CN107675871A - One kind is building rise long-span outrigger wall-connecting piece construction method - Google Patents

One kind is building rise long-span outrigger wall-connecting piece construction method Download PDF

Info

Publication number
CN107675871A
CN107675871A CN201710612987.6A CN201710612987A CN107675871A CN 107675871 A CN107675871 A CN 107675871A CN 201710612987 A CN201710612987 A CN 201710612987A CN 107675871 A CN107675871 A CN 107675871A
Authority
CN
China
Prior art keywords
wall
connecting piece
span
outrigger
constructional column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710612987.6A
Other languages
Chinese (zh)
Inventor
陈玮
刘文吉
杜耀进
崔荣苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Engineering Group Co Ltd filed Critical Zhejiang Construction Engineering Group Co Ltd
Priority to CN201710612987.6A priority Critical patent/CN107675871A/en
Publication of CN107675871A publication Critical patent/CN107675871A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to technical field of building construction, and in particular to one kind is building rise long-span outrigger wall-connecting piece construction method, applies drawing with building jointly and sets secondary structure beam and column at exterior wall position, secondary structure beam and column includes constructional column and linking beam;Constructional column is first set, and constructional column is equidistantly divided equally along beam span direction to be set, and constructional column is smaller than being equal to 5 meters;And divide equally in short transverse along floor height and linking beam is set, linking beam is smaller than being equal to 4 meters;The mode that pours of constructional column pours for segmentation, and first pours to back is linked every time, finally pours to Vierendeel girder bottom;Wall-connecting piece is fixedly mounted, specific to press 2 step, 2 across spacing setting, i.e. the principle of wall-connecting piece active area 3*3.6m is set.All wall-connecting piece materials that this method uses are recyclable, reduce cost, while also greatly reduce the workload of the secondary repairing of alien invasion and reduce exterior wall leakage hidden danger.

Description

One kind is building rise long-span outrigger wall-connecting piece construction method
Technical field
The present invention relates to technical field of building construction, and in particular to one kind is building rise long-span outrigger wall-connecting piece construction party Method.
Background technology
In recent years, domestic public building requires the therein standard width of a room in an old-style house to be stepped up deeply only, more and more building individual layer layers Height is more than 8m, and main body frame span is more than 10m, and part architectural image is unique, and the setting increase to outer scaffold wall connector is very More difficulty, and such building is both needed to set constructional column and linking beam by code requirement in masonry panel.
Wall-connecting piece refers to strengthen the component of the stability of other structures by being connected with reliable fixing end, in architectural engineering In be used for scaffold support body is connected with major structure of construction, pulling force and the component of pressure can be transmitted.Realized using wall-connecting piece Attached wall be coupled, the resistance to overturning for strengthening scaffold, improve its stable bearing capacity and avoid the occurrence of and topple over or cave in Played a very important role etc. major accident tool.
Secondary structure is just constructed after the construction of the supporting member part of the i.e. agent structure of primary structure finishes, in frame Frame, shear wall, frame cut the concrete structure of some non-bearings in engineering, such as constructional column, linking beam, lintel some needed before decoration The part to be completed.
The outrigger wall-connecting piece of new construction is mostly embedded steel tube in the middle part of structure peripheral top surface of the beam at present;Secondary structure is masonry Complete after-pouring.Following defect be present in the conventional construction method of use:
1st, wall-connecting piece uses the embedded steel tube in the middle part of structure peripheral top surface of the beam, and outer walling and internal and external ornament need secondary reparation, Workload is larger and has hidden leakage defect.
2nd, secondary structure is constructed after the completion of masonry, it is necessary to wire-tie, and formwork, is poured, the series of processes such as form removal, easily Destroy original masonry, cause masonry to loosen, cracking, external wall seepage situations such as, and influence follow-up masonry construction, the duration is elongated.
Therefore, there is an urgent need to find one kind build rise long-span outrigger wall-connecting piece work progress both can ensure that support body it is stable, And can simple process, save duration, cost-effective wall-connecting piece construction method.
The content of the invention
The invention aims to solve the above problems, there is provided one kind is building rise long-span outrigger wall-connecting piece construction party Method.
In order to reach foregoing invention purpose, the present invention uses following technical scheme:
One kind is building rise long-span outrigger wall-connecting piece construction method,
Apply drawing with building jointly secondary structure beam and column is set at exterior wall position, secondary structure beam and column includes constructional column and linking Beam;
Constructional column is first set, and constructional column is equidistantly divided equally along beam span direction to be set, and constructional column is smaller than being equal to 5 meters;
And divide equally in short transverse along floor height and linking beam is set, linking beam is smaller than being equal to 4 meters;
The mode that pours of constructional column pours for segmentation, and first pours to back is linked every time, finally pours to Vierendeel girder bottom;
Wall-connecting piece is fixedly mounted, specific to press 2 step, 2 across spacing setting, i.e. the principle of wall-connecting piece active area 3*3.6m is set.
As preferable scheme, the construction intercolumniation is 3-4.5 rice.
As preferable scheme, the case bay that links is 3.5-4 rice.
As preferable scheme, it is more than 8 meters suitable for floor height, span is more than 10 meters.
As preferable scheme, the Φ 14 of pore-forming 4 specially on the outside of above-mentioned secondary structure beam or post, and use 4 Φ 12 Mechanical bolt fixes the rear-mounted steel plates of 10 × 100 × 100mm.
As preferable scheme, rear-mounted steel plate and the wall-connecting piece steel tube head section one side full welds of Φ 48.3 × 3.6 are connected Connect as outrigger wall-connecting piece.
As preferable scheme, this method uses wall-connecting piece structure;Wall-connecting piece structure includes wall-connecting piece and outrigger;Outrigger bag Include vertical rod, vertical pole, cross bar, snap close piece;Wall-connecting piece includes wall connecting rod, even wall coil, adjusting rod and rearmounted plate;Vertical rod, vertical pole, cross bar Between locked by snap close piece, cross bar with even wall coil locked by snap close piece;Wall connecting rod insertion is even in wall coil, and its one end uses Rearmounted plate is bolted, and the other end of wall connecting rod is exposed to even outside wall coil, and the end coordinates lock by locking plate and bolt Tightly;Adjusting rod is at least one, and one end of adjusting rod is provided with adjusting screw rod, and the end contacts with secondary structure beam or post, regulation The other end of bar is connected with even wall coil or vertical rod;Even wall coil outer end is provided with end seat, even wall coil wall thickness 2-5mm, and even wall coil external diameter is 16-20mm, even wall coil and the cooperation of wall connecting rod gap.
The present invention compared with prior art, has the advantages that:
(1)It is fixedly mounted after rear-mounted steel plate pore-forming with mechanical bolt, installation effect is intuitively visible to be surveyed, quality control difficulty It is low.
(2)All wall-connecting piece materials are recyclable, reduce cost.
(3)Secondary structure is constructed in advance, shortens the construction period, reduces masonry breakage probability, and masonry project is neat and artistic.
(4)Wall-connecting piece is connected with constructional column in advance, it is ensured that external scaffolding resistance to overturning is reliable.
(5)Greatly reduce the workload of the secondary repairing of alien invasion and reduce exterior wall leakage hidden danger.
Brief description of the drawings
Fig. 1 is constructional column and linking beam setting floor map used by the inventive method;
Fig. 2 is the wall-connecting piece steel pipe of the present invention and rear-mounted steel plate connecting node side schematic view;
Fig. 3 is the wall-connecting piece steel pipe of the present invention and rear-mounted steel plate connecting node side schematic view;
Fig. 4 is the structural representation for the wall-connecting piece structure that the present invention uses.
In figure:01 constructional column, 02 linking beam, 03 rear-mounted steel plate, 04 wall-connecting piece steel pipe, 1 wall-connecting piece, 2 outriggers, 3 vertical rods, 4 vertical poles, 5 cross bars, 6 snap close pieces, 7 wall connecting rods, 8 connect wall coil, 9 adjusting rods, 10 rearmounted plates, 11 locking plates, 12 end seats.
Embodiment
Explanation is further described to technical scheme below by specific embodiment.
If without specified otherwise, the raw material employed in embodiments of the invention is raw material commonly used in the art, is implemented Method employed in example, it is the conventional method of this area.
Embodiment 1:
The outrigger wall-connecting piece floor height of current skyscraper is more than 8 meters, and span is more than 10 meters, therefore in order to which practical floor height is more than 8 Rice, span are more than 10 meters, rise long-span outrigger wall-connecting piece construction method are being built using one kind,
As shown in figure 1, with build jointly apply drawing exterior wall position set secondary structure beam and column, secondary structure beam and column include construction Post 01 and linking beam 02;
Constructional column 01 is first set, and constructional column 01 is equidistantly divided equally along beam span direction to be set, and constructional column is smaller than being equal to 5 meters;It is excellent The construction intercolumniation of choosing is 3-4.5 rice, and the present embodiment is 4 meters,
And divide equally in short transverse along floor height and linking beam 02 is set, linking beam 02 is smaller than being equal to 4 meters;Optimal selection linking beam 02 spacing is 3.5-4 rice, and the present embodiment selection is 3.8 meters;The mode that pours of constructional column 01 pours for segmentation, and first pours every time Push up, finally poured to Vierendeel girder bottom to linking beam 02.
Wall-connecting piece is fixedly mounted, specifically presses 2 step, 2 across spacing setting, i.e. the principle of wall-connecting piece active area 3*3.6m is set Put, as shown in Figures 2 and 3, the Φ 14 of pore-forming 4 specially on the outside of above-mentioned secondary structure beam or post, and use 4 Φ, 12 mechanical spiral shells Bolt fixes the rear-mounted steel plates of 10 × 100 × 100mm.Rear-mounted steel plate 03 and the termination of 48.3 × 3.6 wall-connecting piece steel pipes of Φ 04 are cut The full weld connection of face one side is used as outrigger wall-connecting piece.
Embodiment 2:
One kind is building rise long-span outrigger wall-connecting piece construction method, as shown in figure 1, applying drawing in the setting of exterior wall position with building jointly Secondary structure beam and column, secondary structure beam and column include constructional column 01 and linking beam 02;
Constructional column 01 is first set, and constructional column 01 is equidistantly divided equally along beam span direction to be set, and constructional column is smaller than being equal to 5 meters;It is excellent The construction intercolumniation of choosing is 3-4.5 rice, and the present embodiment is 4 meters,
And divide equally in short transverse along floor height and linking beam 02 is set, linking beam 02 is smaller than being equal to 4 meters;Optimal selection linking beam 02 spacing is 3.5-4 rice, and the present embodiment selection is 3.8 meters;The mode that pours of constructional column 01 pours for segmentation, and first pours every time Push up, finally poured to Vierendeel girder bottom to linking beam 02.
The wall-connecting piece structure used for this method;As shown in figure 4, the wall-connecting piece structure includes wall-connecting piece 1 and outrigger 2; Outrigger 2 includes vertical rod 3, vertical pole 4, cross bar 5, snap close piece 6;Wall-connecting piece 1 includes wall connecting rod 7, even wall coil 8, adjusting rod 9 and rearmounted plate 10;Locked between vertical rod 3, vertical pole 4, cross bar 5 by snap close piece 6, cross bar 5 is locked with even wall coil 8 by snap close piece 6;Wall connecting rod 7 Insertion is even in wall coil 8, and its one end is bolted using rearmounted plate 10, and the other end of wall connecting rod 7 is exposed to even wall coil 8 Outside, and the end is locked by locking plate 11 and bolt;Adjusting rod 9 is at least one, and one end of adjusting rod 9 is provided with regulation spiral shell Bar, and the end contacts with secondary structure beam or post, the other end of adjusting rod 9 is connected with even wall coil 8 or vertical rod 3;The even outer end of wall coil 8 Provided with end seat 12, connect the wall thickness 2-5mm of wall coil 8, even the external diameter of wall coil 8 is 16-20mm, and even wall coil 8 coordinates with the gap of wall connecting rod 7.
By setting wall connecting rod 7, even wall coil 8, adjusting rod 9 and locking plate 11 can coordinate and reach to the reasonable of outrigger 2 Regulation, so as to keep the firm of outrigger, installation is reliable, repeats and utilizes.

Claims (7)

1. one kind is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that
Apply drawing with building jointly secondary structure beam and column is set at exterior wall position, secondary structure beam and column includes constructional column and linking Beam;
Constructional column is first set, and constructional column is equidistantly divided equally along beam span direction to be set, and constructional column is smaller than being equal to 5 meters;
And divide equally in short transverse along floor height and linking beam is set, linking beam is smaller than being equal to 4 meters;
The mode that pours of constructional column pours for segmentation, and first pours to back is linked every time, finally pours to Vierendeel girder bottom;
Wall-connecting piece is fixedly mounted, specific to press 2 step, 2 across spacing setting, i.e. the principle of wall-connecting piece active area 3*3.6m is set.
2. one kind according to claim 1 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that described Construction intercolumniation is 3-4.5 rice.
3. one kind according to claim 1 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that described It is 3.5-4 rice to link case bay.
4. one kind according to claim 1 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that is applicable It is more than 8 meters in floor height, span is more than 10 meters.
5. one kind according to claim 1 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that specific For the Φ 14 of pore-forming 4 on the outside of above-mentioned secondary structure beam or post, and after fixing 10 × 100 × 100mm using the mechanical bolts of 4 Φ 12 Put formula steel plate.
6. one kind according to claim 5 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that by after Put formula steel plate and be connected with the wall-connecting piece steel tube head section one side full welds of Φ 48.3 × 3.6 and be used as outrigger wall-connecting piece.
7. one kind according to claim 1 is building rise long-span outrigger wall-connecting piece construction method, it is characterised in that the party Method uses wall-connecting piece structure;Wall-connecting piece structure includes wall-connecting piece(1)And outrigger(2);Outrigger(2)Including vertical rod(3), vertical pole(4)、 Cross bar(5), snap close piece(6);Wall-connecting piece(1)Including wall connecting rod(7), even wall coil(8), adjusting rod(9)With rearmounted plate(10);Vertical rod (3), vertical pole(4), cross bar(5)Between pass through snap close piece(6)Locking, cross bar(5)With even wall coil(8)Pass through snap close piece(6)Locking; Wall connecting rod(7)Insertion connects wall coil(8)It is interior, and its one end uses rearmounted plate(10)It is bolted, wall connecting rod(7)The other end Exposed to even wall coil(8)Outside, and the end passes through locking plate(11)Locked with bolt;Adjusting rod(9)At least one, regulation Bar(9)One end be provided with adjusting screw rod, and the end contacts with secondary structure beam or post, adjusting rod(9)The other end with even wall coil (8)Or vertical rod(3)Connection;Even wall coil(8)Outer end is provided with end seat(12), connect wall coil(8)Wall thickness 2-5mm, connect wall coil(8)External diameter is 16-20mm, connect wall coil(8)With wall connecting rod(7)Gap coordinates.
CN201710612987.6A 2017-07-25 2017-07-25 One kind is building rise long-span outrigger wall-connecting piece construction method Pending CN107675871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710612987.6A CN107675871A (en) 2017-07-25 2017-07-25 One kind is building rise long-span outrigger wall-connecting piece construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710612987.6A CN107675871A (en) 2017-07-25 2017-07-25 One kind is building rise long-span outrigger wall-connecting piece construction method

Publications (1)

Publication Number Publication Date
CN107675871A true CN107675871A (en) 2018-02-09

Family

ID=61133093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710612987.6A Pending CN107675871A (en) 2017-07-25 2017-07-25 One kind is building rise long-span outrigger wall-connecting piece construction method

Country Status (1)

Country Link
CN (1) CN107675871A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162363A (en) * 2018-06-19 2019-01-08 浙江省建工集团有限责任公司 A kind of structure and its technique for accelerating high structures masonry project progress and overall stability
CN111636673A (en) * 2020-05-22 2020-09-08 五冶集团上海有限公司 Large-span and super-story-height building external scaffold wall connecting piece fixing auxiliary tool
CN113550562A (en) * 2021-06-02 2021-10-26 中国五冶集团有限公司 Large-span large-storey high-wall-connecting piece setting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191013855A (en) * 1910-06-08 1911-03-16 William John Wood Improvements in Scaffold Brackets.
CN102312563A (en) * 2011-06-16 2012-01-11 永升建设集团有限公司 Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN103452304A (en) * 2013-08-08 2013-12-18 广西建工集团第五建筑工程有限责任公司 Inserted type outer frame L-type steel wall connecting piece structure free of scaffold hole and construction method thereof
CN104295003A (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 Structural column construction method
CN105863236A (en) * 2016-03-25 2016-08-17 上海十三冶建设有限公司 Construction method of wall connecting device for industrial factory building outer wall scaffold
CN106013755A (en) * 2016-06-29 2016-10-12 浙江省建工集团有限责任公司 Cantilever frame for existing building and construction method
CN205840299U (en) * 2016-06-29 2016-12-28 浙江省建工集团有限责任公司 A kind of wall-connecting piece structure for Overhanging Outside Scaffold
CN206158151U (en) * 2016-09-26 2017-05-10 中建三局第三建设工程有限责任公司 Improvement type is wall spare even

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191013855A (en) * 1910-06-08 1911-03-16 William John Wood Improvements in Scaffold Brackets.
CN102312563A (en) * 2011-06-16 2012-01-11 永升建设集团有限公司 Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN103452304A (en) * 2013-08-08 2013-12-18 广西建工集团第五建筑工程有限责任公司 Inserted type outer frame L-type steel wall connecting piece structure free of scaffold hole and construction method thereof
CN104295003A (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 Structural column construction method
CN105863236A (en) * 2016-03-25 2016-08-17 上海十三冶建设有限公司 Construction method of wall connecting device for industrial factory building outer wall scaffold
CN106013755A (en) * 2016-06-29 2016-10-12 浙江省建工集团有限责任公司 Cantilever frame for existing building and construction method
CN205840299U (en) * 2016-06-29 2016-12-28 浙江省建工集团有限责任公司 A kind of wall-connecting piece structure for Overhanging Outside Scaffold
CN206158151U (en) * 2016-09-26 2017-05-10 中建三局第三建设工程有限责任公司 Improvement type is wall spare even

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162363A (en) * 2018-06-19 2019-01-08 浙江省建工集团有限责任公司 A kind of structure and its technique for accelerating high structures masonry project progress and overall stability
CN111636673A (en) * 2020-05-22 2020-09-08 五冶集团上海有限公司 Large-span and super-story-height building external scaffold wall connecting piece fixing auxiliary tool
CN113550562A (en) * 2021-06-02 2021-10-26 中国五冶集团有限公司 Large-span large-storey high-wall-connecting piece setting method

Similar Documents

Publication Publication Date Title
CN203866966U (en) Novel assembly type frame core tube steel structure residential housing system
CN103352564B (en) Horizontal structure shuttering system and construction method
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN107675871A (en) One kind is building rise long-span outrigger wall-connecting piece construction method
CN106351445A (en) Bracing reinforcement system and installation construction method of steel reinforced concrete inclined shear wall form assembly
CN202202412U (en) Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN110725402B (en) Multi-cavity combined shear wall and H-shaped steel beam assembled node and construction method thereof
CN207453446U (en) One kind is building rise long-span outrigger wall-connecting piece
CN103669566B (en) construction method of steel reinforced concrete base of large-span net rack roof
CN202202415U (en) Side node of rectangular steel pipe concrete special-shaped column and steel beam framework
CN210238867U (en) Buckle formula exempts from to tear open form structure
CN114737789A (en) Combined structure dismantling and external wall temporary reinforcing construction method
CN104234418A (en) Early removal formwork for fabrication of reinforced concrete beams and construction method thereof
CN109235709B (en) Full cast-in-place outer wall structure of building
CN105756323A (en) Civil building kitchen and toilet-based construction method for sunk suspended form mold
CN104088580B (en) A kind of Combined gate having enough to meet the need use and preparation method thereof
CN104895220A (en) Connecting joint of assembled profile steel confined concrete shear wall structure
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure
CN206053129U (en) A kind of light steel construction post of T-shaped
CN111321844A (en) Hollow sandwich steel pipe concrete beam with eccentrically placed inner pipe
CN217000198U (en) Fixing structure for upright post connecting beam
CN217000308U (en) Short-limb independent masonry structure for building
CN212224622U (en) Pouring mold for constructional column of filler wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209