CN107832866A - A kind of method for predicting and device, storage medium, terminal - Google Patents

A kind of method for predicting and device, storage medium, terminal Download PDF

Info

Publication number
CN107832866A
CN107832866A CN201710881422.8A CN201710881422A CN107832866A CN 107832866 A CN107832866 A CN 107832866A CN 201710881422 A CN201710881422 A CN 201710881422A CN 107832866 A CN107832866 A CN 107832866A
Authority
CN
China
Prior art keywords
predeterminable area
flow rate
real
characteristic parameter
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710881422.8A
Other languages
Chinese (zh)
Inventor
汤奇峰
古丽米热·艾力肯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZAMPLUS ADVERTISING (SHANGHAI) CO Ltd
Original Assignee
ZAMPLUS ADVERTISING (SHANGHAI) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZAMPLUS ADVERTISING (SHANGHAI) CO Ltd filed Critical ZAMPLUS ADVERTISING (SHANGHAI) CO Ltd
Priority to CN201710881422.8A priority Critical patent/CN107832866A/en
Publication of CN107832866A publication Critical patent/CN107832866A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Databases & Information Systems (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Remote Sensing (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Traffic Control Systems (AREA)

Abstract

A kind of method for predicting and device, storage medium, terminal, methods described include:Obtain the real-time traffic data in predeterminable area;Type based on the real-time traffic data and changes in flow rate of the predeterminable area determines predictor formula in history;According to predeterminable area described in the predictor formula and real-time traffic data prediction in the flow of following special time period.Can be according to the flow for precisely predicting predeterminable area in following random time section by scheme provided by the invention, also, corresponding to the different types of real-time traffic data of access, can flexibly obtain different types of volume forecasting result.

Description

A kind of method for predicting and device, storage medium, terminal
Technical field
The present invention relates to big data application field, more particularly to a kind of method for predicting and device, storage medium, end End.
Background technology
Flux prediction model is more and more applied to daily life.For example, in the scene of smart city, can With the prediction by the inlet flow rate to specific region, prediction of wagon flow flow to specific region etc., with information and communication Technological means is made rational planning for the running of city items function, and then creates more good days for the people in city, promotes city Harmony, Sustainable Growth.
But existing volume forecasting scheme generally existing precision of prediction it is low, can not be flexible with the prediction logic of standardization Suitable for different types of volume forecasting demand.
The content of the invention
Present invention solves the technical problem that it is how a kind of flux prediction model is provided, so as to improve the same of precision of prediction When, corresponding to different data types, the property of can adapt to obtains different types of volume forecasting result.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of method for predicting, including:Obtain predeterminable area Interior real-time traffic data;The changes in flow rate of type based on the real-time traffic data and the in history predeterminable area is true Determine predictor formula;According to predeterminable area described in the predictor formula and real-time traffic data prediction in the stream of following special time period Amount.
Optionally, the real-time traffic data obtained in predeterminable area include:Divided on default longitude and latitude flowmeter, To obtain at least one predeterminable area, the difference between the flux density of each predeterminable area is not more than predetermined threshold value;For each Individual predeterminable area, the real-time traffic data of the predeterminable area are obtained based on the default longitude and latitude flowmeter.
Optionally, the type based on the real-time traffic data and the in history changes in flow rate of the predeterminable area Determine that predictor formula includes:Based on the changes in flow rate of the predeterminable area and its neighboring area in history, at least one spy is predicted Levy predicted flow rate change of the parameter in following special time period;Changes in flow rate based on the predeterminable area in history determines every The weight of one characteristic parameter;The preset formula is determined based on each characteristic parameter and its weight, wherein, the preset formula is Linear formula.
Optionally, the predicted flow rate change of the characteristic parameter is influenceed by least one reference factor, and described at least one Individual reference factor determines according to the type of the real-time traffic data.
Optionally, the reference factor includes following one or more:Weather conditions, festivals or holidays factor and traffic congestion because Element.
Optionally, the predicted flow rate change of the characteristic parameter comprises at least:Predicted flow rate inside the predeterminable area Change;The borderline predicted flow rate change of predeterminable area.
Optionally, when the predicted flow rate of the characteristic parameter becomes the predicted flow rate change turned to inside predeterminable area, institute State based on the changes in flow rate of the predeterminable area and its neighboring area in history, predict at least one characteristic parameter following specific Predicted flow rate change in period includes:Data on flows training based on the predeterminable area in history obtains time series mould Type, the time series models are used for the changes in flow rate trend for describing the predeterminable area;Flow based on the predeterminable area Predicted flow rate change of the trend inside the predeterminable area in following special time period.
Optionally, when the predicted flow rate change of the characteristic parameter, which turns to the borderline predicted flow rate of predeterminable area, to be changed, It is described based on the changes in flow rate of the predeterminable area and its neighboring area in history, predict at least one characteristic parameter following special The predicted flow rate in section of fixing time change includes:Based on the data on flows of the predeterminable area and its neighboring area in history, really The borderline flow for being positioned at the predeterminable area enters the probability of the predeterminable area.
Optionally, the data on flows is vector data.
Optionally, the probability is determined based on pre-programmed curve, and the pre-programmed curve is determined based on day type.
Optionally, the day type is selected from:Working day, weekend and festivals or holidays.
Optionally, the changes in flow rate based on the predeterminable area in history determines the weight bag of each characteristic parameter Include:The preset formula is tested by multivariate logistic regression algorithm, it is described described default in history to determine to best suit The benchmark preset formula of the changes in flow rate in region;Weight based on each characteristic parameter in the benchmark preset formula determines each spy Levy the weight of parameter.
Optionally, the type of the real-time traffic data is selected from:The information point data of mobile device;The monitoring number of vehicle According to.
The embodiment of the present invention also provides a kind of volume forecasting device, including:Acquisition module, for obtaining in predeterminable area Real-time traffic data;Determining module, for the type based on the real-time traffic data and in history predeterminable area Changes in flow rate determines predictor formula;Prediction module, for being preset according to the predictor formula and real-time traffic data prediction Flow of the region in following special time period.
Optionally, the acquisition module includes:Submodule is divided, for being divided on default longitude and latitude flowmeter, to obtain At least one predeterminable area, the difference between the flux density of each predeterminable area are not more than predetermined threshold value;Acquisition submodule is right In each predeterminable area, the real-time traffic data based on the default longitude and latitude flowmeter acquisition predeterminable area.
Optionally, the determining module includes:Submodule is predicted, for based on the predeterminable area and its periphery in history The changes in flow rate in region, predict predicted flow rate change of at least one characteristic parameter in following special time period;First determines Submodule, the weight of each characteristic parameter is determined for the changes in flow rate based on the predeterminable area in history;Second determines son Module, for determining the preset formula based on each characteristic parameter and its weight, wherein, the preset formula is linear public Formula.
Optionally, the predicted flow rate change of the characteristic parameter is influenceed by least one reference factor, and described at least one Individual reference factor determines according to the type of the real-time traffic data.
Optionally, the reference factor includes following one or more:Weather conditions, festivals or holidays factor and traffic congestion because Element.
Optionally, the predicted flow rate change of the characteristic parameter comprises at least:Predicted flow rate inside the predeterminable area Change;The borderline predicted flow rate change of predeterminable area.
Optionally, when the predicted flow rate of the characteristic parameter becomes the predicted flow rate change turned to inside predeterminable area, institute Stating prediction submodule includes:Training unit, time sequence is obtained for the data on flows training based on the predeterminable area in history Row model, the time series models are used for the changes in flow rate trend for describing the predeterminable area;Predicting unit, for based on institute Predicted flow rate of the changes in flow rate trend prediction of predeterminable area inside the predeterminable area in following special time period is stated to become Change.
Optionally, when the predicted flow rate change of the characteristic parameter, which turns to the borderline predicted flow rate of predeterminable area, to be changed, The prediction submodule includes:First determining unit, for based on the predeterminable area in history and its flow of neighboring area Data, it is determined that the borderline flow positioned at the predeterminable area enters the probability of the predeterminable area.
Optionally, the data on flows is vector data.
Optionally, the probability is determined based on pre-programmed curve, and the pre-programmed curve is determined based on day type.
Optionally, the day type is selected from:Working day, weekend and festivals or holidays.
Optionally, first determination sub-module includes:Test cell, for by multivariate logistic regression algorithm to described Preset formula is tested, to determine to best suit the benchmark preset formula of the changes in flow rate of the predeterminable area described in history; Second determining unit, the power of each characteristic parameter is determined for the weight based on each characteristic parameter in the benchmark preset formula Weight.
Optionally, the type of the real-time traffic data is selected from:The information point data of mobile device;The monitoring number of vehicle According to.
The embodiment of the present invention also provides a kind of storage medium, is stored thereon with computer instruction, the computer instruction fortune The step of above method is performed during row.
The embodiment of the present invention also provides a kind of terminal, including memory and processor, and being stored with the memory can The computer instruction run on the processor, the processor perform the step of the above method when running the computer instruction Suddenly.
Compared with prior art, the technical scheme of the embodiment of the present invention has the advantages that:
Obtain the real-time traffic data in predeterminable area;Type based on the real-time traffic data and described in history The changes in flow rate of predeterminable area determines predictor formula;According to predeterminable area described in the predictor formula and real-time traffic data prediction In the flow of following special time period.Needed than existing for the special flux prediction model of different types of design data Scheme, the technical scheme of the embodiment of the present invention can make the type of the real-time traffic data of access it is determined that during predictor formula For one of measurement factor, to determine more suitably predictor formula according to the type of the real-time traffic data so that it is determined that it is pre- The type characteristic of real-time traffic data of access can preferably be met by surveying formula, and then obtains more accurately flow on this basis Measure prediction result.It will be appreciated by those skilled in the art that can be following any according to accurate prediction by the scheme of the embodiment of the present invention The flow of predeterminable area in period, also, corresponding to the different types of real-time traffic data of access, can be according to the reality When data on flows type characteristic targetedly determine predictor formula, and then obtain different types of volume forecasting result.
Further, the real-time traffic data obtained in predeterminable area can include:On default longitude and latitude flowmeter Division, to obtain at least one predeterminable area, the difference between the flux density of each predeterminable area is not more than predetermined threshold value;For Each predeterminable area, the real-time traffic data of the predeterminable area are obtained based on the default longitude and latitude flowmeter.Than existing There is the scheme that volume forecasting is carried out in units of a single point, can be reasonable according to flux density using the scheme of the embodiment of the present invention Predeterminable area is divided, so as to effectively avoid producing sparse matrix, provides more preferable data basis for follow-up volume forecasting, greatly Improve the precision of follow-up volume forecasting.
Brief description of the drawings
Fig. 1 is a kind of flow chart of method for predicting of the first embodiment of the present invention;
Fig. 2 is inlet flow rate's versus time curve in history in first embodiment of the invention;
Fig. 3 is a kind of structural representation of volume forecasting device of the second embodiment of the present invention.
Embodiment
It will be appreciated by those skilled in the art that as background technology is sayed, existing flux prediction model is mostly for certain kinds The design data of type.In actual applications, for different types of access data, user needs to train different models to come pair Different types of access data carry out volume forecasting, cause to train cost increase, influence the application of flux prediction model.
Further, generally also there is the problem of precision of prediction is low in existing flux prediction model, cause to accessing data Prediction result it is inaccurate, influence the use feeling of user.
In order to solve this technical problem, the technical scheme of the embodiment of the present invention obtains the real-time traffic number in predeterminable area According to;Type based on the real-time traffic data and changes in flow rate of the predeterminable area determines predictor formula in history;Root According to predeterminable area described in the predictor formula and real-time traffic data prediction in the flow of following special time period.
It will be appreciated by those skilled in the art that the technical scheme of the embodiment of the present invention will can access it is determined that during predictor formula Real-time traffic data type as one of measurement factor, to be determined more suitably according to the type of the real-time traffic data Predictor formula so that it is determined that predictor formula can preferably meet access real-time traffic data type characteristic, Jin Er More accurately volume forecasting result is obtained on the basis of this.
Further, can be according to precisely predicting preset areas in following random time section by the scheme of the embodiment of the present invention The flow in domain, also, corresponding to the different types of real-time traffic data of access, can be according to the class of the real-time traffic data Type feature targetedly determines predictor formula, and then obtains different types of volume forecasting result.
It is understandable to enable above-mentioned purpose, feature and the beneficial effect of the present invention to become apparent, below in conjunction with the accompanying drawings to this The specific embodiment of invention is described in detail.
Fig. 1 is a kind of flow chart of method for predicting of the first embodiment of the present invention.Wherein, the flow can be Pass through the physical quantities of predeterminable area in preset time;The object can include vehicle, pedestrian etc..
Specifically, the present embodiment can be according to the different types of data on flows (can be referred to as data) of access, in advance Survey predicted flow rate of the type in following special time period on predeterminable area.For example, when the stream of input (alternatively referred to as accessing) Data are measured when be population data on flows, can be using described in the present embodiment in program prediction future special time period on predeterminable area Inlet flow rate;In another example when the data on flows of input is flow motor (can be referred to as wagon flow), this implementation can be used Wagon flow in the example program prediction future special time period on predeterminable area.
Next the idiographic flow of the present embodiment is specifically described using forecasted population flow as example.It is pointed out that institute The inlet flow rate and flow motor can be not limited only to by stating the type of data on flows.In actual applications, people in the art Member can input other kinds of data on flows as needed, and the flow that corresponding types are obtained with the scheme based on the present embodiment is pre- Result is surveyed, will not be described here.
More specifically, in the present embodiment, the method for predicting may include steps of:
Step S101, obtain the real-time traffic data in predeterminable area.
Step S102, the changes in flow rate of type based on the real-time traffic data and the in history predeterminable area are true Determine predictor formula.
Step S103, according to predeterminable area described in the predictor formula and real-time traffic data prediction in following special time The flow of section (alternatively referred to as preset time period).
Further, the real-time traffic data can be mobile information point (Point of Interest, abbreviation POI, alternatively referred to as point of interest) data, it is described default by being determined with the information exchange of object to be predicted in the predeterminable area The real-time traffic data of the object to be predicted in region.Preferably, the information point data of the movement can be set including user Standby interaction data;The monitoring data of vehicle can also be included.
For example, it is necessary to obtain described default when it is desirable that predicting predeterminable area in the inlet flow rate of following special time period The current real-time inlet flow rate in region, accordingly, the object to be predicted can be the people by the predeterminable area, then can be with Data interaction of the communication apparatus (such as mobile phone, IPAD) between communication base station based on the people in the predeterminable area, obtain The location information of the communication apparatus, so as to position communication apparatus quantity and the position in the predeterminable area, and then really Real-time inlet flow rate in the fixed predeterminable area.Further, the real-time traffic data can also be vector data, that is, wrap Moving direction containing the real-time traffic data.
In another example, it is necessary to obtain described default when it is desirable that predicting wagon flow of the predeterminable area in following special time period The current real-time traffic flow data in region, accordingly, the object to be predicted can be (also may be used by the vehicle of the predeterminable area Referred to as automobile), then the vehicle number that the predeterminable area can be passed through based on camera (such as monitoring camera) collection on road surface According to, and then determine the real-time traffic flow in the predeterminable area.Wherein, the vehicle data can include, and the automobile of certain car plate exists Time point A is by the camera on the B of section.
Further, the predeterminable area can be dynamically determined according to flux density, to avoid producing coefficient matrix, it is ensured that Performing when the present embodiment is predicted can have enough basic datas (to be able to ensure that the real-time traffic data all the time Data volume is sufficiently large).
As a non-limiting example, the step S101 can include:Divided on default longitude and latitude flowmeter, To obtain at least one predeterminable area, the difference between the flux density of each predeterminable area is not more than predetermined threshold value;For each Individual predeterminable area, the real-time traffic data of the predeterminable area are obtained based on the default longitude and latitude flowmeter.
Preferably, the default longitude and latitude flowmeter can include the real time position and mobile message for being identified with population Map.Wherein, the map can be global map, or map of China, can also be the map of some specific region.
Preferably, the real time position of the population on the map can be based on latitude and longitude information acquisition.It is for example, described Latitude and longitude information can (can such as be based on sending out to the user equipment by what the user device associations such as the mobile phone of user obtained The broadcast message sent determines).For example, can be according to positional information (such as longitude and latitude identified in the default longitude and latitude flowmeter Information) determine the inlet flow rate of predeterminable area described in current time.
Preferably, on the default longitude and latitude flowmeter, the area of population more intensive (i.e. the density of inlet flow rate is bigger) Domain, the predeterminable area length of division are shorter (that is, the predeterminable area marked off is smaller);Population is more sparse, the predeterminable area of division It is bigger, to ensure the density of the inlet flow rate in each predeterminable area marked off (density of population can be referred to as) basic phase Together, so as to effectively avoid producing coefficient matrix.
Preferably, the predetermined threshold value can predefine, and in actual applications, user can also be to the predetermined threshold value It is adjusted.
In another example user can initially provide the candidate's predeterminable area for wishing to predict, then scheme described in the present embodiment can be with The geographic range for providing covering is more than the map for the scope that candidate's predeterminable area covers, to perform the step S101 When, the actual coverage of candidate's predeterminable area can be finely tuned according to the real-time inlet flow rate on the map with final true The fixed predeterminable area, because the real-time inlet flow rate of the predeterminable area after adjustment is enough, it can be ensured that subsequent prediction Precision.
As a non-limiting example, performing the step S101 to obtain the real-time traffic of the predeterminable area After data, before performing the step S102, it can also include:Examine the real-time traffic data of the predeterminable area obtained Whether Gaussian Profile, and the real-time traffic data fit Gaussian Profile of the predeterminable area in the detection determination acquisition are met When, just perform the step S102;Otherwise, i.e., when testing result shows the real-time traffic data of the predeterminable area of acquisition not When meeting the Gaussian Profile, the step S101 can be re-executed, to adjust the length of the predeterminable area, until obtaining The predeterminable area real-time traffic data fit described in Gaussian Profile.
Preferably, can be based on the predeterminable area that K-S (Kolmogorov-Smirnov) test and judge obtains Whether real-time traffic data meet Gaussian Profile.Those skilled in the art can also use other inspection parties according to being actually needed Whether the real-time traffic data on the predeterminable area that method judges to obtain meet Gaussian Profile.
For example, the real-time traffic data on the predeterminable area that can first assume to obtain meet Gaussian Profile, so Verify whether the real-time traffic data on the predeterminable area of acquisition actually meet Gaussian Profile using K-S hypothesis afterwards. Specifically, if the real-time traffic data on the predeterminable area obtained examine the assumed value (p- calculated through K-S Value) it is more than default tolerance, real-time traffic data fit Gaussian Profile on the predeterminable area that obtains can be received It is assumed that the present embodiment can continue executing with the step S102 and step S103;Otherwise, the step S101 is re-executed, can In a manner of the body of a map or chart covered by adjusting the predeterminable area, the real-time streams on the predeterminable area of acquisition are adjusted Data are measured, until the real-time traffic data fit Gaussian Profile position on the predeterminable area obtained.Or re-executing During the step S101, the predeterminable area temporarily can not also be adjusted, but is waited for a period of time, described when acquisition is preset When real-time traffic data on region change, examine whether the real-time traffic data on the predeterminable area after change accord with Close Gaussian Profile.
Wherein, the default tolerance can be used for the shortage of data for accommodating certain rank, so as to when the institute of the acquisition The real-time traffic data on predeterminable area are stated when meeting Gaussian Profile in general trend, it is possible to continue subsequently to calculate. Preferably, the default tolerance can be 0.05.
Preferably, all data that can include to the real-time traffic data on the predeterminable area of acquisition carry out K-S Examine, to judge whether the real-time traffic data on the predeterminable area obtained meet Gaussian Profile;Or can also be from obtaining A certain amount of data are randomly selected as sample data in the real-time traffic data on the predeterminable area taken, by detecting State whether sample data meets Gaussian Profile to judge whether the real-time traffic data on the predeterminable area obtained meet height This distribution.
Further, in the present embodiment, the type of the real-time traffic data can be population;Accordingly, it is described to go through The changes in flow rate of the predeterminable area can include inlet flow rate's change of the predeterminable area in history in history.
Further, the predictor formula can be used for the inlet flow rate's changing rule for describing the predeterminable area.For example, The predictor formula can be that inlet flow rate's change fitting of the predeterminable area in history according to obtains.
As a non-limiting example, the step S102 can include:Based on the predeterminable area in history and The changes in flow rate of its neighboring area, predict predicted flow rate change of at least one characteristic parameter in following special time period;Base The weight of each characteristic parameter is determined in the changes in flow rate of the predeterminable area in history;Based on each characteristic parameter and its weight The preset formula is determined, wherein, the preset formula is linear formula.
Represented for example, the preset formula can be based on equation below:
Predicted flow rate change=∑ (characteristic parameter i predicted flow rate change × weight i) of predeterminable area;
Wherein, the characteristic parameter i is ith feature parameter;The weight i is weight corresponding to ith feature parameter.
Preferably, the characteristic parameter can include the inlet flow rate in the predeterminable area, can also include described pre- If the inlet flow rate on zone boundary.Accordingly, predicted flow rate change of the characteristic parameter in following special time period can With including:Predicted flow rate inside the predeterminable area in following special time period changes;Not on the predeterminable area border Carry out the predicted flow rate change of special time period.
For example, above-mentioned predictor formula can be refined as equation below:
Forecasted population changes in flow rate × first weight+preset areas in predicted flow rate change=predeterminable area of predeterminable area The weight of the borderline forecasted population changes in flow rate in domain × second;
Wherein, first weight is corresponding with the forecasted population changes in flow rate in the predeterminable area;Second power Weight is corresponding with the borderline forecasted population changes in flow rate of the predeterminable area × second weight.
Further, the predicted flow rate change of the characteristic parameter can be influenceed by least one reference factor, described At least one reference factor determines according to the type of the real-time traffic data.Preferably, the reference factor can include with The next item down is multinomial:Weather conditions, festivals or holidays factor and traffic congestion factor.
For example, the predictor formula after above-mentioned refinement can be further refined as equation below:
The predicted flow rate change of predeterminable area=by the forecasted population changes in flow rate in the predeterminable area of inside even from weather Forecasted population changes in flow rate × four weights+predeterminable area in the predeterminable area for × the three weight+influenceed by festivals or holidays factor The weight of borderline forecasted population changes in flow rate × second;
Wherein, the 3rd weight and the forecasted population changes in flow rate phase in the predeterminable area by inside even from weather It is corresponding;4th weight is corresponding with the forecasted population changes in flow rate in the predeterminable area influenceed by festivals or holidays factor.
It is similar, the borderline forecasted population changes in flow rate of predeterminable area can also be further refined as by weather because The borderline forecasted population changes in flow rate of predeterminable area that element influences, and on the predeterminable area border influenceed by festivals or holidays factor Forecasted population changes in flow rate.
Further, when prediction is wagon flow of the predeterminable area in following special time period, the reference factor may be used also With including traffic congestion factor, traffic accident factor etc..
As a non-limiting example, when the predicted flow rate of the characteristic parameter become turn to it is pre- inside predeterminable area When measurement of discharge changes, data on flows training that can be based on the predeterminable area in history obtains time series models, when described Between series model can be used for the changes in flow rate trend that describes the predeterminable area;The flow for being then based on the predeterminable area becomes Change predicted flow rate change of the trend prediction inside the predeterminable area in following special time period, with based on the time sequence Row model, the changes in flow rate rule with reference to described in historical data analysis in predeterminable area, and then predict the predeterminable area not Carry out the flow of special time period.
It will be appreciated by those skilled in the art that the time series models can be used for counting in predeterminable area one section in history Data on flows in time.Specifically, can when observing the position data of inlet flow rate on the basis of the predeterminable area The data more than comparison are collected into, by taking a long cycle (such as one month) as an example, can be shown in the form of statistical chart described pre- If the situation of change of inlet flow rate's data in region, also, this change is usually regular.So it can use Difference integrates rolling average autoregression (Autoregressive Integrated Moving Average Model, abbreviation ARIMA) model, the predicted flow rate changing rule inside the predeterminable area is fitted based on historical data, it is described pre- so as to predict If region is in the inlet flow rate of following special time period.
Further, the inlet flow rate in the predeterminable area be it is regular can be target-seeking, can typically pass through scatter diagram, song The modes such as line chart describe inlet flow rate's variation tendency of the predeterminable area.
For example, with reference to figure 2, the change of the inlet flow rate over time is regular (for example, it may be shown in Fig. 2 Alternating changing rule).More specifically, when the predeterminable area is industrial park, on Monday to Friday (i.e. working day) The preset areas during the inlet flow rate of predeterminable area described in period can be more than Saturday and Sunday (i.e. two-day weekend) on the whole The inlet flow rate in domain;And when being observed in units of day, inlet flow rate inside predeterminable area change can be again with Time adds up and is on the whole reduction trend, but the particular moment (such as noon, evening peak) in one day, the preset areas Inlet flow rate inside domain has a small amount of rise again.
Further, on this basis, the ARIMA models can be used, by history several cycles shown in Fig. 2 The inlet flow rate's data inside the predeterminable area obtained, simulation, predict the predeterminable area in following special time period Inlet flow rate's variation tendency.For example, when the following special time period for needing to predict is working day, can be according to Fig. 2 Date in history between inlet flow rate's trend described in following special time period inlet flow rate.
As a non-limiting example, when the predicted flow rate of the characteristic parameter becomes, to turn to predeterminable area borderline , can be based on the data on flows of the predeterminable area and its neighboring area in history, it is determined that positioned at described when predicted flow rate changes The borderline flow of predeterminable area enters the probability of the predeterminable area.
It will be appreciated by those skilled in the art that when performing scheme described in the present embodiment, except needing to predict the predeterminable area Outside internal inlet flow rate's variation tendency, it is also necessary to the borderline inlet flow rate's variation tendency of the predeterminable area is predicted, with More accurately predict inlet flow rate of the predeterminable area in following special time period.
Preferably, the border of the predeterminable area can include the part that the predeterminable area is bordered on its neighboring area.
Preferably, the probability can be based on pre-programmed curve determination, and the pre-programmed curve can be based on day type and determine.Its In, the day type can be selected from:Working day, weekend and festivals or holidays.
Preset for example, the borderline population entrance for being located at the specific trellis can be calculated according to Bayes or leave this The probability of grid, and then determine the borderline forecasted population changes in flow rate of predeterminable area.
Specifically, for positioned at the borderline people of the predeterminable area, it can be observed on the predeterminable area border On moving direction, still try to exit from institute being attempt to the predeterminable area as described in positioned at the borderline people of predeterminable area State predeterminable area.
Based on above-mentioned thought, the borderline inlet flow rate of the predeterminable area can be become and be divided into two kinds of vector datas:P (in) and P (out), wherein, P (in) can enter the predeterminable area positioned at the borderline inlet flow rate of the predeterminable area Probability;P (out) can be the probability that the predeterminable area is left positioned at the borderline inlet flow rate of the predeterminable area.
More specifically, the pre-programmed curve can be based on and weigh the P (in) and P (out), and with described in above-mentioned determination The changing rule of inlet flow rate is similar in predeterminable area, the pre-programmed curve can also because the day type it is different without Together.
Further, for different day types, on the predeterminable area border, the movement probability of the inlet flow rate May be different, that is, inlet flow rate variation tendency of the borderline inlet flow rate of the predeterminable area in not type on the same day may It is different.
Accordingly, the P (in) can be refined as P_ (u, t, dt) (in), for describing under time t, day type dt, The borderline inlet flow rate of predeterminable area enters predeterminable area u probability.Similar, the P (out) can be refined as P_ (u, t, dt) (out), it is described to prefetch described in borderline inlet flow rate leaves for describing under time t, day type dt Predeterminable area u probability.
Further, R_ (u, t, dt) (in) can also be defined to describe in following special time period t from the preset areas On the u borders of domain enter the predeterminable area u inlet flow rate, wherein it is possible to obtain formula R_ (u, t, dt) (in)=(time t, Under its type dt, positioned at the borderline forecasted population flows of predeterminable area u) × P_ (u, t, dt) (in).
Accordingly, R_ (u, t, dt) (out) can also be defined to describe in following special time period t from the predeterminable area The inlet flow rate of the predeterminable area u is left on u borders, wherein it is possible to obtain formula R_ (u, t, dt) (out)=(time t, Under its type dt, positioned at the borderline forecasted population flows of predeterminable area u) × P_ (u, t, dt) (out).
Further, it is determined that after the characteristic parameter that predictor formula needs include, it is also necessary to determine each feature ginseng Several weight, more accurately to predict flow of the predeterminable area in following special time period.
As a non-limiting example, to the weight, constant current journey can include really:Pass through multivariate logistic regression Algorithm is tested the preset formula, to determine to best suit the benchmark of the changes in flow rate of the predeterminable area described in history Preset formula;Weight based on each characteristic parameter in the benchmark preset formula determines the weight of each characteristic parameter.
For example, it is determined that after the characteristic parameter that predictor formula needs include, the multivariate logistic regression can be based on Algorithm, the predictor formula is detected and trained with reference to historical data, by assuming that the side of the weight of each characteristic parameter Formula, simulate the benchmark preset formula for best suiting the changes in flow rate of the predeterminable area in history.When the benchmark preset formula After it is determined that, the weight of parameters in the benchmark preset formula both can be as the weight of the predictor formula.
Further, in actual applications, with the increase of historical data, the weight of parameters feature can also be real-time Adjustment, to keep even improving prediction precision.
Preferably, the changes in flow rate of each characteristic parameter and the predeterminable area in history can be calculated based on scatter diagram As a result relation, because the result of picture is substantial linear, it may be determined that the inlet flow rate of the predeterminable area and each spy Sign parameter has linear relationship, therefore, it is possible to determine the weight of each characteristic parameter using linear regression algorithm.
Further, when performing the step S103, the prediction result at different time interval can be illustrated in map Superposition displaying is done on (such as the default longitude and latitude flowmeter).Curve that can also be in different colors represents the predeterminable area Real time section inlet flow rate and early stage to the difference of the forecasted population flow of the period so that the flow finally obtained Bandwagon effect is more convenient for understanding, analyzed.
,, can be by the real-time traffic data of access it is determined that during predictor formula using scheme described in the present embodiment by upper Type is as one of measurement factor, to determine more suitably predictor formula according to the type of the real-time traffic data so that really Fixed predictor formula can preferably meet the type characteristic of the real-time traffic data of access, and then obtain on this basis more smart Accurate volume forecasting result.It will be appreciated by those skilled in the art that can be according to accurate prediction not by the scheme of the embodiment of the present invention Carry out the flow of predeterminable area in random time section, also, corresponding to the different types of real-time traffic data of access, being capable of basis The type characteristic of the real-time traffic data targetedly determines predictor formula, and then obtains different types of volume forecasting knot Fruit.
Fig. 3 is a kind of structural representation of volume forecasting device of the second embodiment of the present invention.Those skilled in the art Understand, volume forecasting device 3 described in the present embodiment can be used for implementing the method described in above-mentioned Fig. 1 and embodiment illustrated in fig. 2 Technical scheme.
Specifically, in the present embodiment, the volume forecasting device 3 can include acquisition module 31, default for obtaining Real-time traffic data in region;Determining module 32, for the type based on the real-time traffic data and described in history The changes in flow rate of predeterminable area determines predictor formula;Prediction module 33, for according to the predictor formula and real-time traffic data Predict flow of the predeterminable area in following special time period.
Further, the acquisition module 31 can include division submodule 311, in default longitude and latitude flowmeter Division, to obtain at least one predeterminable area, the difference between the flux density of each predeterminable area is not more than predetermined threshold value;Obtain Submodule 312, for each predeterminable area, the real-time streams based on the default longitude and latitude flowmeter acquisition predeterminable area Measure data.
Further, the determining module 32 can include prediction submodule 321, for based on the preset areas in history Domain and its changes in flow rate of neighboring area, predict that predicted flow rate of at least one characteristic parameter in following special time period becomes Change;First determination sub-module 322, the power of each characteristic parameter is determined for the changes in flow rate based on the predeterminable area in history Weight;Second determination sub-module 323, for determining the preset formula based on each characteristic parameter and its weight, wherein, it is described pre- If formula is linear formula.
Preferably, the characteristic parameter predicted flow rate change can be influenceed by least one reference factor, it is described extremely A few reference factor can determine according to the type of the real-time traffic data.Wherein, the reference factor can include with The next item down is multinomial:Weather conditions, festivals or holidays factor and traffic congestion factor.
Preferably, the predicted flow rate change of the characteristic parameter can at least include:Prediction inside the predeterminable area Changes in flow rate;The borderline predicted flow rate change of predeterminable area.
As a non-limiting example, when the predicted flow rate of the characteristic parameter become turn to it is pre- inside predeterminable area When measurement of discharge changes, the prediction submodule 321 can include training unit 3211, for based on the predeterminable area in history Data on flows training obtain time series models, the time series models are used to describe the changes in flow rate of the predeterminable area Trend;Predicting unit 3212, for based on the changes in flow rate trend prediction of the predeterminable area in following special time period Predicted flow rate change inside the predeterminable area.
As another non-limiting example, turned to when the predicted flow rate of the characteristic parameter becomes on predeterminable area border Predicted flow rate change when, it is described prediction submodule 321 can include the first determining unit 3213, for based on described in history Predeterminable area and its data on flows of neighboring area, it is determined that the borderline flow positioned at the predeterminable area enters described preset The probability in region.
Further, the data on flows can be vector data.
Further, the probability can be based on pre-programmed curve determination, and the pre-programmed curve can be based on day type and determine. Wherein, the day type can be selected from:Working day, weekend and festivals or holidays.
Further, first determination sub-module 322 can include test cell 3221, for being returned by more metalogic Reduction method is tested the preset formula, to determine to best suit the base of the changes in flow rate of the predeterminable area described in history Quasi- preset formula;Second determining unit 3222, determined for the weight based on each characteristic parameter in the benchmark preset formula every The weight of one characteristic parameter.
Further, the type of the real-time traffic data can be selected from:The information point data of mobile device;The prison of vehicle Control data.
More contents of operation principle, working method on the volume forecasting device 3, are referred in Fig. 1 and Fig. 2 Associated description, repeat no more here.
Further, a kind of storage medium is also disclosed in the embodiment of the present invention, is stored thereon with computer instruction, the calculating The method and technology scheme described in above-mentioned Fig. 1 and embodiment illustrated in fig. 2 is performed during machine instruction operation.Preferably, the storage is situated between Matter can include computer-readable recording medium.The storage medium can include ROM, RAM, disk or CD etc..
Further, a kind of terminal, including memory and processor is also disclosed in the embodiment of the present invention, is deposited on the memory The computer instruction that can be run on the processor is contained, the processor performs above-mentioned when running the computer instruction Method and technology scheme described in Fig. 1 and embodiment illustrated in fig. 2.
Although present disclosure is as above, the present invention is not limited to this.Any those skilled in the art, this is not being departed from In the spirit and scope of invention, it can make various changes or modifications, therefore protection scope of the present invention should be with claim institute The scope of restriction is defined.

Claims (28)

  1. A kind of 1. method for predicting, it is characterised in that including:
    Obtain the real-time traffic data in predeterminable area;
    Type based on the real-time traffic data and changes in flow rate of the predeterminable area determines predictor formula in history;
    According to predeterminable area described in the predictor formula and real-time traffic data prediction in the flow of following special time period.
  2. 2. method for predicting according to claim 1, it is characterised in that the real-time traffic obtained in predeterminable area Data include:
    Divided on default longitude and latitude flowmeter, to obtain at least one predeterminable area, between the flux density of each predeterminable area Difference be not more than predetermined threshold value;
    For each predeterminable area, the real-time traffic number based on the default longitude and latitude flowmeter acquisition predeterminable area According to.
  3. 3. method for predicting according to claim 1, it is characterised in that the class based on the real-time traffic data The type and changes in flow rate of the predeterminable area determines that predictor formula includes in history:
    Based on the changes in flow rate of the predeterminable area and its neighboring area in history, predict at least one characteristic parameter following special The predicted flow rate change fixed time in section;
    Changes in flow rate based on the predeterminable area in history determines the weight of each characteristic parameter;
    The preset formula is determined based on each characteristic parameter and its weight, wherein, the preset formula is linear formula.
  4. 4. method for predicting according to claim 3, it is characterised in that the characteristic parameter predicted flow rate change by The influence of at least one reference factor, at least one reference factor determine according to the type of the real-time traffic data.
  5. 5. method for predicting according to claim 4, it is characterised in that the reference factor is included with the next item down or more :Weather conditions, festivals or holidays factor and traffic congestion factor.
  6. 6. method for predicting according to claim 3, it is characterised in that the predicted flow rate of the characteristic parameter is changed to Include less:
    Predicted flow rate change inside the predeterminable area;
    The borderline predicted flow rate change of predeterminable area.
  7. 7. method for predicting according to claim 6, it is characterised in that when the predicted flow rate of the characteristic parameter changes It is described to be become based on the predeterminable area in history and its flow of neighboring area when changing for the predicted flow rate inside predeterminable area Change, predict that predicted flow rate change of at least one characteristic parameter in following special time period includes:
    Data on flows training based on the predeterminable area in history obtains time series models, and the time series models are used for The changes in flow rate trend of the predeterminable area is described;
    Inside the predeterminable area based on the changes in flow rate trend prediction of the predeterminable area in following special time period Predicted flow rate changes.
  8. 8. method for predicting according to claim 6, it is characterised in that when the predicted flow rate of the characteristic parameter changes It is described based on the predeterminable area in history and its flow of neighboring area during predicted flow rate change borderline for predeterminable area Change, predict that predicted flow rate change of at least one characteristic parameter in following special time period includes:
    Based on the data on flows of the predeterminable area and its neighboring area in history, it is determined that on the border of the predeterminable area Flow enter the predeterminable area probability.
  9. 9. method for predicting according to claim 8, it is characterised in that the data on flows is vector data.
  10. 10. method for predicting according to claim 8, it is characterised in that the probability is based on pre-programmed curve determination, institute Pre-programmed curve is stated to determine based on day type.
  11. 11. method for predicting according to claim 10, it is characterised in that the day type is selected from:Working day, weekend And festivals or holidays.
  12. 12. method for predicting according to claim 3, it is characterised in that described based on the predeterminable area in history Changes in flow rate determine that the weight of each characteristic parameter includes:
    The preset formula is tested by multivariate logistic regression algorithm, it is described described default in history to determine to best suit The benchmark preset formula of the changes in flow rate in region;
    Weight based on each characteristic parameter in the benchmark preset formula determines the weight of each characteristic parameter.
  13. 13. the method for predicting according to any one of claim 1 to 12, it is characterised in that the real-time traffic number According to type be selected from:
    The information point data of mobile device;
    The monitoring data of vehicle.
  14. A kind of 14. volume forecasting device, it is characterised in that including:
    Acquisition module, for obtaining the real-time traffic data in predeterminable area;
    Determining module, the changes in flow rate of the predeterminable area is true for the type based on the real-time traffic data and in history Determine predictor formula;
    Prediction module, for according to the predictor formula and real-time traffic data prediction predeterminable area in following special time The flow of section.
  15. 15. volume forecasting device according to claim 14, it is characterised in that the acquisition module includes:
    Submodule is divided, for being divided on default longitude and latitude flowmeter, to obtain at least one predeterminable area, each preset areas Difference between the flux density in domain is not more than predetermined threshold value;
    Acquisition submodule, for each predeterminable area, the predeterminable area is obtained based on the default longitude and latitude flowmeter Real-time traffic data.
  16. 16. volume forecasting device according to claim 14, it is characterised in that the determining module includes:
    Submodule is predicted, at least one based on the changes in flow rate of the predeterminable area and its neighboring area in history, prediction Predicted flow rate change of the characteristic parameter in following special time period;
    First determination sub-module, the power of each characteristic parameter is determined for the changes in flow rate based on the predeterminable area in history Weight;
    Second determination sub-module, for determining the preset formula based on each characteristic parameter and its weight, wherein, it is described default Formula is linear formula.
  17. 17. volume forecasting device according to claim 16, it is characterised in that the predicted flow rate change of the characteristic parameter Influenceed by least one reference factor, at least one reference factor determines according to the type of the real-time traffic data.
  18. 18. volume forecasting device according to claim 17, it is characterised in that the reference factor include with the next item down or It is multinomial:Weather conditions, festivals or holidays factor and traffic congestion factor.
  19. 19. volume forecasting device according to claim 16, it is characterised in that the predicted flow rate change of the characteristic parameter Comprise at least:
    Predicted flow rate change inside the predeterminable area;
    The borderline predicted flow rate change of predeterminable area.
  20. 20. volume forecasting device according to claim 19, it is characterised in that when the predicted flow rate of the characteristic parameter becomes When turning to the predicted flow rate change inside predeterminable area, the prediction submodule includes:
    Training unit, time series models are obtained for the data on flows training based on the predeterminable area in history, when described Between series model be used to describe the changes in flow rate trend of the predeterminable area;
    Predicting unit, for described pre- in following special time period based on the changes in flow rate trend prediction of the predeterminable area If the predicted flow rate change inside region.
  21. 21. volume forecasting device according to claim 19, it is characterised in that when the predicted flow rate of the characteristic parameter becomes When turning to the change of predeterminable area borderline predicted flow rate, the prediction submodule includes:
    First determining unit, for based on the data on flows of the predeterminable area and its neighboring area in history,
    It is determined that the borderline flow positioned at the predeterminable area enters the probability of the predeterminable area.
  22. 22. volume forecasting device according to claim 21, it is characterised in that the data on flows is vector data.
  23. 23. volume forecasting device according to claim 21, it is characterised in that the probability based on pre-programmed curve determine, The pre-programmed curve is determined based on day type.
  24. 24. volume forecasting device according to claim 23, it is characterised in that the day type is selected from:Working day, weekend And festivals or holidays.
  25. 25. volume forecasting device according to claim 16, it is characterised in that first determination sub-module includes:
    Test cell, it is described to determine to best suit for being tested by multivariate logistic regression algorithm the preset formula The benchmark preset formula of the changes in flow rate of the predeterminable area in history;
    Second determining unit, each characteristic parameter is determined for the weight based on each characteristic parameter in the benchmark preset formula Weight.
  26. 26. the volume forecasting device according to any one of claim 14 to 25, it is characterised in that the real-time traffic number According to type be selected from:
    The information point data of mobile device;
    The monitoring data of vehicle.
  27. 27. a kind of storage medium, is stored thereon with computer instruction, it is characterised in that is performed during the computer instruction operation The step of any one of claim 1 to 13 methods described.
  28. 28. a kind of terminal, including memory and processor, it is stored with what can be run on the processor on the memory Computer instruction, it is characterised in that any one of perform claim requirement 1 to 13 institute when the processor runs the computer instruction The step of stating method.
CN201710881422.8A 2017-09-26 2017-09-26 A kind of method for predicting and device, storage medium, terminal Pending CN107832866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710881422.8A CN107832866A (en) 2017-09-26 2017-09-26 A kind of method for predicting and device, storage medium, terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710881422.8A CN107832866A (en) 2017-09-26 2017-09-26 A kind of method for predicting and device, storage medium, terminal

Publications (1)

Publication Number Publication Date
CN107832866A true CN107832866A (en) 2018-03-23

Family

ID=61643378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710881422.8A Pending CN107832866A (en) 2017-09-26 2017-09-26 A kind of method for predicting and device, storage medium, terminal

Country Status (1)

Country Link
CN (1) CN107832866A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108765010A (en) * 2018-05-29 2018-11-06 腾讯科技(深圳)有限公司 User retains probability forecasting method, device, predictive server and storage medium
CN108961762A (en) * 2018-08-24 2018-12-07 东北林业大学 A kind of urban road traffic flow amount prediction technique based on multifactor fusion
CN109039691A (en) * 2018-06-01 2018-12-18 平安科技(深圳)有限公司 The method and storage medium of server, forecasting system calling amount
CN109413071A (en) * 2018-10-31 2019-03-01 新华三信息安全技术有限公司 A kind of anomalous traffic detection method and device
CN109615852A (en) * 2018-11-20 2019-04-12 上海海事大学 A kind of method of road traffic delay distribution quick predict under burst accident
CN110400024A (en) * 2019-07-31 2019-11-01 京东城市(北京)数字科技有限公司 Method, apparatus, equipment and the computer readable storage medium of order forecasting
CN110535784A (en) * 2018-05-23 2019-12-03 北京三快在线科技有限公司 Flow managing method and device and calculating equipment based on confidence interval
CN110555537A (en) * 2018-05-30 2019-12-10 微软技术许可有限责任公司 Multi-factor multi-time point correlated prediction
CN110838018A (en) * 2018-08-16 2020-02-25 ***通信集团浙江有限公司 Method and device for predicting maximum number of users in cell during holidays
CN111147899A (en) * 2019-12-16 2020-05-12 南京亚信智网科技有限公司 Fault early warning method and device
CN111343006A (en) * 2020-02-12 2020-06-26 咪咕文化科技有限公司 CDN peak flow prediction method, device and storage medium
CN111461384A (en) * 2019-12-10 2020-07-28 阿里巴巴集团控股有限公司 Object flow prediction method, device and equipment
CN113642807A (en) * 2021-09-01 2021-11-12 智慧足迹数据科技有限公司 Population mobility prediction method and related device
CN114282732A (en) * 2021-12-29 2022-04-05 重庆紫光华山智安科技有限公司 Regional pedestrian flow prediction method and device
CN114333324A (en) * 2022-01-06 2022-04-12 厦门市美亚柏科信息股份有限公司 Real-time traffic state acquisition method and terminal
CN117332239A (en) * 2023-11-27 2024-01-02 深圳润世华软件和信息技术服务有限公司 Method, device, equipment and storage medium for calculating generated energy

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5168136A (en) * 1991-10-15 1992-12-01 Otis Elevator Company Learning methodology for improving traffic prediction accuracy of elevator systems using "artificial intelligence"
CN105404850A (en) * 2015-10-21 2016-03-16 中南大学 Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method
CN105512447A (en) * 2014-09-26 2016-04-20 山西云智慧科技股份有限公司 Bus passenger volume prediction method based on Holt-Winters model
CN106355879A (en) * 2016-09-30 2017-01-25 西安翔迅科技有限责任公司 Time-space correlation-based urban traffic flow prediction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5168136A (en) * 1991-10-15 1992-12-01 Otis Elevator Company Learning methodology for improving traffic prediction accuracy of elevator systems using "artificial intelligence"
CN105512447A (en) * 2014-09-26 2016-04-20 山西云智慧科技股份有限公司 Bus passenger volume prediction method based on Holt-Winters model
CN105404850A (en) * 2015-10-21 2016-03-16 中南大学 Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method
CN106355879A (en) * 2016-09-30 2017-01-25 西安翔迅科技有限责任公司 Time-space correlation-based urban traffic flow prediction method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110535784A (en) * 2018-05-23 2019-12-03 北京三快在线科技有限公司 Flow managing method and device and calculating equipment based on confidence interval
CN110535784B (en) * 2018-05-23 2021-01-15 北京三快在线科技有限公司 Traffic management method and device based on confidence interval and computing equipment
CN108765010A (en) * 2018-05-29 2018-11-06 腾讯科技(深圳)有限公司 User retains probability forecasting method, device, predictive server and storage medium
CN110555537A (en) * 2018-05-30 2019-12-10 微软技术许可有限责任公司 Multi-factor multi-time point correlated prediction
CN109039691A (en) * 2018-06-01 2018-12-18 平安科技(深圳)有限公司 The method and storage medium of server, forecasting system calling amount
CN110838018A (en) * 2018-08-16 2020-02-25 ***通信集团浙江有限公司 Method and device for predicting maximum number of users in cell during holidays
CN108961762A (en) * 2018-08-24 2018-12-07 东北林业大学 A kind of urban road traffic flow amount prediction technique based on multifactor fusion
CN109413071A (en) * 2018-10-31 2019-03-01 新华三信息安全技术有限公司 A kind of anomalous traffic detection method and device
CN109413071B (en) * 2018-10-31 2021-08-06 新华三信息安全技术有限公司 Abnormal flow detection method and device
CN109615852A (en) * 2018-11-20 2019-04-12 上海海事大学 A kind of method of road traffic delay distribution quick predict under burst accident
CN109615852B (en) * 2018-11-20 2021-03-30 上海海事大学 Method for rapidly predicting road traffic flow distribution under sudden accident
CN110400024A (en) * 2019-07-31 2019-11-01 京东城市(北京)数字科技有限公司 Method, apparatus, equipment and the computer readable storage medium of order forecasting
CN111461384A (en) * 2019-12-10 2020-07-28 阿里巴巴集团控股有限公司 Object flow prediction method, device and equipment
CN111461384B (en) * 2019-12-10 2024-04-05 阿里巴巴集团控股有限公司 Object flow prediction method, device and equipment
CN111147899B (en) * 2019-12-16 2023-05-23 南京亚信智网科技有限公司 Fault early warning method and device
CN111147899A (en) * 2019-12-16 2020-05-12 南京亚信智网科技有限公司 Fault early warning method and device
CN111343006A (en) * 2020-02-12 2020-06-26 咪咕文化科技有限公司 CDN peak flow prediction method, device and storage medium
CN113642807B (en) * 2021-09-01 2022-04-12 智慧足迹数据科技有限公司 Population mobility prediction method and related device
CN113642807A (en) * 2021-09-01 2021-11-12 智慧足迹数据科技有限公司 Population mobility prediction method and related device
CN114282732A (en) * 2021-12-29 2022-04-05 重庆紫光华山智安科技有限公司 Regional pedestrian flow prediction method and device
CN114333324A (en) * 2022-01-06 2022-04-12 厦门市美亚柏科信息股份有限公司 Real-time traffic state acquisition method and terminal
CN117332239A (en) * 2023-11-27 2024-01-02 深圳润世华软件和信息技术服务有限公司 Method, device, equipment and storage medium for calculating generated energy

Similar Documents

Publication Publication Date Title
CN107832866A (en) A kind of method for predicting and device, storage medium, terminal
Selby et al. Spatial prediction of traffic levels in unmeasured locations: applications of universal kriging and geographically weighted regression
CN107111794B (en) Predicting and exploiting variability of travel time in a mapping service
Lin et al. A review of travel-time prediction in transport and logistics
US9349150B2 (en) System and method for multi-task learning for prediction of demand on a system
Kurzhanskiy et al. Active traffic management on road networks: a macroscopic approach
Van Lint Reliable travel time prediction for freeways
Hans et al. Real-time bus route state forecasting using particle filter and mesoscopic modeling
Nagle et al. Accuracy of networkwide traffic states estimated from mobile probe data
US20140222321A1 (en) Traffic state estimation with integration of traffic, weather, incident, pavement condition, and roadway operations data
CN105740991A (en) Climate change prediction method and system for fitting various climate modes based on modified BP neural network
US20060178811A1 (en) Method and apparatus for end-to-end travel time estimation using dynamic traffic data
CN110956807B (en) Highway flow prediction method based on combination of multi-source data and sliding window
Polson et al. Bayesian analysis of traffic flow on interstate I-55: The LWR model
Chu et al. Real-time traffic prediction and probing strategy for Lagrangian traffic data
Celikoglu Reconstructing freeway travel times with a simplified network flow model alternating the adopted fundamental diagram
Chen et al. A multiscale-grid-based stacked bidirectional GRU neural network model for predicting traffic speeds of urban expressways
CN108876056A (en) A kind of shared bicycle Demand Forecast method, apparatus, equipment and storage medium
Wismans et al. Real time traffic models, decision support for traffic management
Moghaddam et al. Evaluating the performance of algorithms for the detection of travel time outliers
Goodall et al. Microscopic estimation of freeway vehicle positions using mobile sensors
Baclet et al. Near-real-time dynamic noise mapping and exposure assessment using calibrated microscopic traffic simulations
Tettamanti et al. Road traffic measurement and related data fusion methodology for traffic estimation
Qiao et al. Short-term traffic flow forecast based on parallel long short-term memory neural network
Sharmila et al. Bus arrival time prediction and measure of uncertainties using survival models

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323

RJ01 Rejection of invention patent application after publication