Sky Tower
Technical field
The present invention relates to a kind of Sky Tower, especially players can be according to oneself physical qualification and psychological condition, freely
Selection ascend a height mode, unrestricted choice ascend a height height, freely determines the residence time, ascend a height watch and take exercises take into account, the old and the young all
Suitable Sky Tower.
Background technique
Ferris wheel is popular.To find out its cause, beautiful scenery has a panoramic view first is that ascending a height and enjoying a distant view;Second is that it is very thrilling, there is frightened nothing
Danger.
But ferris wheel has the following disadvantages.
First, ferris wheel has been gone up, what player cannot ascend a height according to the physical qualification and psychological condition unrestricted choice of oneself
Highly, thrilling highest point will be passed through involuntarily.For those it is probably high and it is accidentally upper those of, without the thrilling beginner experienced
With timid children, their screens breathing, close eyes tightly, both without pleasant ornamental, also without relaxing enjoyment, incomparable tight
It opens and very much in fear, gives ferris wheel life, leave it to chance.Ferris wheel is left, is in a trance, it appears that has got a life back.
The elderly hangs back, and sighs with feeling that oneself is born at the wrong time, and does not have condition object for appreciation when young, and old object for appreciation of having ready conditions is not played but, can only
Stand ground listen issued from ferris wheel in terror scream.
Second, ferris wheel is very of short duration by the time most beneficial for ornamental highest point, those bold players,
Have little time to press the shutter of camera, highest point is already expired in carriage, leave ferris wheel leave unavoidably it is unfulfilling sorry.
Third, ferris wheel does not take into account the function of taking exercises.
It, will be more favourable if improving upgrading to ferris wheel for disadvantages mentioned above.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of player can according to oneself physical qualification and psychological condition,
Unrestricted choice ascend a height mode, unrestricted choice ascend a height height, freely determine the residence time, ascending a height watches and takes exercises and take into account, always
Few all suitable Sky Tower.
In order to solve the above technical problems, the technical solution of the present invention is as follows:
A kind of Sky Tower contains tower body, elevator, multiple platforms, multiple outer courses, multiple interior roads, multiple two pass beams.
The tower body of the Sky Tower towers on level ground, axis vertical, has multiple pyllers in tower wall;This is more
In a pyller, the axis of n+m-1 pyller on the same line, the straight line by the longitudinal profile of the tower body axis,
Remaining pyller is scattered in the bottom periphery of the tower wall.
The elevator of the Sky Tower, is surrounded by the borehole wall, is located in the inner cavity of the tower body, the axis of axis and the tower body
Line is overlapped, and cross section is rectangle, between the inner surface of the tower wall of the corner of borehole wall outer surface and the nearest tower body
Distance is equal to s and the s is greater than 2 times of human body width, interior to install elevator, has n+m+1 borehole wall door on the borehole wall;This n+m+1
A borehole wall door, axis are located at the same of the tower body axis on same vertical line, with n+m-1 pyller in the tower wall
Side, straight line where the axis of straight line and this n+m-1 pyller where axis are cutd open by the same longitudinal direction of the tower body axis
On face;The borehole wall door of bottom one in this n+m+1 borehole wall door is stood on ground.
In multiple platforms of the Sky Tower, n platform is successively continuously installed on the top of the tower body, m platform dispersion peace
Waist loaded on the tower body;In this n platform, uppermost platform is located at the top of the tower body, between two neighboring platform
Difference in height is h;One of this multiple platform are prevented by protective fence, one piece of guidance tape, two passageway excessively outside a platform board, a platform board
Guardrail, a long beam, multiple short beams composition;Long beam on this multiple platform is located at the same side of the tower body axis, and this is multiple
The axis of long beam on platform is located on same perpendicular;One of this multiple platform are upper to erect a borehole wall door;This is multiple flat
In platform, in addition to uppermost platform, one of remaining platform erects a pyller thereon, and long beam thereon, which is located at, to be erect thereon
The underface of borehole wall door and pyller;It is located at uppermost platform in this multiple platform, long beam thereon is located at the well erect thereon
Protective fence in mounting platform plate is gone back in the underface of wall door thereon.
