CN107838221B - A kind of steel tube seamless treatment process - Google Patents

A kind of steel tube seamless treatment process Download PDF

Info

Publication number
CN107838221B
CN107838221B CN201711085233.6A CN201711085233A CN107838221B CN 107838221 B CN107838221 B CN 107838221B CN 201711085233 A CN201711085233 A CN 201711085233A CN 107838221 B CN107838221 B CN 107838221B
Authority
CN
China
Prior art keywords
pipe
idler wheel
frame
steel
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711085233.6A
Other languages
Chinese (zh)
Other versions
CN107838221A (en
Inventor
朱则军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Special Steel Tube Co Ltd
Original Assignee
Zhejiang Special Steel Tube Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Special Steel Tube Co Ltd filed Critical Zhejiang Special Steel Tube Co Ltd
Priority to CN201711085233.6A priority Critical patent/CN107838221B/en
Publication of CN107838221A publication Critical patent/CN107838221A/en
Application granted granted Critical
Publication of CN107838221B publication Critical patent/CN107838221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/0807Tube treating or manipulating combined with, or specially adapted for use in connection with tube making machines, e.g. drawing-off devices, cutting-off
    • B21C37/0811Tube treating or manipulating combined with, or specially adapted for use in connection with tube making machines, e.g. drawing-off devices, cutting-off removing or treating the weld bead
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C51/00Measuring, gauging, indicating, counting, or marking devices specially adapted for use in the production or manipulation of material in accordance with subclasses B21B - B21F

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

The invention proposes a kind of steel tube seamless treatment process, including including the following steps: that the two edges to on-gauge plate material carry out two-sided milling, it is wide to reach preset plate, then carries out edges of boards pre-bending using prebending machine, reaches predetermined curvature;Edges of boards after pre-bending are rolled through multiple tracks roll, form round pipe;Round pipe is obtained into seamed welded pipe through high-frequency buckling welding fabrication;Remove the inside and outside wall weld redundance crator of seamed welded pipe;Whether removed completely after the annealing of high frequency weld seam using failure detector detection steel duct crator;Steel pipe after will test qualification carries out rolling and reaches preset diameter;It deoils and steel pipe is carried out by Length-fixing cutting using pipe cutting machine after cleaning, repair end face, in steel pipe in inner wall spraying abrasion-proof layer, then the steel pipe after Pipe Cutting detected, be packaged to be finished product, simple process, energy-saving, at low cost easy to operate, operating rate is high, the standard requirements of seamless pipe can be reached in terms of uniform wall thickness, welded tube performance and chemical component.

Description

A kind of steel tube seamless treatment process
Technical field
The present invention relates to and a kind of production technical field of seamless steel pipe, especially a kind of steel tube seamless treatment process.
Background technique
The production method of existing seamless steel pipe mainly includes hot-rolled pipe production technology, cold rolling, cold-drawn production technology and Welded tube adds tension reducing mill seamless process technique, usual hot-rolled pipe production technology: mainly including surface treatment, cuts, centering, adds Fronts process and tube rolling, the expansions such as heat, perforation, the rear portions such as sizing, cooling, detect a flaw, suppress inspections, be packed and stored handle work Sequence.Due to being using hot-rolling perforation machine, pipe is in perforation deformation process, and stress is complicated, and Deformational Environment is severe, and cold rolling, cold Pull out production technology: main includes fronts process and tup, pickling, the phosphatizations such as surface treatment, cutting, centering, heating, perforation With saponification, cold rolling or cold-drawn, annealing, cutting head cutting tail, the rear portions treatment process such as inspection, detect a flaw, be packed and stored.Except there are above-mentioned heat Outside all disadvantages of roll process, since production passage increases, lumber recovery is caused.It specifically includes that the trimming of raw material strip, round tube Molding, welding, removal welding burr, heating, on stretch-reducing mill tube reducing, cooling, detect a flaw, suppress inspection, be packed and stored Process.The disadvantage is that: do not add the extruding of inner core by tube rolling, roll, roll real weld seam, weld seam and maternal tissue one cannot be made It causes, weld strength is low.Weld seam trace can not be eliminated, moreover it is possible to see weld seam, it is proposed that a kind of steel tube seamless treatment process.
Summary of the invention
The object of the invention is to solve the problems of the prior art, a kind of steel tube seamless treatment process is proposed, with solution High production cost certainly of the existing technology can not eliminate weld seam trace and the low problem of weld strength, while using flaw detection dress The inner wall weld of detection steel pipe is set, flaw detection camera is always positioned at the center of seamless steel pipe, and camera is apart from seamless steel pipe Inner wall being equidistant everywhere, good imaging quality guarantees the quality of product.
To achieve the above object, the invention proposes a kind of steel tube seamless treatment process, it is characterised in that including as follows Step:
The pretreatment of a plate: after carrying out full plate ultrasound examination to plate, the two edges of qualified plate carry out two-sided milling, It is wide to reach preset plate, edges of boards pre-bending is then carried out using prebending machine, reaches predetermined curvature;
B forming processes: the edges of boards after pre-bending are rolled through multiple tracks roll, form round pipe;
C molding welding: round pipe is obtained into seamed welded pipe through high-frequency buckling welding fabrication;
D finishing procedure: the inside and outside wall weld redundance crator of seamed welded pipe is removed;
The annealing of e high frequency weld seam: annealing temperature is 1050 DEG C, and annealing time is 45 minutes;
F weld seam detection: whether removed completely using failure detector detection steel duct crator;
The failure detector includes installation bar body, support connecting base, idler wheel control assembly, carrying out flaw detection probe, driving Adjusting bracket and flexible drive frame, the installation bar body, which is equipped with, adjusts sleeve, and the support connecting base is mounted on mounting rod sheet On body, the carrying out flaw detection probe is fixed on the end of installation bar body, and the periphery of the installation bar body is equipped with several rollings Control assembly is taken turns, one end of the idler wheel control assembly is equipped with idler wheel, and the other end of the idler wheel control assembly is equipped with the first hinge Joint chair, first hinged seat are mounted on the periphery of support connecting base, and the idler wheel control assembly is equipped with bogie, described Driver slot is offered on bogie, the driving adjusting bracket is equipped with drive ring, and the drive ring runs through driver slot, the driving Adjusting bracket is movably arranged on support connecting base by flexible drive frame;
G rolling: the steel pipe after will test qualification carries out rolling and reaches preset diameter;
H cleaning: carrying out oil removing for the steel pipe after rolling, then carry out ultrasonic cleaning, and calico detection is played after cleaning;
I is cut surely and finished product detection: steel pipe being carried out Length-fixing cutting using pipe cutting machine, repairs end face, then to the steel after Pipe Cutting Pipe carries out hydraulic pressure test, pipe end and tube body flaw detection, surface polishing treatment or sandblasting, coding, is packaged to be finished product seamless steel tube.
Preferably, by the drafts of debugging roll in step b forming processes, thus void in rate-determining steps c Width range in 1-3mm.
Preferably, the step i is cut surely with finished product detection, the steel pipe after cutting surely is in inner wall spraying abrasion-proof layer.
Preferably, the idler wheel control assembly further includes support frame, installing frame and auxiliary slider, the one of support frame as described above End is mounted on support connecting base by the first hinged seat, and the other end of support frame as described above is connected with installing frame, the installing frame For U-shaped frame, the two sides of the installing frame offer regulating tank, and the idler wheel is mounted in regulating tank by pedestal, institute The two sides for stating regulating tank offer sliding slot, and the auxiliary slider is movably arranged in sliding slot, one end of the auxiliary slider and axis Frame is connected, and the other end of the auxiliary slider is connected by spring with the end of regulating tank.
Preferably, the idler wheel control assembly is distributed in uniform circular, the number of the idler wheel control assembly is three, The driver slot is strip groove.
Preferably, the driving adjusting bracket further includes connection ring, connecting rod, auxiliary drive frame, the connection ring and drive Rotating ring, the axis for installing bar body coincide, and the installation bar body runs through connection ring, and the internal diameter of the connection ring is greater than installation The outer diameter of bar body is connected between the connection ring and drive ring by several connecting rods, and the periphery of the connection ring is uniform Several auxiliary drive framves are installed, the auxiliary drive frame is connected with flexible drive frame.
Preferably, the flexible drive frame includes sleeve, telescopic rod and connection frame, one end of the telescopic rod passes through company It connects frame to be connected with driving adjusting bracket, the other end of the telescopic rod is mounted in sleeve by spring, the sleeve, telescopic rod Axis is parallel with the installation axis of bar body.
Beneficial effects of the present invention: the present invention is by adding welded still pipe through processes such as finishing procedure, the annealing of high frequency weld seam Work obtains the steel pipe of seamless process, and simple process is energy-saving, at low cost easy to operate, and operating rate is high, uniform wall thickness, welded tube The standard requirements that can reach seamless pipe with chemical component aspect pass through driving adjusting bracket and bullet in the process of detection weld seam Property bogie can drive idler wheel that can synchronize the inner wall for being adjacent to steel pipe, guarantee that flaw detection camera is always positioned in seamless steel pipe The heart be damaged camera will not, will not scratch the inner wall of steel pipe, and the distance of inner wall of the camera apart from seamless steel pipe everywhere It is equal, good imaging quality.
Feature and advantage of the invention will be described in detail by embodiment combination attached drawing.
[Detailed description of the invention]
Fig. 1 is a kind of schematic view of the front view of steel tube seamless treatment process first embodiment of the present invention;
Fig. 2 is a kind of right side structural representation of steel tube seamless treatment process of the present invention;
Fig. 3 is a kind of structure chart of the idler wheel control assembly of steel tube seamless treatment process of the present invention;
Fig. 4 is a kind of left view schematic diagram of the driving adjusting bracket of steel tube seamless treatment process of the present invention;
Fig. 5 is a kind of schematic top plan view of the flexible drive frame of steel tube seamless treatment process of the present invention;
Fig. 6 is a kind of schematic view of the front view of steel tube seamless treatment process second embodiment of the present invention.
[specific embodiment]
Refering to fig. 1 to a kind of steel tube seamless treatment process of Fig. 6 present invention, it is characterised in that include the following steps:
The pretreatment of a plate: after carrying out full plate ultrasound examination to plate, the two edges of qualified plate carry out two-sided milling, It is wide to reach preset plate, edges of boards pre-bending is then carried out using prebending machine, reaches predetermined curvature;
B forming processes: the edges of boards after pre-bending are rolled through multiple tracks roll, form round pipe, by the pressure for debugging roll Amount, so that the width range of void is in 1-3mm in rate-determining steps c;
C molding welding: round pipe is obtained into seamed welded pipe through high-frequency buckling welding fabrication;
D finishing procedure: the inside and outside wall weld redundance crator of seamed welded pipe is removed;
The annealing of e high frequency weld seam: annealing temperature is 1050 DEG C, and annealing time is 45 minutes;
F weld seam detection: whether removed completely using failure detector detection steel duct crator;
G rolling: the steel pipe after will test qualification carries out rolling and reaches preset diameter;
H cleaning: carrying out oil removing for the steel pipe after rolling, then carry out ultrasonic cleaning, and it is clear that calico detection is played after cleaning Whether thoroughly;
I is cut surely and finished product detection: steel pipe being carried out Length-fixing cutting using pipe cutting machine, repairs end face, in steel pipe in inner-wall spraying Then wearing layer carries out hydraulic pressure test, pipe end and tube body flaw detection, surface polishing treatment or sandblasting, coding to the steel pipe after Pipe Cutting, It is packaged to be finished product seamless steel tube.
Failure detector in the step f weld seam detection includes installation bar body 1, support connecting base 2, idler wheel control assembly 3, carrying out flaw detection probe 4, driving adjusting bracket 5 and flexible drive frame 6, the installation bar body 1, which is equipped with, adjusts sleeve 11, described Support connecting base 2 is mounted in installation bar body 1, and the carrying out flaw detection probe 4 is fixed on the end of installation bar body 1, described The periphery for installing bar body 1 is equipped with several idler wheel control assemblies 3, and one end of the idler wheel control assembly 3 is equipped with idler wheel 34, institute The other end for stating idler wheel control assembly 3 is equipped with the first hinged seat 312, and first hinged seat 312 is mounted on support connecting base 2 On periphery, the idler wheel control assembly 3 is equipped with bogie 32, offers driver slot 321, the driving on the bogie 32 Adjusting bracket 5 is equipped with drive ring 51, and the drive ring 51 runs through driver slot 321, and the driving adjusting bracket 5 passes through flexible drive frame 6 are movably arranged on support connecting base 2.The idler wheel control assembly 3 further includes support frame 31, installing frame 33 and auxiliary slider 35, one end of support frame as described above 31 is mounted on support connecting base 2 by the first hinged seat 312, support frame as described above 31 it is another End is connected with installing frame 33, and the installing frame 33 is U-shaped frame, and the two sides of the installing frame 33 offer regulating tank 331, The idler wheel 34 is mounted in regulating tank 331 by pedestal 341, and the two sides of the regulating tank 331 offer sliding slot 332, described Auxiliary slider 35 is movably arranged in sliding slot 332, and one end of the auxiliary slider 35 is connected with pedestal 341, the auxiliary slider 35 other end is connected by spring with the end of regulating tank 331.The idler wheel control assembly 3 is distributed in uniform circular, described The number of idler wheel control assembly 3 is three, and the driver slot 321 is strip groove.The driving adjusting bracket 5 further includes connection ring 52, connecting rod 53, auxiliary drive frame 54, the connection ring 52 and the axis of drive ring 51, installation bar body 1 coincide, described Bar body 1 is installed and runs through connection ring 52, the internal diameter of the connection ring 52 is greater than the outer diameter of installation bar body 1, the connection ring 52 It is connected between drive ring 51 by several connecting rods 53, the periphery of the connection ring 52 is uniformly equipped with several auxiliary and drives Moving frame 54, the auxiliary drive frame 54 are connected with flexible drive frame 6.The flexible drive frame 6 includes sleeve 61,62 and of telescopic rod One end of connection frame 63, the telescopic rod 62 is connected by connection frame 63 with driving adjusting bracket 5, the other end of the telescopic rod 62 It is mounted in sleeve 61 by spring, the sleeve 61, the axis of telescopic rod 62 are parallel with the installation axis of bar body 1.
The course of work of the present invention:
The working principle of failure detector in a kind of steel tube seamless treatment process of the present invention are as follows: will visit in the process of work Hurt device to be put into inside steel pipe 10, idler wheel has the function of guiding, driving lower edge of the driving adjusting bracket 5 in flexible drive frame 6 Driver slot 321 be moved to the left, control the end radial dilatation of support frame 31, driving drive ring 51 in a ring can guarantee The synchronism of three idler wheels, and then guarantee the alignment of carrying out flaw detection probe and steel pipe 10, i.e. driving idler wheel can be close to steel pipe Side wall, while idler wheel being connected with auxiliary slider 35, there is buffer function, avoid idler wheel from scratching the side wall of steel pipe, furthermore Can by installing two groups of support connecting bases 2 in installation bar body 1, idler wheel control assembly 3 drive the structure such as the of adjusting bracket 5 Shown in two embodiments, supports installation bar body 1 more stable, keep operation more simple.
Above-described embodiment is the description of the invention, is not limitation of the invention, after any pair of simple transformation of the present invention Scheme all belong to the scope of protection of the present invention.

Claims (5)

1. a kind of steel tube seamless treatment process, it is characterised in that include the following steps:
The pretreatment of a plate: after carrying out full plate ultrasound examination to plate, the two edges of qualified plate carry out two-sided milling, reach Preset plate is wide, then carries out edges of boards pre-bending using prebending machine, reaches predetermined curvature;
B forming processes: the edges of boards after pre-bending are rolled through multiple tracks roll, form round pipe;
C molding welding: round pipe is obtained into seamed welded pipe through high-frequency buckling welding fabrication;
D finishing procedure: the inside and outside wall weld redundance crator of seamed welded pipe is removed;
The annealing of e high frequency weld seam: annealing temperature is 1050 DEG C, and annealing time is 45 minutes;
F weld seam detection: whether removed completely using failure detector detection steel duct crator;The failure detector includes mounting rod Ontology (1), support connecting base (2), idler wheel control assembly (3), carrying out flaw detection probe (4), driving adjusting bracket (5) and flexible drive Frame (6), the installation bar body (1), which is equipped with, adjusts sleeve (11), and the support connecting base (2) is mounted on installation bar body (1) on, the carrying out flaw detection probe (4) is fixed on the end of installation bar body (1), and the periphery of installation bar body (1) is set There are several idler wheel control assemblies (3), one end of the idler wheel control assembly (3) is equipped with idler wheel (34), the idler wheel control group The other end of part (3) is equipped with the first hinged seat (312), and first hinged seat (312) is mounted on the periphery of support connecting base (2) On, the idler wheel control assembly (3) is equipped with bogie (32), offers driver slot (321) on the bogie (32), described Adjusting bracket (5) are driven to be equipped with drive ring (51), the drive ring (51) runs through driver slot (321), the driving adjusting bracket (5) It is movably arranged on support connecting base (2) by flexible drive frame (6);
G rolling: the steel pipe after will test qualification carries out rolling and reaches preset diameter;
H cleaning: carrying out oil removing for the steel pipe after rolling, then carry out ultrasonic cleaning, and calico detection is played after cleaning;
I is cut surely and finished product detection: using pipe cutting machine by steel pipe carry out Length-fixing cutting, repair end face, then to the steel pipe after Pipe Cutting into Row hydraulic pressure test, pipe end and tube body flaw detection, surface polishing treatment or sandblasting, coding, are packaged to be finished product seamless steel tube.
2. a kind of steel tube seamless treatment process as described in claim 1, it is characterised in that: pass through in step b forming processes The drafts for debugging roll, so that the width range of void is in 1-3mm in rate-determining steps c.
3. a kind of steel tube seamless treatment process as described in claim 1, it is characterised in that: the step i is cut surely and finished product In detection, the steel pipe after cutting surely is in inner wall spraying abrasion-proof layer.
4. a kind of steel tube seamless treatment process as described in claim 1, it is characterised in that: the idler wheel control assembly (3) It further include support frame (31), installing frame (33) and auxiliary slider (35), one end of support frame as described above (31) passes through the first hinged seat (312) it is mounted on support connecting base (2), the other end of support frame as described above (31) is connected with installing frame (33), the installing frame It (33) is U-shaped frame, the two sides of the installing frame (33) offer regulating tank (331), and the idler wheel (34) passes through pedestal (341) it is mounted in regulating tank (331), the two sides of the regulating tank (331) offer sliding slot (332), the auxiliary slider (35) it is movably arranged in sliding slot (332), one end of the auxiliary slider (35) is connected with pedestal (341), the auxiliary slider (35) the other end is connected by spring with the end of regulating tank (331), and the idler wheel control assembly (3) is in uniform circular point Cloth, the number of the idler wheel control assembly (3) are three, and the driver slot (321) is strip groove.
5. a kind of steel tube seamless treatment process as described in claim 1, it is characterised in that: the driving adjusting bracket (5) is also Including connection ring (52), connecting rod (53), auxiliary drive frame (54), the connection ring (52) and drive ring (51), mounting rod sheet The axis of body (1) coincides, and the installation bar body (1) runs through connection ring (52), and the internal diameter of the connection ring (52) is greater than peace The outer diameter for filling bar body (1) is connected between the connection ring (52) and drive ring (51) by several connecting rods (53), described The periphery of connection ring (52) is uniformly equipped with several auxiliary drive framves (54), the auxiliary drive frame (54) and flexible drive frame (6) it is connected.
CN201711085233.6A 2017-11-07 2017-11-07 A kind of steel tube seamless treatment process Active CN107838221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711085233.6A CN107838221B (en) 2017-11-07 2017-11-07 A kind of steel tube seamless treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711085233.6A CN107838221B (en) 2017-11-07 2017-11-07 A kind of steel tube seamless treatment process

Publications (2)

Publication Number Publication Date
CN107838221A CN107838221A (en) 2018-03-27
CN107838221B true CN107838221B (en) 2019-05-21

Family

ID=61681752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711085233.6A Active CN107838221B (en) 2017-11-07 2017-11-07 A kind of steel tube seamless treatment process

Country Status (1)

Country Link
CN (1) CN107838221B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040218A (en) * 2019-04-30 2019-07-23 上海海事大学 Boom type body section weld seam detection vehicle
CN113714321B (en) * 2021-07-28 2022-10-25 西安交通大学 Refractory and rare noble metal pipe and preparation method thereof
CN115351519B (en) * 2022-10-20 2023-08-22 江苏银环精密钢管有限公司 Preparation method of inner cylinder for heat exchange unit of high-temperature gas cooled reactor evaporator

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3705458A (en) * 1969-05-22 1972-12-12 Nelson D Abbey Jr Method for testing welded seam pipes in a tube mill
JPS62156018A (en) * 1985-12-27 1987-07-11 Nippon Steel Corp Method preventing seam twist of resistance welded tube
CN101130197A (en) * 2006-09-26 2008-02-27 李永立 Cold drawing, cold rolling production method for high-accuracy weldless steel tube
CN102274870A (en) * 2010-06-08 2011-12-14 黄武军 Production process for stainless steel pierced billet
CN103506821A (en) * 2012-06-28 2014-01-15 浙江兆隆合金股份有限公司 Production method of low-stress copper steel compound welded pipe
CN104646932A (en) * 2013-11-16 2015-05-27 无锡大金高精度冷拔钢管有限公司 Manufacturing method for high-precision cold-drawing welded pipe
CN106670743B (en) * 2016-12-14 2019-06-11 安徽楚江特钢有限公司 A kind of manufacturing method of precision gas spring straight seam welded pipe

Also Published As

Publication number Publication date
CN107838221A (en) 2018-03-27

Similar Documents

Publication Publication Date Title
CN107838221B (en) A kind of steel tube seamless treatment process
US8863565B2 (en) Three-dimensionally bending machine, bending-equipment line, and bent product
CN102029503A (en) Method for forming right cone stainless steel tank
CA2640235C (en) Method of manufacturing lined tubing
CN101444881A (en) Technology for repairing surfacing of piston rod of super large marine diesel engine
EP1738839B1 (en) Cold rolling process for metal tubes
CN201361788Y (en) Novel production equipment for titanic or titanium alloy pipe
CN102500993A (en) Welding repair method for martensitic stainless steel superlarge deep hole
US20130239642A1 (en) Production line of large diameter longitudinal welded pipe
CN113458161A (en) Cold rolling method of stainless steel strip and rolling mill adopted by same
CN117283095A (en) Welding process method suitable for titanium alloy bogie of high-speed railway passenger car
CN105268869B (en) 1500T expanding machine
CN205183337U (en) Arrangement structure of hot rolling mill air purge set
CN110640399A (en) Production process for preparing cold-rolled thin-wall sleeve
CN214024154U (en) Roller surfacing heating heat-preserving cover device
CN116079342A (en) Manufacturing method of high-uniformity and high-grain-size welded titanium cylinder for cathode roller
CN113668304B (en) Intelligent repairing vehicle for steel rail profile
CN211361332U (en) Laser welded pipe production line for pipe machining
CN113829005A (en) Processing technology of high-strength nickel-based alloy welded pipe
JP6142858B2 (en) Method and apparatus for measuring shape of forged steel pipe
CN113000625A (en) Welded pipe processing technology capable of replacing seamless pipe
CN112207583A (en) Method and equipment for simulating welding seam rolling
CN205732280U (en) A kind of connection push rod for hot rolling
CN110695713A (en) Laser welded pipe production line for pipe machining and production method
RU2791999C1 (en) Method for manufacturing longitudinally electric-welded pipe of large diameter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant