CN107832963A - A kind of complete period fine fitment monitoring system for housing development - Google Patents
A kind of complete period fine fitment monitoring system for housing development Download PDFInfo
- Publication number
- CN107832963A CN107832963A CN201711165225.2A CN201711165225A CN107832963A CN 107832963 A CN107832963 A CN 107832963A CN 201711165225 A CN201711165225 A CN 201711165225A CN 107832963 A CN107832963 A CN 107832963A
- Authority
- CN
- China
- Prior art keywords
- construction
- fine fitment
- monitoring system
- complete period
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 33
- 238000011161 development Methods 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 claims abstract description 86
- 238000000034 method Methods 0.000 claims abstract description 26
- 238000007689 inspection Methods 0.000 claims abstract description 16
- 238000013461 design Methods 0.000 claims description 11
- 238000012800 visualization Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 210000004899 c-terminal region Anatomy 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000005201 scrubbing Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of complete period fine fitment monitoring system for housing development, including:Fine fitment information database, the database are stored with project information with multilevel hierarchy;Decorating scheme generation module, the project information is shown, and inputted according to user's request, decorating scheme is automatically generated based on the fine fitment information database;Arrangement and method for construction generation module, arrangement and method for construction is generated according to the decorating scheme;Construction monitoring module, condition of construction data are received, quality inspection report is obtained based on the arrangement and method for construction, monitors Construction State.Compared with prior art, the present invention has the advantages that to improve operating efficiency and construction quality.
Description
Technical field
The present invention relates to decoration technology field, and system is monitored more particularly, to a kind of complete period fine fitment for housing development
System.
Background technology
The existing monitoring to fine fitment process mainly uses manual type, and the building carried out is built into data and enterprise
And product information is collected filing using file, list data is organized into by artificial mode, in common system
Simple typing, so as to realize monitoring.Prior art simply will completely or partially have in project data return in a file or
Used for reference in person's documentation form, but can not synchronously determine design, cost, buying, each details of construction.It is this to do
Method not only spends that the time is long, efficiency is low, also has the following disadvantages:
(1) the difficult control of construction quality, including style, brand, construction technology, process monitoring and examination, the ring such as ensure after sale
Section, room enterprise are all unmanageable to construction team.
(2) the difficult control of construction period:Compared to former B2C present situation, direct management and control is looked forward to by room, supply chain matches somebody with somebody delivery link
Complexity, cycle difficult control, secondly, project is numerous, and the same hardly possible of construction period is controlled.
(3) the difficult control of financial risks:Compared to former B2C present situation, present financial risks are directly married again by C-terminal client
Itself is looked forward to room, financial risks are big, and because design standardization is lack of standardization, component part design requires disunity, causes to fill
The control for repairing standard often excesses budget scope.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind is used for housing development
Complete period fine fitment monitoring system.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of complete period fine fitment monitoring system for housing development, including:
Fine fitment information database, the database are stored with project information with multilevel hierarchy;
Decorating scheme generation module, the project information is shown, and inputted according to user's request, believed based on the fine fitment
Breath database automatically generates decorating scheme;
Arrangement and method for construction generation module, arrangement and method for construction is generated according to the decorating scheme;
Construction monitoring module, condition of construction data are received, quality inspection report, monitoring construction shape are obtained based on the arrangement and method for construction
State.
Further, the project information includes house type conceptual design information, cost information and the fine fitment bill of materials.
Further, the decorating scheme generation module includes:
Data base call unit, the control instruction based on reception call the project letter in the fine fitment information database
Breath;
Visualization, the project information that Real time displaying is called;
Decorating scheme output unit, user's request input is received, according to the user's request input and output decorating scheme.
Further, the visualization includes:
Contrast shows subelement, and index comparing result is shown according to the project information called.
Further, the arrangement and method for construction generation module includes:
Construction node setting unit, construction node is set according to the decorating scheme, forms arrangement and method for construction.
Further, the construction monitoring module includes:
Construction State updating block, condition of construction data and the quality inspection report of each construction node are received, updates each construction section
The Construction State of point;
Construction State display unit, show the Construction State of each construction node.
The Construction State is not including completing, having completed, quality inspection with quality inspection by not passing through.
Further, the system also includes:
Statistics sees plate module, and the decorating scheme is analyzed, and shows the statistical value of each setting index.
Further, the setting index Design style, house type chooses to install and real estate company.
Further, the system also includes:
Priority assignation module, role attribute and corresponding function authority are set.
Compared with prior art, the invention has the advantages that:
1) present invention is by computer technology application, is done in terms of the data processing of fine fitment scheme and in terms of procedure links
Total innovation is arrived.
2) present invention has decorating scheme generation module, and by the display to project information, can quickly obtain user needs
Input is asked, effectively increases the output efficiency of hard-cover scheme, saves the time of Scheme Choice, improves the effect that owner selectes scheme
Rate, solve traditional data collect manual processing mode speed is slow, the shortcomings of error rate is high and workload is big, real-time display goes out
The effect and cost information of selected scheme, obtain more targeted data message.
3) the achievable complete period monitoring of the present invention, generates arrangement and method for construction, and work progress is supervised according to decorating scheme
Control, each stage of construction is controlled comprehensively, monitors each quality inspection links, control construction quality in real time.
4) present invention can synchronously determine design, cost, buying, each details of construction, save the working time, improve work
Make efficiency, save human input and reduce financial risks.
5) use of present system can be efficiently modified working method, and on line under line, conventional hard-cover scheme information is not
It can artificially be lost in, effectively accomplish the accumulation of information to final data storehouse.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the course of work schematic diagram of each role of the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to
Following embodiments.
As shown in figure 1, the present embodiment provides a kind of complete period fine fitment monitoring system for housing development, including hard-cover
Information database 1, decorating scheme generation module 2, arrangement and method for construction generation module 3 and construction monitoring module 4 are repaiied, achievable determination is set
Meter, cost, buying, the complete period monitoring of construction.The system uses all on-line online interaction mode, caused by avoiding off line business
Data are inaccurate, not in real time, and sensitive data and critical data (SHA-256) algorithm for encryption being directed to, file transmit into
Row (MAC) verification, ensure the reliability of data transfer.
Fine fitment information database 1 is stored with project information with multilevel hierarchy, and the project information is set including house type scheme
Count information, cost information and the fine fitment bill of materials.Decorating scheme generation module 2 shows the project information, and according to user
Demand is inputted, and decorating scheme is automatically generated based on the fine fitment information database.Arrangement and method for construction generation module 3 is according to the dress
Repair schemes generation arrangement and method for construction.Construction monitoring module 4 receives condition of construction data, and quality inspection report is obtained based on the arrangement and method for construction
Accuse, monitor Construction State, when the construction node of whole completes simultaneously quality inspection by the way that a hard-cover project is just fully completed.
Decorating scheme generation module 1 includes data base call unit, visualization and decorating scheme output unit, its
In, control instruction of the data base call unit based on reception calls the project information in the fine fitment information database;Visually
Change the project information that unit Real time displaying is called;Decorating scheme output unit receives user's request input, according to the user
Demand input and output decorating scheme.
Visualization includes showing that the contrast of index comparing result shows subelement according to the project information called, can
Kinds of schemes and its comparing result are shown simultaneously, allows owner more accurately to select the residence pattern design scheme oneself liked.It is described
Project information shows that index includes style, class etc..
Arrangement and method for construction generation module 2 includes construction node setting unit, and construction node, shape are set according to the decorating scheme
Into arrangement and method for construction.
Construction monitoring module 3 includes Construction State updating block and Construction State display unit, wherein, Construction State renewal
Unit receives condition of construction data and the quality inspection report of each construction node, updates the Construction State of each construction node;Construction State
Display unit shows the Construction State of each construction node, realizes checking for construction speed.The Construction State include do not complete,
Completion, quality inspection with quality inspection by not passing through.Construction State is related to project integral construction situation and housing construction situation.
In another embodiment of the present invention, monitoring system also sees plate module 5 including statistics, and the decorating scheme is divided
Analysis, the statistical value of each setting index is shown, the Information Statistics of relevant programme can be checked.The setting index Design style, house type
Choose to install and real estate company.
In another embodiment of the present invention, monitoring system also includes priority assignation module 6, sets role attribute and corresponding work(
Can authority.The role includes marketing personnel, workmen and quality inspection personnel, and the course of work of each role is as shown in Figure 2.Respectively
Role, by setting authority login system, performs corresponding operating by client.
In another embodiment of the present invention, database uses MYSQL database server, and the file system of preservation uses
Mogilefs distributed file systems, core system, WebServer, gateway interface, data scrubbing service arrangement are grasped in Linux
Make system.
In another embodiment of the present invention, decorating scheme generation module 1 has search engine, distributed in full using solr
Search engine.
Fine fitment information database 1 is realized that decorating scheme generation module 2, arrangement and method for construction generate mould by database server
Block 3 and construction monitoring module 4 are respectively and independently separated by application server realizing, database server and application server, respectively
Deployment is set up, and ensures data and the stability interactive each other of application.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without
Creative work can is needed to make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical scheme, all should be in the protection domain being defined in the patent claims.
Claims (10)
- A kind of 1. complete period fine fitment monitoring system for housing development, it is characterised in that including:Fine fitment information database, the database are stored with project information with multilevel hierarchy;Decorating scheme generation module, the project information is shown, and inputted according to user's request, based on the fine fitment Information Number Decorating scheme is automatically generated according to storehouse;Arrangement and method for construction generation module, arrangement and method for construction is generated according to the decorating scheme;Construction monitoring module, condition of construction data are received, quality inspection report is obtained based on the arrangement and method for construction, monitors Construction State.
- 2. the complete period fine fitment monitoring system according to claim 1 for housing development, it is characterised in that the item Mesh information includes house type conceptual design information, cost information and the fine fitment bill of materials.
- 3. the complete period fine fitment monitoring system according to claim 1 for housing development, it is characterised in that the dress Repairing schemes generation module includes:Data base call unit, the control instruction based on reception call the project information in the fine fitment information database;Visualization, the project information that Real time displaying is called;Decorating scheme output unit, user's request input is received, according to the user's request input and output decorating scheme.
- 4. the complete period fine fitment monitoring system according to claim 3 for housing development, it is characterised in that it is described can Include depending on changing unit:Contrast shows subelement, and index comparing result is shown according to the project information called.
- 5. the complete period fine fitment monitoring system according to claim 1 for housing development, it is characterised in that described to apply Work schemes generation module includes:Construction node setting unit, construction node is set according to the decorating scheme, forms arrangement and method for construction.
- 6. the complete period fine fitment monitoring system according to claim 5 for housing development, it is characterised in that described to apply Work monitoring modular includes:Construction State updating block, condition of construction data and the quality inspection report of each construction node are received, updates each construction node Construction State;Construction State display unit, show the Construction State of each construction node.
- 7. the complete period fine fitment monitoring system according to claim 6 for housing development, it is characterised in that described to apply Work state is not including completing, having completed, quality inspection with quality inspection by not passing through.
- 8. the complete period fine fitment monitoring system according to claim 1 for housing development, it is characterised in that also wrap Include:Statistics sees plate module, and the decorating scheme is analyzed, and shows the statistical value of each setting index.
- 9. the complete period fine fitment monitoring system according to claim 8 for housing development, it is characterised in that described to set Determine index Design style, house type chooses to install and real estate company.
- 10. the complete period fine fitment monitoring system according to claim 1 for housing development, it is characterised in that also wrap Include:Priority assignation module, role attribute and corresponding function authority are set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711165225.2A CN107832963A (en) | 2017-11-21 | 2017-11-21 | A kind of complete period fine fitment monitoring system for housing development |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711165225.2A CN107832963A (en) | 2017-11-21 | 2017-11-21 | A kind of complete period fine fitment monitoring system for housing development |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107832963A true CN107832963A (en) | 2018-03-23 |
Family
ID=61652139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711165225.2A Pending CN107832963A (en) | 2017-11-21 | 2017-11-21 | A kind of complete period fine fitment monitoring system for housing development |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107832963A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109299915A (en) * | 2018-09-07 | 2019-02-01 | 江苏核电有限公司 | A kind of scaffold operational method |
CN110020833A (en) * | 2019-04-12 | 2019-07-16 | 深圳市瑞云科技有限公司 | A method of automatically generating project construction plan |
CN111401718A (en) * | 2020-03-10 | 2020-07-10 | 陶建军 | One-stop management system and method for building industry |
CN116090634A (en) * | 2023-01-09 | 2023-05-09 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201345685Y (en) * | 2008-04-18 | 2009-11-11 | 陈荣泉 | Intelligentized control system for decoration |
US20140129277A1 (en) * | 2008-09-30 | 2014-05-08 | Textura Corporation | Field management and mobile inspection |
CN104778756A (en) * | 2015-04-10 | 2015-07-15 | 北京明兰网络科技有限公司 | Intelligent home decoration design system |
CN106228287A (en) * | 2016-07-18 | 2016-12-14 | 广西家之宝网络科技有限公司 | A kind of finishing based on distributed system management cloud system |
CN106354819A (en) * | 2016-08-30 | 2017-01-25 | 浪潮电子信息产业股份有限公司 | Service platform and decoration searching method |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
-
2017
- 2017-11-21 CN CN201711165225.2A patent/CN107832963A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201345685Y (en) * | 2008-04-18 | 2009-11-11 | 陈荣泉 | Intelligentized control system for decoration |
US20140129277A1 (en) * | 2008-09-30 | 2014-05-08 | Textura Corporation | Field management and mobile inspection |
CN104778756A (en) * | 2015-04-10 | 2015-07-15 | 北京明兰网络科技有限公司 | Intelligent home decoration design system |
CN106228287A (en) * | 2016-07-18 | 2016-12-14 | 广西家之宝网络科技有限公司 | A kind of finishing based on distributed system management cloud system |
CN106354819A (en) * | 2016-08-30 | 2017-01-25 | 浪潮电子信息产业股份有限公司 | Service platform and decoration searching method |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109299915A (en) * | 2018-09-07 | 2019-02-01 | 江苏核电有限公司 | A kind of scaffold operational method |
CN110020833A (en) * | 2019-04-12 | 2019-07-16 | 深圳市瑞云科技有限公司 | A method of automatically generating project construction plan |
CN111401718A (en) * | 2020-03-10 | 2020-07-10 | 陶建军 | One-stop management system and method for building industry |
CN116090634A (en) * | 2023-01-09 | 2023-05-09 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
CN116090634B (en) * | 2023-01-09 | 2024-02-23 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107832963A (en) | A kind of complete period fine fitment monitoring system for housing development | |
CN102542414B (en) | A kind of operation flow of rule-based engine and the loosely coupled method of business data processing and system | |
CN104361424B (en) | Main data system integrated approach based on Enterprise Service Bus | |
CN107798486A (en) | The fine fitment monitoring human-computer interactive system for housing development based on mobile terminal | |
US6725181B2 (en) | Method and system for collecting and monitoring shop floor information | |
CN114493213A (en) | Carbon emission data acquisition and processing method based on Internet of things | |
CN115481884A (en) | Engineering progress information visual management method based on engineering structure tree | |
CN107992392A (en) | A kind of automatic monitoring repair system and method for cloud rendering system | |
US20220137585A1 (en) | Engineering based digital twin platform | |
Jeyaraj et al. | Validation of business process models using swimlane diagrams | |
CN109508896A (en) | A kind of after-sale service trustship method and system based on household electrical appliances shared platform | |
US20040167790A1 (en) | Method of conducting business in a system requiring frequency up-dates and corrections | |
CN111787119A (en) | Communication protocol device for controlling industrial Internet of things equipment based on block chain technology | |
CN111523812A (en) | Model life cycle management method and system, equipment and storage medium | |
CN111523810A (en) | Enterprise-level model management method, system, device and storage medium | |
Sharma et al. | Understanding LSS 4.0 through golden circle model and reviewing its scope in Indian textile industry | |
CN109978512A (en) | The control method of project management system, electronic equipment, storage medium | |
CN113793110A (en) | Industrial equipment data acquisition and analysis method based on cloud computing and cloud service platform | |
CN112990886A (en) | Aviation industry data management display system based on mobile phone terminal | |
CN108023740A (en) | The indicating risk method and apparatus of exception information in monitoring | |
NOVIKOV et al. | Improving the enterprise resource planning system based on digital modules of the industry 4.0 concept | |
CN111523808B (en) | Model centralized management method, system, equipment and storage medium | |
CN110262973B (en) | Data maintenance method, device, equipment and computer storage medium | |
CN104573010B (en) | A kind of information processing method and system | |
CN113792421A (en) | TPM device management data processing system and method based on digital twin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180323 |