CN107686056A - Special lifting platform and application method are installed in the lifting of assembly concrete building element - Google Patents

Special lifting platform and application method are installed in the lifting of assembly concrete building element Download PDF

Info

Publication number
CN107686056A
CN107686056A CN201710967009.3A CN201710967009A CN107686056A CN 107686056 A CN107686056 A CN 107686056A CN 201710967009 A CN201710967009 A CN 201710967009A CN 107686056 A CN107686056 A CN 107686056A
Authority
CN
China
Prior art keywords
platform
lifting
wallboard
floor
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710967009.3A
Other languages
Chinese (zh)
Other versions
CN107686056B (en
Inventor
焦安亮
冯大阔
黄延铮
张中善
陈璐
鲁万卿
吴耀清
张海东
曹江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201710967009.3A priority Critical patent/CN107686056B/en
Publication of CN107686056A publication Critical patent/CN107686056A/en
Application granted granted Critical
Publication of CN107686056B publication Critical patent/CN107686056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/60Derricks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0445Devices for both conveying and distributing with distribution hose with booms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of lifting of assembly concrete building element to install special lifting platform and its application method, including the synchronous jacking control system of interconnection, platform stable control system and lifting installation system;Wherein, lifting installation system includes:Support lower mast, the top of lower mast is supported to be provided with lifting mounting platform, lifting mounting platform includes the first rail layer, interim locating support layer and the second rail layer successively from bottom to top, first rail layer is provided with the first track, second rail layer is provided with the second track, first track is provided with floor hoisting machine structure, and the second track is provided with wallboard hoisting mechanism;Platform mounting mechanism is also movably equipped with lifting mounting platform, and the side of building body is connected with wallboard vertical transporting mechanism, opposite side is connected with floor stair vertical transporting mechanism.Automaticity of the present invention is high, registration, and digitlization, the degree of modularity are high, substantially increase operating efficiency, have higher practicality and market value.

Description

Special lifting platform and application method are installed in the lifting of assembly concrete building element
Technical field
The present invention relates to technical field of building construction, and in particular to one kind can be accurately positioned, automate, the degree of modularity It is high, be convenient to mount and dismount integrate component automatic clamping and placing, the assembly concrete that handling, posture adjustment, in place, seam are constructed builds structure Special lifting platform is installed in part lifting.
Background technology
China's industrialized building at this stage has been enter into high-speed development period, but assembled architecture construction equipment is not yet prominent at present It is broken, have that automaticity is low, difficulty in place is big, low construction efficiency, labor intensity are high, safety guarantee using conventional equipment construction The problems such as difficult, have become one of bottleneck for restricting assembled architecture development.Therefore research and develop and be adapted to China's national situation, have independently The assembled architecture construction technique and new equipment of intellectual property, it has also become industrialized building construction modernization development in China's is compeled It is essential and asks.
The content of the invention
For the deficiency of above-mentioned background technology, the invention provides a kind of lifting installation of assembly concrete building element is special With lifting platform, to solve, automaticity in the prior art is low, difficulty in place is big, low construction efficiency, labor intensity are high, peace The technical problems such as all risk insurance barrier difficulty.
The technical scheme is that:Special lifting platform is installed in a kind of assembly concrete building element lifting, including Synchronous jacking control system, platform stable control system, central control system and the lifting installation system of interconnection;Wherein, lift Installation system includes:The support lower mast being connected with building body, the top of lower mast is supported to be provided with lifting mounting platform, lifting installation Platform includes the first rail layer, interim locating support layer and the second rail layer successively from bottom to top, in the first rail layer activity set There is the first track, the second track is movably equipped with the second rail layer, the first track is parallel with the second track, is set on the first track There is floor hoisting machine structure, the second track is provided with wallboard hoisting mechanism;Interim locating support layer is provided with telescopic supporting rod, stretches Support bar is corresponding with building body;Platform mounting mechanism is additionally provided with lifting mounting platform, platform mounting mechanism is installed with lifting Platform activity connects and above the second rail layer;The side of building body is connected with wallboard vertical transporting mechanism, opposite side connects It is connected to floor stair vertical transporting mechanism;Wallboard vertical transporting mechanism is corresponding with wallboard hoisting mechanism, and floor stair are vertically transported Transfer mechanism is corresponding with floor hoisting machine structure, wallboard hoisting mechanism respectively.
The top of the support lower mast is provided with platform lifting stock, and platform lifting stock is fixed with lifting mounting platform to be connected Connect;Support lower mast is connected by attached wall with building body.
The both sides of first rail layer are parallel to be provided with the first slideway, and the first slideway is engaged with the first track, and first Track slides along the first slideway;The both sides of second rail layer are parallel to be provided with the second slideway, and the second slideway is engaged with the second track, And second track slided along the second slideway.
The platform mounting mechanism includes two transfer arms, and grasping mechanism is equipped with transfer arm, and grasping mechanism edge is moved Arm slides;Two transfer arms are separately mounted to lift the both sides of mounting platform;Transfer arm is provided with concrete distributing mechanism.
The wallboard vertical transporting mechanism includes vertically disposed two the first haul roads, and two the first haul roads are mutually flat OK;First haul road is provided with wallboard seat and wallboard seat slides along the first haul road.
The floor stair vertical transporting mechanism includes vertically disposed two the second haul roads, two the second haul road phases It is mutually parallel;Second haul road is provided with floor seat and floor seat slides along the second haul road.
The application method of special lifting platform is installed in a kind of assembly concrete building element lifting, is comprised the following steps:
S1:Realize that lifting mounting platform quiet climb to construction location, passes through platform stable control by synchronous jacking control system System processed, lifting mounting platform is adjusted to stable, normal condition and lifting mounting platform is detected;Interim locating support The telescopic supporting rod of layer stretches out to be contacted with building body, forms support;
S2:Wallboard is placed on wallboard seat;Floor, stair are placed on floor seat, under the control action of central control system, are loaded with wall The wallboard seat of plate delivers to lifting mounting platform by the first slide rail, and the floor seat for being loaded with floor or stair is delivered to by the second slide rail Lift mounting platform;
S3:Wallboard is transported to specified location by the wallboard hoisting mechanism on the second track, and is entered by interim locating support layer Row support, floor are transported to specified location by the floor hoisting machine structure on the first track, and stair pass through the wall on the second track Plate hoisting mechanism is transported to specified location;Under the control action of central control system, wallboard, stair, floor, which are automatically performed, to be sought position, hangs Dress, installation;
S4:Mounted wallboard, stair, floor are entered in the concrete distributing mechanism in the presence of central control system on transfer arm Row concreting, realize that seam pours;
S5:Under central control system effect, two transfer arms of platform mounting mechanism set standard knot reality toward filling out in platform lifting stock Increasing for lower mast is now supported, and then realizes the automatic rise of lifting mounting platform;
S6:When construction finishes, under central control system effect, two transfer arms of platform mounting mechanism are torn open out of platform lifting stock Except standard knot, realize support lower mast and lift the decline of mounting platform and the dismounting of platform.
The present invention is realized after raising, construct automatically with construction process using Liftable type lifting mounting platform It is automatic drop to after ground and jacking in place can with the purpose of building quick lock in, it is simple to operate, improve job safety Property;Interim locating support layer is to realize the device that vertical member is quickly fixed temporarily, by matching with platform stable control system Close, automatic capturing can be achieved, and realized with finely tuning to vertical member by locking, to vertical member perpendicularity automatic detection It is fast and reliable interim fixed, improve efficiency of construction and reduce operation labor intensity, automaticity is high.Floor hoisting machine structure and wall Plate hoisting mechanism is used cooperatively, and span is big, and rated load weight is big, can be worked asynchronously, not interfere with each other, and greatly improves work effect Rate;Wallboard vertical transporting mechanism and floor stair vertical transporting mechanism lifting velocity and the speed of service are fast, and security is good, improves Operating efficiency.The present invention is ingenious in design, automaticity is high, registration, greatly reduces constructional difficulties, improves work effect Rate, there is higher practicality and market value.The present invention is directed to conventional equipment problem present in assembled architecture construction, Innovation research and development assembled architecture Key Techniques in Construction and device, formation collection component automatic clamping and placing, handling, posture adjustment, in place, seam are applied Work efficiently lifts installation comprehensive equipment in the automation of one, digitlization, modularization, platform-type large-scale assembled architecture, goes forward side by side Row engineering mimoir application, job site lifting component installation effectiveness and safety are improved, for China's industrialized building construction modernization Technology and equipment support is provided.
Brief description of the drawings
Fig. 1 is front view of the present invention.
Fig. 2 is top view of the present invention.
Fig. 3 is partial enlarged drawing at A in Fig. 1.
Fig. 4 is platform mechanism for assembling-disassembling structural representation.
Fig. 5 is wallboard vertical transporting mechanism structural representation.
Fig. 6 is floor stair vertical transporting mechanism structural representation.
Embodiment
Embodiment 1:As shown in figures 1 to 6, special lifting platform is installed in a kind of assembly concrete building element lifting, including Synchronous jacking control system, platform stable control system, central control system and the lifting installation system of interconnection;Synchronization of jacking up control System processed has upper brace inclination angle abnormity early warning, single-point load monitoring and warning, the structural key point stress of multiple spot jacking process The functions such as monitoring and warning and can effective Feedback to central control system, ensure each fulcrum jacking synchronism of lifting mounting platform, structure Stress equalization with stably, lifting mounting platform in place afterwards i.e. in can working condition convenience, realize that lifting installation is flat The safe and reliable of platform quickly climbs.Platform stable control system can to support the stability of lower mast, interim locating support layer it is steady Qualitative, component precision in place etc. is controlled and detected, and improves the stability of lifting platform, it is ensured that safe construction.Central control system Member position monitoring accuracy, component orientations angular accuracy, component vertical transport speed etc. can be detected and controlled, improve work Quality, automation and centralization degree are high, and wherein component Jing Du in place≤± 5mm, member position Jian surveys Jing Du≤± 3mm, structure Part orientation angular accuracy≤± 1 °, it is ensured that component automatic clamping and placing, posture adjustment, the accuracy for seeking position.Lifting installation system includes:With building The support lower mast 2 that body 1 is connected, support lower mast 2 are made up of for supporting lifting mounting platform standard knot, support the upper of lower mast 2 Portion is provided with lifting mounting platform 3, and lifting mounting platform 3 includes the first rail layer 31, interim locating support layer successively from bottom to top 32 and second rail layer 33, slide in the first rail layer 31 and be provided with the first track 4, in the second rail layer 33 slip be provided with the second rail Road 5, the first track 4 is parallel with the second track 5, and the first track 4 is located at the lower section of the second track 5, and realization is simultaneously operable, and first Track 4 is provided with floor hoisting machine structure 6, and for lifting the components such as floor, the second track is provided with wallboard hoisting mechanism 7, is used for Lift the components such as wallboard, stair;Platform mounting mechanism 8 is additionally provided with lifting mounting platform 3, platform mounting mechanism 8 is pacified with lifting Assembling platform 3 is flexibly connected, and the automatic dismantling after raising and construct automatically with construction process, interim positioning branch can be achieved The lateral surface of rack-layer 32 is provided with telescopic supporting rod 9, and telescopic supporting rod 9 is corresponding with building body 1, when progress lifting component, installation When, the telescopic supporting rod 9 of the lateral surface of interim locating support layer 32 stretches out to be contacted with building body 1, forms support, plays stable face When locating support layer effect, interim locating support layer 32, for temporarily position wallboard, it is ensured that the accuracy of its installation site; Telescopic supporting rod 9 is withdrawn when lifting mounting platform climbs or landed separates with building, is easy to lift the lifting of mounting platform;Build The side of building body 1 is connected with wallboard vertical transporting mechanism 10, opposite side is connected with floor stair vertical transporting mechanism 11;Wallboard hangs down Straight transport establishment 10 is corresponding with wallboard hoisting mechanism 7, and wallboard is transported to lifting mounting platform by wallboard vertical transporting mechanism, Then installation site is transported to by wallboard hoisting mechanism;Floor stair vertical transporting mechanism 11 is relative with floor hoisting machine structure 6 Should, floor is transported to lifting mounting platform through floor stair vertical transporting mechanism, is then transported to peace by floor hoisting machine structure Holding position;Floor stair vertical transporting mechanism 11 is corresponding with wallboard hoisting mechanism 7, and stair are through floor stair vertical transporting mechanism Lifting mounting platform is transported to, installation site is then transported to by wallboard hoisting mechanism.
The application method of special lifting platform is installed in the lifting of assembly concrete building element, is comprised the following steps:S1:It is logical Synchronous jacking control system and platform stabilizing control system are crossed, lifting mounting platform is adjusted to stable, normal condition;It is interim fixed The telescopic supporting rod of the lateral surface of position shelf layer stretches out to be contacted with building body, forms support;S2:Wallboard is placed on wallboard seat;Building Plate, stair are placed on floor seat, and in the presence of central control system, the wallboard seat for being loaded with wallboard delivers to lifting by the first slide rail Mounting platform, the floor seat for being loaded with floor or stair deliver to lifting mounting platform by the second slide rail;S3:Wallboard passes through the second rail Wallboard hoisting mechanism on road is transported to specified location, and is supported by interim locating support layer, and floor passes through the first rail Floor hoisting machine structure on road is transported to specified location, and stair are transported to specific bit by the wallboard hoisting mechanism on the second track Put;Under the control action of central control system, wallboard, stair, floor, which are automatically performed, seeks position, lifting, installation;S4:In central control system In the presence of concrete distributing mechanism on transfer arm concreting is carried out to mounted wallboard, stair, floor, realize Seam pours;S5:Under central control system effect, two transfer arms of platform mounting mechanism are accurate toward bidding is filled out in platform lifting stock The realization support lower mast of section increases, and then realizes the automatic rise of lifting mounting platform;Or by two transfer arms from flat Standard knot is removed in platform climbing frame, support lower mast is realized and lifts the decline and dismounting of mounting platform.
Embodiment 2:As shown in figures 1 to 6, special lifting platform is installed in a kind of assembly concrete building element lifting, described The top of support lower mast 2 is provided with platform lifting stock 12, and platform lifting stock 12 is fixedly connected with lifting mounting platform 3;Support Lower mast 2 is connected by attached wall 14 with building body 1, and lifting mounting platform is by setting standard knot toward filling out in platform lifting stock 12 Mode realizes increasing for support lower mast 2, and then realizes the automatic rise of lifting mounting platform 3;Similarly, from platform lifting stock 12 The interior mode for removing standard knot, realize support lower mast 2 and lift the decline of mounting platform 3.Special lifting platform modular combination The repetitive cycling for designing the effective fractionation for realizing platform, multiple combinations and platform uses.
Further preferably, the both sides of the first rail layer 31 are parallel is provided with the first slideway 15, the first slideway 15 and the first track 4 It is engaged, and the first track 4 slides along the first slideway 15;The both sides of second rail layer 33 are parallel to be provided with the second slideway 16, and second Slideway 16 is engaged with the second track 5, and the second track 5 slides along the second slideway 16.
Further preferably, the platform mounting mechanism 8 includes two transfer arms 81, and the slewing area of transfer arm 81 is whole Mounting platform is lifted, is equipped with grasping mechanism 82 on transfer arm 81, grasping mechanism 82 slides along transfer arm 81;Two transfer arms 81 It is separately mounted to lift the both sides of mounting platform 3, is independent of each other, is simultaneously operable, operating efficiency is high;Transfer arm 81 is provided with mixed Native material-feeding mechanism 13 is coagulated, for pouring for concrete, its work area can cover whole building body.
Further preferably, the wallboard vertical transporting mechanism 10 includes vertically disposed two the first haul roads 101, two First haul road is parallel to each other;First haul road 101 is provided with wallboard seat 102 and wallboard seat 102 is slided along the first haul road 101 Dynamic, wallboard seat is used to fix wallboard, prevents occurring swinging or rock in transport process deadlight, and pass through the first haul road 101 It is transported to lifting mounting platform.
Further preferably, the floor stair vertical transporting mechanism 11 includes vertically disposed two the second haul roads 111, Two the second haul road is parallel to each other;Second haul road 111 is provided with floor seat 112 and floor seat 112 along the second haul road 111 Slide.Floor seat is used to fixing and holding the components such as floor, stair, prevents occurring swinging or rock in transport process deadlight, And lifting mounting platform is transported to by the second haul road 111.
Other structures are same as Example 1.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, the change or replacement that can readily occur in, It should all be included within the scope of the present invention.

Claims (7)

1. special lifting platform is installed in a kind of assembly concrete building element lifting, it is characterised in that:Including interconnection Synchronous jacking control system, platform stable control system, central control system and lifting installation system;Wherein, installation system bag is lifted Include:With building body(1)The support lower mast being connected(2), support lower mast(2)Top be provided with lifting mounting platform(3), lifting peace Assembling platform(3)Include the first rail layer successively from bottom to top(31), interim locating support layer(32)With the second rail layer(33), the One rail layer(31)On be movably equipped with the first track(4), the second rail layer(33)On be movably equipped with the second track(5), the first rail Road(4)With the second track(5)It is parallel, the first track(4)It is provided with floor hoisting machine structure(6), the second track is provided with wallboard Hoisting mechanism(7);Interim locating support layer(32)It is provided with telescopic supporting rod(9), telescopic supporting rod(9)With building body(1)Phase It is corresponding;Lift mounting platform(3)On be additionally provided with platform mounting mechanism(8), platform mounting mechanism(8)With lifting mounting platform(3) It is flexibly connected and is located at the second rail layer(33)Top;Building body(1)Side be connected with wallboard vertical transporting mechanism(10), it is another Side is connected with floor stair vertical transporting mechanism(11);Wallboard vertical transporting mechanism(10)With wallboard hoisting mechanism(7)Relatively Should, floor stair vertical transporting mechanism(11)Respectively with floor hoisting machine structure(6), wallboard hoisting mechanism(7)It is corresponding.
2. special lifting platform is installed in assembly concrete building element lifting according to claim 1, it is characterised in that: The support lower mast(2)Top be provided with platform lifting stock(12), platform lifting stock(12)With lifting mounting platform(3)Gu Fixed connection;Support lower mast(2)Pass through attached wall(14)With building body(1)It is connected.
3. special lifting platform is installed in assembly concrete building element lifting according to claim 1, it is characterised in that: First rail layer(31)Both sides parallel be provided with the first slideway(15), the first slideway(15)With the first track(4)It is engaged, And first track(4)Along the first slideway(15)Slide;Second rail layer(33)Both sides parallel be provided with the second slideway(16), second Slideway(16)With the second track(5)It is engaged, and the second track(5)Along the second slideway(16)Slide.
4. special lifting platform is installed in assembly concrete building element lifting according to claim 1, it is characterised in that: The platform mounting mechanism(8)Including two transfer arms(81), transfer arm(81)On be equipped with grasping mechanism(82), grasping mechanism (82)Along transfer arm(81)Slide;Two transfer arms(81)It is separately mounted to lift mounting platform(3)Both sides;Transfer arm(81) It is provided with concrete distributing mechanism(13).
5. special lifting platform is installed in assembly concrete building element lifting according to claim 1, it is characterised in that: The wallboard vertical transporting mechanism(10)Including vertically disposed two the first haul roads(101), two the first haul roads are mutual It is parallel;First haul road(101)It is provided with wallboard seat(102)And wallboard seat(102)Along the first haul road(101)Slide.
6. special lifting platform is installed in assembly concrete building element lifting according to claim 1, it is characterised in that: The floor stair vertical transporting mechanism(11)Including vertically disposed two the second haul roads(111), two the second haul roads It is parallel to each other;Second haul road(111)It is provided with floor seat(112)And floor seat(112)Along the second haul road(111)Slide.
7. the application method of special lifting platform is installed in a kind of assembly concrete building element lifting, it is characterised in that:Including Following steps:
S1:Realize that lifting mounting platform quiet climb to construction location, passes through platform stable control by synchronous jacking control system System processed, lifting mounting platform is adjusted to stable, normal condition and lifting mounting platform is detected;Interim locating support The telescopic supporting rod of layer stretches out to be contacted with building body, forms support;
S2:Wallboard is placed on wallboard seat;Floor, stair are placed on floor seat, under the control action of central control system, are loaded with wall The wallboard seat of plate delivers to lifting mounting platform by the first slide rail, and the floor seat for being loaded with floor or stair is delivered to by the second slide rail Lift mounting platform;
S3:Wallboard is transported to specified location by the wallboard hoisting mechanism on the second track, and is entered by interim locating support layer Row support, floor are transported to specified location by the floor hoisting machine structure on the first track, and stair pass through the wall on the second track Plate hoisting mechanism is transported to specified location;Under the control action of central control system, wallboard, stair, floor, which are automatically performed, to be sought position, hangs Dress, installation;
S4:Mounted wallboard, stair, floor are entered in the concrete distributing mechanism in the presence of central control system on transfer arm Row concreting, realize that seam pours;
S5:Under central control system effect, two transfer arms of platform mounting mechanism set standard knot reality toward filling out in platform lifting stock Increasing for lower mast is now supported, and then realizes the automatic rise of lifting mounting platform;
S6:When construction finishes, under central control system effect, two transfer arms of platform mounting mechanism are torn open out of platform lifting stock Except standard knot, realize support lower mast and lift the decline of mounting platform and the dismounting of platform.
CN201710967009.3A 2017-10-17 2017-10-17 Special lifting platform for lifting and installing assembled concrete building components and application method Active CN107686056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710967009.3A CN107686056B (en) 2017-10-17 2017-10-17 Special lifting platform for lifting and installing assembled concrete building components and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710967009.3A CN107686056B (en) 2017-10-17 2017-10-17 Special lifting platform for lifting and installing assembled concrete building components and application method

Publications (2)

Publication Number Publication Date
CN107686056A true CN107686056A (en) 2018-02-13
CN107686056B CN107686056B (en) 2023-12-19

Family

ID=61154608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710967009.3A Active CN107686056B (en) 2017-10-17 2017-10-17 Special lifting platform for lifting and installing assembled concrete building components and application method

Country Status (1)

Country Link
CN (1) CN107686056B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265991A (en) * 2018-04-13 2018-07-10 中清大装配式建筑有限公司 Aerial for industrialized building makes building machine and its construction method
CN108590197A (en) * 2018-05-09 2018-09-28 湖南易兴建筑有限公司 A kind of assembled architecture artificial intelligence transhipment installation system and implementing process
CN108646788A (en) * 2018-05-31 2018-10-12 中国能源建设集团安徽电力建设第工程有限公司 A kind of intelligent control system of delivery track
CN108915310A (en) * 2018-08-06 2018-11-30 湖南易兴建筑有限公司 The method that movable building factory and its house are built
CN109967991A (en) * 2018-11-22 2019-07-05 河北卓达建材研究院有限公司 A kind of Intelligent Frame Standard device
WO2020155600A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Building construction system and construction method therefor
CN111502293A (en) * 2020-05-19 2020-08-07 太原理工大学 Method and system for hoisting single peripheral component of assembly type building
CN111661768A (en) * 2020-05-19 2020-09-15 太原理工大学 Method and system for hoisting multiple peripheral components of assembly type building
CN112267692A (en) * 2020-10-23 2021-01-26 中国建筑第七工程局有限公司 Assembly type building component hoisting comprehensive equipment and construction method thereof
CN112551366A (en) * 2020-11-18 2021-03-26 多门朗工程技术(上海)有限公司 Lifting and transporting frame integrated building erecting machine construction equipment and construction method thereof
CN113620131A (en) * 2021-08-13 2021-11-09 中国建筑第七工程局有限公司 Prefabricated component hoisting platform control system
CN114132848A (en) * 2021-11-24 2022-03-04 中国建筑第七工程局有限公司 Hoisting platform for hoisting assembly type concrete building component
CN115818414A (en) * 2022-11-25 2023-03-21 中建三局科创产业发展有限公司 Integrated device for transporting and installing slide rail type prefabricated plate
CN116040544A (en) * 2023-04-03 2023-05-02 四川蜀道建筑科技有限公司 Self-pushing lifting reset equipment
CN116101875A (en) * 2023-04-11 2023-05-12 四川蜀道建筑科技有限公司 Automatic lifting and installing equipment for self-climbing building component

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345520Y (en) * 1998-08-25 1999-10-27 张成武 Construction hoist with safety protector and capable of self-dismounting
JP2000053375A (en) * 1998-08-17 2000-02-22 Ohbayashi Corp Vertical carrier system corresponding to slewing overhead crane
JP2000240287A (en) * 1999-02-19 2000-09-05 Ohbayashi Corp Carrier system for automated construction method
KR20100002643A (en) * 2008-06-30 2010-01-07 주식회사 씨에스구조엔지니어링 Temporary construction system for the automation of building projects and construction method using the same
CN102864936A (en) * 2012-10-10 2013-01-09 江苏南通六建建设集团有限公司 Combination lifting construction method for large-scale high hollow building roof of steel structure
CN103935901A (en) * 2014-05-12 2014-07-23 陈建光 Automatic high-rise wall plate hoisting system
CN207293959U (en) * 2017-10-17 2018-05-01 中国建筑第七工程局有限公司 Special lifting platform is installed in the lifting of assembly concrete building element

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000053375A (en) * 1998-08-17 2000-02-22 Ohbayashi Corp Vertical carrier system corresponding to slewing overhead crane
CN2345520Y (en) * 1998-08-25 1999-10-27 张成武 Construction hoist with safety protector and capable of self-dismounting
JP2000240287A (en) * 1999-02-19 2000-09-05 Ohbayashi Corp Carrier system for automated construction method
KR20100002643A (en) * 2008-06-30 2010-01-07 주식회사 씨에스구조엔지니어링 Temporary construction system for the automation of building projects and construction method using the same
CN102864936A (en) * 2012-10-10 2013-01-09 江苏南通六建建设集团有限公司 Combination lifting construction method for large-scale high hollow building roof of steel structure
CN103935901A (en) * 2014-05-12 2014-07-23 陈建光 Automatic high-rise wall plate hoisting system
CN207293959U (en) * 2017-10-17 2018-05-01 中国建筑第七工程局有限公司 Special lifting platform is installed in the lifting of assembly concrete building element

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265991A (en) * 2018-04-13 2018-07-10 中清大装配式建筑有限公司 Aerial for industrialized building makes building machine and its construction method
CN108590197A (en) * 2018-05-09 2018-09-28 湖南易兴建筑有限公司 A kind of assembled architecture artificial intelligence transhipment installation system and implementing process
CN108646788A (en) * 2018-05-31 2018-10-12 中国能源建设集团安徽电力建设第工程有限公司 A kind of intelligent control system of delivery track
CN108915310A (en) * 2018-08-06 2018-11-30 湖南易兴建筑有限公司 The method that movable building factory and its house are built
CN109967991A (en) * 2018-11-22 2019-07-05 河北卓达建材研究院有限公司 A kind of Intelligent Frame Standard device
WO2020155600A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Building construction system and construction method therefor
CN111502293B (en) * 2020-05-19 2021-06-15 太原理工大学 Method and system for hoisting single peripheral component of assembly type building
CN111502293A (en) * 2020-05-19 2020-08-07 太原理工大学 Method and system for hoisting single peripheral component of assembly type building
CN111661768B (en) * 2020-05-19 2021-07-16 太原理工大学 Method and system for hoisting multiple peripheral components of assembly type building
CN111661768A (en) * 2020-05-19 2020-09-15 太原理工大学 Method and system for hoisting multiple peripheral components of assembly type building
CN112267692B (en) * 2020-10-23 2022-06-07 中国建筑第七工程局有限公司 Assembly type building component hoisting comprehensive equipment and construction method thereof
CN112267692A (en) * 2020-10-23 2021-01-26 中国建筑第七工程局有限公司 Assembly type building component hoisting comprehensive equipment and construction method thereof
CN112551366A (en) * 2020-11-18 2021-03-26 多门朗工程技术(上海)有限公司 Lifting and transporting frame integrated building erecting machine construction equipment and construction method thereof
CN113620131A (en) * 2021-08-13 2021-11-09 中国建筑第七工程局有限公司 Prefabricated component hoisting platform control system
CN114132848A (en) * 2021-11-24 2022-03-04 中国建筑第七工程局有限公司 Hoisting platform for hoisting assembly type concrete building component
CN114132848B (en) * 2021-11-24 2023-09-05 中国建筑第七工程局有限公司 Hoisting platform for hoisting assembled concrete building components
CN115818414A (en) * 2022-11-25 2023-03-21 中建三局科创产业发展有限公司 Integrated device for transporting and installing slide rail type prefabricated plate
CN115818414B (en) * 2022-11-25 2024-02-02 中建三局钢构科技有限公司 Sliding rail type prefabricated plate transportation and installation integrated device
CN116040544A (en) * 2023-04-03 2023-05-02 四川蜀道建筑科技有限公司 Self-pushing lifting reset equipment
CN116101875A (en) * 2023-04-11 2023-05-12 四川蜀道建筑科技有限公司 Automatic lifting and installing equipment for self-climbing building component

Also Published As

Publication number Publication date
CN107686056B (en) 2023-12-19

Similar Documents

Publication Publication Date Title
CN107686056A (en) Special lifting platform and application method are installed in the lifting of assembly concrete building element
EP2893103B1 (en) A panel support bracket
CN108867647B (en) Multifunctional steel pipe column verticality adjusting machine for pile and column integrated construction
CN109573851A (en) Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method
CN216949170U (en) Sliding frame for construction of overhanging cornice of metal roof
US20210404173A1 (en) Lifting an assembled wall module into position for attachment to a building structure
JP4978443B2 (en) Special work cart device for PC block installation work for preventing falling bridges
EP3030719B1 (en) Scaffold
CN207293959U (en) Special lifting platform is installed in the lifting of assembly concrete building element
JP2005282353A (en) Steel tower assembling construction method by helicopter and work tool for it
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN205558915U (en) Portable operation device
RU2383701C2 (en) Mobile scaffolding
CN115306136A (en) Inclined wall eversion climbing type steel platform construction device and method
CN206512533U (en) A kind of empty rail of suspension type installs positioning underground frock
CN108756197A (en) A kind of construction method of hoistway operation platform
CN205259574U (en) Quick assembly and disassembly safety protection screen
CN112523103A (en) Integrated integral multifunctional construction platform for pier and towering structure
JP4389200B2 (en) Steel bracket and block mounting device for preventing falling bridges
JP3892196B2 (en) Slope-equipment carrying work device and construction method of this device
CN105442828B (en) One kind is conveniently detached security protection screen
AU2013203442B2 (en) Screen Module
JP3717910B2 (en) Steel tower assembly method by helicopter
CN210263966U (en) Building construction system
JP2005089148A (en) Installation platform device of elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.267, 15th Street, Jingkai, Zhengzhou, Henan Province, 450003

Applicant after: CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 450003 No. 108 Chengdong Road, Jinshui District, Henan, Zhengzhou

Applicant before: CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION Corp.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant