CN107764235B - 用于高层建筑施工的高程竖向传递测量方法 - Google Patents
用于高层建筑施工的高程竖向传递测量方法 Download PDFInfo
- Publication number
- CN107764235B CN107764235B CN201610664591.1A CN201610664591A CN107764235B CN 107764235 B CN107764235 B CN 107764235B CN 201610664591 A CN201610664591 A CN 201610664591A CN 107764235 B CN107764235 B CN 107764235B
- Authority
- CN
- China
- Prior art keywords
- elevation
- control
- construction
- marking
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种用于高层建筑施工的高程竖向传递测量方法,本方法首先引测拟建建筑物的首层控制标高,在距离拟建建筑物最近的塔吊塔身上标注所述控制标高并作出标记;采用钢卷尺以该标记为基准,沿塔身向上一次测量到顶,标注拟建建筑物各施工层的控制标高,并且作出各施工层的控制标高标记;截取60cm长尺身,将尺身零刻度对准塔吊塔身的各施工层控制标高标记并且垂直粘贴;各施工层施工过程的高程测量、控制、检查时,在各楼层架设水准仪,以对应层尺身为标靶,照准尺身刻度,即可直接读取后视点数据,实现高程竖向传递测量。本方法使测量人员无需反复登塔操作,有效提高了测量效率,降低测量人员的作业强度,并且提高了测量精度。
Description
技术领域
本发明涉及一种用于高层建筑施工的高程竖向传递测量方法。
背景技术
随着基础建设的发展,建筑行业的发展十分迅猛,其中高层建筑的施工项目越来越多;高层建筑施工的高程竖向传递及检查控制工作十分频繁,也十分重要,稍有不慎就将导致无法弥补的损失。
就目前来说,高层建筑施工的高程竖向传递测量方法有多种,其中最常用的方法为首先将高程引测到塔吊底层塔身上;再使用钢卷尺沿塔吊塔身往上量取各施工楼层所需高程,并做好标记;然后测量人员拿着塔尺爬到塔吊上取好后视点,往施工楼层引测高程或用于检查控制。由于正在施工的楼层随时需要用到高程测量及检查,又没有位置稳定可引测标记的部位,因此测量人员每次都需拿着塔尺爬上塔吊读取后视点数据。如此既降低了高程竖向传递测量的效率,又增加了测量人员的劳动强度,并且提高了测量误差。
发明内容
本发明所要解决的技术问题是提供一种用于高层建筑施工的高程竖向传递测量方法,本方法在高程竖向传递测量时测量人员无需反复登塔操作,即一次准备,可以多次使用,有效提高了工作效率,降低测量人员的作业强度,并且提高了测量精度。
为解决上述技术问题,本发明用于高层建筑施工的高程竖向传递测量方法包括如下步骤:
步骤一、引测拟建建筑物的首层控制标高,在距离拟建建筑物最近的塔吊塔身上标注所述控制标高,并且作出标记;
步骤二、采用钢卷尺以所述控制标高的标记为基准,沿塔吊塔身向上一次测量到顶,标注拟建建筑物各施工层的控制标高,并且作出各施工层的控制标高标记;
步骤三、截取60cm长尺身,尺身刻度取整数,将尺身零刻度对准塔吊塔身的各施工层控制标高标记并且垂直粘贴;
步骤四、各施工层施工过程的高程测量、控制、检查时,在各楼层架设水准仪,以粘贴于塔吊塔身的对应层尺身为标靶,照准尺身刻度,即可直接读取后视点数据,实现高程竖向传递测量。
进一步,各施工层的控制标高采用结构1米线。
由于本发明用于高层建筑施工的高程竖向传递测量方法采用了上述技术方案,即本方法首先引测拟建建筑物的首层控制标高,在距离拟建建筑物最近的塔吊塔身上标注所述控制标高并作出标记;采用钢卷尺以该标记为基准,沿塔身向上一次测量到顶,标注拟建建筑物各施工层的控制标高,并且作出各施工层的控制标高标记;截取60cm长尺身,将尺身零刻度对准塔吊塔身的各施工层控制标高标记并且垂直粘贴;各施工层施工过程的高程测量、控制、检查时,在各楼层架设水准仪,以对应层尺身为标靶,照准尺身刻度,即可直接读取后视点数据,实现高程竖向传递测量。本方法在高程竖向传递测量时测量人员无需反复登塔操作,即一次准备,可以多次使用,有效提高了工作效率,降低测量人员的作业强度,并且提高了测量精度。
附图说明
下面结合附图和实施方式对本发明作进一步的详细说明:
图1为本发明用于高层建筑施工的高程竖向传递测量方法示意图;
图2为本方法中粘贴塔吊塔身的尺身示意图。
具体实施方式
实施例如图1和图2所示,本发明用于高层建筑施工的高程竖向传递测量方法包括如下步骤:
步骤一、引测拟建建筑物的首层控制标高,在距离拟建建筑物1最近的塔吊2塔身上标注所述控制标高,并且作出标记;
步骤二、采用钢卷尺以所述控制标高的标记为基准,沿塔吊2塔身向上一次测量到顶,标注拟建建筑物1各施工层的控制标高,并且作出各施工层的控制标高标记;
步骤三、截取60cm长尺身3,尺身3刻度取整数,将尺身3零刻度对准塔吊2塔身的各施工层控制标高标记并且垂直粘贴;
步骤四、各施工层施工过程的高程测量、控制、检查时,在各楼层架设水准仪4,以粘贴于塔吊2塔身的对应层尺身3为标靶,照准尺身3刻度,即可直接读取后视点数据,实现高程竖向传递测量。
优选的,各施工层的控制标高采用结构一米线。结构一米线是指从楼板面向上1米的标高。
本方法操作简单方便,随用随取,测量人员无需每次拿着塔尺爬上塔吊取后视点读数;降低了测量误差,提高精度。并且塔吊结构相对比较稳定,在施工楼层里架设水准仪每次都可以读取到设置于塔吊上的后视点,后视点位置固定,测量的数据误差就越小,从而提高了拟建建筑物的施工质量。同时采用本方法大大减少了测量的准备工作,一次准备,可多次使用,降低了测量人员的劳动强度,提高工作效率。
Claims (2)
1.一种用于高层建筑施工的高程竖向传递测量方法,其特征在于本方法包括如下步骤:
步骤一、引测拟建建筑物的首层控制标高,在距离拟建建筑物最近的塔吊塔身上标注所述控制标高,并且作出标记;
步骤二、采用钢卷尺以所述控制标高的标记为基准,沿塔吊塔身向上一次测量到顶,标注拟建建筑物各施工层的控制标高,并且作出各施工层的控制标高标记;
步骤三、截取60cm长尺身,尺身刻度取整数,将尺身零刻度对准塔吊塔身的各施工层控制标高标记并且垂直粘贴;
步骤四、各施工层施工过程的高程测量、控制、检查时,在各楼层架设水准仪,以粘贴于塔吊塔身的对应层尺身为标靶,照准尺身刻度,即可直接读取后视点数据,实现高程竖向传递测量。
2.根据权利要求1所述的用于高层建筑施工的高程竖向传递测量方法,其特征在于:各施工层的控制标高采用结构1米线。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664591.1A CN107764235B (zh) | 2016-08-15 | 2016-08-15 | 用于高层建筑施工的高程竖向传递测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664591.1A CN107764235B (zh) | 2016-08-15 | 2016-08-15 | 用于高层建筑施工的高程竖向传递测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107764235A CN107764235A (zh) | 2018-03-06 |
CN107764235B true CN107764235B (zh) | 2020-04-14 |
Family
ID=61259680
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610664591.1A Active CN107764235B (zh) | 2016-08-15 | 2016-08-15 | 用于高层建筑施工的高程竖向传递测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107764235B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110160488B (zh) * | 2019-05-13 | 2021-08-31 | 北京铁科工程检测有限公司 | 一种异形钢索塔高程的测量方法及测量装置 |
CN113356608A (zh) * | 2021-07-26 | 2021-09-07 | 何相昆 | 一种房建工程施工用规避墙体间距误差的标高方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308030A (zh) * | 2012-12-14 | 2013-09-18 | 北京市测绘设计研究院 | 超高层标高高精度自动传递工艺方法 |
CN104677345A (zh) * | 2013-12-03 | 2015-06-03 | 黑龙江融德建筑技术开发有限公司 | 一种竖向标高传递装置 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6986209B2 (en) * | 2003-09-19 | 2006-01-17 | Todd Cook | Laser sighting device and method |
JP5191101B2 (ja) * | 2006-04-06 | 2013-04-24 | 中国電力株式会社 | レーザ受光装置及びこれを用いた警報装置 |
JP2012194070A (ja) * | 2011-03-16 | 2012-10-11 | Chugoku Electric Power Co Inc:The | 鉄塔レベル測定補助具 |
-
2016
- 2016-08-15 CN CN201610664591.1A patent/CN107764235B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308030A (zh) * | 2012-12-14 | 2013-09-18 | 北京市测绘设计研究院 | 超高层标高高精度自动传递工艺方法 |
CN104677345A (zh) * | 2013-12-03 | 2015-06-03 | 黑龙江融德建筑技术开发有限公司 | 一种竖向标高传递装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107764235A (zh) | 2018-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103196417B (zh) | 采用双联系三角形进行竖井定向测量的方法 | |
CN107764235B (zh) | 用于高层建筑施工的高程竖向传递测量方法 | |
CN114152239A (zh) | 一种表层沉降的测量方法及其观测装置 | |
CN201421330Y (zh) | 水平测量装置 | |
CN108303072B (zh) | 一种用于闸门门槽安装过程中的测量装置以及测量方法 | |
CN203811178U (zh) | 一种建筑模板和墙体垂直度检测装置 | |
CN103954196A (zh) | 一种测量室内净高的测量杆及其测量方法 | |
CN110631550A (zh) | 一种围堰封底倾斜度的测量方法及测量装置 | |
CN216483078U (zh) | 一种墙体垂直度测绘装置 | |
CN203053430U (zh) | 激光电子全站仪照相接收装置 | |
CN205748238U (zh) | 一种建筑工程垂直度检测尺检定装置 | |
CN102175263B (zh) | 无强制对中观测墩的亚毫米级三维控制场建立方法 | |
CN201688806U (zh) | 一种阶梯孔径专用测量工具 | |
CN212642719U (zh) | 一种箱涵顶进轴线测量工具 | |
CN204788143U (zh) | 一种用于定位构件表面缺陷的测量装置 | |
CN211060834U (zh) | 一种模板拼接位移监测装置 | |
CN108731646B (zh) | 水平位移观测标尺、测量结构、水闸观测***及观测方法 | |
CN202329634U (zh) | 测钉 | |
CN106184612B (zh) | 一种雷达桅水上吊装的定位方法 | |
CN102589519A (zh) | 建筑施工过程中两点找水平的方法 | |
CN203672378U (zh) | 一种预埋件测量定位装置 | |
RU216529U1 (ru) | Регулируемая нивелирная стойка | |
CN217059674U (zh) | 一种激光式房屋楼板荷载试验加载位置指示仪 | |
CN212779194U (zh) | 一种深基坑标高传递辅助装置 | |
CN219736337U (zh) | 便携式高度检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |