CN107664726A - The control method of switching network detecting system and switching network detecting system - Google Patents

The control method of switching network detecting system and switching network detecting system Download PDF

Info

Publication number
CN107664726A
CN107664726A CN201610609258.0A CN201610609258A CN107664726A CN 107664726 A CN107664726 A CN 107664726A CN 201610609258 A CN201610609258 A CN 201610609258A CN 107664726 A CN107664726 A CN 107664726A
Authority
CN
China
Prior art keywords
voltage
battery
capacitor
measurement apparatus
battery pack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610609258.0A
Other languages
Chinese (zh)
Inventor
赵恩海
董维胜
宋佩
邹庆华
谭婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Gaode Rail Transit Technology Co ltd
Original Assignee
Yancheng Huizhong New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Huizhong New Energy Technology Co Ltd filed Critical Yancheng Huizhong New Energy Technology Co Ltd
Priority to CN201610609258.0A priority Critical patent/CN107664726A/en
Publication of CN107664726A publication Critical patent/CN107664726A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Secondary Cells (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

This application discloses switching network detecting system and the control method of switching network detecting system.Wherein, an embodiment of switching network detecting system includes:First voltage measurement apparatus, one end are connected with the negative pole of battery pack or capacitor bank, and the other end is directly connected with the first output end, or are connected by switching with the first output end;Second voltage measurement apparatus, one end are connected with the negative pole of battery pack or capacitor bank, and the other end is directly connected with the second output end, or are connected by switching with the second output end;Processor, it is connected with first voltage measurement apparatus and second voltage measurement apparatus, for judging the voltage that first voltage measurement apparatus measures or the voltage that second voltage measurement apparatus is measured whether in the range of pre-setting, if it is not, then it is abnormal to determine that switching network occurs.The embodiment realizes the detection of switching network failure, while detects simple circuit, and reliability is high, strong antijamming capability.

Description

The control method of switching network detecting system and switching network detecting system
Technical field
The application is related to technical field of electric power, more particularly to the control of switching network detecting system and switching network detecting system Method processed.
Background technology
Battery pack or capacitor bank are widely used in fields such as communication back-up source, electric automobile, energy-accumulating power stations.And It is required to use switching network in the voltage measurement of battery pack or capacitor bank and equalization operation.Usual switching network and battery Each section cell or each capacitor in group or capacitor bank have connection.
The detection of existing switching network mainly by each switch the detection circuit of serial or parallel connection one come real It is existing.However, the cell or capacitor due to being connected in battery pack or capacitor are relatively more, for example, the battery of electric bus Group can connect up to hundreds of section cells, therefore when whether each internal switch of detection switch network has abnormality, need Circuit is largely detected, so causes the volume, cost, complexity of integrated circuit to greatly increase, and it is reliability, anti-interference Ability is greatly reduced.
The content of the invention
This application provides switching network detecting system, to solve the problems, such as to mention in background technology.
In a first aspect, this application provides a kind of switching network detecting system, the switching network, one end connection battery pack Or capacitor bank, the other end are output end, for the combination by internal switch, make at least one in battery pack or capacitor bank Individual battery or capacitor are connected to the output end, and the output end includes the first output end and the second output end, and described first Output end and the second output end are respectively cathode output end and cathode output end, and the system includes:First voltage measurement apparatus, One end is connected with the negative pole of battery pack or capacitor bank, and the other end is directly connected with first output end, or by switch with First output end is connected;Second voltage measurement apparatus, one end are connected with the negative pole of battery pack or capacitor bank, and the other end is straight Connect and be connected with second output end, or be connected by switching with second output end;Processor, surveyed with the first voltage Amount device and the second voltage measurement apparatus are connected, for judge voltage that the first voltage measurement apparatus measures or Whether the voltage that the second voltage measurement apparatus is measured is in the range of pre-setting, if it is not, then determining the switch Network occurs abnormal.
In certain embodiments, the battery pack or capacitor bank are in series by even number battery or capacitor, each The positive pole and negative pole of battery or capacitor are connected with the prime internal switch of the switching network, the battery pack or capacitor bank In adjacent two batteries or the capacitor positive pole and negative pole that are connected with each other, be connected with same prime internal switch, it is and described The other end of the prime internal switch of the positive pole of battery pack or capacitor bank connection is connected to the second voltage measurement apparatus, with The other end of switch of the negative pole connection of the battery pack or capacitor bank is connected to the first voltage measurement apparatus, and described The other end that the prime internal switch of odd number battery or capacitor is separated between the positive pole of battery pack or capacitor bank is connected to institute First voltage measurement apparatus is stated, the prime with being separated with even number battery or capacitor between the positive pole of the battery pack or capacitor bank The other end of internal switch is connected to the second voltage measurement apparatus.
In certain embodiments, the system also includes tertiary voltage measurement apparatus, and the tertiary voltage measurement apparatus is used In the voltage for measuring the output end;And the processor is connected with the tertiary voltage measurement apparatus, the processor is also The voltage measured for obtaining the tertiary voltage measurement apparatus.
In certain embodiments, the battery pack or capacitor bank are in series by odd number battery or capacitor, each The positive pole and negative pole of battery or capacitor are connected with the prime internal switch of the switching network, the battery pack or capacitor bank In adjacent two batteries or the capacitor positive pole and negative pole that are connected with each other, be connected with same prime internal switch, it is and described The other end of the prime internal switch of the positive pole of battery pack or capacitor bank connection is connected to the first voltage measurement apparatus, with The other end of switch of the negative pole connection of the battery pack or capacitor bank is connected to the second voltage measurement apparatus, and described The other end that the prime internal switch of even number battery or capacitor is separated between the positive pole of battery pack or capacitor bank is connected to institute First voltage measurement apparatus is stated, the prime with being separated with odd number battery or capacitor between the positive pole of the battery pack or capacitor bank The other end of internal switch is connected to the second voltage measurement apparatus.
In certain embodiments, the switching network also includes rear class internal switch, the rear class internal switch with it is described Prime internal switch connects, for the prime internal switch to be accessed into cathode output end or cathode output end.
In certain embodiments, the battery pack or capacitor bank are in series by battery or capacitor, each battery or The positive pole and negative pole of capacitor are connected with the internal switch of the switching network, adjacent two in the battery pack or capacitor bank The positive pole and negative pole that individual battery or capacitor are connected with each other, are connected with two internal switches, described two internal switches it is another End is respectively connecting to first voltage measurement apparatus and second voltage measurement apparatus, connects with the positive pole of the battery pack or capacitor bank The other end of the internal switch connect is connected to the first voltage measurement apparatus, connects with the negative pole of the battery pack or capacitor bank The other end of the switch connect is connected to the second voltage measurement apparatus.
In certain embodiments, the processor is additionally operable to after determining that exception occurs in the switching network, is opened described in control The internal switch for closing network is all off.
In certain embodiments, the scope is according to each electricity in the battery pack or capacitor bank measured in advance The overcharging of each battery or capacitor, overdischarge pressure are set in pond or the voltage of capacitor, or battery pack or capacitor bank.
In certain embodiments, the processor is connected by network with remote server, and the remote server is used for Obtain the information for being used to represent that the switching network appearance to be abnormal that the processor is sent.
Second aspect, this application provides a kind of control method of switching network detecting system, methods described includes:Control Switch closure between the battery of the output end or the negative pole of capacitor and the first voltage measurement apparatus, with Obtain the output end that the first voltage measurement apparatus is measured battery or capacitor negative pole with Voltage between the negative pole of the battery pack or capacitor bank;Judge whether is voltage that the first voltage measurement apparatus measures In the battery of the predetermined output end or the negative pole of capacitor and the battery pack or capacitor bank Negative pole between voltage in the range of;If it is not, then it is abnormal to determine that the switching network occurs.
In certain embodiments, the battery or capacitor of the output end, is followed successively by the battery pack Or in capacitor bank, each battery or electricity from closest to the battery or capacitor of the battery pack or the negative pole of capacitor bank Container;And it is described judge voltage that the first voltage measurement apparatus measures whether it is predetermined it is described it is to be connected extremely In the range of voltage between the battery of the output end or the negative pole of capacitor and the battery pack or the negative pole of capacitor bank, Also include:If it is, the battery of the control output end or the positive pole of capacitor and the second voltage Switch closure between measurement apparatus, to obtain the output end that the second voltage measurement apparatus measures Voltage between battery or the positive pole and the battery pack or the negative pole of capacitor bank of capacitor;Judge the second voltage measurement The voltage that measurement device goes out whether the predetermined output end battery or capacitor positive pole with In the range of voltage between the negative pole of the battery pack or capacitor bank;If it is not, then it is different to determine that the switching network occurs Often;If it is, the battery of the output end or capacitor are connected into the output end, pass through described Three voltage measuring apparatus measure the voltage of the output end.
In certain embodiments, the negative pole of the battery of the output end or capacitor and the battery pack Or the scope and the battery of the output end or the positive pole of capacitor of the voltage between the negative pole of capacitor bank The scope of voltage between the battery pack or the negative pole of capacitor bank is according to the overcharging of battery or capacitor, overdischarge pressure And the tertiary voltage measurement apparatus measures the voltage determination of the output end.
The switching network detecting system that the application provides, pass through first voltage measurement apparatus and second voltage measurement apparatus Set, realize the detection of switching network failure, while detect simple circuit, reliability is high, strong antijamming capability.
Brief description of the drawings
By reading the detailed description made to non-limiting example made with reference to the following drawings, the application's is other Feature, objects and advantages will become more apparent upon:
Fig. 1 is to can apply to exemplary system architecture figure therein according to the application;
Fig. 2 is a structural representation according to the embodiment of the switching network detecting system of the application;
Fig. 3 A, Fig. 3 B, Fig. 3 C, Fig. 3 D are another structures according to the embodiment of the switching network detecting system of the application Schematic diagram;
Fig. 4 is another structural representation according to the embodiment of the switching network detecting system of the application;
Fig. 5 is a schematic diagram according to the application scenarios of the switching network detecting system of the application;
Fig. 6 is the flow chart according to one embodiment of the control method of the switching network detecting system of the application;
Fig. 7 is adapted for the structural representation of the processor of the switching network detecting system for realizing the embodiment of the present application.
Embodiment
The application is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining related invention, rather than the restriction to the invention.It also should be noted that in order to Be easy to describe, illustrate only in accompanying drawing to about the related part of invention.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the application in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Fig. 1 shows the exemplary system architecture 100 for the embodiment that can apply the switching network detecting system of the application.
As shown in figure 1, system architecture 100 can include being provided with the equipment 101 of battery pack or capacitor bank, network 102, Server 103.Network 102 between equipment 101 and server 103 provide communication link medium.Network 102 can wrap Include various connection types, such as wired, wireless communication link or fiber optic cables etc..
Equipment 101 can be communication back-up source, electric automobile, electric automobile charging pile, energy-accumulating power station etc..
Server 103 can be the server analyzed information and recorded, such as switching network in equipment 101 is examined The abnormal information for the switching network that examining system is sent is analyzed and recorded, and generation includes position or the numbering letter of the equipment of exception The prompting message of breath, the remote management of switching network is realized with this.Server 103 can be used for issuing to control device 101 The voltage of each battery or capacitor in battery pack or capacitor bank measure in advance or extrapolating.In addition, server 103 is also It can directly send and instruct to equipment 101, the processor in control device 101 carries out the detection operation of switching network.
It should be noted that each part for the switching network detecting system that the embodiment of the present application is provided typically divides It is not arranged in equipment 101, correspondingly, the control method of switching network detecting system is typically performed by equipment 101.
It should be understood that the number of the equipment, network and server in Fig. 1 is only schematical., can according to needs are realized With with any number of equipment, network and server.
With continued reference to Fig. 2, Fig. 2 shows the structural representation of one embodiment of switching network detecting system.Switch net Network 201, one end connection battery pack or capacitor bank 202, the other end are output end 203, for the combination by internal switch, are made At least one battery or capacitor in battery pack or capacitor bank 202 are connected to output end 203, and output end 203 includes first Output end and the second output end, the first output end and the second output end are respectively cathode output end and cathode output end, this implementation The switching network detecting system 200 of example includes:First voltage measurement apparatus 204, one end and battery pack or capacitor bank 202 it is negative Extremely it is connected, the other end is directly connected with the first output end, or is connected by switching with the first output end;Second voltage measurement apparatus 205, one end is connected with the negative pole of battery pack or capacitor bank 202, and the other end is directly connected with the second output end, or passes through switch It is connected with the second output end;Processor (not shown), with first voltage measurement apparatus 204 and second voltage measurement apparatus 205 are connected, for judging voltage that first voltage measurement apparatus 204 measures or second voltage measurement apparatus 205 measures Whether voltage is in the range of pre-setting, if it is not, then determining that exception occurs in switching network 201.Processor can be one For the comparator of comparison voltage size, or other PLDs and microcomputer.
In the present embodiment, processor can be by common wireless connection or wired connection mode with being used for controlling switch The controller of the internal switch opening and closing of network 201, first voltage measurement apparatus 204 and second voltage measurement apparatus 205 are connected.
In the present embodiment, output end 203 can be connected to each electricity in detection and balancing battery group or capacitor bank The device of the electricity of pond or capacitor, or the device of the health status (SOH) for detecting battery or capacitor.
In some optional implementations of the present embodiment, system also includes tertiary voltage measurement apparatus (not shown), The tertiary voltage measurement apparatus is used for the voltage for measuring the output end 203;And the processor and the tertiary voltage Measurement apparatus connects, and the processor is additionally operable to obtain the voltage that the tertiary voltage measurement apparatus is measured.It is determined that being used for A battery or capacitor in battery pack or capacitor bank 202, or multiple adjacent batteries or capacitor are connected to output end Internal switch it is normal after, it can be connected to output end by above-mentioned internal switch, be measured by tertiary voltage measurement apparatus Go out its real voltage.Processor can be further determined that including said one battery or capacitor by the real voltage measured, Or the voltage range of the multiple batteries or capacitor of multiple adjacent batteries or capacitor.
In some optional implementations of the present embodiment, above range is according to the battery pack or electricity measured in advance The voltage of each battery or capacitor in container group 202, or the overcharging of each battery or capacitor in battery pack or capacitor bank, Overdischarge pressure is set.When the scope pre-set is 202 normal work of switching network, first voltage measurement apparatus 204 or the The scope for the voltage that two voltage measuring apparatus 205 should be measured, for example, the both ends of first voltage measurement apparatus 204 are respectively connecting to The both positive and negative polarity of a certain section cell, the virtual voltage of the section cell is that first voltage measurement apparatus 204 should be measured Voltage.The voltage of the section cell can be measured in advance, determine that first voltage measurement apparatus 204 should be measured with this Voltage, also can according to the overcharging of the section cell is obtained ahead of time, overdischarge pressure determines that first voltage measurement apparatus 204 should be surveyed The voltage measured.The electrically operated record of charge and discharge can also be carried out according to an Initial Voltage Value and then to this battery or capacitor Estimate the now virtual voltage of the battery or capacitor.For example, the voltage for measuring the section cell in advance is 2.0V, in advance The error of setting is no more than 0.1V, then the scope for the voltage that first voltage measurement apparatus 204 should be measured be 1.9V~ 2.1V;If the overcharged voltage of the section cell is 4V, overdischarge pressure is 1V, and the error pre-set is no more than 0.1V, that The scope for the voltage that first voltage measurement apparatus 204 should be measured is 0.9V~4.1V.
In some optional implementations of the present embodiment, battery pack or capacitor bank 202 are by even number battery or electricity Container is in series, and the positive pole and negative pole of each battery or capacitor are connected with the prime internal switch of switching network 201, battery The positive pole and negative pole that two adjacent batteries or capacitor are connected with each other in group or capacitor bank 202, are connected with same prime Internal switch, the other end for the prime internal switch being connected with the positive pole of battery pack or capacitor bank 202 are connected to second voltage Measurement apparatus 205, the other end for the switch being connected with the negative pole of battery pack or capacitor bank 202 are connected to first voltage measurement dress Put 204, be separated between the positive pole of battery pack or capacitor bank 202 odd number battery or capacitor prime internal switch it is another End is connected to first voltage measurement apparatus 204, with being separated with even number battery or electric capacity between the positive pole of battery pack or capacitor bank 202 The other end of the prime internal switch of device is connected to second voltage measurement apparatus 205.
As shown in Figure 3A, if the cell being connected in series in battery pack is even number, to battery or capacitor (2m) is measured or the operation such as equilibrium, then needs closure switch S (2n), S (2n-1), SE1 and SO0, cathode output end and electricity The positive pole of pond or capacitor (2m) connects, and cathode output end connects with the negative pole of battery or capacitor (2m), to cathode output end Carried out between cathode output end voltage measurement or charge and discharge be exactly battery or capacitor (2m) are carried out voltage measurement or fill, Electric discharge.Now, the voltage that first voltage measurement apparatus 204 measures is battery or capacitor (2m) Anode and battery group or capacitor Voltage between group negative pole, the voltage that second voltage measurement apparatus 205 measures is exactly battery or capacitor (2m-1) positive pole and electricity Voltage between pond group or capacitor bank negative pole, the electricity that first voltage measurement apparatus 204 measures with second voltage measurement apparatus 205 The difference of pressure is the voltage of battery or capacitor (2m).To be measured to battery or capacitor (2m-1) or the operation such as equilibrium, Then need closure switch S (2n-1), S (2n-2), SO1 and the positive pole of SE0, cathode output end and battery or capacitor (2m-1) Connection, cathode output end connects with the negative pole of battery or capacitor (2m-1), to entering between cathode output end and cathode output end Row voltage measurement or charge and discharge are exactly to carry out voltage measurement or charge and discharge to battery or capacitor (2m-1).Now, the second electricity The voltage that pressure measuring device 205 measures is the electricity between battery or capacitor (2m-1) Anode and battery group or capacitor bank negative pole Pressure, the voltage that first voltage measurement apparatus 204 measures is exactly battery or capacitor (2m-2) Anode and battery group or capacitor bank Voltage between negative pole, the difference in voltage that first voltage measurement apparatus 204 and second voltage measurement apparatus 205 measure be battery or The voltage of capacitor (2m-1).The mode of operation of other cells is by that analogy.The principle of structure shown in Fig. 3 C and Fig. 3 A classes Seemingly.
In some optional implementations of the present embodiment, battery pack or capacitor bank 202 are by odd number battery or electricity Container is in series, and the positive pole and negative pole of each battery or capacitor are connected with the prime internal switch of switching network 201, battery The positive pole and negative pole that two adjacent batteries or capacitor are connected with each other in group or capacitor bank 202, are connected with same prime Internal switch, the other end for the prime internal switch being connected with the positive pole of battery pack or capacitor bank 202 are connected to first voltage Measurement apparatus 204, the other end for the switch being connected with the negative pole of battery pack or capacitor bank 202 are connected to second voltage measurement dress Put 205, be separated between the positive pole of battery pack or capacitor bank 202 even number battery or capacitor prime internal switch it is another End is connected to first voltage measurement apparatus 204, with being separated with odd number battery or electric capacity between the positive pole of battery pack or capacitor bank 202 The other end of the prime internal switch of device is connected to second voltage measurement apparatus 205.
As shown in Figure 3 B, the cell being connected in series in battery pack is odd number, to battery or capacitor (2m+ 1) measure or the operation such as equilibrium, then need closure switch S (2n+1), S (2n), SO1 and SE0, cathode output end and battery Or the positive pole connection of capacitor (2m+1), cathode output end connect with the negative pole of battery or capacitor (2m+1), positive pole are exported Carried out between end and cathode output end voltage measurement or charge and discharge be exactly to battery or capacitor (2m+1) progress voltage measurement or Charge and discharge.Now, the voltage that second voltage measurement apparatus 205 measures be battery or capacitor (2m+1) Anode and battery group or Voltage between capacitor bank negative pole, the voltage that first voltage measurement apparatus 204 measures are exactly battery or capacitor (2m) positive pole Voltage between battery pack or capacitor bank negative pole, first voltage measurement apparatus 204 measure with second voltage measurement apparatus 205 Difference in voltage be battery or capacitor (2m+1) voltage.To be measured to battery or capacitor (2m) or the behaviour such as equilibrium Make, then need closure switch S (2n), S (2n-1), SE1 and the positive pole of SO0, cathode output end and battery or capacitor (2m) to connect Connect, cathode output end connects with the negative pole of battery or capacitor (2m), to carrying out electricity between cathode output end and cathode output end Pressure measurement or charge and discharge are exactly to carry out voltage measurement or charge and discharge to battery or capacitor (2m).Now, first voltage measures The voltage that device 204 measures is the voltage between battery or capacitor (2m) Anode and battery group or capacitor bank negative pole, second The voltage that voltage measuring apparatus 205 measures is exactly between battery or capacitor (2m-1) Anode and battery group or capacitor bank negative pole Voltage, the difference in voltage that first voltage measurement apparatus 204 and second voltage measurement apparatus 205 measure is battery or capacitor The voltage of (2m).The mode of operation of other cells is by that analogy.The principle of structure is similar with Fig. 3 B shown in Fig. 3 D.
In some optional implementations of the present embodiment, switching network 201 also includes rear class internal switch, in rear class Portion's switch is connected with prime internal switch, for prime internal switch to be accessed into cathode output end 203 or cathode output end 203. As shown in Figure 3A, prime internal switch includes S (0)~S (2n), and rear class internal switch includes the switch that SE and SO take the lead;Such as figure Shown in 3B, prime internal switch includes S (0)~S (2n+1), and rear class internal switch includes the switch that SE and SO take the lead;Such as Fig. 3 C Shown, prime internal switch includes S (0)~S (2n), and rear class internal switch includes the switch that SP takes the lead;As shown in Figure 3 D, prime Internal switch includes S (0)~S (2n+1), and rear class internal switch includes the switch that SP takes the lead.In the course of work of reality, with Prime internal switch can be neglected compared to the fault rate of rear class internal switch, now by taking Fig. 3 A as an example, can use following method The failure of detection switch network:
It is possible, firstly, to closure switch S (0), obtains the voltage that second voltage measurement apparatus 205 measures, now second voltage The voltage that measurement apparatus 205 measures should be 0, if more than the error range of setting, such as 0.1V, then judge abnormality occur, All switches should be now disconnected, avoid damaging.If not less than the error range of setting, closure switch S (1), first is obtained The voltage that voltage measuring apparatus 204 measures, now what first voltage measurement apparatus 204 measured is the voltage that voltage is battery (1). If the overcharged voltage of battery (1) is 4V, overdischarge pressure is 1V, then the voltage that now first voltage measurement apparatus 204 measures should be In the range of 0.9V~4.1V, if not in this range, there is abnormality in judgement, should now disconnect all switches, avoid Infringement.If the voltage that the first voltage measurement apparatus 204 measured measures is in the range of 0.9V~4.1V, it is determined that S (0) with S (1) is working properly.Battery (1) is now connected to by output end 203 by switching network 201, the tertiary voltage measurement dress passed through Put the voltage for measuring battery (1), if the voltage for measuring battery (1) is 2V, then the voltage range of battery (1) by 0.9V~4.1V more New is 1.9V~2.1V.
Then, switch S (0), closure switch S (2) can be disconnected, the voltage that now second voltage measurement apparatus 205 measures is Voltage after battery (1) and battery (2) series connection.Known battery (1) voltage is 2V, and the overcharged voltage of battery (2) is 4V, overdischarge Press as 1V, it can be deduced that the voltage that now second voltage measurement apparatus 205 measures should be in the range of 2.9V~6.1V, if not existing Then judge abnormality occur, should now disconnect all switches, avoid damaging.If the second voltage measurement apparatus measured 205 voltages measured are in the range of 2.9V~6.1V, it is determined that working properly.Now can be by switching network 201 by battery (2) Output end 203 is connected to, the tertiary voltage measurement apparatus passed through measures the voltage of battery (2), if measuring the voltage of battery (2) For 2V.Switch S (1), closure switch S (3) can be further disconnected, the voltage that now first voltage measurement apparatus 204 measures is Voltage after battery (1), battery (2) and battery (3) series connection.Known battery (1) voltage is 2V, and battery (2) voltage is 2V, battery (3) overcharged voltage is 4V, and overdischarge pressure is 1V, it can be deduced that the voltage that now first voltage measurement apparatus 204 measures should be In the range of 4.9V~8.1V, if not existing, there is abnormality in judgement, should now disconnect all switches, avoid damaging.If The voltage that the first voltage measurement apparatus 204 measured measures is in the range of 4.9V~8.1V, it is determined that working properly.With such Push away, the electricity that first voltage measurement apparatus 204, second voltage measurement apparatus 205 measure when can obtain connecting different monomers battery Pressure should scope.
In addition, the voltage of battery (1) can be also measured again, and closure switch S (0) and S (1), second voltage measurement apparatus 205 The voltage measured is as more than 0.1V, then judged abnormality occur, the voltage that first voltage measurement apparatus 204 measures is not if existed In the range of 1.9V~2.1V, then judge abnormality occur, should now disconnect all switches, avoid damaging.Now if electricity Pond (1) by the operation such as charging or equilibrium, voltage due to rising to 2.01V, then the voltage that first voltage measurement apparatus 204 measures Should scope be changed into 1.91V~2.11V.When measuring the voltage of battery (2) again, closure switch S (1) and S (2), the second electricity The voltage that pressure measuring device 205 measures then judges abnormality occur, should now disconnected if not in the range of 3.9V~4.1V All switches, avoid damaging.Now if battery (2) by the operation such as electric discharge or equilibrium, voltage due to dropping to 1.98V, this When, the voltage after battery (1) and battery (2) series connection is 3.99V, then the voltage that first voltage measurement apparatus 204 measures should Scope is changed into 3.89V~4.09V.The like, first voltage measurement apparatus 204 when can obtain connecting different monomers battery, The voltage that second voltage measurement apparatus 205 measures should dynamic scope.
In some optional implementations of the present embodiment, battery pack or capacitor bank 202 are by battery or capacitor string Connection forms, and the positive pole and negative pole of each battery or capacitor are connected with the internal switch of switching network 201, battery pack or capacitor The positive pole and negative pole that two adjacent batteries or capacitor are connected with each other in group 202, are connected with two internal switches, two inside The other end of switch is respectively connecting to first voltage measurement apparatus 204 and second voltage measurement apparatus 205, with battery pack or electric capacity The other end of the internal switch of the positive pole connection of device group 202 is connected to first voltage measurement apparatus 204, with battery pack or capacitor The other end of the switch of the negative pole connection of group 202 is connected to second voltage measurement apparatus 205.Specific connected mode refers to Fig. 4.
In some optional implementations of the present embodiment, processor is additionally operable to determine that exception occurs in switching network 201 Afterwards, the internal switch of controlling switch network 201 is all off.Avoided with this after exception occurs in switching network 201 due to short circuit Equipment is damaged Deng caused by.The switching of active and standby switching network can be also carried out if there is backup circuit breaker network.
In some optional implementations of the present embodiment, processor is connected by network with remote server, remotely Server be used for obtain processor transmission be used for represent that abnormal information occurs in switching network 201.Remote server is obtaining To after for representing that abnormal information occurs in switching network 201, to the terminal pushed information of related personnel it can be made to open this Network is closed to be overhauled.
As shown in figure 5, in some optional implementations of the present embodiment, above-mentioned battery pack or capacitor bank 502 can To be connected with power supply 501 or load 503, above-mentioned power supply 501 is used to charge to above-mentioned battery pack capacitor bank 502, above-mentioned Load 503 is used to obtain the electric energy that above-mentioned battery pack or capacitor bank 502 provide.
The switching network detecting system that the application provides, pass through first voltage measurement apparatus 204 and second voltage measurement dress 205 setting is put, realizes the detection of switching network failure, while detects simple circuit, reliability is high, strong antijamming capability.
Below with reference to Fig. 6, it illustrates the implementation of one of the control method of the switching network detecting system according to the application The flow 600 of example.
Step 601, between the negative pole and first voltage measurement apparatus that control the battery to output end or capacitor to be connected Switch closure, with the negative pole of the battery or capacitor to be connected to output end that obtains that first voltage measurement apparatus measures with Voltage between battery pack or the negative pole of capacitor bank.
In the present embodiment, the electronic equipment of the control method operation of switching network detecting system thereon can be various Processor and controller, such as single-chip microcomputer, programmable logic controller (PLC) (Programmable Logic Controller, ), or other programming devices PLC.In practice, because switching network is likely to occur failure, it is to be connected extremely that processor sends control The instruction of switch closure between the battery of output end or the negative pole of capacitor and first voltage measurement apparatus may not reach pre- The effect of phase, the negative pole of the battery or capacitor to be connected to output end that first voltage measurement apparatus is measured and battery pack or Voltage between the negative pole of capacitor bank, which also just differs, is set to its real voltage.
In the present embodiment, the battery or capacitor to be connected to output end can be any in battery pack or capacitor bank Individual battery or capacitor, its both positive and negative polarity by the combination of internal switch in switching network be connected to first voltage measurement apparatus and Second voltage measurement apparatus.Battery or capacitor to be connected to output end can also be that processor determines the battery or capacitor Electricity is too high or too low, it is necessary to be connected to the battery or capacitor of detection and balancer, or needs to measure its parameter Battery or capacitor, whether first detection switch network abnormal before detection and balancer is connected to, and can avoid Due to the failure such as short circuit caused by switching network exception.
Step 602, judge voltage that first voltage measurement apparatus measures whether predetermined to be connected to exporting In the range of voltage between the battery at end or the negative pole of capacitor and battery pack or the negative pole of capacitor bank, if it is not, then entering Enter step 603.
In the present embodiment, because switching network there may be failure, control may not up to expected effect in step 601 Fruit, therefore, the electronic equipment that the control method of switching network detecting system is run thereon need to judge first voltage measurement dress The voltage measured is put whether predetermined to be connected to the battery of output end or the negative pole and battery pack or electricity of capacitor In the range of voltage between the negative pole of container group, to confirm whether switching network is normal.
In the present embodiment, the negative pole and battery pack or capacitor bank 202 of the battery or capacitor to be connected to output end Negative pole between the scope of voltage be according to each battery or capacitor in the battery pack or capacitor bank 202 measured in advance Voltage, or the overcharging of each battery or capacitor, overdischarge pressure determine in battery pack or capacitor bank.Predetermined model Enclose when being 202 normal work of switching network, what first voltage measurement apparatus 204 or second voltage measurement apparatus 205 should be measured The scope of voltage, for example, the both ends of first voltage measurement apparatus 204 are respectively connecting to the both positive and negative polarity of a certain section cell, the section The virtual voltage of cell is the voltage that first voltage measurement apparatus 204 should be measured.The section list can be measured in advance The voltage of body battery, voltage that first voltage measurement apparatus 204 should be measured is determined with this, also can be according to the section be obtained ahead of time The overcharging of cell, overdischarge pressure determine the voltage that first voltage measurement apparatus 204 should be measured.Can also be according to an electricity Press initial value and the electrically operated record estimation of the charge and discharge now reality of the battery or capacitor is then carried out to this battery or capacitor Border voltage.
In some optional implementations of the present embodiment, the battery or capacitor to be connected to output end, it is followed successively by In battery pack or capacitor bank, each battery from the battery or capacitor closest to battery pack or the negative pole of capacitor bank or Capacitor, such as first voltage measurement dress can be judged as the battery (1) shown in Fig. 3 A, battery (2), battery (3) ... The voltage measured is put whether predetermined to be connected to the battery of output end or the negative pole and battery pack or electricity of capacitor In the range of voltage between the negative pole of container group, if it is, controlling the battery or capacitor to be connected to output end just Switch closure between pole and second voltage measurement apparatus, to obtain the extremely output to be connected that second voltage measurement apparatus is measured Voltage between the battery at end or the positive pole of capacitor and battery pack or the negative pole of capacitor bank;Judge second voltage measurement apparatus The voltage measured whether predetermined battery or capacitor to be connected to output end positive pole and battery pack or electric capacity In the range of voltage between the negative pole of device group;If it is not, then it is abnormal to determine that switching network occurs;If it is, will be to be connected Battery or capacitor to output end are connected to output end, and the voltage of output end is measured by tertiary voltage measurement apparatus.
In some optional implementations of the present embodiment, the negative pole of the battery or capacitor to be connected to output end with The positive pole of the scope of voltage between battery pack or the negative pole of capacitor bank and the battery or capacitor to be connected to output end with The scope of voltage between battery pack or the negative pole of capacitor bank is according to the overcharging of battery or capacitor, overdischarge pressure and the What the voltage of three voltage measuring apparatus measurement output end determined.
Step 603, it is abnormal to determine that switching network occurs.
In the present embodiment, can be true in the electronic equipment of the control method operation of switching network detecting system thereon Determine after exception occurs in switching network, to carry out the switching of active and standby switching network, send abnormal information by communicator or pass through The output device output abnormality information of some similar display devices.
By taking Fig. 3 A as an example, specifically it can determine whether switching network exception occurs using following method:
It is possible, firstly, to closure switch S (0), obtains the voltage that second voltage measurement apparatus 205 measures, now second voltage The voltage that measurement apparatus 205 measures should be 0, if more than the error range of setting, such as 0.1V, then judge abnormality occur, All switches should be now disconnected, avoid damaging.If not less than the error range of setting, closure switch S (1), first is obtained The voltage that voltage measuring apparatus 204 measures, now what first voltage measurement apparatus 204 measured is the voltage that voltage is battery (1). If the overcharged voltage of battery (1) is 4V, overdischarge pressure is 1V, then the voltage that now first voltage measurement apparatus 204 measures should be In the range of 0.9V~4.1V, if not in this range, there is abnormality in judgement, should now disconnect all switches, avoid Infringement.If the voltage that the first voltage measurement apparatus 204 measured measures is in the range of 0.9V~4.1V, it is determined that S (0) with S (1) is working properly.Battery (1) is now connected to by output end 203 by switching network 201, the tertiary voltage measurement dress passed through Put the voltage for measuring battery (1), if the voltage for measuring battery (1) is 2V, then the voltage range of battery (1) by 0.9V~4.1V more New is 1.9V~2.1V.
Then, switch S (0), closure switch S (2) can be disconnected, the voltage that now second voltage measurement apparatus 205 measures is Voltage after battery (1) and battery (2) series connection.Known battery (1) voltage is 2V, and the overcharged voltage of battery (2) is 4V, overdischarge Press as 1V, it can be deduced that the voltage that now second voltage measurement apparatus 205 measures should be in the range of 2.9V~6.1V, if not existing Then judge abnormality occur, should now disconnect all switches, avoid damaging.If the second voltage measurement apparatus measured 205 voltages measured are in the range of 2.9V~6.1V, it is determined that working properly.Now can be by switching network 201 by battery (2) Output end 203 is connected to, the tertiary voltage measurement apparatus passed through measures the voltage of battery (2), if measuring the voltage of battery (2) For 2V.Switch S (1), closure switch S (3) can be further disconnected, the voltage that now first voltage measurement apparatus 204 measures is Voltage after battery (1), battery (2) and battery (3) series connection.Known battery (1) voltage is 2V, and battery (2) voltage is 2V, battery (3) overcharged voltage is 4V, and overdischarge pressure is 1V, it can be deduced that the voltage that now first voltage measurement apparatus 204 measures should be In the range of 4.9V~8.1V, if not existing, there is abnormality in judgement, should now disconnect all switches, avoid damaging.If The voltage that the first voltage measurement apparatus 204 measured measures is in the range of 4.9V~8.1V, it is determined that working properly.With such Push away, the electricity that first voltage measurement apparatus 204, second voltage measurement apparatus 205 measure when can obtain connecting different monomers battery Pressure should scope.
In addition, the voltage of battery (1) can be also measured again, and closure switch S (0) and S (1), second voltage measurement apparatus 205 The voltage measured is as more than 0.1V, then judged abnormality occur, the voltage that first voltage measurement apparatus 204 measures is not if existed In the range of 1.9V~2.1V, then judge abnormality occur, should now disconnect all switches, avoid damaging.Now if electricity Pond (1) by the operation such as charging or equilibrium, voltage due to rising to 2.01V, then the voltage that first voltage measurement apparatus 204 measures Should scope be changed into 1.91V~2.11V.When measuring the voltage of battery (2) again, closure switch S (1) and S (2), the second electricity The voltage that pressure measuring device 205 measures then judges abnormality occur, should now disconnected if not in the range of 3.9V~4.1V All switches, avoid damaging.Now if battery (2) by the operation such as electric discharge or equilibrium, voltage due to dropping to 1.98V, this When, the voltage after battery (1) and battery (2) series connection is 3.99V, then the voltage that first voltage measurement apparatus 204 measures should Scope is changed into 3.89V~4.09V.The like, first voltage measurement apparatus 204 when can obtain connecting different monomers battery, The voltage that second voltage measurement apparatus 205 measures should dynamic scope.
Below with reference to Fig. 7, it illustrates suitable for for realizing the processing of the switching network detecting system of the embodiment of the present application The structural representation of device.
As shown in fig. 7, processor includes CPU (CPU) 701, it can be according to the journey in storage part 706 Sequence and perform various appropriate actions and processing.CPU 701 is connected with input/output (I/O) interface 703 by bus 702.
I/O interfaces 703 are connected to lower component:Importation 704;Output par, c 705;Storage part including hard disk etc. 706;And the communications portion 707 of the NIC including LAN card, modem etc..Communications portion 707 is via all Network such as internet performs communication process.
Especially, in accordance with an embodiment of the present disclosure, it may be implemented as computer above with reference to the process of flow chart description Software program.For example, embodiment of the disclosure includes a kind of computer program product, it includes being tangibly embodied in machine readable Computer program on medium, the computer program include the program code for being used for the method shown in execution flow chart.
Flow chart in accompanying drawing, it is illustrated that according to the system of the various embodiments of the application, method and computer program product Architectural framework in the cards, function and operation.At this point, each square frame in flow chart can represent a module, A part for program segment or code, a part for the module, program segment or code include one or more and are used to realize rule The executable instruction of fixed logic function.It should also be noted that at some as the function of in the realization replaced, being marked in square frame Can also be with different from the order marked in accompanying drawing generation.For example, two square frames succeedingly represented can essentially be basic It is performed in parallel, they can also be performed in the opposite order sometimes, and this is depending on involved function.It is also noted that The combination of the square frame in each square frame and flow chart in flow chart, the special of function or operation as defined in performing can be used Hardware based system realize, or can be realized with the combination of specialized hardware and computer instruction.
Present invention also provides a kind of nonvolatile computer storage media, the nonvolatile computer storage media can be with It is the nonvolatile computer storage media described in above-described embodiment included in device;Can also be individualism, without The nonvolatile computer storage media being incorporated in terminal.Above-mentioned nonvolatile computer storage media is stored with one or more Individual program, when one or more of programs are performed by an equipment so that the equipment:Control to be connected to described defeated The switch closure gone out between the battery at end or the negative pole of capacitor and the first voltage measurement apparatus, to obtain first electricity The battery for the output end that pressure measuring device is measured or the negative pole of capacitor and the battery pack or electricity Voltage between the negative pole of container group;Judge voltage that the first voltage measurement apparatus is measured whether in predetermined institute State the electricity between the battery of the output end or the negative pole of capacitor and the battery pack or the negative pole of capacitor bank In the range of pressure;If it is not, then it is abnormal to determine that the switching network occurs.
Above description is only the preferred embodiment of the application and the explanation to institute's application technology principle.People in the art Member should be appreciated that invention scope involved in the application, however it is not limited to the technology that the particular combination of above-mentioned technical characteristic forms Scheme, while should also cover in the case where not departing from the inventive concept, carried out by above-mentioned technical characteristic or its equivalent feature The other technical schemes for being combined and being formed.Such as features described above has similar work(with (but not limited to) disclosed herein The technical scheme that the technical characteristic of energy is replaced mutually and formed.

Claims (12)

  1. A kind of 1. switching network detecting system, it is characterised in that the switching network, one end connection battery pack or capacitor bank, The other end is output end, for the combination by internal switch, makes at least one battery or electricity in battery pack or capacitor bank Container is connected to the output end, and the output end includes the first output end and the second output end, first output end and Two output ends are respectively cathode output end and cathode output end, and the system includes:
    First voltage measurement apparatus, one end are connected with the negative pole of battery pack or capacitor bank, and the other end is directly defeated with described first Go out end to be connected, or be connected by switching with first output end;
    Second voltage measurement apparatus, one end are connected with the negative pole of battery pack or capacitor bank, and the other end is directly defeated with described second Go out end to be connected, or be connected by switching with second output end;
    Processor, it is connected with the first voltage measurement apparatus and the second voltage measurement apparatus, for judging described Whether voltage that the voltage or the second voltage measurement apparatus that one voltage measuring apparatus is measured are measured is pre-setting In the range of, if it is not, then it is abnormal to determine that the switching network occurs.
  2. 2. system according to claim 1, it is characterised in that the system also includes tertiary voltage measurement apparatus, described Tertiary voltage measurement apparatus is used for the voltage for measuring the output end;And
    The processor is connected with the tertiary voltage measurement apparatus, and the processor is additionally operable to obtain the tertiary voltage measurement The voltage that measurement device goes out.
  3. 3. system according to claim 1, it is characterised in that the battery pack or capacitor bank are by even number battery or electricity Container is in series, and the positive pole and negative pole of each battery or capacitor are connected with the prime internal switch of the switching network, institute State positive pole and negative pole that two batteries adjacent in battery pack or capacitor bank or capacitor are connected with each other, be connected with it is same before Level internal switch, the other end of the prime internal switch being connected with the positive pole of the battery pack or capacitor bank are connected to described the Two voltage measuring apparatus, the other end for the switch being connected with the negative pole of the battery pack or capacitor bank are connected to first electricity Pressure measuring device, the prime internal switch with being separated with odd number battery or capacitor between the positive pole of the battery pack or capacitor bank The other end be connected to the first voltage measurement apparatus, be separated between the positive pole of the battery pack or capacitor bank even number electricity The other end of the prime internal switch of pond or capacitor is connected to the second voltage measurement apparatus.
  4. 4. system according to claim 1, it is characterised in that the battery pack or capacitor bank are by odd number battery or electricity Container is in series, and the positive pole and negative pole of each battery or capacitor are connected with the prime internal switch of the switching network, institute State positive pole and negative pole that two batteries adjacent in battery pack or capacitor bank or capacitor are connected with each other, be connected with it is same before Level internal switch, the other end of the prime internal switch being connected with the positive pole of the battery pack or capacitor bank are connected to described the One voltage measuring apparatus, the other end for the switch being connected with the negative pole of the battery pack or capacitor bank are connected to second electricity Pressure measuring device, the prime internal switch with being separated with even number battery or capacitor between the positive pole of the battery pack or capacitor bank The other end be connected to the first voltage measurement apparatus, be separated between the positive pole of the battery pack or capacitor bank odd number electricity The other end of the prime internal switch of pond or capacitor is connected to the second voltage measurement apparatus.
  5. 5. the system according to Claims 2 or 3, it is characterised in that the switching network also includes rear class internal switch, institute State rear class internal switch to be connected with the prime internal switch, for the prime internal switch to be accessed into cathode output end or negative Pole output end.
  6. 6. system according to claim 1, it is characterised in that the battery pack or capacitor bank are by battery or capacitor string Connection forms, and the positive pole and negative pole of each battery or capacitor are connected with the internal switch of the switching network, the battery pack or The positive pole and negative pole that two adjacent batteries or capacitor are connected with each other in capacitor bank, are connected with two internal switches, described The other end of two internal switches is respectively connecting to first voltage measurement apparatus and second voltage measurement apparatus, with the battery pack Or the other end of the internal switch of the positive pole connection of capacitor bank is connected to the first voltage measurement apparatus, with the battery pack Or the other end of the switch of the negative pole connection of capacitor bank is connected to the second voltage measurement apparatus.
  7. 7. according to the system any one of claim 1,2,3,4,6, it is characterised in that the processor is additionally operable to determine After exception occurs in the switching network, control the internal switch of the switching network all off.
  8. 8. according to the system any one of claim 1,2,3,4,6, it is characterised in that the scope is according to survey in advance The voltage of each battery or capacitor in the battery pack or capacitor bank that measure, or each electricity in battery pack or capacitor bank The overcharging of pond or capacitor, overdischarge pressure is set.
  9. 9. according to the system any one of claim 1,2,3,4,6, it is characterised in that the processor by network with Remote server connects, and the remote server is used to obtaining that the processor to send is used to represent that the switching network to occur Abnormal information.
  10. A kind of 10. control method of switching network detecting system as claimed in any one of claims 1-9 wherein, it is characterised in that Methods described includes:
    Control opening between the battery of the output end or the negative pole of capacitor and the first voltage measurement apparatus Close and close, to obtain the battery or capacitor of the output end that the first voltage measurement apparatus is measured Negative pole and the battery pack or the negative pole of capacitor bank between voltage;
    Judge voltage that the first voltage measurement apparatus is measured whether in the predetermined output In the range of voltage between the battery at end or the negative pole of capacitor and the battery pack or the negative pole of capacitor bank;
    If it is not, then it is abnormal to determine that the switching network occurs.
  11. 11. according to the method for claim 10, it is characterised in that the battery or electric capacity of the output end Device, it is followed successively by the battery pack or capacitor bank, from the battery or electricity closest to the battery pack or the negative pole of capacitor bank The each battery or capacitor that container rises;And
    It is described to judge voltage that the first voltage measurement apparatus is measured whether predetermined described to be connected to described In the range of voltage between the battery of output end or the negative pole of capacitor and the battery pack or the negative pole of capacitor bank, also wrap Include:
    If it is, the battery of the control output end or the positive pole of capacitor measure with the second voltage Switch closure between device, to obtain the battery for the output end that the second voltage measurement apparatus is measured Or the voltage between the positive pole and the battery pack or the negative pole of capacitor bank of capacitor;Judge the second voltage measurement apparatus The voltage measured whether the battery of the predetermined output end or the positive pole of capacitor with it is described In the range of voltage between battery pack or the negative pole of capacitor bank;If it is not, then it is abnormal to determine that the switching network occurs;Such as Fruit is that the battery of the output end or capacitor then are connected into the output end, passes through the described 3rd electricity Pressure measuring device measures the voltage of the output end.
  12. 12. according to the method for claim 11, it is characterised in that the battery or electric capacity of the output end The scope of voltage between the negative pole of device and the battery pack or the negative pole of capacitor bank and the output end Battery or capacitor positive pole and the battery pack or the negative pole of capacitor bank between voltage scope be according to battery or What the voltage that the overcharging of capacitor, overdischarge pressure and the tertiary voltage measurement apparatus measure the output end determined.
CN201610609258.0A 2016-07-28 2016-07-28 The control method of switching network detecting system and switching network detecting system Pending CN107664726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610609258.0A CN107664726A (en) 2016-07-28 2016-07-28 The control method of switching network detecting system and switching network detecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610609258.0A CN107664726A (en) 2016-07-28 2016-07-28 The control method of switching network detecting system and switching network detecting system

Publications (1)

Publication Number Publication Date
CN107664726A true CN107664726A (en) 2018-02-06

Family

ID=61115704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610609258.0A Pending CN107664726A (en) 2016-07-28 2016-07-28 The control method of switching network detecting system and switching network detecting system

Country Status (1)

Country Link
CN (1) CN107664726A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI795149B (en) * 2021-12-28 2023-03-01 華碩電腦股份有限公司 Power module and power supplying method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009276297A (en) * 2008-05-16 2009-11-26 Mazda Motor Corp Apparatus and method of measuring voltage
CN201373909Y (en) * 2009-02-17 2009-12-30 朱灿 Device for testing voltage of single battery of battery pack
CN102162834A (en) * 2010-12-14 2011-08-24 宁波飞驰达电子科技发展有限公司 Battery voltage detecting device in serially-connected battery pack and method of battery voltage detecting device
CN102331561A (en) * 2011-09-16 2012-01-25 深圳桑达国际电子器件有限公司 Battery voltage detection circuit and battery management system
CN202421470U (en) * 2011-12-22 2012-09-05 赵恩海 Single battery voltage measuring circuit in arbitrary-string battery pack
WO2013005440A2 (en) * 2011-07-05 2013-01-10 Kabushiki Kaisha Toyota Jidoshokki Cell equalization control system
CN103176131A (en) * 2011-12-22 2013-06-26 赵恩海 Single battery voltage measurement circuit in any one battery in series-connection battery pack
JP2014106054A (en) * 2012-11-26 2014-06-09 Sanyo Electric Co Ltd Battery management device and power supply device
CN103884988A (en) * 2012-12-21 2014-06-25 比亚迪股份有限公司 Battery pack fault detection device and detection method
US20140197841A1 (en) * 2013-01-16 2014-07-17 Denso Corporation Voltage monitoring apparatus
CN105548892A (en) * 2015-12-02 2016-05-04 北京新能源汽车股份有限公司 Fault detection system, method and device of battery system and electric vehicle
CN205861804U (en) * 2016-07-28 2017-01-04 盐城市惠众新能源科技有限公司 Switching network detecting system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009276297A (en) * 2008-05-16 2009-11-26 Mazda Motor Corp Apparatus and method of measuring voltage
CN201373909Y (en) * 2009-02-17 2009-12-30 朱灿 Device for testing voltage of single battery of battery pack
CN102162834A (en) * 2010-12-14 2011-08-24 宁波飞驰达电子科技发展有限公司 Battery voltage detecting device in serially-connected battery pack and method of battery voltage detecting device
WO2013005440A2 (en) * 2011-07-05 2013-01-10 Kabushiki Kaisha Toyota Jidoshokki Cell equalization control system
CN102331561A (en) * 2011-09-16 2012-01-25 深圳桑达国际电子器件有限公司 Battery voltage detection circuit and battery management system
CN202421470U (en) * 2011-12-22 2012-09-05 赵恩海 Single battery voltage measuring circuit in arbitrary-string battery pack
CN103176131A (en) * 2011-12-22 2013-06-26 赵恩海 Single battery voltage measurement circuit in any one battery in series-connection battery pack
JP2014106054A (en) * 2012-11-26 2014-06-09 Sanyo Electric Co Ltd Battery management device and power supply device
CN103884988A (en) * 2012-12-21 2014-06-25 比亚迪股份有限公司 Battery pack fault detection device and detection method
US20140197841A1 (en) * 2013-01-16 2014-07-17 Denso Corporation Voltage monitoring apparatus
CN105548892A (en) * 2015-12-02 2016-05-04 北京新能源汽车股份有限公司 Fault detection system, method and device of battery system and electric vehicle
CN205861804U (en) * 2016-07-28 2017-01-04 盐城市惠众新能源科技有限公司 Switching network detecting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI795149B (en) * 2021-12-28 2023-03-01 華碩電腦股份有限公司 Power module and power supplying method thereof

Similar Documents

Publication Publication Date Title
KR102200550B1 (en) Apparatus for estimating state of charge for secondary battery
CN103941210B (en) The checking monitoring system of a kind of BMS and method thereof
CN105548892B (en) Fault detection system, method and device of battery system and electric vehicle
CN105629172B (en) A kind of method and device of mixing accumulator fault detection
CN205693405U (en) Set of cells or capacitor group management system
CN205880181U (en) High -pressure simulation tests system of battery package
CN110133536A (en) Determine system, the method and apparatus of the index of battery group object internal leakage electric current
CN104881001A (en) Energy storage battery management system based on deep learning network
CN104635165A (en) Accurate estimation method for residual electric quantity of accumulator of photoelectric complementary power supply system
CN207263852U (en) A kind of test system of electric automobile direct-current charging post
Bockrath et al. State of charge estimation using recurrent neural networks with long short-term memory for lithium-ion batteries
CN104852415B (en) Pre-charge process monitoring method and system
CN106199450A (en) A kind of battery health evaluation system and method
CN108051756A (en) Evaluation method, system and the storage medium of accumulator SOC
Chang et al. Electric vehicle battery pack micro-short circuit fault diagnosis based on charging voltage ranking evolution
CN103632043A (en) Dominant power system instability mode recognition method based on real-time measurement response information
CN107942261A (en) The method of estimation and system of battery charge state
CN108446493A (en) A kind of power of motor grade emulation mode and device
Mohammed et al. Programmable logic controller based lithium-ion battery management system for accurate state of charge estimation
CN111707943A (en) Battery simulation-based electric vehicle charging fault early warning method and system
Kim et al. SOC estimation and BMS design of Li-ion battery pack for driving
CN106384436A (en) Intelligent charging system and intelligent charging method
CN109752664A (en) A kind of charging detects the method and application of battery core internal resistance in battery pack
CN107664726A (en) The control method of switching network detecting system and switching network detecting system
Tang et al. An aging-and load-insensitive method for quantitatively detecting the battery internal-short-circuit resistance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220621

Address after: 224051 No. 258, Ruihe Road, Yancheng City, Jiangsu Province

Applicant after: Jiangsu Gaode Rail Transit Technology Co.,Ltd.

Address before: 224045 No. 666 Yingbin Avenue, environmental protection industrial park, Tinghu District, Yancheng City, Jiangsu Province

Applicant before: YANCHENG HUIZHONG NEW ENERGY TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180206

WD01 Invention patent application deemed withdrawn after publication