CN107775720A - A kind of method that fastener is installed in sandwich - Google Patents

A kind of method that fastener is installed in sandwich Download PDF

Info

Publication number
CN107775720A
CN107775720A CN201610728655.XA CN201610728655A CN107775720A CN 107775720 A CN107775720 A CN 107775720A CN 201610728655 A CN201610728655 A CN 201610728655A CN 107775720 A CN107775720 A CN 107775720A
Authority
CN
China
Prior art keywords
fastener
sandwich
blind hole
hole
drilled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610728655.XA
Other languages
Chinese (zh)
Inventor
李景虎
佟元元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Aircraft Industrial Group Co Ltd
Original Assignee
Chengdu Aircraft Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Aircraft Industrial Group Co Ltd filed Critical Chengdu Aircraft Industrial Group Co Ltd
Priority to CN201610728655.XA priority Critical patent/CN107775720A/en
Publication of CN107775720A publication Critical patent/CN107775720A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/16Perforating by tool or tools of the drill type

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Laminated Bodies (AREA)

Abstract

The method that fastener is installed in a kind of sandwich of the present invention, the first drilling blind hole first in sandwich, blind hole diameter are more than fastener head maximum gauge, and blind hole depth is less than upper covering and core thickness sum;Pasty state glue is filled up in blind hole, is solidified;The hole to match with fastener is drilled on the colloid of solidification;If countersunk fastener, the corresponding countersunk head nest of ream system on colloid;Fastener is installed in the hole being drilled.Present invention process is simple, and increase weight is few, is easy to the drilling of sandwich countersunk fastener and installation method that assembling stage is constructed.

Description

A kind of method that fastener is installed in sandwich
Technical field
The present invention relates to mechanical manufacturing technology, and fastener technology is particularly installed on aircraft sandwich structures.
Background technology
Sandwich generally includes honeycomb sandwich construction and the major class of foamed sandwich structure two, by upper and lower two layers of covering and folder Honeycomb or foam core material composition in centre, is a kind of structure for being widely used in aircraft time load part, have it is in light weight, The characteristics of rigidity is high.Sandwich is suitable to bear distributed load, but bears the poor ability of concentrfated load.For sandwich Fastener is typically bolt or screw.When installing fastener in sandwich, load is necessarily concentrated in the installation position of fastener Lotus position, it is necessary to which carrying out specially treated can just make sandwich bear the concentrfated load that fastener transmits, and generally have with lower section Method.
The first is that harder material is inlayed in the place for needing to install fastener in sandwich(Such as metal or composite wood Material)Bushing or cushion block.Bushing or cushion block need the upper and lower covering in sandwich with being installed before core gluing.
Honeycomb sandwich construction is only applicable to second, in the region for needing to install fastener, in the honeycomb of comb core Filling-foam glue in hole, then carried out with upper and lower covering glued.Harder material is formed after foaming adhesive curing, makes to bear to concentrate The ability of load is improved.
The third is in the regional area for needing to install fastener, and core is cut off, upper and lower covering is fit together As solid construction.The gross thickness of usual upper and lower covering is too small, also needs to increase among two layers of covering to increase thickness herein Material, the several layers of composites of Ru Duopu, or add metallic gasket.Between thicker interlayer position and relatively thin solid position, It is the transition region that thickness gradually changes.
Above-mentioned three kinds of methods, have one it is common the shortcomings that:Before upper and lower covering and core gluing, it is necessary to accurate(The It is a kind of)Or substantially(Second, third kind)Determine the installation site of fastener.If sandwich be installed to upper level part it Before can not determine the installation site of fastener, these three methods can not all use.In addition, these three methods can all increase it is more Weight.The shortcomings that second method, also resides in it and may be only available for honeycomb sandwich construction, can not be applied to foamed sandwich structure.The Three kinds of methods add the complexity of manufacturing process because the change of local thickness and material be present.
The content of the invention
The technical problem to be solved in the present invention is to provide one kind without that will determine to fasten before sandwich gluing Part installation site, the thickness for not changing sandwich and material, increase weight is less, simple to operate is installed in sandwich The method of fastener.
In order to solve the above technical problems, the method for fastener is installed, first in interlayer knot in a kind of sandwich of the present invention First drilling blind hole on structure, blind hole diameter are more than fastener head maximum gauge, and blind hole depth is less than upper covering and core thickness sum; Pasty state glue is filled up in blind hole, is solidified;The hole to match with fastener is drilled on the colloid of solidification;If countersunk head fastens Part, the corresponding countersunk head nest of ream system on colloid;Fastener is installed in the hole being drilled.
The present invention has following good effect compared to prior art:
The present invention is before the glued shaping of sandwich, without determining the installation site of fastener, without in advance to sandwich Carry out any specially treated., can be in its any part by drilling of the present invention, installation when sandwich is installed to upper level part Fastener;
Sandwich is a structure that each part thickness is uniform, material is unified, therefore its manufacturing process is extremely simple;
Glue is only filled at fastener receptacles, makes hole that there is enough intensity to bear concentrfated load, and the weight brought increases Add considerably less.
Brief description of the drawings
Fig. 1 is the sandwich diagrammatic cross-section for installing fastener.
In figure:Covering on 1,2 cores, 3 times coverings, 4 colloids, 5 fasteners.
Embodiment
With reference to embodiment, the invention will be further described.
Refering to Fig. 1, major diameter blind hole is bored from upper covering 1 first in sandwich, its diameter is not less than the head of fastener Portion's diameter;The depth of blind hole retains covering 3 and is defined to pierce upper covering 1 and core 2, and retaining covering 3 has preferably Intensity.After blind hole is drilled, pasty state glue is filled up in blind hole.After adhesive curing turns into solid, just turn into herein one it is firm Material, possesses the intensity born required for concentrfated load.The aperture to match with fastener is finally drilled on colloid 4, if It is countersunk fastener, it is also necessary to the corresponding countersunk head nest of ream system on colloid 4;Fastener 5 is installed in the hole being drilled.

Claims (1)

1. the method for fastener is installed in a kind of sandwich, it is characterised in that first drilling blind hole, blind hole first in sandwich Diameter is more than fastener head maximum gauge, and blind hole depth is less than upper covering and core thickness sum;Pasty state is filled up in blind hole Glue, solidification;The hole to match with fastener is drilled on the colloid of solidification;If countersunk fastener, the ream phase on colloid The countersunk head nest answered;Fastener is installed in the hole being drilled.
CN201610728655.XA 2016-08-25 2016-08-25 A kind of method that fastener is installed in sandwich Pending CN107775720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610728655.XA CN107775720A (en) 2016-08-25 2016-08-25 A kind of method that fastener is installed in sandwich

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610728655.XA CN107775720A (en) 2016-08-25 2016-08-25 A kind of method that fastener is installed in sandwich

Publications (1)

Publication Number Publication Date
CN107775720A true CN107775720A (en) 2018-03-09

Family

ID=61439017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610728655.XA Pending CN107775720A (en) 2016-08-25 2016-08-25 A kind of method that fastener is installed in sandwich

Country Status (1)

Country Link
CN (1) CN107775720A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113290626A (en) * 2021-05-12 2021-08-24 上海复合材料科技有限公司 Skin hole making device assembled after bearing cylinder and hole making method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101596667A (en) * 2009-04-23 2009-12-09 贵州航天精工制造有限公司 A kind of on composite the method and the structure of embedding nut
JP5005721B2 (en) * 2009-03-23 2012-08-22 株式会社朝日堂 Display board mounting structure
CN103586500A (en) * 2013-11-04 2014-02-19 中航成飞民用飞机有限责任公司 Hole making method for honeycomb interlayer composite materials
CN104690769A (en) * 2015-02-12 2015-06-10 大连崇达电路有限公司 Processing method of finished holes of circuit board with inner-layer copper thickness of more than 420 micrometers
CN105885708A (en) * 2008-10-09 2016-08-24 泽菲罗斯公司 Provision of inserts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105885708A (en) * 2008-10-09 2016-08-24 泽菲罗斯公司 Provision of inserts
JP5005721B2 (en) * 2009-03-23 2012-08-22 株式会社朝日堂 Display board mounting structure
CN101596667A (en) * 2009-04-23 2009-12-09 贵州航天精工制造有限公司 A kind of on composite the method and the structure of embedding nut
CN103586500A (en) * 2013-11-04 2014-02-19 中航成飞民用飞机有限责任公司 Hole making method for honeycomb interlayer composite materials
CN104690769A (en) * 2015-02-12 2015-06-10 大连崇达电路有限公司 Processing method of finished holes of circuit board with inner-layer copper thickness of more than 420 micrometers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113290626A (en) * 2021-05-12 2021-08-24 上海复合材料科技有限公司 Skin hole making device assembled after bearing cylinder and hole making method

Similar Documents

Publication Publication Date Title
US4428705A (en) Spreading dowel for securing an insert in a panel with the aid of the dowel
US9441660B2 (en) Mounting insert and method
CN104129495B (en) Composite construction and its manufacture method for aircraft
CN101249885A (en) Rib support for wing panels
US2607447A (en) Fastener
US20110119891A1 (en) Method for assembling a piece of metal material to a piece of composite material
JP7242197B2 (en) Central wing box of co-cured girders and stringers
CN107775720A (en) A kind of method that fastener is installed in sandwich
EP2125347B1 (en) Localized working of reinforced foam materials and sandwich component
JP5671096B2 (en) Junction structure
BR112016029083B1 (en) PROCESS FOR CONNECTING A COFFEE STRUCTURE, INCLUDING ELEMENTARY PARTS, AIRCRAFT WING AND AIRCRAFT
CN106194931B (en) It is a kind of that reversely the method for bushing is inlayed in installation in sandwich
EP2930011A1 (en) A method of repairing a sandwich component having a honeycomb core with an associated core height
CN106239936A (en) A kind of composite walls plate structure of pre-buried support member
US10087968B2 (en) Metallic-composite joint
CN101596667A (en) A kind of on composite the method and the structure of embedding nut
CN110997303B (en) Sandwich structure with embedded connecting elements
CN206938873U (en) Tailgate strut mounting bracket, tailgate strut mounting assembly and automobile
CN106257971A (en) Multilayer blind plate and manufacture method thereof
EP2944455B1 (en) A method of repairing a sandwich component having a honeycomb core which is arranged between a first and a second cover plate
CN107538758A (en) A kind of composite material connection method
CN109572064A (en) A kind of connection method of paper honeycomb sandwich structure
CN114412111A (en) Method for manufacturing heat-preservation and decoration integrated plate
CN201411040Y (en) Complicated wing type full height foam sandwiched sub-wing structure
CN108882524A (en) One kind burying electromagnet core wiring board core plate production method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180309

WD01 Invention patent application deemed withdrawn after publication