CN107816329A - A kind of device for being used to handle choke tube sand card cable in perforating job with pressure - Google Patents

A kind of device for being used to handle choke tube sand card cable in perforating job with pressure Download PDF

Info

Publication number
CN107816329A
CN107816329A CN201711012865.XA CN201711012865A CN107816329A CN 107816329 A CN107816329 A CN 107816329A CN 201711012865 A CN201711012865 A CN 201711012865A CN 107816329 A CN107816329 A CN 107816329A
Authority
CN
China
Prior art keywords
choke tube
clip
flow pipe
choked flow
overcoat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711012865.XA
Other languages
Chinese (zh)
Other versions
CN107816329B (en
Inventor
张波
张�林
刘云刚
张脉全
董淑高
朱元飞
高起福
张兴杰
刘增
蔡锐
胡维
邵恒
寇春磊
王志奎
李杨
李洪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Logging Co Of Sinopec Jingwei Co ltd
China Petrochemical Corp
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Sinopec Jingwei Co Ltd
Original Assignee
Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry, Sinopec Oilfield Service Corp, Sinopec Shengli Petroleum Engineering Corp filed Critical Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry
Priority to CN201711012865.XA priority Critical patent/CN107816329B/en
Publication of CN107816329A publication Critical patent/CN107816329A/en
Application granted granted Critical
Publication of CN107816329B publication Critical patent/CN107816329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/107Fishing for or freeing objects in boreholes or wells using impact means for releasing stuck parts, e.g. jars

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention belongs to unconventionaloil pool well perforating technology field with pressure, more particularly, to a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, the apparatus structure is compact workable, choke tube sand card cable problem in perforating job with pressure can be quickly handled, so as to provide help to improve the treatment effeciency of such engineering accident.Device for handling choke tube sand card cable in perforating job with pressure includes choked flow pipe clip, choke tube overcoat clip, choked flow pipe clip nut, choke tube overcoat clip nut and leading screw;Choked flow pipe clip is made up of the two block-shaped quick firmwares of identical choke tube;Two choked flow pipe clip fastener holes and a choked flow pipe clip leading screw connecting hole are provided with the quick firmware of every piece of choke tube;Choke tube overcoat clip is made up of the two block-shaped quick firmwares of identical choke tube overcoat;Two choke tube overcoat clip fastener holes and a choke tube overcoat clip leading screw connecting hole are provided with every piece of quick firmware of choke tube overcoat.

Description

A kind of device for being used to handle choke tube sand card cable in perforating job with pressure
Technical field
The invention belongs to unconventionaloil pool well perforating technology field with pressure, is used to handle perforation with pressure more particularly, to one kind The device of choke tube sand card cable in operation.
Background technology
Sand progress pressure break is taken using slippery water due to needing in unconventional reservoir fracturing process, thus it is inevitable in well Can many fracturing sands of remaining.And perforation with pressure construction operating mode is complex, particularly during upper portable cable, stop-leak compound can be wrapped up in Fracturing sand along cable to enter in choke tube;With the continuous accumulation of fracturing sand, and then sand card cable in choke tube can be caused Unfavorable phenomenon occur.It is worth noting that, if choke tube sand card cable handling method is improper, cable drawing can be further resulted in Disconnected, cable falls the extreme accident such as well and occurred.But inventor has found in research process, technical staff is in processing choke tube sand card Cable blowout control device need to be closed when not having suitable disposal plant during cable, therefore handling;And switch can be right every time for preventer Its degree of reliability produces certain influence, well head risk out of control be present, mishandling easily to trigger security incident;In addition, Shutdown process overlong time can have an impact to construction speed.
The content of the invention
The invention provides a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, the apparatus structure It is compact, workable, choke tube sand card cable problem in perforating job with pressure can be quickly handled, so as to be such accident of raising Treatment effeciency help is provided.
In order to solve the above technical problems, present invention employs following technical scheme:
It is a kind of to be used to handling the device of choke tube sand card cable in perforating job with pressure, described device include choked flow pipe clip, Choke tube overcoat clip, choked flow pipe clip nut, choke tube overcoat clip nut and leading screw;
Choked flow pipe clip is made up of the two block-shaped quick firmwares of identical choke tube;Two are provided with the quick firmware of every piece of choke tube Individual choked flow pipe clip fastener hole and a choked flow pipe clip leading screw connecting hole;Choked flow pipe clip fastener hole opening position is provided with choked flow Pipe clip fastening bolt, by tightening choked flow pipe clip fastening bolt, choked flow pipe clip establishes close annexation with choke tube; Choked flow pipe clip is arranged in choked flow pipe clip leading screw connecting hole with nut, to establish consolidating for choked flow pipe clip and leading screw one end Determine annexation;
Choke tube overcoat clip is made up of the two block-shaped quick firmwares of identical choke tube overcoat;Every piece of choke tube overcoat is quickly solid Two choke tube overcoat clip fastener holes and a choke tube overcoat clip leading screw connecting hole are provided with part;Choke tube overcoat Clip fastening hole location is provided with choke tube overcoat clip fastening bolt, by tightening choke tube overcoat clip fastening bolt, resistance Flow tube overcoat clip establishes close annexation with choke tube overcoat;Choke tube overcoat clip is arranged on choke tube overcoat with nut In clip leading screw connecting hole, relation is fixedly connected with to establish choke tube overcoat clip and the leading screw other end.
Further, the bumper jar for jarring choked flow pipe clip is also included in described device.
It is more preferable, it is characterised in that choked flow pipe clip fastening bolt is also supporting to be provided with choked flow pipe clip fastening spiral shell Cap.
More preferable, choke tube overcoat clip fastening bolt is also supporting to be provided with choke tube overcoat clip fastening nut.
Preferably, choked flow pipe clip rubber sheet gasket is additionally provided with the choked flow pipe clip for the opening position that is in contact with choke tube.
Preferably, choke tube overcoat card is additionally provided with the choke tube overcoat clip for the opening position that is in contact with choke tube overcoat Bind round silica gel pad.
The invention provides a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, the device includes There is the knot such as choked flow pipe clip, choke tube overcoat clip, choked flow pipe clip nut, choke tube overcoat clip nut and leading screw Structure unit.The device for being used to handle choke tube sand card cable in perforating job with pressure as characterized above, can be relaxedly and rapidly Choke tube sand card cable fault is handled, so as to effectively avoid accident from further deteriorating, and it is simple in construction, workable.
Brief description of the drawings
Fig. 1 is a kind of device for being used to handle choke tube sand card cable in perforating job with pressure provided by the invention in well head Handle the schematic diagram of choke tube sand card cable fault;
Fig. 2 is a kind of structural representation for being used to handle the device of choke tube sand card cable in perforating job with pressure provided by the invention Figure;
Fig. 3 a kind of is used to handle in perforating job with pressure choked flow pipe clamp in the device of choke tube sand card cable to be provided by the invention The structural representation of hoop;
Fig. 4 a kind of is used to handle in perforating job with pressure in the device of choke tube sand card cable outside choke tube to be provided by the invention Cover the structural representation of clip;
Fig. 5 a kind of is used to handle in perforating job with pressure bumper jar in the device of choke tube sand card cable to be provided by the invention Structural representation.
Embodiment
The invention provides a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, the apparatus structure It is compact, workable, choke tube sand card cable problem in perforating job with pressure can be quickly handled, so as to be such accident of raising Maintenance efficiency help is provided.
As shown in figure 1, Fig. 1 is shown provided by the present invention for handling choke tube sand card cable in perforating job with pressure Schematic diagram of the device in well head processing choke tube sand card cable fault.For example, well head is provided with head valve 2, three wings are prevented The equipment such as spray apparatus 3, lubricator 4, and provided by the present invention for handling the device 1 of choke tube sand card cable in perforating job with pressure It need to only be sling by the control first 6 of crane 5, open the choke tube overcoat of choke tube and multistage step by step from top to bottom, and The dirt that adheres to is cleared up on cable afterwards.Further as shown in Fig. 2 Fig. 2 is for handling choke tube in perforating job with pressure The structural representation of the device of sand card cable.Device bag specific for handling choke tube sand card cable in perforating job with pressure Choked flow pipe clip 11 is included(It is fixedly connected for being established with choke tube 7), choke tube overcoat clip 12(For with choke tube overcoat 8 foundation are fixedly connected), choked flow pipe clip nut 13, choke tube overcoat clip nut 14 and leading screw 15.As shown in figure 3, Choked flow pipe clip 11 is made up of the two block-shaped quick firmwares of identical choke tube;Two are provided with the quick firmware of every piece of choke tube Choked flow pipe clip fastener hole 111 and a choked flow pipe clip leading screw connecting hole 112;The opening position of choked flow pipe clip fastener hole 111 Cross and be provided with choked flow pipe clip fastening bolt, by tightening choked flow pipe clip fastening bolt, choked flow pipe clip is established tight with choke tube Close annexation(Label 113 is the choke tube position fettered by choke tube clip in wherein Fig. 3);It is more excellent herein Choosing, choked flow pipe clip fastening bolt is also supporting to be provided with the choke tube overcoat clip fastening nut to match, so as to facilitate work Choked flow pipe clip fastening bolt is tightened as personnel.And it is additionally provided with choked flow on the choked flow pipe clip for the opening position that is in contact with choke tube Pipe clip rubber sheet gasket, choked flow pipe clip rubber sheet gasket play a part of increasing frictional force.Choked flow pipe clip leading screw connecting hole 112 Choked flow pipe clip nut is inside installed, establish choked flow pipe clip with nut by choked flow pipe clip connects with the fixed of leading screw one end Connect relation.
As shown in figure 4, choke tube overcoat clip 12 is made up of the two block-shaped quick firmwares of identical choke tube overcoat;Every piece Two choke tube overcoat clip fastener holes 121 and a choke tube overcoat clip silk are provided with the quick firmware of choke tube overcoat Thick stick connecting hole 122;Likewise, the opening position of choke tube overcoat clip fastener hole 121 is crossed provided with choke tube overcoat clip fastening bolt, By tightening choke tube overcoat clip fastening bolt, choke tube overcoat clip establishes close annexation with choke tube overcoat(Its Label 123 is that the choke tube overcoat place fettered by choke tube overcoat clip is external in middle Fig. 4);It is more preferable herein, Choke tube overcoat clip fastening bolt is also supporting to be provided with the choke tube overcoat clip fastening nut to match, equally plays conveniently Staff tightens the effect of choked flow pipe clip fastening bolt.And it is in contact with choke tube overcoat outside the choke tube of opening position Choke tube overcoat clip silica gel pad is additionally provided with set clip, for increasing both frictional force.Choke tube overcoat clip silk Choke tube overcoat clip nut is installed in thick stick connecting hole 122, established by choke tube overcoat clip with nut outside choke tube Set clip is fixedly connected with relation with the leading screw other end.
It is worth noting that, as shown in figure 5, this kind is used for the device for handling choke tube sand card cable in perforating job with pressure Inside also preferably it is provided with bumper jar;Jarring is carried out to choked flow pipe clip using bumper jar, so as to complete to the slight card of choke tube Dead unfreezing work.And when bumper jar all can not carry out unfreezing to choke tube, then need choked flow pipe clip, choke tube overcoat card Hoop and leading screw cooperating realize unfreezing.Specifically, fastening choked flow pipe clip first, make choked flow pipe clip and choke tube close Connection;Choke tube overcoat clip is then fastened, choke tube overcoat clip is closely connected with choke tube overcoat;Then uniform precession The choked flow pipe clip nut and choke tube overcoat clip nut at leading screw both ends, the tension force provided using leading screw is by choke tube Stuck state releases, and clears up the dirt accumulated in cable and choke tube.If multistage choke tube overcoat there are choked flow Pipe stuck state, then circulate unfreezing using said apparatus.
The invention provides a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, the device includes There is the knot such as choked flow pipe clip, choke tube overcoat clip, choked flow pipe clip nut, choke tube overcoat clip nut and leading screw Structure unit.The device for being used to handle choke tube sand card cable in perforating job with pressure as characterized above, can be relaxedly and rapidly Choke tube sand card cable fault is handled, so as to effectively avoid accident from further deteriorating, and it is simple in construction, workable.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (6)

1. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure, it is characterised in that described device includes There are choked flow pipe clip, choke tube overcoat clip, choked flow pipe clip nut, choke tube overcoat clip nut and leading screw;
Choked flow pipe clip is made up of the two block-shaped quick firmwares of identical choke tube;Two are provided with the quick firmware of every piece of choke tube Individual choked flow pipe clip fastener hole and a choked flow pipe clip leading screw connecting hole;Choked flow pipe clip fastener hole opening position is provided with choked flow Pipe clip fastening bolt, by tightening choked flow pipe clip fastening bolt, choked flow pipe clip is established with choke tube and be closely connected pass System;Choked flow pipe clip is arranged in choked flow pipe clip leading screw connecting hole with nut, to establish choked flow pipe clip and leading screw one end Be fixedly connected with relation;
Choke tube overcoat clip is made up of the two block-shaped quick firmwares of identical choke tube overcoat;Every piece of choke tube overcoat is quickly solid Two choke tube overcoat clip fastener holes and a choke tube overcoat clip leading screw connecting hole are provided with part;Choke tube overcoat Clip fastening hole location is provided with choke tube overcoat clip fastening bolt, by tightening choke tube overcoat clip fastening bolt, makes Choke tube overcoat clip establishes close annexation with choke tube overcoat;Choke tube overcoat clip is arranged on outside choke tube with nut Cover in clip leading screw connecting hole, relation is fixedly connected with to establish choke tube overcoat clip and the leading screw other end.
2. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure according to claim 1, it is special Sign is, the bumper jar for jarring choked flow pipe clip is also included in described device.
3. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure according to claim 1, it is special Sign is that choked flow pipe clip fastening bolt is also supporting to be provided with choked flow pipe clip fastening nut.
4. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure according to claim 1, it is special Sign is that choke tube overcoat clip fastening bolt is also supporting to be provided with choke tube overcoat clip fastening nut.
5. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure according to claim 1, it is special Sign is, choked flow pipe clip rubber sheet gasket is additionally provided with the choked flow pipe clip for the opening position that is in contact with choke tube.
6. a kind of device for being used to handle choke tube sand card cable in perforating job with pressure according to claim 1, it is special Sign is, choke tube overcoat clip silicagel pad is additionally provided with the choke tube overcoat clip for the opening position that is in contact with choke tube overcoat Piece.
CN201711012865.XA 2017-10-26 2017-10-26 Device for processing choke tube sand-blocking cable in perforating operation under pressure Active CN107816329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711012865.XA CN107816329B (en) 2017-10-26 2017-10-26 Device for processing choke tube sand-blocking cable in perforating operation under pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711012865.XA CN107816329B (en) 2017-10-26 2017-10-26 Device for processing choke tube sand-blocking cable in perforating operation under pressure

Publications (2)

Publication Number Publication Date
CN107816329A true CN107816329A (en) 2018-03-20
CN107816329B CN107816329B (en) 2023-12-12

Family

ID=61604220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711012865.XA Active CN107816329B (en) 2017-10-26 2017-10-26 Device for processing choke tube sand-blocking cable in perforating operation under pressure

Country Status (1)

Country Link
CN (1) CN107816329B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2269460Y (en) * 1996-07-30 1997-12-03 明柱平 Guide cone mill shoe
CN104879079A (en) * 2015-06-05 2015-09-02 辽宁石油机械制造有限公司 Sluice-valve under-pressure replacement device and method of oil extraction wellhead
CN106050178A (en) * 2016-06-15 2016-10-26 西南石油大学 Steel wire rope pushing device for drilling tool fishing
CN205955684U (en) * 2016-08-30 2017-02-15 中国长江电力股份有限公司 Portable drilling dipmeter probe fishing device
CN106593382A (en) * 2017-02-09 2017-04-26 撒占东 Method for collecting natural gas from producing well
CN207485394U (en) * 2017-10-26 2018-06-12 中石化石油工程技术服务有限公司 A kind of device for being used to handle choke tube sand card cable in perforating job with pressure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2269460Y (en) * 1996-07-30 1997-12-03 明柱平 Guide cone mill shoe
CN104879079A (en) * 2015-06-05 2015-09-02 辽宁石油机械制造有限公司 Sluice-valve under-pressure replacement device and method of oil extraction wellhead
CN106050178A (en) * 2016-06-15 2016-10-26 西南石油大学 Steel wire rope pushing device for drilling tool fishing
CN205955684U (en) * 2016-08-30 2017-02-15 中国长江电力股份有限公司 Portable drilling dipmeter probe fishing device
CN106593382A (en) * 2017-02-09 2017-04-26 撒占东 Method for collecting natural gas from producing well
CN207485394U (en) * 2017-10-26 2018-06-12 中石化石油工程技术服务有限公司 A kind of device for being used to handle choke tube sand card cable in perforating job with pressure

Also Published As

Publication number Publication date
CN107816329B (en) 2023-12-12

Similar Documents

Publication Publication Date Title
CN207485394U (en) A kind of device for being used to handle choke tube sand card cable in perforating job with pressure
CN103964352A (en) Novel well cover opening tool
CN107816329A (en) A kind of device for being used to handle choke tube sand card cable in perforating job with pressure
CN202866685U (en) Under-pressure energy storage workover rig
CN207985791U (en) A kind of dangerous material tank system device
CN207520793U (en) A kind of exhaust gas purification and treatment device
CN207756583U (en) A kind of cement bunker deashing device
CN105065780B (en) Delivery pipe throwing prevention device, pneumatic pick component, anchor pole thermomechanical components and rock drilling thermomechanical components
CN104691989B (en) Replacement and drying device for tank
CN209076977U (en) A kind of spray equipment for organic exhaust gas biological purification system
CN207004564U (en) A kind of automatic sprayer
CN202522053U (en) Automatic opening device for top cover of boiling dryer
CN206817010U (en) A kind of Fast Installation and the pipeline connecting device of dismounting and self-locking self sealss
CN207186966U (en) A kind of fire-fighting drill equipment
CN201050197Y (en) Securing member for construction safety net
CN219483730U (en) Dangerous waste landfill gas guide and exhaust device
CN206126849U (en) Gaseous quick recovery unit of SF6
CN204389116U (en) A kind of device for detecting sealability of retaining valve
CN211302557U (en) Gas recovery device for VOC treatment
CN204437453U (en) A kind of device for teaching simulation repacking valve
CN205583520U (en) General type is led, two protection device of ground wire
CN209325190U (en) A kind of high pressure pipe fixing device
CN204384744U (en) Forestry crane accessory hydraulic tubing fender guard
CN203742466U (en) Automatic sludge scraper
CN207036635U (en) Mortar Anti-leakage instrument is used in a kind of mortar detection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220218

Address after: 100029 Chaoyang District, Beijing Hui Xin Street six, Twelfth level.

Applicant after: SINOPEC OILFIELD SERVICE Corp.

Applicant after: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Applicant after: Sinopec Jingwei Co.,Ltd.

Applicant after: Shengli logging company of Sinopec Jingwei Co.,Ltd.

Address before: 100101 Beichen West Road, Chaoyang District, Beijing 8 Beichen world center, block A 703.

Applicant before: SINOPEC OILFIELD SERVICE Corp.

Applicant before: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Applicant before: WELL LOGGING COMPANY, SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221206

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Applicant after: SINOPEC Group

Applicant after: SINOPEC OILFIELD SERVICE Corp.

Applicant after: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Applicant after: Sinopec Jingwei Co.,Ltd.

Applicant after: Shengli logging company of Sinopec Jingwei Co.,Ltd.

Address before: 100029 Chaoyang District, Beijing Hui Xin Street six, Twelfth level.

Applicant before: SINOPEC OILFIELD SERVICE Corp.

Applicant before: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Applicant before: Sinopec Jingwei Co.,Ltd.

Applicant before: Shengli logging company of Sinopec Jingwei Co.,Ltd.

GR01 Patent grant
GR01 Patent grant