CN107697817B - A kind of method of tower crane crane arm elongated degree in the air - Google Patents

A kind of method of tower crane crane arm elongated degree in the air Download PDF

Info

Publication number
CN107697817B
CN107697817B CN201711035432.6A CN201711035432A CN107697817B CN 107697817 B CN107697817 B CN 107697817B CN 201711035432 A CN201711035432 A CN 201711035432A CN 107697817 B CN107697817 B CN 107697817B
Authority
CN
China
Prior art keywords
arm
arm joint
pin shaft
tower crane
raising line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711035432.6A
Other languages
Chinese (zh)
Other versions
CN107697817A (en
Inventor
廉成虎
万辉
吕爱武
陈凤海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zizhu Hui Construction Service Ltd By Share Ltd
Original Assignee
Beijing Zizhu Hui Construction Service Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zizhu Hui Construction Service Ltd By Share Ltd filed Critical Beijing Zizhu Hui Construction Service Ltd By Share Ltd
Priority to CN201711035432.6A priority Critical patent/CN107697817B/en
Publication of CN107697817A publication Critical patent/CN107697817A/en
Application granted granted Critical
Publication of CN107697817B publication Critical patent/CN107697817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

A kind of method of tower crane crane arm elongated degree in the air, traditional tower machine is solved in the narrow construction site of building dense, tower crane large arm is often limited by peripheral obstacle, can not normal operation deficiency, by in large arm, mounting bracket on counter-jib, the dismantlement work of large arm arm joint and counterweight is completed using Lift Mechanism in Power Hoist, guarantee that tower crane can normal construction operation, both safe and reliable, again convenient for operation, engineering cost is saved, accelerate construction speed, obtain good economic benefit and social benefit, the change brachium problem for being flat-top tower crane under special operation condition provides a kind of practicable construction method;This construction technology can smoothly complete the aerial change brachium work of flat-top tower crane in the case where not by other lifting equipments, provide valuable arrangement and method for construction and technical support to encounter similar ask in construction later.

Description

A kind of method of tower crane crane arm elongated degree in the air
Technical field
The present invention relates to tower crane technical field for building, the method for especially a kind of tower crane crane arm elongated degree in the air.
Background technique
With the fast development of urban construction, large size city synthesis project is in full flourish like the mushrooms after rain, annex, tower Building is closely coupled, and building and tower crane density are increasing, these synthesis construction projects are often that foundation construction area is big, project Integral synchronous construction generally uses group towers work group operating mode, and the different construction stages requires difference to the brachium of tower crane, So under complicated construction operating condition, to tower crane avoidance, more stringent requirements are proposed with tower scheme is torn open;
In conjunction with domestic construction status, causing flat-top tower crane to need the reason of changing brachium mainly has following aspects:
(1) Party A's modification of orders.Due to being changed etc. architectural design change, arrangement and method for construction, tower crane is big when causing operation Arm and barrier are interfered;
(2) tower crane arrangement and method for construction considers not comprehensive, not scientific, fails to fully understand construction operating condition, generates tower crane The phenomenon that mutually beating tower body;
(3) building structure is special, and tower crane normally drops section when tearing tower open, and large arm is interfered with building exterior wall face, can not be reduced Tower is torn open after tower crane height;
(4) special construction scheme, such as large size city synthesis project need group towers work, and the foundation construction stage needs Larger arm length, high building construction stage need minor arms long;
(5) other special operation conditions;
Tower crane production, the competition of leasing market also grow in intensity, and construction side not only needs product, with greater need for profession Service, flat-top tower crane become brachium technical solution and exactly comply with industry development, complete to become brachium by Lift Mechanism in Power Hoist, are project Normal construction operation provides guarantee.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides a kind of methods of tower crane crane arm elongated degree in the air, solve Traditional tower machine often limited by peripheral obstacle in the narrow construction site of building dense, tower crane large arm, can not normal operation Deficiency completes the disassembly work of large arm arm joint and counterweight using Lift Mechanism in Power Hoist by the mounting bracket on large arm, counter-jib Make, guarantees that tower crane can normal construction operation;Not only safe and reliable, but also convenient for operation, saved engineering cost, accelerated construction Progress obtains good economic benefit and social benefit, and the change brachium problem for being flat-top tower crane under special operation condition provides A kind of practicable construction method;
Mentality of designing in order to better illustrate the present invention, with the change of Zhong Lianchong section TCT7015-10E flat-top tower crane 70m arm For 65m arm, brachium technology is become to flat-top tower crane and carries out detailed analysis, and specifically setting critical component parameter is as follows;
1. the setting of TCT7015-10E tower crane major parameter is as shown in table 1:
Table 1
2. the weight set of different brachium combinations and each arm joint is shown in Table 2:
Table 2
3. combinations of weights parameter setting is shown in Table 3:
Table 3
4. lifting mechanism parameter setting is shown in Table 4:
5. required conventional tool inventory is shown in Table 5 to table 4:
6. see Table 6 for details for special stand for table 5:
Table 6
A kind of method of tower crane crane arm elongated degree in the air, comprising the following steps:
Remove whether place, road etc. meet dismounting demand Step 1: checking;It is linked up with project management department, necessary match is provided It closes;It must safety, management side station;Counterweight, large arm lower zone drawing warning line are being removed, if security area, operation forbids nothing before finishing Pass personnel enter;Maintenance, maintenance and the inspection of tower crane, to guarantee safety, the integrity of equipment;
Step 2: tower crane returns back to position easy to dismantle, swing mechanism braking, operation forbids tower crane to turn round before finishing; According to brachium situation of change, counterweight, large arm combined state are searched;
Step 3: installing pulley yoke on tower top, roller frame is installed in large arm, takes off bridge, the roller frame is mounted on On the main string in the front end of each arm joint, the bridge of taking off is mounted on the main string in seven front end of arm joint;Portal frame is installed on counter-jib, is adjusted Whole pulley is mounted on the top of 1.3t counterweight;
Illustrate as an example, since the height of arm joint one, two, three is 2.5m, the high 1.7m of remaining arm joint, so operation Personnel must match on-slip shoes, safety belt, prevent from falling, tool, the component to be installed used is connected to steel construction with safety rope On, it prevents from falling;
Step 4: opening trolley to large arm front end, suspension hook is removed in suspension hook landing;
Step 5: removing arm point lock rope cover of wedge, wirerope is fixed on the trolley, withdraws trolley to large arm arm root, open Dynamic lifting mechanism withdraws raising line to lifting mechanism;
Step 6: passing around raising line again, the row's of sequentially passing through rope sheave, the pulley yoke of tower top, portal frame are sliding since reel Wheel, and gear rope bar is installed, it prevents from skipping rope;It is connected with steel wire rope clamp, shackle and 1.3t counterweight lifting lug, at the last one steel wire rope clamp If safety is curved;Lifting mechanism is slowly started, 1.3t counterweight 100mm hovering 1min is promoted, checks whether connection state fastens, if There is no problem, extracts 1.3t counterweight and connects pin shaft, starts lifting mechanism and transfers 1.3t counterweight to ground, withdraws raising line;
Illustrate as an example, lifting mechanism maximum drawbar pull 30kN, safety coefficient 2.3;
Step 7: pass around raising line again in large arm using the trolley, row rope sheave, tower top are sequentially passed through from reel Pulley yoke, the roller frame of large arm and gin pole frame pulley, and install gear rope bar, pays attention to inspection, prevent wirerope tangle steel construction or Pin shaft is fixed on raising line end with steel wire rope clamp the weld with string main in arm joint eight and third root web member;
Step 8: trolley is parked in seven front end of arm joint, is connected at pin shaft 0.5m away from arm joint seven, eight, make small lock using rope Tightly in large arm, prevent it from moving freely, as workbench when removing;Front end variable-amplitude steel wire rope is removed, a disk is rolled into It is fixed in the arm joint seven in large arm;Upper main chord in seven front end of arm joint installs 5t hoist, and seven other end of arm joint is locked at In arm joint eight at first of diagonal web member of main string;Hoist is tensed, is write off using a dedicated pin shaft of φ 35, is struck with sledgehammer It beats and writes off, remove the lower main string pin shaft that arm joint seven is connect with arm joint eight, the dedicated pin shaft of φ 35 installs backing pin;With same method Main string pin shaft under the other end is removed, the dedicated pin shaft of φ 35 installs backing pin;
Slowly pine hoist gets the upper main string pin shaft that arm joint seven and arm joint eight connect;Continue to open while loose hoist Dynamic lifting mechanism transfers raising line;Make main string separation in arm joint seven and arm joint eight;Check whether raising line slips rope phenomenon, such as nothing It slips rope phenomenon then to continue to transfer raising line while loose hoist, until raising line is caught in main string connector, at this time with 1 φ In 35 dedicated pin shaft insertion arm joints seven in main string connecting pin bores, it is stuck in raising line on the inside of pin shaft, backing pin is installed;
Continue to transfer raising line, until eighty per cant vertical state of arm joint, unclamp one end of 5t hoist connection arm joint eight, It is fixed on eight lower boom of arm joint again, tenses hoist, remove the dedicated pin shaft of lower boom φ 35 that arm joint seven is connect with arm joint eight;
Continue loose hoist, while transferring raising line, until arm joint eight completely disengages arm joint seven, unclamps hoist and arm joint Eight connection.Decentralization raising line is until arm joint eight, nine lands;
As a kind of security protection for example, the safety belt of installation personnel must two links hang over big arm rest simultaneously On bar, it is necessary to which, with one end of the tools such as safety rope connection sledgehammer, hoist, the other end is connected on steel construction, can use small The maintenance hanging basket of vehicle carries out dismounting operation;
Illustrate as an example, lifting mechanism maximum drawbar pull 30kN, hoist rated load weight 5t, arm joint eight, nine Gross weight 0.45t, raising line can be met the requirements with hoist pulling force 12.5kN;
Step 9: dismantle arm joint eight and nine on the ground, by raising line across the dedicated pin shaft of φ 35 of nine top boom of arm joint, It is fixed on top boom and web member junction, arm joint nine is sling, lower boom jointing is installed lower boom pin shaft, torn open to after just Except the dedicated pin shaft of top boom φ 35, raising line is received, arm joint nine installs top boom pin shaft after the rotation in place of lower boom pin shaft;
Step 10: illustratively book end tower program installs variable amplitude rope, suspension hook, raising line, safety and limiting device are debugged, until This, TCT7015-10E flat-top tower crane 70m arm becomes the work of 65m arm and terminates.
The utility model has the advantages that
1, the present invention program is safe and reliable, economically feasible, convenient and efficient, is suitble to promote;
2, this construction technology can smoothly complete the aerial of flat-top tower crane in the case where not by other lifting equipments Become brachium work, provides valuable arrangement and method for construction and technical support to encounter similar ask in construction later.
Detailed description of the invention
Fig. 1 is a kind of flat-top tower crane working effect figure of tower crane crane arm of the present invention method of elongated degree in the air
Fig. 2 is that a kind of flat-top tower crane TCT7015-10E structure of tower crane crane arm of the present invention method of elongated degree in the air is shown It is intended to
Fig. 3 is a kind of flat-top tower crane TCT7015-10E large arm group of tower crane crane arm of the present invention method of elongated degree in the air At structure chart
Fig. 4 is that a kind of special stand of tower crane crane arm of the present invention method of elongated degree in the air is mounted on the position on tower crane Schematic diagram
Fig. 5 a is that a kind of 1.3t counterweight of tower crane crane arm of the present invention method of elongated degree in the air removes operation schematic diagram
Fig. 5 b is that a kind of 1.3t counterweight of tower crane crane arm of the present invention method of elongated degree in the air removes work partial enlargement Schematic diagram
Fig. 6 is that a kind of trolley of tower crane crane arm of the present invention method of elongated degree in the air passes around raising line again in large arm Operation schematic diagram
Fig. 7 is that a kind of working condition of tower crane crane arm of the present invention dismounting arm joint eight, nine of the method for elongated degree in the air is shown It is intended to
Fig. 8 is a kind of working effect schematic diagram of tower crane crane arm of the present invention installation arm joint nine of the method for elongated degree in the air
Fig. 9 is a kind of structural design drawing of tower crane crane arm of the present invention special stand pulley yoke of the method for elongated degree in the air
Figure 10 is a kind of structure design of tower crane crane arm of the present invention special stand roller frame of the method for elongated degree in the air Figure
Figure 11 is that a kind of special stand of tower crane crane arm of the present invention method of elongated degree in the air takes off the structure design of bridge Figure
Figure 12 is a kind of structure design of tower crane crane arm of the present invention special stand portal frame of the method for elongated degree in the air Figure
Figure 13 is that a kind of structure of tower crane crane arm of the present invention dedicated pin shaft of special stand of the method for elongated degree in the air is set Meter figure
Specific embodiment
In the following, with reference to figures 1 through shown in Figure 13, mentality of designing in order to better illustrate the present invention, with Zhong Lianchong section TCT7015-10E flat-top tower crane 70m arm becomes for 65m arm, becomes brachium technology to flat-top tower crane and carries out detailed analysis, and specifically sets It is as follows to determine critical component parameter;
1. the setting of TCT7015-10E tower crane major parameter is as shown in table 1:
Table 1
2. the weight set of different brachium combinations and each arm joint is shown in Table 2:
Table 2
3. combinations of weights parameter setting is shown in Table 3:
Table 3
4. lifting mechanism parameter setting is shown in Table 4:
5. required conventional tool inventory is shown in Table 5 to table 4:
6. see Table 6 for details for specific purpose tool for table 5:
Table 6
A kind of method of tower crane crane arm elongated degree in the air, comprising the following steps:
Remove whether place, road etc. meet dismounting demand Step 1: checking;It is linked up with project management department, necessary match is provided It closes;It must safety, management side station;Counterweight, large arm lower zone drawing warning line are being removed, if security area, operation forbids nothing before finishing Pass personnel enter;Maintenance, maintenance and the inspection of tower crane, to guarantee safety, the integrity of equipment;
Step 2: tower crane returns back to position easy to dismantle, swing mechanism braking, operation forbids tower crane to turn round before finishing; According to brachium situation of change, counterweight, large arm combined state are searched;
Step 3: installing pulley yoke 10 on tower top, roller frame 11, gin pole frame 12, the roller frame are installed in large arm 11 are mounted on the main string in front end of each arm joint, and the gin pole frame 12 is mounted on the main string in 7 front end of arm joint;It is installed on counter-jib Portal frame 13, adjustment pulley are mounted on the top of 1.3t counterweight;
Illustrate as an example, due to arm joint 1,2,3 height be 2.5m, the high 1.7m of remaining arm joint 4,5,6,7,8,9, So operating personnel must match on-slip shoes, safety belt, prevent from falling, tool, the component to be installed used is connected with safety rope On steel construction, prevent from falling;
Step 4: opening trolley to large arm front end, suspension hook is removed in suspension hook landing;
Step 5: removing arm point lock rope cover of wedge, wirerope is fixed on the trolley, withdraws trolley to large arm arm root, open Dynamic lifting mechanism withdraws raising line to lifting mechanism;
Step 6: raising line is passed around again, pulley yoke 10, the portal frame of the row's of sequentially passing through rope sheave, tower top since reel Pulley, and gear rope bar is installed, it prevents from skipping rope;It is connected with steel wire rope clamp, shackle and 1.3t counterweight lifting lug, the last one steel wire rope clamp It is curved that place sets safety;Lifting mechanism is slowly started, 1.3t counterweight 100mm hovering 1min is promoted, checks whether connection state fastens, such as There is no problem for fruit, extracts 1.3t counterweight and connects pin shaft, starts lifting mechanism and transfers 1.3t counterweight to ground, withdraws raising line;
Illustrate as an example, lifting mechanism maximum drawbar pull 30kN, safety coefficient 2.3;
Step 7: pass around raising line again in large arm using the trolley, row rope sheave, tower top are sequentially passed through from reel 12 pulley of pulley yoke 10, the roller frame 11 of large arm and gin pole frame, and gear rope bar is installed, pay attention to checking, prevents wirerope from tangling steel Structure or pin shaft are fixed on raising line end with steel wire rope clamp the weld with string main in arm joint 8 and third root web member;
Step 8: trolley is parked in 7 front end of arm joint, is connected at pin shaft 0.5m away from arm joint 7,8, be locked at trolley using rope In large arm, prevent it from moving freely, as workbench when removing;Front end variable-amplitude steel wire rope is removed, a disk is rolled into and fixes In arm joint 7 in large arm;Upper main chord in 7 front end of arm joint installs 5t hoist, and 7 other end of arm joint is locked in arm joint 8 At first of diagonal web member of main string;Hoist is tensed, is write off using a dedicated pin shaft of φ 35, beats abatement with sledgehammer, The lower main string pin shaft that arm joint 7 is connect with arm joint 8 is removed, the dedicated pin shaft of φ 35 installs backing pin;It is removed with same method another Main string pin shaft under end, the dedicated pin shaft of φ 35 install backing pin;
Slowly pine hoist gets the upper main string pin shaft that arm joint 7 and arm joint 8 connect;Continue to start while loose hoist Lifting mechanism transfers raising line;Make main string separation in arm joint 7 and arm joint 8;Check whether raising line slips rope phenomenon, as nothing slips rope Phenomenon then continues to transfer raising line while loose hoist, until raising line is caught in main string connector, it is special with 1 φ 35 at this time It is inserted into arm joint 7 in main string connecting pin bores with pin shaft, is stuck in raising line on the inside of pin shaft, backing pin is installed;
Continue to transfer raising line, until arm joint 8 is at vertical state, unclamps one end of 5t hoist connection arm joint 8, then It is fixed on 8 lower boom of arm joint, tenses hoist, remove the dedicated pin shaft of lower boom φ 35 that arm joint 7 is connect with arm joint 8;
Continue loose hoist, while transferring raising line, until arm joint 8 completely disengages arm joint 7, unclamps hoist and arm joint 8 Connection, decentralization raising line until arm joint 8,9 land;
As a kind of security protection for example, the safety belt of installation personnel must two links hang over big arm rest simultaneously On bar, it is necessary to which, with one end of the tools such as safety rope connection sledgehammer, hoist, the other end is connected on steel construction, can use small The maintenance hanging basket of vehicle carries out dismounting operation;
Illustrate as an example, lifting mechanism maximum drawbar pull 30kN, hoist rated load weight 5t, arm joint 8,9 is total Weight 0.45t, raising line can be met the requirements with hoist pulling force 12.5kN;
Step 9: arm joint 8 and 9 is dismantled on the ground, by raising line across the dedicated pin shaft of φ 35 of 9 top boom of arm joint, Gu It is scheduled on top boom and web member junction, arm joint 9 is sling, lower boom jointing is to after just, installing lower boom pin shaft, in dismounting The dedicated pin shaft of chord member φ 35, receives raising line, and arm joint 9 installs top boom pin shaft after the rotation in place of lower boom pin shaft;
Step 10: illustratively book end tower program installs variable amplitude rope, suspension hook, raising line, safety and limiting device are debugged, until This, TCT7015-10E flat-top tower crane 70m arm becomes the work of 65m arm and terminates.
The present invention program is safe and reliable, economically feasible, convenient and efficient, is suitble to promote;This construction technology is not by other In the case where lifting equipment, the aerial change brachium work of flat-top tower crane can be completed, smoothly to encounter class in construction later It seemingly asks and provides valuable arrangement and method for construction and technical support;
Disclosed above is only the specific embodiment of the application, and however, this application is not limited to this, any this field Technical staff can think variation, should all fall in the protection domain of the application.

Claims (4)

1. a kind of method of tower crane crane arm elongated degree in the air, which comprises the following steps:
Remove whether place, road etc. meet dismounting demand Step 1: checking;It is linked up with project management department, necessary cooperation is provided;Palpus Station by safety, management;Counterweight, large arm lower zone drawing warning line are being removed, if security area, operation forbids irrelevant personnel before finishing Into;Maintenance, maintenance and the inspection of tower crane, to guarantee safety, the integrity of equipment;
Step 2: tower crane returns back to position easy to dismantle, swing mechanism braking, operation forbids tower crane to turn round before finishing;According to Brachium situation of change searches counterweight, large arm combined state;
Step 3: installing pulley yoke on tower top, roller frame is installed in large arm, takes off bridge, the roller frame is mounted on each On the main string in the front end of arm joint, the bridge of taking off is mounted on the main string in seven front end of arm joint;Portal frame is installed on counter-jib, adjustment is slided Wheel is mounted on the top of 1.3t counterweight;
Step 4: opening trolley to large arm front end, suspension hook is removed in suspension hook landing;
Step 5: removing arm point lock rope cover of wedge, wirerope is fixed on the trolley, withdraws trolley to large arm arm root, start It rises mechanism and withdraws raising line to lifting mechanism;
Step 6: raising line is passed around again, the row's of sequentially passing through rope sheave, the pulley yoke of tower top, portal frame pulley since reel, and Installation gear rope bar, prevents from skipping rope;It is connected with steel wire rope clamp, shackle and 1.3t counterweight lifting lug, sets peace at the last one steel wire rope clamp It is complete curved;Lifting mechanism is slowly started, 1.3t counterweight 100mm hovering 1min is promoted, checks whether connection state fastens, if do not had Problem extracts 1.3t counterweight and connects pin shaft, starts lifting mechanism and transfers 1.3t counterweight to ground, withdraws raising line;
Step 7: passing around raising line again in large arm using the trolley, the pulley of row's rope sheave, tower top is sequentially passed through from reel Frame, the roller frame of large arm and gin pole frame pulley, and gear rope bar is installed, pay attention to checking, prevent wirerope from tangling steel construction or pin shaft, Raising line end is fixed on steel wire rope clamp the weld with string main in arm joint eight and third root web member;
Step 8: trolley is parked in seven front end of arm joint, is connected at pin shaft 0.5m away from arm joint seven, eight, be locked at trolley using rope In large arm, prevent it from moving freely, as workbench when removing;Front end variable-amplitude steel wire rope is removed, a disk is rolled into and fixes In arm joint seven in large arm;Upper main chord in seven front end of arm joint installs 5t hoist, and seven other end of arm joint is locked at arm joint On eight at first of diagonal web member of main string;Hoist is tensed, is write off using a dedicated pin shaft of φ 35, beats punching with sledgehammer Pin, removes the lower main string pin shaft that arm joint seven is connect with arm joint eight, and the dedicated pin shaft of φ 35 installs backing pin;It is removed with same method Main string pin shaft under the other end, the dedicated pin shaft of φ 35 install backing pin;
Slowly pine hoist gets the upper main string pin shaft that arm joint seven and arm joint eight connect;Continue to have started while loose hoist It rises mechanism and transfers raising line;Make main string separation in arm joint seven and arm joint eight;Check whether raising line slips rope phenomenon, as nothing slips rope Phenomenon then continues to transfer raising line while loose hoist, until raising line is caught in main string connector, it is special with 1 φ 35 at this time It is inserted into arm joint seven in main string connecting pin bores with pin shaft, is stuck in raising line on the inside of pin shaft, backing pin is installed;
Continue to transfer raising line, until eighty per cant vertical state of arm joint, unclamps one end of 5t hoist connection arm joint eight, then solid It is scheduled on eight lower boom of arm joint, tenses hoist, remove the dedicated pin shaft of lower boom φ 35 that arm joint seven is connect with arm joint eight;
Continue loose hoist, while transferring raising line, until arm joint eight completely disengages arm joint seven, unclamps hoist and arm joint eight Connection, decentralization raising line is until arm joint eight, nine lands;
Step 9: arm joint eight and nine is dismantled on the ground, it is fixed by raising line across the dedicated pin shaft of φ 35 of nine top boom of arm joint In top boom and web member junction, arm joint nine is sling, lower boom jointing is to after just, installing lower boom pin shaft, in dismounting The dedicated pin shaft of chord member φ 35, receives raising line, and arm joint nine installs top boom pin shaft after the rotation in place of lower boom pin shaft;
Step 10: illustratively book end tower program installs variable amplitude rope, suspension hook, raising line, safety and limiting device are debugged, so far, TCT7015-10E flat-top tower crane 70m arm becomes the work of 65m arm and terminates.
2. a kind of method of tower crane crane arm according to claim 1 elongated degree in the air, which is characterized in that the lifting machine Structure maximum drawbar pull 30kN, safety coefficient 2.3.
3. a kind of method of tower crane crane arm according to claim 2 elongated degree in the air, which is characterized in that arm joint eight, nine Gross weight 0.45t, raising line can be met the requirements with hoist pulling force 12.5kN.
4. a kind of method of tower crane crane arm according to claim 3 elongated degree in the air, which is characterized in that the pulley yoke For guiding raising line by lifting mechanism to large arm top.
CN201711035432.6A 2017-10-30 2017-10-30 A kind of method of tower crane crane arm elongated degree in the air Active CN107697817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711035432.6A CN107697817B (en) 2017-10-30 2017-10-30 A kind of method of tower crane crane arm elongated degree in the air

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711035432.6A CN107697817B (en) 2017-10-30 2017-10-30 A kind of method of tower crane crane arm elongated degree in the air

Publications (2)

Publication Number Publication Date
CN107697817A CN107697817A (en) 2018-02-16
CN107697817B true CN107697817B (en) 2019-01-18

Family

ID=61176947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711035432.6A Active CN107697817B (en) 2017-10-30 2017-10-30 A kind of method of tower crane crane arm elongated degree in the air

Country Status (1)

Country Link
CN (1) CN107697817B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111533005B (en) * 2020-04-17 2021-11-05 中国化学工程第三建设有限公司 Method for disassembling large tower crane arm rod by using small tower crane
CN111422759B (en) * 2020-04-17 2021-11-09 中国化学工程第三建设有限公司 Method for dismantling tower crane in narrow space
CN113526366B (en) * 2021-06-11 2023-10-03 浙江省建设工程机械集团有限公司 Multifunctional flat arm tower crane for fire fighting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1024106A1 (en) * 1999-01-27 2000-08-02 Potain Method and device for mounting of the top of the tower of tower cranes
CN101759108A (en) * 2008-12-25 2010-06-30 抚顺永茂建筑机械有限公司 Self-disassembling device of tower crane
CN105621280A (en) * 2016-03-28 2016-06-01 庄爱军 Device and method for mounting and dismounting crane boom
CN106115500A (en) * 2016-08-16 2016-11-16 中昇建机(南京)重工有限公司 A kind of high-rise building is special to be hung and certainly tears method open from tearing formula roofing open
CN107055347A (en) * 2017-05-22 2017-08-18 庄爱军 A kind of high-rise Tower crane disassembly structures and methods installed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1024106A1 (en) * 1999-01-27 2000-08-02 Potain Method and device for mounting of the top of the tower of tower cranes
CN101759108A (en) * 2008-12-25 2010-06-30 抚顺永茂建筑机械有限公司 Self-disassembling device of tower crane
CN105621280A (en) * 2016-03-28 2016-06-01 庄爱军 Device and method for mounting and dismounting crane boom
CN106115500A (en) * 2016-08-16 2016-11-16 中昇建机(南京)重工有限公司 A kind of high-rise building is special to be hung and certainly tears method open from tearing formula roofing open
CN107055347A (en) * 2017-05-22 2017-08-18 庄爱军 A kind of high-rise Tower crane disassembly structures and methods installed

Also Published As

Publication number Publication date
CN107697817A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN107697817B (en) A kind of method of tower crane crane arm elongated degree in the air
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN106115500B (en) A kind of high-rise building is special, and tearing formula roofing open hangs and tears open certainly method certainly
CN103523683B (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN108002250A (en) A kind of roofing device for hoisting and the method for dismounting of crane and crane arm
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN103663189B (en) Moving arm tower crane installation method
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN103821356A (en) Construction equipment and system of elevator shaft shear wall
CN205973523U (en) Super high -rise building is special to be hung from tearing formula roofing open
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN208200044U (en) Roof truss lifts suspender easy to disassemble
CN110282559A (en) A kind of concrete wall hanging apparatus
CN105060138B (en) Disassembling and installation method for tower crane attachment and device thereof
CN208120600U (en) A kind of quick provision for disengagement of large size inside-climbing tower crane
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN201102869Y (en) Large arm device of midair-disassembling horizontal lazy-arm type tower crane
CN114873445A (en) Bridge prefabricated part hoisting tool and hoisting method
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN101003350B (en) Erecting and mounting method for up-rotation self erecting tower crane
CN107482524A (en) Power transmission line inspection robot with anti-falling function automatically up and down earth system
CN208200206U (en) A kind of boom hoisting used in culvert pipe
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN200995933Y (en) Self-erection and up-rotating tower-type elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant