pipe of three sections should be 2:1:3, i.e., section dirt of three sections
The flow of pipe is respectively 2Q/6, Q/6 and 3Q/6;
(c) in the stream for cutting dirty pipe of each section corresponding to the ratio control of the flow area for cutting dirty pipe of each section
Amount;The maximum stream flow Q of the actual receptive rainwater of system end (facility end of regulating and storing) is cut into dirt according to each section
The ratio of the flow area of pipe, to distribute the flow for cutting dirty pipe of corresponding each section;For example, system end (is regulated and stored and set
Apply end) maximum stream flow of actual receptive rainwater be Q, system includes three sections, and the dirt that cuts of three sections is managed
Flow area ratio be 4:5:6, then the flow-rate ratio for cutting dirty pipe of three sections is 4:5:6, i.e., the dirt that cuts of three sections is managed
Flow be respectively 4Q/15,5Q/15 and 6Q/15;
2) when dirt is cut in certain section to be finished, then the water conservancy switch cut on dirty pipe of corresponding section is closed, control is arranged on it
The flow for cutting dirty pipe of his section, the flow sum for cutting dirty pipe of other sections is set to be equal to system end (facility end of regulating and storing)
The maximum stream flow Q of actual receptive rainwater, the control method select above-mentioned steps 1) in one kind in (a), (b) and (c);
For example, system includes three sections, first section, the second section and the 3rd section are designated as, when the first section
When reaching the first rain rainfall L1 that the needs of setting dam, now think the first section cut it is dirty completely, that closes the first section cuts dirt
Water conservancy switch on pipe, the maximum stream flow Q of the actual receptive rainwater of system end (facility end of regulating and storing) is redistributed,
Distribution method is the same as (a) in step 1), (b) and (c);
After certain time, during the first rain rainfall L1 that needs that the second section reaches setting dam, the second section is now thought
Dirty complete, to close on section dirty pipe of the second section water conservancy switch is cut, system end (facility end of regulating and storing) can actually be connect
The maximum stream flow Q for the rainwater received is redistributed, and distribution method is the same as (a) in step 1), (b) and (c).
Embodiment 3
The present embodiment provides a kind of control system for being applied to embodiment 1 or the methods described of embodiment 2, the control system
Including the control unit for monitoring the device of rainfall and being connected with its signal;Described control unit is cut on dirty pipe with each section
Water conservancy switching signal connects;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, and the rainfall monitoring of generation is believed
Control unit number is conveyed to, control unit controls the water conservancy cut on dirty pipe of each section to open according to the rainfall monitoring signal of reception
The aperture of pass;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with
The water conservancy switching signal connection cut on dirty pipe of each section;The monitoring device is used to monitor time, generation time supervision letter
Number, the time supervision signal of generation is conveyed to control unit, control unit controls each according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe of section.
In a preferred embodiment of the present invention, the device of the monitoring rainfall is selected from rainfall gauge etc.;The monitoring
The device of time is selected from timer etc..
More than, embodiments of the present invention are illustrated.But the present invention is not limited to above-mentioned embodiment.It is all
Within the spirit and principles in the present invention, any modification, equivalent substitution and improvements done etc., it should be included in the guarantor of the present invention
Within the scope of shield.
Claims (10)
1. the sewage in drainage system in each section rainwater pipeline and plumbing drain is controlled to import facility of regulating and storing during a kind of rainfall
Method, the drainage system include according to region division multiple sections, the rainwater pipeline and plumbing drain of each section, with
What rainwater pipeline was connected cuts dirty pipe, the sewage pipe being connected with plumbing drain and facility of regulating and storing;Described section of dirty pipe, sewage pipe point
It is not connected with facility of regulating and storing, the drainage system end (end for facility of regulating and storing) is connected with sewage treatment plant;
A) the facility of regulating and storing be not reaching to accommodate the upper limit when, to each section cut dirty pipe flow without control, when
When certain section section dirt finishes, then that closes corresponding section cuts dirty manage;And/or
B) when the facility of regulating and storing, which reaches, accommodates the upper limit, using following control method:
Assuming that the maximum stream flow of the actual receptive rainwater of system end (facility end of regulating and storing) is Q, then Q take (Q1-Q3) and
(Q2-Q3) minimum value in, wherein, Q1 is that sewage treatment plant can handle the maximum stream flow of sewage, Q2 for facility of regulating and storing arrange to
The maximum stream flow of sewage treatment plant, Q3 are the flow of sewage pipe;
Methods described includes:
1) when rainfall, the flow for cutting dirty pipe of each section is controlled, the flow for the facility end that makes to regulate and store is equal to Q, the control
One kind in the following method of method choice:
(a) control the flow for cutting dirty pipe of each section identical;
(b) flow for cutting dirty pipe of each section corresponding to being controlled in the ratio of watershed area corresponding to each section;
(c) in the flow for cutting dirty pipe of each section corresponding to the ratio control of the flow area for cutting dirty pipe of each section;
2) when dirt is cut in certain section to be finished, then the dirty pipe that cuts for corresponding to section is closed, control is arranged on section dirty pipe of other sections
Flow, the flow for the facility end that makes to regulate and store are equal to Q, and the control method selects above-mentioned steps 1) in (a), (b) and (c) one
Kind.
2. according to the method for claim 1, it is characterised in that the ratio of the flow area for cutting dirty pipe by each section
The flow for cutting dirty pipe of each section refers to corresponding to example control, in the ratio of the flow area for cutting dirty pipe of each section, comes
The flow of dirty pipe is cut in each section corresponding to distribution, and the flow sum for cutting dirty pipe of each section is equal to Q.
Preferably, the ratio of dirty pipe flow area is cut in each section and the ratio for the flow that dirty pipe distributes is cut in corresponding each section
Example is identical.
3. method according to claim 1 or 2, it is characterised in that the watershed area as corresponding to each section
Ratio refer to come the flow for cutting dirty pipe of each section corresponding to controlling, the ratio of watershed area as corresponding to each section
Example, to distribute the flow of section dirty pipe of corresponding each section, and the flow sum for cutting dirty pipe of each section is set to be equal to Q.
Preferably, the ratio of watershed area corresponding to each section cuts the flow of dirty pipe distribution with corresponding each section
Ratio it is identical.
4. according to the method any one of claim 1-3, it is characterised in that the facility of regulating and storing includes storage pond, adjusted
Store box culvert, sewage-catching case culvert, deep tunnel or shallow tunnel etc..
5. according to the method any one of claim 1-4, it is characterised in that the drainage system also includes being arranged on respectively
The water conservancy switch cut on dirty pipe of individual section.
6. according to the method any one of claim 1-5, it is characterised in that the drainage system also includes control system
System, the control unit that the control system includes the device of monitoring rainfall and is connected with its signal;Described control unit with it is each
The water conservancy switching signal connection cut on dirty pipe of section;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, will
The rainfall monitoring signal of generation is conveyed to control unit, and control unit controls each section according to the rainfall monitoring signal of reception
The aperture of the water conservancy switch cut on dirty pipe;Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with it is each
The water conservancy switching signal connection cut on dirty pipe of section;The monitoring device is used to monitor the time, generates time supervision signal, will
The time supervision signal of generation is conveyed to control unit, and control unit controls each section according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe.
Preferably, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timer etc..
Preferably, the water conservancy cut on the dirty pipe switch of each section is separately selected from valve (ball valve, gate valve, disconnecting link
Valve, butterfly valve, lift rubber slab dam check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (upper open type weir
Door, bottom-open type weir gate, rotary weir gate etc.), one kind in flap valve (flap valve that dams etc.).
7. according to the method any one of claim 1-6, it is characterised in that corresponded to according to each section in watershed
The first rain millimeter of required collection sets the first rain rainfall L1 that each section needs to dam, and described just rain rainfall can be in the control
Set in the control unit of system processed.
Preferably, the device of the monitoring rainfall is rainfall gauge, and it is arranged in section.
8. according to the method any one of claim 1-7, it is characterised in that according to the rain time of early-stage rainwater and respectively
Individual section correspond to early-stage rainwater whole footpath in watershed flow to each section cut dirty pipe in required for time set each
The first rain rain time T1 in area, the just rain rain time can be set in the control unit of the control system.
Preferably, the device of the monitoring time is timer, and it is arranged in section.
9. according to the method any one of claim 1-8, it is characterised in that described section of dirt, which finishes, refers to the corresponding remittance in section
The first rain millimeter of required collection reaches the first rain rainfall L1 that the section needs dam in aqua region, and the section corresponds to charge for remittance
The first rain millimeter of required collection can be selected according to factors such as weather and regions in region, such as can be 5-
20mm;Or
Described section of dirt, which finishes, refers to that early-stage rainwater whole footpath is flowed to required in the dirty pipe in each section section in corresponding watershed
Time reaches the first rain rain time T1 of the section, and the section corresponds to early-stage rainwater whole footpath in watershed and flows to each
The time that area is cut required in dirty pipe can be selected according to factors such as weather and regions, such as can be 5-40min.
Preferably, it is described to carry out region division by 0.04-2 square kilometres of area according to region division.In the region
One or more rainwater treatment facilities can be included.
Preferably, the dirty pipe that cuts of each section is connected by the rainwater treatment facility with the section with rainwater pipeline.
Preferably, the rainwater treatment facility is selected from least one of savings facility, online treatment facility and shunting well.
10. a kind of control system suitable for method any one of claim 1-9, the control system includes monitoring rain
The device of amount and the control unit being connected with its signal;Described control unit and the water conservancy switch cut on dirty pipe of each section are believed
Number connection;The monitoring device is used to monitor rainfall, generates rainfall monitoring signal, the rainfall monitoring signal of generation is conveyed into control
Unit processed, control unit control the aperture of the water conservancy switch cut on dirty pipe of each section according to the rainfall monitoring signal of reception;
Or
The control unit that the control system includes the device of monitoring time and is connected with its signal;Described control unit with it is each
The water conservancy switching signal connection cut on dirty pipe of section;The monitoring device is used to monitor the time, generates time supervision signal, will
The time supervision signal of generation is conveyed to control unit, and control unit controls each section according to the time supervision signal of reception
The aperture of the water conservancy switch cut on dirty pipe.
Preferably, the device of the monitoring rainfall is selected from rainfall gauge etc.;The device of the monitoring time is selected from timer etc..
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711042426.3A CN107675771A (en) | 2017-10-30 | 2017-10-30 | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711042426.3A CN107675771A (en) | 2017-10-30 | 2017-10-30 | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107675771A true CN107675771A (en) | 2018-02-09 |
Family
ID=61141959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711042426.3A Pending CN107675771A (en) | 2017-10-30 | 2017-10-30 | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107675771A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103343570A (en) * | 2013-07-23 | 2013-10-09 | 北京建筑大学 | Flow combined system regulating storage tank real-time control system and control method thereof |
CN104358302A (en) * | 2014-10-29 | 2015-02-18 | 陈云峰 | Treatment method for initial rainwater of separate system |
CN105544698A (en) * | 2016-02-15 | 2016-05-04 | 武汉圣禹排水***有限公司 | Separate system pipe network based area fragmented rainwater abandoned flow treatment system |
CN105544697A (en) * | 2016-02-04 | 2016-05-04 | 武汉圣禹排水***有限公司 | Area partitioned rainwater flow distribution, storage regulation and processing system based on combined-system pipe network |
CN105625545A (en) * | 2016-02-15 | 2016-06-01 | 武汉圣禹排水***有限公司 | Region sectioning rainwater treatment system based on separate-system pipe network |
CN105888046A (en) * | 2016-04-19 | 2016-08-24 | 武汉圣禹排水***有限公司 | Novel anti-backflow intercepting well control method |
CN205637033U (en) * | 2016-04-19 | 2016-10-12 | 武汉圣禹排水***有限公司 | Burst is abandoned to flow and is cut dirty discharge system |
-
2017
- 2017-10-30 CN CN201711042426.3A patent/CN107675771A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103343570A (en) * | 2013-07-23 | 2013-10-09 | 北京建筑大学 | Flow combined system regulating storage tank real-time control system and control method thereof |
CN104358302A (en) * | 2014-10-29 | 2015-02-18 | 陈云峰 | Treatment method for initial rainwater of separate system |
CN105544697A (en) * | 2016-02-04 | 2016-05-04 | 武汉圣禹排水***有限公司 | Area partitioned rainwater flow distribution, storage regulation and processing system based on combined-system pipe network |
CN105544698A (en) * | 2016-02-15 | 2016-05-04 | 武汉圣禹排水***有限公司 | Separate system pipe network based area fragmented rainwater abandoned flow treatment system |
CN105625545A (en) * | 2016-02-15 | 2016-06-01 | 武汉圣禹排水***有限公司 | Region sectioning rainwater treatment system based on separate-system pipe network |
CN105888046A (en) * | 2016-04-19 | 2016-08-24 | 武汉圣禹排水***有限公司 | Novel anti-backflow intercepting well control method |
CN205637033U (en) * | 2016-04-19 | 2016-10-12 | 武汉圣禹排水***有限公司 | Burst is abandoned to flow and is cut dirty discharge system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188340U (en) | Urban drainage system under closure-type comprehensive drainage system | |
WO2019061870A1 (en) | Water drainage system and water drainage control method | |
WO2019061871A1 (en) | Water drainage system with regulation and storage facility, and water drainage control method | |
CN104234171B (en) | Based on the arterial drainage regulating and controlling water quality system and method that pollution of area source controls | |
CN107806164A (en) | A kind of road rain water shunting processing system and its control method | |
CN107620374A (en) | A kind of method for controlling the sewage in drainage system to import trunk sewer during rainfall | |
CN107869177A (en) | A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer and facility of regulating and storing during rainfall | |
CN107806163A (en) | A kind of method for controlling the sewage in drainage system to import trunk sewer during rainfall | |
CN207436169U (en) | A kind of combined flow system pipe network system for controlling sewage and initial rainwater pollution | |
CN2585906Y (en) | Divided-flow rainwater automatic defeating device | |
CN107859139A (en) | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import trunk sewer during rainfall | |
CN107620373A (en) | A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import facility of regulating and storing during rainfall | |
CN107806162A (en) | A kind of method for controlling the sewage that each shunting facility is cut in dirty pipe in drainage system to import trunk sewer during rainfall | |
CN107675771A (en) | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall | |
CN208280275U (en) | A kind of road rain water shunting processing system | |
CN107859136A (en) | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import trunk sewer during rainfall | |
CN107859138A (en) | A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall | |
CN107675770A (en) | A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import trunk sewer during rainfall | |
CN107859137A (en) | A kind of method for controlling the sewage that each section is cut in dirty pipe in drainage system to import facility of regulating and storing during rainfall | |
Ning et al. | Current research trend on urban sewerage system in China | |
CN103643735A (en) | Overflow rainwater interception and division control device provided with combined pipe network | |
CN107761904A (en) | A kind of method for controlling the sewage in drainage system in each section to import trunk sewer and facility of regulating and storing during rainfall | |
CN107620372A (en) | A kind of method for controlling the sewage that each shunting facility is cut in dirty pipe in drainage system to import trunk sewer during rainfall | |
CN210134501U (en) | Sewage interception and storage regulation system | |
CN202689163U (en) | Partly building type rainwater regulating storage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180209 |
|
RJ01 | Rejection of invention patent application after publication |