CN107797052A - String supplementary set Chinese style acquisition system protection act delay measurement system and method - Google Patents

String supplementary set Chinese style acquisition system protection act delay measurement system and method Download PDF

Info

Publication number
CN107797052A
CN107797052A CN201610798506.0A CN201610798506A CN107797052A CN 107797052 A CN107797052 A CN 107797052A CN 201610798506 A CN201610798506 A CN 201610798506A CN 107797052 A CN107797052 A CN 107797052A
Authority
CN
China
Prior art keywords
signal
protection
chinese style
supplementary set
protection act
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610798506.0A
Other languages
Chinese (zh)
Inventor
常远
赵玉灿
汪涛
李响
文继锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201610798506.0A priority Critical patent/CN107797052A/en
Publication of CN107797052A publication Critical patent/CN107797052A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • G01R31/3278Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The present invention disclose it is a kind of go here and there supplementary set Chinese style acquisition system protection act delay measurement system and method, system includes signal generation apparatus, remote signaling acquisition module, combining unit, protection device, waveform recording device and signal processing unit, is the step of method:Signal generation apparatus applies analog quantity to remote signaling acquisition module, and the analog quantity accesses waveform recording device simultaneously;Analog signalses are converted to data signal by remote signaling acquisition module, are transferred to combining unit;Data signal is transmitted to protection device by combining unit, and protection device judges whether to break down, and protection signal is sent after reaching action definite value, closes output relay, the action signal access waveform recording device of relay;Signal processing unit calculates the signal of signal generation apparatus output and the phase difference of the action signal of relay, obtains protection act delay.This technical scheme can accurate measurement string supplementary set Chinese style acquisition system protection act delay, for protect definite value selection foundation is provided.

Description

String supplementary set Chinese style acquisition system protection act delay measurement system and method
Technical field
It is special the invention belongs to flexible AC transmission FACTS (Flexible AC Transmission Systems) field It is not related to a kind of string supplementary set Chinese style acquisition system protection act delay measurement system and method.
Background technology
Because tandem type flexible AC transmission equipment is typically used in series in circuit, therefore when line failure, series connection Very big overvoltage will be born on type flexible AC transmission equipment, therefore typically all configures various overvoltage protective devices, and is matched somebody with somebody Various defencive functions are put, tandem type flexible AC transmission equipment is very high for the rapidity requirement of protection act, general to require Action message in 100us.Measurement current transform er on single-phase insulated platform is up to 8, divider 1, due to insulated platform Insulating requirements over the ground, all analog quantitys (magnitude of current and voltage) to be measured, which need to be converted to digital quantity, is sent to ground, if often Individual one photo-translating system of CT configuration, then the cost of single-phase sampling system will rise.If by all Current Mutual Inductances Device secondary cable, which is connected at same photoelectric conversion device, carries out unified conversion, referred to as centralized acquisition mode, substantially reduces and makes Valency.
The composition of string supplementary set Chinese style acquisition system is shown in Fig. 1, mainly includes distal end acquisition module, combining unit, protection device 3 Most of, the bang path of signal in systems is shown in Fig. 2.
The delay of acquisition system mainly has following source, the string being arranged on insulated platform of acquisition system centralized first One end of connection type flexible AC transmission equipment is connected with insulated platform, and all devices and ground are without electrical link on insulated platform. Therefore the analog quantity of its measuring apparatus must be converted into digital quantity optical signal transmission to the control protective unit on ground.But consider The limitation of centralized acquisition system power supply mode, it is desirable to which the power consumption of equipment of the centralized acquisition system on high-voltage isulation platform will It is low.But the sampling of centralization is sent to combining unit due to carrying out coding to multi-analog sampled data, in combining unit side Need to reduce coded data, obtain the sampled value of every road analog quantity.The traffic rate of optical fiber is limited, and the data conversion of multichannel must Extra delay is so introduced, the delay of centralized acquisition system is bigger than the de-centralized acquisition system of routine.Need a kind of survey The protection act delay of amount method accurate measurement string supplementary set Chinese style acquisition system.
The high/ultrahigh voltage transmission system platform data acquisition system of the designs of ZL0323627.9 and 200620012632.0 System does not provide the delay data of measurement protection system, the problems such as whole-sample delay is big or indefinite be present, and The 200410032354.0 Time delay measurement methods provided are used for the communications field, are not used to measure centralization sampling protection system Delay.
The content of the invention
The purpose of the present invention, it is to provide a kind of string supplementary set Chinese style acquisition system protection act delay measurement system and side Method, its can accurate measurement string supplementary set Chinese style acquisition system protection act delay, for protect definite value selection foundation is provided.
In order to reach above-mentioned purpose, solution of the invention is:
One kind string supplementary set Chinese style acquisition system protection act delay measurement system, including signal generation apparatus, remote signaling Acquisition module, combining unit, protection device, waveform recording device and signal processing unit, wherein, signal generation apparatus is to defeated Go out analog signalses, the analog signalses access to the waveform recording device;The analog signalses are also through remote signaling Acquisition module is changed into data signal, accesses the combining unit, and the protection device is accessed to after combining unit;It is described The output end connection waveform recording device of protection device, and the output end of waveform recording device connection signal processing unit.
Above-mentioned signal generation apparatus uses reaying protection test instrument.
Connected between said distal ends signal acquisition module and combining unit with optical fiber.
Above-mentioned waveform recording device uses multichannel oscillograph.
One kind string supplementary set Chinese style acquisition system protection act Time delay measurement method, comprises the following steps:
Step 1, signal generation apparatus applies analog quantity, the simulation to the analog input port of remote signaling acquisition module Amount accesses waveform recording device simultaneously;
Step 2, analog signalses are converted to data signal by remote signaling acquisition module, are transferred to combining unit;
Step 3, the data signal that remote signaling acquisition module transmits is transmitted to protection device, protection device by combining unit Judge whether to break down, protection signal is sent after reaching action definite value, and close output relay, the action of relay Signal accesses waveform recording device;
Step 4, signal processing unit calculates the phase of the signal of signal generation apparatus output and the action signal of relay Difference, obtain protection act delay.
In above-mentioned steps 1, signal generation apparatus output step signal, output analog quantity is within a sampling period from zero Rise to more than protection device action definite value.
The particular content of above-mentioned steps 4 is:Signal processing unit input signal step moment on wave recording is used as ginseng According to point, for witness mark to the time difference at actuating of relay waveform change moment, the time difference is centralized sampling system Sampling time delay.
In above-mentioned steps 2, the data signal of remote signaling acquisition module output is transferred to combining unit by optical fiber.
In above-mentioned steps 3, the action signal of relay accesses waveform recording device after stabilization is handled.
After such scheme, the waveform of the invention by comparing input analog amount signal and protective relay action signal The accurate delay for obtaining system, for the actuation time of accurate evaluation protection system, application is direct current step signal, is avoided In regular alternating current protection, the protection act that the computational methods difference of actuation time virtual value is brought is delayed the problem of inconsistent.
Brief description of the drawings
Fig. 1 is the integrated stand composition of existing string supplementary set Chinese style acquisition system;
Fig. 2 is the delay pie graph of string supplementary set Chinese style acquisition system;
Fig. 3 is the integrated stand composition of measuring system of the present invention;
Fig. 4 is the fundamental diagram of measuring system of the present invention;
Fig. 5 is the flow chart of measuring method of the present invention.
Embodiment
Below with reference to accompanying drawing, technical scheme is described in detail.
As shown in figure 3, the present invention provides a kind of string supplementary set Chinese style acquisition system protection act delay measurement system, to survey The delay of amount string supplementary set Chinese style acquisition system, the measuring system include signal generation apparatus, remote signaling acquisition module, merged Unit, protection device, waveform recording device and signal processing unit, wherein, signal generation apparatus to export analog signalses, The analog signalses access to the waveform recording device;The analog signalses are also changed into through remote signaling acquisition module Data signal, accesses the combining unit, and the protection device is accessed to after combining unit.
Coordinate shown in Fig. 4, in the present embodiment, signal generation apparatus is reaying protection test instrument, it is, of course, also possible to from Other signal source output devices.Signal generation apparatus exports step signal, and output analog quantity rises within a sampling period To more than protection device action definite value.
Remote signaling acquisition module is located at high voltage platform, and the analog signalses the signal generation apparatus is exported turn It is changed to data signal.
The output of signal generation apparatus accesses waveform recording device simultaneously.
The combining unit receives data signal and is transmitted to the protection device.The remote signaling acquisition module is with closing And connected between unit with optical fiber, the data signal of transmission passes through Manchester's code, and numeral letter is transmitted using 60044-8 agreements Number.
The protection device receives the data signal of combining unit forwarding, obtains sampling code value after decoding, is multiplied by corresponding The original value of sampling is obtained after downsampling factor.Protection module built in the protection device, some protection definite values are set, when detecting Continuous 3 sampled values all meet to judge protection act during protection act condition, issue protection act instruction, control exit relay Action.
The exit relay contact access waveform recording device of the protection device.
The waveform recording device is multichannel oscillograph or other waveform recording devices.
Signal processing unit is to the delay data according to the shape information of recording device records acquisition combining unit, this reality Apply in example, the method for its acquisition delay data is:The input signal step moment is as reference point, measurement reference on wave recording For point to the time difference at actuating of relay waveform change moment, the time difference is the sampling time delay of centralized sampling system.Signal Processing unit can be the waveform analysis function that waveform analysis software or oscillograph carry.
Based on above measuring system, as shown in figure 5, the present invention also provides a kind of string supplementary set Chinese style acquisition system protection act Time delay measurement method, comprises the following steps:
Step 1, signal generation apparatus applies the analog quantity (magnitude of current to the analog input port of remote signaling acquisition module Or voltage), the analog quantity accesses waveform recording device simultaneously;Wherein, signal generation apparatus output is step signal, output Analog quantity is raised to more than protection device action definite value within a sampling period (such as 50us) from above freezing;
Step 2, analog signalses are converted to data signal by remote signaling acquisition module, and it is single to be transferred to merging by optical fiber Member;
Step 3, the sampled data that remote signaling acquisition module transmits is transmitted to protection device, protection device by combining unit Judge whether to break down by protection algorism, send protection signal after reaching action definite value, and drive and output relay Action, output relay is closed, after stabilization is handled, the action signal of relay connects the action signal of the amount of outputing output contact Enter waveform recording device;
Step 4, signal processing unit calculates the step signal of signal generation apparatus output and the action signal of relay Phase difference, obtain protection act delay.
The technological thought of above example only to illustrate the invention, it is impossible to protection scope of the present invention is limited with this, it is every According to technological thought proposed by the present invention, any change done on the basis of technical scheme, the scope of the present invention is each fallen within Within.

Claims (9)

1. one kind string supplementary set Chinese style acquisition system protection act delay measurement system, it is characterised in that:Including signal generation apparatus, Remote signaling acquisition module, combining unit, protection device, waveform recording device and signal processing unit, wherein, signal fills Put to export analog signalses, the analog signalses access to the waveform recording device;The analog signalses also pass through Remote signaling acquisition module is changed into data signal, accesses the combining unit, and the protection is accessed to after combining unit Device;The output end connection waveform recording device of the protection device, and the output end of waveform recording device connection signal transacting Unit.
2. string supplementary set Chinese style acquisition system protection act delay measurement system as claimed in claim 1, it is characterised in that:It is described Signal generation apparatus uses reaying protection test instrument.
3. string supplementary set Chinese style acquisition system protection act delay measurement system as claimed in claim 1, it is characterised in that:It is described Connected between remote signaling acquisition module and combining unit with optical fiber.
4. string supplementary set Chinese style acquisition system protection act delay measurement system as claimed in claim 1, it is characterised in that:It is described Waveform recording device uses multichannel oscillograph.
5. one kind string supplementary set Chinese style acquisition system protection act Time delay measurement method, it is characterised in that comprise the following steps:
Step 1, signal generation apparatus applies analog quantity to the analog input port of remote signaling acquisition module, and the analog quantity is same When access waveform recording device;
Step 2, analog signalses are converted to data signal by remote signaling acquisition module, are transferred to combining unit;
Step 3, the data signal that remote signaling acquisition module transmits is transmitted to protection device by combining unit, and protection device judges Whether break down, protection signal is sent after reaching action definite value, and close output relay, the action signal of relay Access waveform recording device;
Step 4, signal processing unit calculates the signal of signal generation apparatus output and the phase difference of the action signal of relay, obtains It is delayed to protection act.
6. string supplementary set Chinese style acquisition system protection act Time delay measurement method as claimed in claim 5, it is characterised in that:It is described In step 1, signal generation apparatus output step signal, output analog quantity is raised to protection dress within a sampling period from above freezing Put more than action definite value.
7. string supplementary set Chinese style acquisition system protection act Time delay measurement method as claimed in claim 6, it is characterised in that:It is described The particular content of step 4 is:Signal processing unit input signal step moment on wave recording refers to as reference point, measurement For point to the time difference at actuating of relay waveform change moment, the time difference is the sampling time delay of centralized sampling system.
8. string supplementary set Chinese style acquisition system protection act Time delay measurement method as claimed in claim 5, it is characterised in that:It is described In step 2, the data signal of remote signaling acquisition module output is transferred to combining unit by optical fiber.
9. string supplementary set Chinese style acquisition system protection act Time delay measurement method as claimed in claim 5, it is characterised in that:It is described In step 3, the action signal of relay accesses waveform recording device after stabilization is handled.
CN201610798506.0A 2016-08-31 2016-08-31 String supplementary set Chinese style acquisition system protection act delay measurement system and method Withdrawn CN107797052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610798506.0A CN107797052A (en) 2016-08-31 2016-08-31 String supplementary set Chinese style acquisition system protection act delay measurement system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610798506.0A CN107797052A (en) 2016-08-31 2016-08-31 String supplementary set Chinese style acquisition system protection act delay measurement system and method

Publications (1)

Publication Number Publication Date
CN107797052A true CN107797052A (en) 2018-03-13

Family

ID=61530473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610798506.0A Withdrawn CN107797052A (en) 2016-08-31 2016-08-31 String supplementary set Chinese style acquisition system protection act delay measurement system and method

Country Status (1)

Country Link
CN (1) CN107797052A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239666A (en) * 2020-02-07 2020-06-05 云南电网有限责任公司电力科学研究院 Transient characteristic test system of far-end module box
CN111934760A (en) * 2020-08-14 2020-11-13 南方电网科学研究院有限责任公司 Signal processing transmission delay characteristic detection device and method and terminal equipment
CN113702894A (en) * 2021-09-23 2021-11-26 云南电网有限责任公司电力科学研究院 Fault diagnosis method and device for remote module and merging unit

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930064A (en) * 2009-06-23 2010-12-29 华东电力试验研究院有限公司 Delay measuring method of merging unit and system thereof
CN202383278U (en) * 2011-12-07 2012-08-15 重庆市电力公司电力科学研究院 Merging unit sampling value time delay measuring system
CN102751708A (en) * 2011-04-20 2012-10-24 南京南瑞继保电气有限公司 Self-adaptive sampling delay compensation method of differential protection
CN103439679A (en) * 2013-08-28 2013-12-11 国家电网公司 Absolute time delay detection device and method of intelligent substation mutual inductor data collection system
CN103777104A (en) * 2014-02-24 2014-05-07 国家电网公司 Time-delay characteristic testing device and method of digital substation secondary signal transmission system
CN204287355U (en) * 2014-12-15 2015-04-22 国家电网公司 The specified time-delay detection system of Intelligent substation merging unit
CN204287461U (en) * 2014-12-01 2015-04-22 国家电网公司 The specified time delay detector of Intelligent substation merging unit
CN104698421A (en) * 2014-05-27 2015-06-10 国家电网公司 Electronic current transformer transient transformation delay time measuring device and method
CN105203875A (en) * 2015-09-15 2015-12-30 国家电网公司 Merging unit rated time delay measuring method based on frequency domain scanning and recognition
CN105548769A (en) * 2016-01-13 2016-05-04 江苏省电力公司电力科学研究院 Relay protection action delay time grading test system and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930064A (en) * 2009-06-23 2010-12-29 华东电力试验研究院有限公司 Delay measuring method of merging unit and system thereof
CN102751708A (en) * 2011-04-20 2012-10-24 南京南瑞继保电气有限公司 Self-adaptive sampling delay compensation method of differential protection
CN202383278U (en) * 2011-12-07 2012-08-15 重庆市电力公司电力科学研究院 Merging unit sampling value time delay measuring system
CN103439679A (en) * 2013-08-28 2013-12-11 国家电网公司 Absolute time delay detection device and method of intelligent substation mutual inductor data collection system
CN103777104A (en) * 2014-02-24 2014-05-07 国家电网公司 Time-delay characteristic testing device and method of digital substation secondary signal transmission system
CN104698421A (en) * 2014-05-27 2015-06-10 国家电网公司 Electronic current transformer transient transformation delay time measuring device and method
CN204287461U (en) * 2014-12-01 2015-04-22 国家电网公司 The specified time delay detector of Intelligent substation merging unit
CN204287355U (en) * 2014-12-15 2015-04-22 国家电网公司 The specified time-delay detection system of Intelligent substation merging unit
CN105203875A (en) * 2015-09-15 2015-12-30 国家电网公司 Merging unit rated time delay measuring method based on frequency domain scanning and recognition
CN105548769A (en) * 2016-01-13 2016-05-04 江苏省电力公司电力科学研究院 Relay protection action delay time grading test system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239666A (en) * 2020-02-07 2020-06-05 云南电网有限责任公司电力科学研究院 Transient characteristic test system of far-end module box
CN111934760A (en) * 2020-08-14 2020-11-13 南方电网科学研究院有限责任公司 Signal processing transmission delay characteristic detection device and method and terminal equipment
CN111934760B (en) * 2020-08-14 2021-12-28 南方电网科学研究院有限责任公司 Signal processing transmission delay characteristic detection device and method and terminal equipment
CN113702894A (en) * 2021-09-23 2021-11-26 云南电网有限责任公司电力科学研究院 Fault diagnosis method and device for remote module and merging unit

Similar Documents

Publication Publication Date Title
CN110337626B (en) System and method for detecting erroneous data injection in a substation
RU2464581C2 (en) Measurement of full resistance of power transmission line
KR101171027B1 (en) An on-line monitoring system for power facilities and its method using circuit parameter measuring
CN105116246B (en) A kind of operation of power networks protection on-line analysis method
WO2016007217A1 (en) Decision support system for outage management and automated crew dispatch
CN108761313A (en) Extra-high voltage direct-current protective device test method and system based on failure inverting
CN104764991B (en) A kind of high voltage direct current converter valve commutation circuit IGCT method for detecting operation state
CN107797052A (en) String supplementary set Chinese style acquisition system protection act delay measurement system and method
KR102523832B1 (en) System for analyzing voltage current, Method thereof, Computer readable storage medium having the method
CN103969537B (en) Analog quantity, the transformer interference source test system and method for digital quantity mixing collection
CN105548948A (en) Device and method for testing digitalization electric energy metering system
CN103792419A (en) Synchronous sampling method achieving hybrid access of analog quantity and digital quantity
CN101299385A (en) Electron type current transformer for ultrahigh voltage transmission lines and corona loss measurement device thereof
CN102004209A (en) Distribution network cable fault on-line distance measuring equipment and distance measuring method
CN109001997A (en) A kind of anti-tampering environment information acquisition system
CN208432662U (en) Device is surveyed when cable connector resistance
CN107884739A (en) A kind of powered analysis system of electronic mutual inductor
CN107092198A (en) Fault analysis method and system for high-voltage direct-current transmission system
CN105629192A (en) Zero-flux current transformer calibration device and method
CN104597424B (en) A kind of optical transformer electrical energy measurement verification platform and verification method
CN201226292Y (en) Electron type current transformer for ultrahigh voltage transmission line and apparatus for measuring corona loss thereof
CN103675470B (en) A kind of N*M dimension resistor network measurement mechanism
KR100538018B1 (en) A new measurement equipment for the shieth currents of grounding power cables
CN108132453A (en) A kind of intelligent termination for Electric Energy Tariff Point Metering Device on-line testing
KR101309400B1 (en) Merging unit with frequency protection function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180313

WW01 Invention patent application withdrawn after publication