CN107656116A - The important active and standby metering method of Electricity customers kilowatt-hour meter - Google Patents
The important active and standby metering method of Electricity customers kilowatt-hour meter Download PDFInfo
- Publication number
- CN107656116A CN107656116A CN201710835334.4A CN201710835334A CN107656116A CN 107656116 A CN107656116 A CN 107656116A CN 201710835334 A CN201710835334 A CN 201710835334A CN 107656116 A CN107656116 A CN 107656116A
- Authority
- CN
- China
- Prior art keywords
- kilowatt
- hour meter
- data
- electricity customers
- important
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
- G01R11/16—Adaptations of counters to electricity meters
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A kind of important active and standby metering method of Electricity customers kilowatt-hour meter, this method uses two pieces of kilowatt-hour meters A, B, while the power consumption of important Electricity customers is measured, and can fix a breakdown data automatically.Its step is as follows:Current Transformer Secondary line is connected at first piece of kilowatt-hour meter second piece of kilowatt-hour meter of reconnection, the Ia of second piece of kilowatt-hour meter gone out, Ib goes out to go out to connect together with Ic and is connected in N phases;Using parallel way by station with voltage transformer secondary line be connected to on Ua, Ub and Uc of two pieces of kilowatt-hour meters;Wireless communication module is connected in data transmission terminal, transfers data to monitoring host computer;Monitoring host computer is classified to data, analyzed, when some important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B continuous three days of data are unchanged, warning window is ejected in prison, when some Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data occurred in three days, power supply department monitoring host computer is using the most kilowatt-hour meter data of cumulative data sum as variable.
Description
Technical field
The present invention relates to a kind of important active and standby metering method of Electricity customers kilowatt-hour meter.
Background technology
At present, power supply department is calculated important Electricity customers such as factories and miness, private factory buildings using single ammeter measuring method
Power consumption.Because the service life of kilowatt-hour meter is limited, use environment has the reasons such as uncertain and artificial illegal operation, lead
Kilowatt-hour meter damage and situation about burning is caused to happen occasionally.Power supply department finds that kilowatt-hour meter damages and sends someone typically to need to in-situ processing
The minimum 3 day time is taken, the electric quantity metering of this period is blank value, it is necessary to electric company consults to carry out valuation processing with client,
Because kilowatt-hour meter reason causes to measure blank value, the general all tendencies of valuation processing estimate that this gives power supply less than normal value
Door causes economic loss.
The content of the invention
The present invention is to propose a kind of important active and standby metering method of Electricity customers kilowatt-hour meter, and this method uses two pieces of electric degrees
Table, them are made to be measured simultaneously to the power consumption of important Electricity customers, while the data that can fix a breakdown automatically, by normal number
According to being transferred to power supply department in time by way of being wirelessly transferred.
The technical scheme is that:
1st, the Current Transformer Secondary line for being used to measure in important Electricity customers transformer station is connected to first block of electricity
On the Ia of degree table enters, Ib enters and entered with Ic, after electric current is by first piece of kilowatt-hour meter, it will return to that Ia goes out, Ib goes out to go out with Ic;
2nd, Ia is gone out, Ib go out to go out to be connected to Ic second piece of kilowatt-hour meter Ia enter, Ib enters to enter with Ic, electric current flows through second piece
After kilowatt-hour meter, the Ia of second piece of kilowatt-hour meter is gone out, Ib goes out to go out to connect together with Ic, be connected in N phases;
3rd, the voltage transformer secondary line for being used to measure in important Electricity customers transformer station is connected to first block of electricity
Spend on Ua, Ub and Uc of table, using mode in parallel, be connected on Ua, Ub and Uc of second piece of kilowatt-hour meter;
3rd, wireless communication module is connected in the data transmission terminal of two pieces of kilowatt-hour meters, transfers data to power supply department monitoring master
Machine, the transmission intercal of each data are set to N seconds, the sum of the important Electricity customers of N=10Sx;
4th, set up monitoring host computer in power supply department, the kilowatt-hour meters of all important Electricity customers in collection institute restriction without
The data that the transmission of line communication module comes;
5th, power supply department monitoring host computer to by wireless communication module transmit Lai data classify, by different important use
Two pieces of kilowatt-hour meters of electric client are respectively defined as important Electricity customers title kilowatt-hour meter A and important Electricity customers title kilowatt-hour meter B;
6th, power supply department monitoring host computer is analyzed each important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data, when
When some important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data are unchanged for three days on end, warning window 1, alarm are ejected in prison
Information is:Certain Electricity customers kilowatt-hour meter data exception;
When some Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data occurred in 3 days, power supply department monitoring host computer
Using the most kilowatt-hour meter data of cumulative data sum as variable;
When some Electricity customers kilowatt-hour meter A data change for three days on end and certain kilowatt-hour meter B data for three days on end without
During change, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter A data as right value, and warning message is
" certain Electricity customers kilowatt-hour meter B fault alarms ";
When some Electricity customers kilowatt-hour meter B data change for three days on end and certain kilowatt-hour meter A data for three days on end without
During change, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter B data as right value, and warning message is
" certain Electricity customers kilowatt-hour meter A fault alarms ";
The beneficial effects of the invention are as follows:
1st, the present invention realizes the active and standby function of measuring of important Electricity customers kilowatt-hour meter, improves the stability of continuous data
And reliability, reduce the extremely caused loss of charging for electric company.
2nd, the present invention makes important Electricity customers kilowatt-hour meter realize abnormal alarm function, can find important electricity consumption visitor in time
The exception of family kilowatt-hour meter and giving is handled;
3rd, the present invention as single ammeter measuring accuracy, can't cause data in addition to it can reach target
Error etc. is abnormal;
4th, cost of the present invention is low, is easy to implement, and in addition to suitable for important Electricity customers, can also use and typically use
In the watt-hour meter box of family, there is extensive promotional value.
Brief description of the drawings
Fig. 1 is the wiring diagram of the present invention.
Embodiment
As illustrated, the present invention's comprises the following steps that:
1st, the Current Transformer Secondary line for being used to measure in important Electricity customers transformer station is connected to first block of electricity
On the Ia of degree table enters, Ib enters and entered with Ic, after electric current is by first piece of kilowatt-hour meter, it will return to that Ia goes out, Ib goes out to go out with Ic.
2nd, Ia is gone out, Ib go out to go out to be connected to Ic second piece of kilowatt-hour meter Ia enter, Ib enters to enter with Ic, electric current flows through second piece
After kilowatt-hour meter, the Ia of second piece of kilowatt-hour meter is gone out, Ib goes out to go out to connect together with Ic, be connected in N phases.
3rd, the voltage transformer secondary line for being used to measure in important Electricity customers transformer station is connected to first block of electricity
Spend on Ua, Ub and Uc of table, using mode in parallel, be connected on Ua, Ub and Uc of second piece of kilowatt-hour meter.
3rd, wireless communication module is connected in the data transmission terminal of two pieces of kilowatt-hour meters, transfers data to power supply department monitoring master
Machine, the transmission intercal of each data are set to N seconds, the sum of the important Electricity customers of N=10Sx.
4th, set up monitoring host computer in power supply department, the kilowatt-hour meters of all important Electricity customers in collection institute restriction without
The data that the transmission of line communication module comes.
5th, power supply department monitoring host computer to by wireless communication module transmit Lai data classify, by different important use
Two pieces of kilowatt-hour meters of electric client are respectively defined as important Electricity customers title kilowatt-hour meter A and important Electricity customers title kilowatt-hour meter B;
6th, power supply department monitoring host computer is analyzed each important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data, when
When some important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data are unchanged for three days on end, warning window 1, alarm are ejected in prison
Information is:Certain Electricity customers kilowatt-hour meter data exception.
When some Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data occurred in 3 days, power supply department monitoring host computer
Using the most kilowatt-hour meter data of cumulative data sum as variable.
When some Electricity customers kilowatt-hour meter A data change for three days on end and certain kilowatt-hour meter B data for three days on end without
During change, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter A data as right value, and warning message is
" certain Electricity customers kilowatt-hour meter B fault alarms ".
When some Electricity customers kilowatt-hour meter B data change for three days on end and certain kilowatt-hour meter A data for three days on end without
During change, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter B data as right value, and warning message is
" certain Electricity customers kilowatt-hour meter A fault alarms ".
The specific embodiment of the present invention is these are only, is not intended to limit the invention, for those skilled in the art
For member, the present invention can have various modifications and variations.Any modification within the spirit and principles of the invention, being made,
Equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (1)
1. a kind of important active and standby metering method of Electricity customers kilowatt-hour meter, it is characterized in that:
1) the Current Transformer Secondary line for being used to measure in important Electricity customers transformer station, is connected to first piece of kilowatt-hour meter
Ia enter, on Ib enters and entered with Ic, after electric current is by first piece of kilowatt-hour meter, will return to that Ia goes out, Ib goes out to go out with Ic;
2), Ia is gone out, Ib go out to go out to be connected to Ic second piece of kilowatt-hour meter Ia enter, Ib enters to enter with Ic, electric current flows through second block of electricity
After spending table, the Ia of second piece of kilowatt-hour meter is gone out, Ib goes out to go out to connect together with Ic, be connected in N phases;
3) the voltage transformer secondary line for being used to measure in important Electricity customers transformer station, is connected to first piece of kilowatt-hour meter
Ua, Ub and Uc on, using mode in parallel, be connected on Ua, Ub and Uc of second piece of kilowatt-hour meter;
4) wireless communication module, is connected in the data transmission terminal of two pieces of kilowatt-hour meters, transfers data to power supply department monitoring host computer,
The transmission intercal of each data is set to N seconds, the sum of N=10S × important Electricity customers;
5), the kilowatt-hour meter of all important Electricity customers in power supply department erection monitoring host computer, collection institute restriction is wireless
The data that communication module transmission comes;
6), power supply department monitoring host computer to by wireless communication module transmit Lai data classify, by different important electricity consumptions
Two pieces of kilowatt-hour meters of client are respectively defined as important Electricity customers title kilowatt-hour meter A and important Electricity customers title kilowatt-hour meter B;
7), power supply department monitoring host computer is analyzed each important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data, when certain
When individual important Electricity customers kilowatt-hour meter A and kilowatt-hour meter B continuous three days of data are unchanged, warning window 1, alarm signal are ejected in prison
Cease and be:Certain Electricity customers kilowatt-hour meter data exception;
When some Electricity customers kilowatt-hour meter A and kilowatt-hour meter B data occurred in three days, power supply department monitoring host computer is with tired
Addend is variable according to the most kilowatt-hour meter data of sum;
When some Electricity customers kilowatt-hour meter A data change and certain kilowatt-hour meter B continuous three days of data are unchanged for three days on end
When, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter A data as right value, and warning message is " certain use
Electric client's kilowatt-hour meter B fault alarms ";
When some Electricity customers kilowatt-hour meter B data change and certain kilowatt-hour meter A continuous three days of data are unchanged for three days on end
When, power supply department monitoring host computer ejects warning window 2 using kilowatt-hour meter B data as right value, and warning message is " certain use
Electric client's kilowatt-hour meter A fault alarms ".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710835334.4A CN107656116A (en) | 2017-09-15 | 2017-09-15 | The important active and standby metering method of Electricity customers kilowatt-hour meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710835334.4A CN107656116A (en) | 2017-09-15 | 2017-09-15 | The important active and standby metering method of Electricity customers kilowatt-hour meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107656116A true CN107656116A (en) | 2018-02-02 |
Family
ID=61130272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710835334.4A Pending CN107656116A (en) | 2017-09-15 | 2017-09-15 | The important active and standby metering method of Electricity customers kilowatt-hour meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107656116A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108196102A (en) * | 2018-02-27 | 2018-06-22 | 嘉兴市星皓仪表有限公司 | A kind of novel mechanical ammeter |
CN110308675A (en) * | 2019-05-29 | 2019-10-08 | 湖北中科能能源技术有限公司 | A kind of control circuit of photo-voltaic power generation station 10kV metering cabinet |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003043099A (en) * | 2001-08-02 | 2003-02-13 | Sony Corp | Method and apparatus for semiconductor test |
CN101266263A (en) * | 2008-05-10 | 2008-09-17 | 珠海市华优电气技术有限公司 | Electric power metrological supervision system and supervision method |
CN102435806A (en) * | 2010-09-03 | 2012-05-02 | Ls产电株式会社 | Energy metering system, apparatus and method |
CN103413382A (en) * | 2013-08-26 | 2013-11-27 | 北海和思科技有限公司 | Household intelligent prepayment electric energy meter |
CN105592128A (en) * | 2014-11-14 | 2016-05-18 | 财团法人资讯工业策进会 | Intelligent electric meter deployment management system |
CN205539190U (en) * | 2016-01-26 | 2016-08-31 | 山东力创科技股份有限公司 | Three -phase electronic electric energy meter with activestandby measurement and storage |
CN106569024A (en) * | 2016-10-21 | 2017-04-19 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Electric energy quantity metering and collecting system |
CN207036924U (en) * | 2017-08-16 | 2018-02-23 | 国网四川省电力公司电力科学研究院 | Electric energy measurement multilevel iudge device |
-
2017
- 2017-09-15 CN CN201710835334.4A patent/CN107656116A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003043099A (en) * | 2001-08-02 | 2003-02-13 | Sony Corp | Method and apparatus for semiconductor test |
CN101266263A (en) * | 2008-05-10 | 2008-09-17 | 珠海市华优电气技术有限公司 | Electric power metrological supervision system and supervision method |
CN102435806A (en) * | 2010-09-03 | 2012-05-02 | Ls产电株式会社 | Energy metering system, apparatus and method |
CN103413382A (en) * | 2013-08-26 | 2013-11-27 | 北海和思科技有限公司 | Household intelligent prepayment electric energy meter |
CN105592128A (en) * | 2014-11-14 | 2016-05-18 | 财团法人资讯工业策进会 | Intelligent electric meter deployment management system |
CN205539190U (en) * | 2016-01-26 | 2016-08-31 | 山东力创科技股份有限公司 | Three -phase electronic electric energy meter with activestandby measurement and storage |
CN106569024A (en) * | 2016-10-21 | 2017-04-19 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Electric energy quantity metering and collecting system |
CN207036924U (en) * | 2017-08-16 | 2018-02-23 | 国网四川省电力公司电力科学研究院 | Electric energy measurement multilevel iudge device |
Non-Patent Citations (1)
Title |
---|
郭洪等: "电能表主、副表连接方法的探讨", 《河南电力》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108196102A (en) * | 2018-02-27 | 2018-06-22 | 嘉兴市星皓仪表有限公司 | A kind of novel mechanical ammeter |
CN108196102B (en) * | 2018-02-27 | 2023-08-15 | 浙江星皓科技股份有限公司 | Mechanical ammeter |
CN110308675A (en) * | 2019-05-29 | 2019-10-08 | 湖北中科能能源技术有限公司 | A kind of control circuit of photo-voltaic power generation station 10kV metering cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10704827B2 (en) | Systems and methods for testing electrical connectors | |
CN103713275B (en) | The inaccurate abnormal method of electric energy meter metering is judged based on Mining Multidimensional Association Rules | |
EP2806572A1 (en) | Detecting and locating power outages via low voltage grid mapping | |
US20190277898A1 (en) | Transformer Monitoring and Data Analysis Systems and Methods | |
US20150212138A1 (en) | Method for detecting open-circuit faults in electric power distribution system, and power distribution facilities management system | |
AU2011371437B2 (en) | Electric energy meter on-line detection method | |
US20170271915A1 (en) | Energy Demand Monitoring System and Smart micro-Grid Controller | |
US20170292999A1 (en) | Transformer monitoring and data analysis systems and methods | |
JP6552715B2 (en) | Disconnection detection device | |
CN107656116A (en) | The important active and standby metering method of Electricity customers kilowatt-hour meter | |
Sebastian et al. | Internet of things based smart energy meter with fault detection feature and theft detection | |
Jaiswal et al. | Arduino mega and IOT based intelligent energy meter (IEM) to increase efficiency and accuracy in current billing methodology | |
CN104181386A (en) | Single-phase fee charged intelligent ammeter | |
Ahmad et al. | Detection of frauds and other non-technical losses in power utilities using smart meters: a review | |
KR101323356B1 (en) | Dc digital watt-hour meter and remote meter reading system using the same | |
US9488495B2 (en) | System, methods, device and non-transitory computer readable storage medium, for identifying connectivities in electrical networks | |
CN105720687A (en) | Electric meter incorrect-installation monitoring system | |
KR100550106B1 (en) | Mornitoring system with electronic watthours-meter | |
CN113655272A (en) | Electric quantity value correction method and device, storage medium and electronic equipment | |
TWM484235U (en) | Apparatus and system for power monitoring | |
CN204204051U (en) | The long-range inspection device of electric substation | |
CN105572614A (en) | Metering device remote tour inspection system | |
CN108802567A (en) | Isolated island monitoring method for new energy | |
Ayanlade et al. | Application of Current Differential Principle in the Detection of Energy Theft in a GSM-Based Single-Phase Smart Meter | |
AU2021106276A4 (en) | A system and method for monitoring, communicating, and alerting power failure and theft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180202 |
|
RJ01 | Rejection of invention patent application after publication |