CN107747319A - A kind of underground pipe gallery and pipe gallery system - Google Patents

A kind of underground pipe gallery and pipe gallery system Download PDF

Info

Publication number
CN107747319A
CN107747319A CN201711136302.1A CN201711136302A CN107747319A CN 107747319 A CN107747319 A CN 107747319A CN 201711136302 A CN201711136302 A CN 201711136302A CN 107747319 A CN107747319 A CN 107747319A
Authority
CN
China
Prior art keywords
pipe gallery
piping lane
underground pipe
partition
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711136302.1A
Other languages
Chinese (zh)
Inventor
陈思
蒋晓昊
侯建强
王婷婷
蔡宝华
孔萃敏
廖丽莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Capital Engineering and Research Incorporation Ltd
Zhongye Jingcheng Engineering Technology Co Ltd
Original Assignee
Zhongye Jingcheng Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Jingcheng Engineering Technology Co Ltd filed Critical Zhongye Jingcheng Engineering Technology Co Ltd
Priority to CN201711136302.1A priority Critical patent/CN107747319A/en
Publication of CN107747319A publication Critical patent/CN107747319A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The invention provides a kind of underground pipe gallery and pipe gallery system, underground pipe gallery has the piping lane main body to locate below ground level, and piping lane main body has top plate and bottom plate, and the vertical range between bottom plate and ground is piping lane buried depth, and piping lane buried depth is 3m 5.5m.Pipe gallery system includes the vegetable layer on ground and the above-mentioned underground pipe gallery below vegetable layer.The underground pipe gallery of the present invention belongs to shallow embedding formula underground pipe gallery, compared with existing underground type pipe gallery, earthwork excavated volume is smaller during construction, backfill amount is less, engineering construction cost is greatly reduced, compared with existing half ground type or ground type pipe gallery, aboveground area will not be occupied, does not influence plot utilization rate.

Description

A kind of underground pipe gallery and pipe gallery system
Technical field
The present invention relates to pipe gallery technical field, the underground pipe gallery and pipe gallery body of especially a kind of shallow embedding formula System.
Background technology
It is larger that half ground type or ground type pipe gallery occupy aboveground area, influences plot utilization rate, and landscape effect It is poor;Underground type pipe gallery will not occupy excessive aboveground area, but the underground type pipe gallery buried depth built at present is larger, Generally 6m-9m, earth and stone digging amount is caused to increase, backfill amount is larger, and engineering construction cost is significantly increased.
The content of the invention
It is an object of the invention to provide a kind of underground pipe gallery and pipe gallery system, and it uses the underground of shallow embedding formula comprehensive Piping lane is closed, compared with existing pipe gallery, both prevents take up aboveground area, and can reduces piping lane construction cost.
To reach above-mentioned purpose, the present invention proposes a kind of underground pipe gallery, and it has the piping lane master to locate below ground level Body, the piping lane main body have top plate and bottom plate, and the vertical range between the bottom plate and ground is piping lane buried depth, the piping lane Buried depth is 3m-5.5m.
Underground pipe gallery as described above, wherein, the vertical range between the top plate and ground is thickness of earth-fill cover, institute It is 0.3m-1.5m to state thickness of earth-fill cover.
Underground pipe gallery as described above, wherein, the piping lane main body also has located at the top plate and the bottom plate Between first partition and the second partition between the first partition and the bottom plate, the first partition is by institute State the piping lane auxiliary device layer and be located at that the space between top plate and the bottom plate is divided into above the first partition Electric cabin and pipeline cabin below the first partition, the electric cabin and the pipeline cabin are located at the left and right of the second partition respectively Both sides.
Underground pipe gallery as described above, wherein, offered the electric cabin and the piping lane in the first partition The escape hole of auxiliary device layer connection.
Underground pipe gallery as described above, wherein, it is covered with fireproof cover plate on the escape hole.
Underground pipe gallery as described above, wherein, the underground pipe gallery also has in the piping lane main body Side, and the passway for escaping connected with the piping lane auxiliary device layer, the passway for escaping are extended to more than ground by the top plate.
Underground pipe gallery as described above, wherein, the top plate, the bottom plate and the first partition are that level is set Put, the second partition is vertically arranged.
Underground pipe gallery as described above, wherein, the thickness of the top plate is 0.3m-0.5m, the thickness of the bottom plate For 0.4m-0.7m.
The present invention also provides a kind of pipe gallery system, and it includes the vegetable layer being located on ground and positioned at the plant Underground pipe gallery as described above below tegillum.
Pipe gallery system as described above, wherein, the vegetable layer includes divot and/or small shrub layer.
The characteristics of underground pipe gallery and pipe gallery system of the present invention and advantage are:
1st, underground pipe gallery of the invention belongs to shallow embedding formula underground pipe gallery, and piping lane buried depth is 3m-5.5m, and existing Underground type pipe gallery is compared, and earthwork excavated volume is smaller during construction, and backfill amount is less, and engineering construction cost is greatly reduced, and existing There are half ground type or ground type pipe gallery to compare, aboveground area will not be occupied, do not influence plot utilization rate;
2nd, pipe gallery system of the invention, vegetable layer, underground synthesis are set on the ground above underground pipe gallery The thickness of earth-fill cover of piping lane need to only meet planting requirement, and compared with existing underground type pipe gallery, thickness of earth-fill cover is shallower, The thickness of earth-fill cover at piping lane node can especially be reduced, reduce piping lane cost.
Brief description of the drawings
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1 is the diagrammatic cross-section at the underground pipe gallery node of the present invention.
Main element label declaration:
1st, piping lane main body;11st, top plate;12nd, bottom plate;13rd, first partition;14th, piping lane auxiliary device layer, 15, electric cabin;16、 Pipeline cabin;17th, escape hole;18th, fireproof cover plate;19th, second partition;2nd, passway for escaping;S, piping lane buried depth;H, thickness of earth-fill cover;W、 Ground.
Embodiment
In order to which technical characteristic, purpose and the effect of the present invention is more clearly understood, now control illustrates this hair Bright embodiment.
As shown in figure 1, the present invention provides a kind of underground pipe gallery, it has the piping lane main body 1 to locate below ground level, pipe Corridor main body 1 has top plate 11 and bottom plate 12, and the vertical range between bottom plate 12 and ground W is piping lane buried depth S, and piping lane buried depth S is 3m-5.5m。
The piping lane buried depth of the underground pipe gallery of the present invention is 3m-5.5m, belongs to shallow embedding formula underground pipe gallery, with piping lane Buried depth is that 6m-9m existing underground type pipe gallery is compared, and earthwork excavated volume is smaller during construction, and backfill amount is less, engineering construction Cost is greatly reduced, and compared with existing half ground type or ground type pipe gallery, will not occupy aboveground area, not influenceing plot makes With rate.
Again as shown in figure 1, further, the vertical range between top plate 11 and ground W is thickness of earth-fill cover H, and thickness of earth-fill cover H is 0.3m-1.5m.In the present invention, because piping lane buried depth is smaller, thickness of earth-fill cover is also corresponding smaller, further reduces backfill when building Amount, reduce engineering construction cost;And the thickness of earth-fill cover of existing underground type pipe gallery is larger, generally 2.5m-3.5m.
As shown in figure 1, in a specific embodiment, piping lane main body 1, which also has, to be located between top plate 11 and bottom plate 12 First partition 13 and the second partition 19 between first partition 13 and bottom plate 12, first partition 13 is by top plate 11 and bottom Space between plate 12 is divided into piping lane auxiliary device layer 14 above first partition 13 and under first partition 13 The electric cabin 15 and pipeline cabin 16 of side, electric cabin 15 and pipeline cabin 16 are located at the left and right sides of second partition 19 respectively.
Wherein, the piping lane auxiliary device such as provided with blower fan or power transformation box in piping lane auxiliary device layer 14.
As shown in figure 1, further, offered in first partition 13 and escape in electric cabin 15 with what piping lane auxiliary device layer 14 connected Raw hole 17, to facilitate personnel escape.
Further, fireproof cover plate 18 is covered with escape hole 17, electric cabin 15 and piping lane auxiliary device layer 14 is separated Open, prevent fire spreading after catching fire.Wherein, fireproof cover plate 18 is made of fire proofing material.It is preferred that fireproof cover plate 18 is lightweight Fireproof cover plate.
As shown in figure 1, further, underground pipe gallery also has positioned at the top of piping lane main body 1, and with piping lane auxiliary device The passway for escaping 2 of the connection of layer 14, passway for escaping 2 is extended to more than ground by top plate 11, to facilitate personnel from underground pipe gallery Inside escape from.
Further, top plate 11, bottom plate 12 and first partition 13 are horizontally disposed that second partition 19 is vertically arranged, in addition, Piping lane main body 1 also has two side plates located at top plate and bottom plate both sides, and two side plates are to be vertically arranged.
Further, the thickness of top plate 11 is 0.3m-0.5m, and the thickness of bottom plate 12 is 0.4m-0.7m.In piping lane body span In the case of identical, the thickness of top plate 11 and bottom plate 12 is respectively than the top plate and bottom plate of existing underground pipe gallery in the present invention Thickness reduces 5cm to 10cm.
As shown in figure 1, the present invention also provides a kind of pipe gallery system, pipe gallery system includes the plant on ground Tegillum and the above-mentioned underground pipe gallery below vegetable layer, it is, the ground above piping lane main body is served only for planting Green plant, therefore landing load is small, the piping lane buried depth of underground pipe gallery only needs 3m-5.5m, the earthing depth of underground pipe gallery Degree only need to meet planting requirement.
Further, vegetable layer includes divot and/or small shrub layer, and divot and small shrub layer will to thickness of earth-fill cover Ask low, so as to further reduce thickness of earth-fill cover.
Wherein, vegetable layer can be with all divots, or all small shrub layers, or part is divot and its remaining part It is divided into small shrub layer.
But the present invention is not limited thereto, vegetable layer may be arranged as:The main part of vegetable layer be divot and/or Small shrub layer, accordingly, the thickness of earth-fill cover below divot and/or small shrub layer are 0.3m-1.5m;The part of vegetable layer For arborous layer and/or large-scale shrub layer, accordingly, the thickness of earth-fill cover below arborous layer and/or large-scale shrub layer is 1.5m- Earthing below 2.5m, that is, arborous layer and/or large-scale shrub layer is higher than the earthing below divot and/or small shrub layer And it is in convex dot shape.Because the main part of vegetable layer is divot and/or small shrub layer, the piping lane most of region in top is covered Native depth is still shallower, and backfill amount when piping lane is built is small.
The pipe gallery system of the present invention, by underground pipe gallery construction below greenery patches, by underground pipe gallery The constraint of top Virescence form, such as a Turf Culture layer or small shrub layer, can reduce the thickness of earth-fill cover at piping lane node, drop Low piping lane cost.
The schematical embodiment of the present invention is the foregoing is only, is not limited to the scope of the present invention.It is any Those skilled in the art, the equivalent variations made on the premise of the design of the present invention and principle is not departed from and modification, all should Belong to the scope of protection of the invention.And it should be noted that the present invention each part be not limited in above-mentioned entirety should With, each technical characteristic described in specification of the invention can according to be actually needed selection one individually use or select it is multinomial Combine use, and therefore, the present invention covers the other combinations relevant with this case inventive point and concrete application in the nature of things.

Claims (10)

  1. A kind of 1. underground pipe gallery, it is characterised in that the underground pipe gallery has the piping lane main body to locate below ground level, The piping lane main body has top plate and bottom plate, and the vertical range between the bottom plate and ground is piping lane buried depth, and the piping lane buries Depth is 3m-5.5m.
  2. 2. underground pipe gallery as claimed in claim 1, it is characterised in that the vertical range between the top plate and ground is Thickness of earth-fill cover, the thickness of earth-fill cover are 0.3m-1.5m.
  3. 3. underground pipe gallery as claimed in claim 1 or 2, it is characterised in that the piping lane main body also has located at described First partition between top plate and the bottom plate and the second partition between the first partition and the bottom plate, institute Stating first partition, that the space between the top plate and the bottom plate is divided into piping lane above the first partition is attached Mechanical floor and electric cabin and pipeline cabin below the first partition, the electric cabin and the pipeline cabin are located at institute respectively State the left and right sides of second partition.
  4. 4. underground pipe gallery as claimed in claim 3, it is characterised in that offered the electric cabin in the first partition The escape hole connected with the piping lane auxiliary device layer.
  5. 5. underground pipe gallery as claimed in claim 4, it is characterised in that be covered with fireproof cover plate on the escape hole.
  6. 6. underground pipe gallery as claimed in claim 3, it is characterised in that the underground pipe gallery also has positioned at described Above piping lane main body, and the passway for escaping connected with the piping lane auxiliary device layer, the passway for escaping are extended by the top plate To more than ground.
  7. 7. underground pipe gallery as claimed in claim 3, it is characterised in that the top plate, the bottom plate and described first every Plate is horizontally disposed, and the second partition is vertically arranged.
  8. 8. underground pipe gallery as claimed in claim 7, it is characterised in that the thickness of the top plate is 0.3m-0.5m, described The thickness of bottom plate is 0.4m-0.7m.
  9. A kind of 9. pipe gallery system, it is characterised in that the pipe gallery system include vegetable layer on the ground and The underground pipe gallery as described in any one of claim 1 to 8 below the vegetable layer.
  10. 10. pipe gallery system as claimed in claim 9, it is characterised in that the vegetable layer includes divot and/or small-sized Shrub layer.
CN201711136302.1A 2017-11-16 2017-11-16 A kind of underground pipe gallery and pipe gallery system Pending CN107747319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711136302.1A CN107747319A (en) 2017-11-16 2017-11-16 A kind of underground pipe gallery and pipe gallery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711136302.1A CN107747319A (en) 2017-11-16 2017-11-16 A kind of underground pipe gallery and pipe gallery system

Publications (1)

Publication Number Publication Date
CN107747319A true CN107747319A (en) 2018-03-02

Family

ID=61250635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711136302.1A Pending CN107747319A (en) 2017-11-16 2017-11-16 A kind of underground pipe gallery and pipe gallery system

Country Status (1)

Country Link
CN (1) CN107747319A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205062838U (en) * 2015-09-22 2016-03-02 赵洪志 Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN205152984U (en) * 2015-12-03 2016-04-13 上海市城市建设设计研究总院 Utility tunnel advances air exit integral structure in two storehouses
CN205329721U (en) * 2016-01-12 2016-06-22 上海市城市建设设计研究总院 Air exit and mouthful combined layout's that flees utility tunnel node structure
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
CN106939618A (en) * 2017-04-27 2017-07-11 中国市政工程西北设计研究院有限公司 A kind of underground pipe gallery ground ventilation mouthful and blower fan hoisting port and escaping exit
CN107059919A (en) * 2017-03-09 2017-08-18 中冶东方工程技术有限公司 A kind of underground pipe gallery
CN207567811U (en) * 2017-11-16 2018-07-03 中冶京诚工程技术有限公司 A kind of underground pipe gallery and pipe gallery system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205062838U (en) * 2015-09-22 2016-03-02 赵洪志 Combination cabin concrete structure is assembled to shallow utility tunnel of burying
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
CN205152984U (en) * 2015-12-03 2016-04-13 上海市城市建设设计研究总院 Utility tunnel advances air exit integral structure in two storehouses
CN205329721U (en) * 2016-01-12 2016-06-22 上海市城市建设设计研究总院 Air exit and mouthful combined layout's that flees utility tunnel node structure
CN107059919A (en) * 2017-03-09 2017-08-18 中冶东方工程技术有限公司 A kind of underground pipe gallery
CN106939618A (en) * 2017-04-27 2017-07-11 中国市政工程西北设计研究院有限公司 A kind of underground pipe gallery ground ventilation mouthful and blower fan hoisting port and escaping exit
CN207567811U (en) * 2017-11-16 2018-07-03 中冶京诚工程技术有限公司 A kind of underground pipe gallery and pipe gallery system

Similar Documents

Publication Publication Date Title
CN103510520A (en) Sectionalized construction method of deep and large foundation pit
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN106703075A (en) Urban underground utility tunnel ventilating shaft
CN103235853B (en) Adopt the multiple base pool layout method based on earthwork balance in limit for coal-mining subsidence rand
CN103741698A (en) Loess hilly-and-gully area coal-mining subsidence and crevice treatment method
CN207567811U (en) A kind of underground pipe gallery and pipe gallery system
CN205742216U (en) A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure
CN113832905A (en) Flood control wall structure capable of comprehensively lifting
CN104064236B (en) Terrace flatly-buried type underground nuclear power station
CN203729624U (en) Box body fixing belt antenna rising and falling integrated square cabin type base station
CN107747319A (en) A kind of underground pipe gallery and pipe gallery system
CN208996076U (en) A kind of reserved scuttle hatch digging is inverse to make structure
CN105569050A (en) Design method of angle brace supporting structure for foundation pit with lateral pressures of adjacent boundaries being imbalanced
CN206646766U (en) Go out ground fresh air well construction for underground space dependent
CN203800541U (en) Outdoor cable trench for intelligent substation
CN104372801A (en) Slope anti-skidding component
CN202374794U (en) Planting soil layer structure for greening
CN202202339U (en) Geogrid reinforced soil retaining wall of concrete module
CN207567812U (en) A kind of energy-saving underground pipe gallery and pipe gallery system
CN204567664U (en) The semi-underground station of platform open type
CN204793754U (en) Ventilation main transformer room of making an uproar falls in electric substation
CN205839771U (en) A kind of soil slope structure being built on basement
CN102619379A (en) Method for constructing ecology landscape type cemetery
CN107882161B (en) Fracturing soft tank and construction method thereof
CN201915413U (en) Flexible grid for steep slope protection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180302