The platform board is horizontal circle annular slab, the axis of the axis and the tower body of inner circumferential surface or external peripheral surface
Line is overlapped, and inner circumferential surface is flushed with the inner surface of the tower wall of the tower body of corresponding position;Except topmost in this multiple platform
Platform outside one of remaining platform, the tower wall of the upper surface near platform board inner circumferential surface and corresponding position is thereon with tight
Fit system links together.
The outer protective fence of the platform board, is looped around on the upper surface near the platform board external peripheral surface, lower end and phase
The upper surface of the platform board of position is answered snugly to link together.
A long beam and multiple short beams on one of this multiple platform, respectively along the difference of the tower body in same level
Radially uniform radiation profiles are contacted in the lower section of the platform board, and with the platform board;It is same to pass through the tower body axis for the long beam
The tower wall of side and the borehole wall of the elevator, inner face are flushed with the inner surface of the borehole wall of corresponding position, outer end face and phase
The external peripheral surface of the platform board of position is answered to flush, one of two lateral faces near inner face and lower surface are respectively and accordingly
The borehole wall of position snugly links together, and passes through one of two lateral faces of part in the tower wall and lower surface
The tower wall with corresponding position snugly links together respectively, is located at upper surface below the platform board and corresponding
The lower surface of the platform board of position snugly links together;One of this multiple short beam, inner end pass through the tower wall,
Its inner face is flushed with the inner surface of the tower wall, one of two lateral faces near inner face and lower surface respectively with corresponding position
The tower wall snugly link together, the lower surface of the platform board of upper surface and corresponding position is with tight fit side
Formula links together.
The guidance tape of crossing is horizontal rectangular plate, but its outer end face is protruded outward in arc surface, and transverse width is greater than the borehole wall
The transverse width of door or pyller, the upper surface near the lateral middle of lower surface and the long beam inner face of corresponding position is with tight
Fit system links together, and inner face is flushed with the inner face of the long beam, the middle part of upper surface and phase near inner face
The lower surface of the borehole wall door of position is answered snugly to link together, the upper surface near one of inner face two sides is under
Surface snugly links together with the borehole wall of corresponding position respectively, and outer end face is interior with the opposed platform board
Having radial distance above the long beam between circumferential surface is the arc-shaped platform notch of s.
The upper surface near one of guidance tape two sides is crossed snugly with this respectively in the lower end of the two passageway protective fences
It links together.
Protective fence in the platform board, the platform board inner circumferential surface being looped around in this multiple platform on the platform of the top are attached
On close upper surface, but it has protective fence notch in platform board, the platform of lower end and corresponding position in the platform indentation, there
The upper surface of plate snugly links together.
The distribution of multiple two pass beams of the Sky Tower is such that in this n platform immediately below the long beam of bottom platform
Difference in height is to have a two pass beam at h;The surface difference in height of the long beam of one of this m platform is to have a two pass beam at h;This
The underface difference in height of the long beam of one of m platform is to have a two pass beam at h.
One of these two pass beams are inserted into the tower wall of the tower body of corresponding position along the same radial direction of the tower body respectively and are somebody's turn to do
In the borehole wall of elevator, snugly link together with the tower wall and the borehole wall respectively, inner face and corresponding positions
The inner surface for the borehole wall set flushes, and outer end is protruding from the tower wall, and the length stretched out is equal to s.
The distribution of multiple outer courses of the Sky Tower is such that high immediately below the long beam of bottom platform in this n platform
Degree difference is that the long beam surface difference in height of the top platform in two pass beam and this m platform at h is between two pass beam at h
There is an outer course;There is an outer course between two two pass beams in this m platform between two neighboring platform;In this m platform
Difference in height is the two pass beam at h and has an outer course between ground immediately below the long beam of bottom platform.
One of this multiple outer course containing guidance tape outside the helical form walked for people, the multiple outer course beams for supporting the outer guidance tape, prevent
Outer guard column that people falls on the outside of the outer guidance tape, two outer course end protective fences for preventing people from falling from the outer course board ends.
Overlook the outer guidance tape, in the counterclockwise direction gradually upward spiral surrounding in the periphery of the tower body of corresponding position,
The screw pitch of the spiral is equal to h, and radial width is equal to s, the outer surface of the tower body tower wall of interior lateral face and corresponding position with
Tight fit mode links together, and the lower surface near both ends is upper with one of two two pass beams of corresponding position extension end respectively
Surface snugly links together, but difference in height is double at h immediately below the long beam of bottom platform in this m platform
The lower surface of the outer guidance tape lower end of outer course, is snugly connected to the ground of corresponding position between road beam and ground
On.
The outer guard column is located on the upper surface on the outside of the outer guidance tape near face, lower end and corresponding position
The upper surface of the outer guidance tape snugly links together.
The lower end of the two outer course end protective fences is respectively with the upper surface near one of the outer course board ends with tight fit side
Formula links together, but difference in height is the two pass beam at h and between ground immediately below the long beam of bottom platform in this m platform
Save outer course end protective fence in the lower end of the outer guidance tape of outer course.
This multiple outer course beam is evenly distributed on the lower section except the outer course board ends, and contacts with the outer guidance tape;This is more
One of a outer course beam is inserted into the tower wall of the tower body of corresponding position and the well of the elevator along the same radial direction of the tower body respectively
In wall, snugly link together with the tower wall and the borehole wall respectively, the borehole wall of inner face and corresponding position
Inner surface flush, from the lower surface of the outer guidance tape of the upper surface and corresponding position at the protruding end of the tower wall with tight fit
Mode links together, and outer end face is flushed with the outer lateral face of the outer guidance tape of corresponding position.
The distribution in multiple interior roads of the Sky Tower is such that immediately below the long beam of one of this m platform that difference in height is at h
Two pass beam and surface difference in height be h at two pass beam between the road You Yigenei;The long beam of bottom platform in this n platform
Underface difference in height road You Yigenei between the long beam of the top platform in the two pass beam and this n platform at h.
One of this multiple interior road containing guidance tape in the helical form walked for people, the multiple interior road beams for supporting the interior guidance tape, prevent
Inside protective fence that people falls on the inside of the interior guidance tape, the road the Liang Genei end protective fence for preventing the road Ren Conggainei board ends from falling.
The interior guidance tape is overlooked, in the counterclockwise direction gradually week of the upward spiral surrounding in the tower body inner cavity of corresponding position
It encloses, the screw pitch of the spiral is equal to h, and radial width is equal to s, the interior table of the tower wall of the tower body of outer lateral face and corresponding position
Face snugly links together, and when waist passes through platform, waist is in the platform notch of the platform;It is flat at this
Platform indentation, there, the lower surface of the interior guidance tape of the upper surface and corresponding position of long beam is snugly connected to one on the platform
It rises, the interior lateral face that the outer end face of guidance tape and the interior guidance tape of corresponding position are crossed on the platform is snugly connected to one
It rises, the outer lateral face of the interior guidance tape of the inner circumferential surface and corresponding position of the platform upper mounting plate plate is snugly connected to
Together.
Difference in height is two pass beam h at and the two pass that surface difference in height is at h immediately below the long beam of one of this m platform
The interior guidance tape in interior road between beam, the lower surface near both ends are upper close to the tower with one of this two two pass beam of corresponding position respectively
The upper surface of wall snugly links together.
Difference in height is most upper in n platform of two pass beam and this at h immediately below the long beam of bottom platform in this n platform
Close to the tower on the interior guidance tape in interior road between the long beam of face platform, the lower surface of lower end and the two pass beam of corresponding position
The upper surface of wall snugly links together, the lower surface near the upper end be located at the platform upper mounting plate notch in
The upper surface of long beam snugly links together;The outer end face and phase of guidance tape are crossed in the platform indentation, there, the platform
The interior lateral face near the interior guidance tape upper end of position is answered snugly to link together, the inner circle of the platform upper mounting plate plate
Outer lateral face near the interior guidance tape upper end of this of perimeter surface and corresponding position snugly links together.
The inside protective fence is located on the upper surface in the interior guidance tape near lateral face, but when the interior guidance tape passes through platform,
The inside protective fence has inside protective fence notch in the platform indentation, there of the platform;The lower end and corresponding position of the inside protective fence
The upper surface of the interior guidance tape snugly link together.
The lower end of the two interior road end protective fences is respectively with the upper surface near one of the interior road board ends with tight fit side
Formula links together.
This multiple interior road beam is distributed in the lower section that the interior guidance tape does not connect two pass beam, the lower surface for not connecting lengthening bar,
And it is contacted with the interior guidance tape;One of this multiple interior road beam, the tower of corresponding position is inserted into along the same radial direction of the tower body respectively
In the tower wall of body and the borehole wall of the elevator, and snugly link together with the tower wall and the borehole wall respectively, in
End face is flushed with the inner surface of the borehole wall of corresponding position, and outer end face is flushed with the outer surface of the tower wall of corresponding position,
Lower surface close to the interior guidance tape of the upper surface and corresponding position of the tower wall snugly links together.
Player can take a lift from ground and be raised to one of this multiple platform, platform can also multiply below in this multiple platform
Elevator is raised to eminence platform, and can take a lift from the eminence platform in this multiple platform and drop to following platform, moreover it is possible to from this
One of multiple platforms, which take a lift, drops to ground.
Along the outer guidance tape of outer course and the interior guidance tape of Nei Dao, player can walk to one of this multiple platform from ground, can also
Platform walks to eminence platform below in this multiple platform, and can walk to from the eminence platform in this multiple platform following
Platform, moreover it is possible to walk to ground from one of this multiple platform.
Player can take a lift reach one of this multiple platform after be changed to walking, can also walking reach one of this multiple platform
After be changed to take a lift.
No matter walking is up or walking is got off, total principle is: the outer guidance tape along outer course goes to the end, passes through corresponding positions
The interior guidance tape in the road pyller Gai Zounei set;Interior guidance tape along interior road is walked to be at the end, and is changed by the pyller of corresponding position and walks outer course
Outer guidance tape.
When the platform that the upward walking of interior guidance tape along interior road passes through by the interior guidance tape: if expecting the platform up, leading to
The pyller for crossing corresponding position is arrived;It takes a lift if wanting to change, the borehole wall door for going to corresponding position waits elevator;If neither wanting to go to this
Platform, and be not intended to change and take a lift, that continues to advance, and when really encountering interior road end protective fence can not move on, can only roll over
Turn.
There are two preferred embodiments for the shape of the tower body.
First preferred embodiment of the shape of the tower body is such that the shape of the tower body is rotary table.
Second preferred embodiment of the shape of the tower body is such that the shape of the tower body is cylinder.
With such a structure, outer course, the interior road due to being equipped with elevator on the Sky Tower and for people's walking.It is to multiply electricity
Ladder or walking, player is according to oneself physical qualification and psychological condition unrestricted choice.The elderly, disabled person, pregnant woman, youngster
Virgin, milquetoast can take a lift, and bold young people can walking.The mode of ascending a height being capable of unrestricted choice, it is shown that the people of the invention
Property design philosophy.
With such a structure, due to taking a lift or walking can reach one of this multiple platform, the height ascended a height, trip
Happy person freely determines according to the physical qualification and psychological condition of oneself.More higher, more dangerous thus more high more stimulate.Height ascend a height freely
Selection, that is, stimulation degree oneself select.Sky Tower is different from ferris wheel, and the height and corresponding stimulation degree ascended a height are trips
Happy person, which measures one's own ability, to fix, and will not feel frightened on platform, will not shield breathing, close eyes tightly, but happy laughters and cheerful voices, the spacious mind of the heart
It is happy;It will not be in a trance on platform, it is desirable to go down fastly, but it is clearheaded, so enchanted by the scenery as to forget to return.Height of ascending a height and corresponding stimulation
Degree being capable of unrestricted choice, it is shown that the human oriented design thought of the invention.
With such a structure, Sky Tower is different from ferris wheel, and player's pinnacled ornamental time will not slightly indulge i.e.
It dies, and can feast one's eyes;It will not have little time according to camera shutter, and fine memory can be left on cameras.
With such a structure, it can not only take a lift and ascend a height and enjoy a distant view, but also can be taken exercises with ornamental take into account of walking, be each got
Its institute, it is to the satisfaction of all.
With such a structure, Sky Tower remains ferris wheel and ascends a height ornamental and stimulatory function, and the shortcomings that ferris wheel
Overcome, Sky Tower may be more welcomed by the people compared with ferris wheel.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
Fig. 1 is the sectional elevation schematic diagram along the tower body axis of the first embodiment of Sky Tower tower body of the present invention, n
Value is that 3, m value is 3.
Fig. 2 is the sectional elevation schematic diagram along the tower body axis of second of embodiment of Sky Tower tower body of the present invention, n
Value is that 3, m value is 3.
Fig. 3 is the schematic diagram of the taken section of line A-A along Fig. 1.
Fig. 4 is the schematic diagram of the taken section of line B-B along Fig. 2.
Specific embodiment
Shown in each figure as shown in Figure 1 to Figure 4, a kind of Sky Tower, containing tower body, elevator, multiple platforms 3, multiple outer courses, it is multiple in
Road, multiple two pass beams 18.
As shown in Figure 1 and Figure 2, the tower body of the Sky Tower towers on level ground, axis vertical, in tower wall 1
There are multiple pyller 1a.In this multiple pyller 1a, on the same line, which is passing through the tower to the axis of n+m-1 pyller 1a
On the longitudinal profile of body axis, remaining pyller 1a is scattered in the bottom periphery of the tower wall 1.
As shown in Figure 1 and Figure 2, the elevator of the Sky Tower is surrounded by the borehole wall 2, is located in the inner cavity of the tower body,
Axis is overlapped with the axis of the tower body, and cross section is rectangle, the tower of the corner of 2 outer surface of the borehole wall and the nearest tower body
The distance between inner surface of wall 1 is equal to s and the s is greater than 2 times of human body width, interior to install elevator, has n+m on the borehole wall 2
+ 1 borehole wall door 2a.This n+m+1 borehole wall door 2a, axis is on same vertical line, with n+m-1 tower in the tower wall 1
Door 1a is located at the same side of the tower body axis, and straight line where the axis of straight line and this n+m-1 pyller 1a where axis exists
By on the same longitudinal profile of the tower body axis.The borehole wall door 2a of bottom one in this n+m+1 borehole wall door 2a stands on ground
On face.
As shown in Figure 1, Figure 2, Figure 3 shows, in multiple platforms 3 of the Sky Tower, n platform 3 is successively continuously installed on the tower body
Top, m platform 3 disperse the waist for being installed on the tower body.In this n platform 3, uppermost platform 3 is located at the tower body
Top, the difference in height between two neighboring platform 3 are h.One of this multiple platform 3 are by anti-outside 4, platform boards of a platform board
5, one pieces of guardrail are crossed the long beam 7a of the passageway protective fence 13, one of guidance tape 6, two, multiple short beam 7b composition.On this multiple platform 3
Long beam 7a is located at the same side of the tower body axis, and the axis of the long beam 7a on this multiple platform 3 is located on same perpendicular.
One of this multiple platform 3 are upper to erect a borehole wall door 2a.In this multiple platform 3, in addition to uppermost platform 3, remaining platform 3 it
One, a pyller 1a is erect thereon, and long beam 7a thereon is located at the underface for erectting borehole wall door 2a and pyller 1a thereon.This
It is located at uppermost platform 3 in multiple platforms 3, long beam 7a thereon is located at the underface for erectting borehole wall door 2a thereon, thereon
Also protective fence 8 in mounting platform plate.
As shown in Figure 1 and Figure 2, the platform board 4 is horizontal circle annular slab, the axis of inner circumferential surface or external peripheral surface
Line is overlapped with the axis of the tower body, and inner circumferential surface is flushed with the inner surface of the tower wall 1 of the tower body of corresponding position.This is multiple
One of remaining platform 3 in platform 3 in addition to uppermost platform 3, the thereon upper surface near 4 inner circumferential surface of platform board and phase
The tower wall 1 of position is answered snugly to link together.
As shown in figure 3, the outer protective fence 5 of the platform board, is looped around the upper surface near 4 external peripheral surface of platform board
On, the upper surface of the platform board 4 of lower end and corresponding position snugly links together.
As shown in Figure 1 and Figure 2, the beam 7a one long and multiple short beam 7b on one of this multiple platform 3, in same level
It is upper to be contacted respectively along the radially uniform radiation profiles of difference of the tower body in the lower section of the platform board 4, and with the platform board 4.The length
Beam 7a passes through the tower wall 1 of the tower body axis the same side and the borehole wall 2 of the elevator, the well of inner face and corresponding position
The inner surface of wall 2 flushes, and outer end face is flushed with the external peripheral surface of the platform board 4 of corresponding position, near inner face
The borehole wall 2 of one of two lateral faces and lower surface respectively with corresponding position snugly links together, and passes through the tower
The tower wall 1 of one of two lateral faces of part in wall 1 and lower surface respectively with corresponding position is snugly connected to one
It rises, the lower surface for being located at the upper surface of 4 lower section of platform board and the platform board 4 of corresponding position is snugly connected to
Together.One of this multiple short beam 7b, inner end pass through the tower wall 1, and inner face is flushed with the inner surface of the tower wall 1, inner end
The tower wall 1 of one of two lateral faces near face and lower surface respectively with corresponding position snugly links together,
The lower surface of this of upper surface and corresponding position platform board 4 snugly links together.
As shown in Figure 1, Figure 2, Figure 3 shows, the guidance tape 6 of crossing is horizontal rectangular plate, but its outer end face is protruded outward in arc surface,
Its transverse width is greater than the transverse width of borehole wall door 2a or pyller 1a, the lateral middle of lower surface and the long beam of corresponding position
Upper surface near 7a inner face snugly links together, and inner face is flushed with the inner face of the long beam 7a,
The lower surface of the borehole wall door 2a at the middle part and corresponding position of upper surface snugly links together near inner face, in
The borehole wall 2 of upper and lower surfaces respectively with corresponding position near one of end face two sides is snugly connected to one
It rises, having radial distance above the long beam 7a between outer end face and the inner circumferential surface of the opposed platform board 4 is the circle of s
Arc platform notch.
As shown in figure 3, the upper surface near one of 6 two sides of guidance tape is crossed with this respectively in the lower end of the two passageway protective fences 13
Snugly link together.
As shown in figure 3, protective fence 8 in the platform board, is looped around in this multiple platform 3 flat on uppermost platform 3
On upper surface near 4 inner circumferential surface of platen, but it has protective fence notch 8a, lower end in platform board in the platform indentation, there
It snugly links together with the upper surface of the platform board 4 of corresponding position.
As shown in Figure 1 and Figure 2, the distribution of multiple two pass beams 18 of the Sky Tower is such that in this n platform 3 bottom
Difference in height is to have a two pass beam 18 at h immediately below the long beam 7a of platform 3.The surface of the long beam 7a of one of this m platform 3 is high
Degree difference is to have a two pass beam 18 at h.The underface difference in height of the long beam 7a of one of this m platform 3 is to have a two pass beam at h
18。
As shown in Figure 1 and Figure 2, one of these two pass beams 18, the same radial direction along the tower body are inserted into corresponding position respectively
In the tower wall 1 of the tower body and the borehole wall 2 of the elevator, one is snugly connected to the tower wall 1 and the borehole wall 2 respectively
It rises, inner face is flushed with the inner surface of the borehole wall 2 of corresponding position, and outer end is protruding from the tower wall 1, and the length stretched out
Degree is equal to s.
As shown in Figure 1 and Figure 2, the distribution of multiple outer courses of the Sky Tower is such that in this n platform 3 bottom platform
Difference in height is high right above the long beam 7a of the top platform 3 in the two pass beam 18 and this m platform 3 at h immediately below 3 long beam 7a
Degree difference has an outer course between the two pass beam 18 at h.Two two pass beams 18 in this m platform 3 between two neighboring platform 3
Between have an outer course.Difference in height is the two pass beam 18 and ground at h immediately below the long beam 7a of bottom platform 3 in this m platform 3
There is an outer course between face.
As shown in Figure 1, Figure 2, Figure 4 shows, one of this multiple outer course containing guidance tape 11 outside the helical form walked for people, support the outer course
Multiple outer course beams 10 of plate 11, prevent people from the outer guidance tape at the outer guard column 12 for preventing people from falling on the outside of the outer guidance tape 11
Two outer course end protective fences 17 that 11 both ends are fallen.
As shown in Figure 1 and Figure 2, overlook the outer guidance tape 11, in the counterclockwise direction gradually upward spiral surrounding in corresponding position
The tower body periphery, the screw pitch of the spiral is equal to h, and radial width is equal to s, the tower body of interior lateral face and corresponding position
The outer surface of tower wall 1 snugly links together, two two pass with corresponding position respectively of the lower surface near both ends
The upper surface of one of beam 18 extension end snugly links together, but in this m platform 3 bottom platform 3 long beam
The lower surface of 7a underface difference in height 11 lower end of outer guidance tape of outer course for the two pass beam 18 at h and between ground, with close-fitting
Conjunction mode is connected on the ground of corresponding position.
As shown in figure 4, the outer guard column 12, is located on the upper surface near the outer lateral face of outer guidance tape 11, under
It holds and snugly links together with the upper surface of the outer guidance tape 11 of corresponding position.
As shown in figure 4, the lower end of the two outer course end protective fences 17 respectively with it is upper near one of outer 11 both ends of guidance tape
Surface snugly links together, but difference in height is at h immediately below the long beam 7a of bottom platform 3 in this m platform 3
Two pass beam 18 and ground between the lower end of outer guidance tape 11 of outer course save outer course end protective fence 17.
As shown in Figure 1 and Figure 2, this multiple outer course beam 10 are evenly distributed on the lower section except outer 11 both ends of guidance tape, and
It is contacted with the outer guidance tape 11.One of this multiple outer course beam 10 are inserted into being somebody's turn to do for corresponding position along the same radial direction of the tower body respectively
In the tower wall 1 of tower body and the borehole wall 2 of the elevator, one is snugly connected to the tower wall 1 and the borehole wall 2 respectively
It rises, inner face is flushed with the inner surface of the borehole wall 2 of corresponding position, upper surface and phase from the protruding end of tower wall 1
The lower surface of the outer guidance tape 11 of position is answered snugly to link together, the outer guidance tape of outer end face and corresponding position
11 outer lateral face flushes.
As shown in Figure 1 and Figure 2, the distribution in multiple interior roads of the Sky Tower is such that the long beam 7a of one of this m platform 3
Underface difference in height is the two pass beam 18 at h and surface difference in height is the road You Yigenei between two pass beam 18 at h.This n
Difference in height is the two pass beam 18 at h and the top platform in this n platform 3 immediately below the long beam 7a of bottom platform 3 in platform 3
The road You Yigenei between 3 long beam 7a.
As shown in Figure 1, Figure 2, Figure 4 shows, one of this multiple interior road containing guidance tape 15 in the helical form walked for people, support the interior road
Multiple interior road beams 14 of plate 15, prevent people from the interior guidance tape at the inside protective fence 16 for preventing people from falling on the inside of the interior guidance tape 15
The road the Liang Genei end protective fence 9 that 15 both ends are fallen.
As shown in Figure 1 and Figure 2, overlook the interior guidance tape 15, in the counterclockwise direction gradually upward spiral surrounding in corresponding position
The tower body inner cavity around, the screw pitch of the spiral is equal to h, and radial width is equal to s, outer lateral face and corresponding position should
The inner surface of the tower wall 1 of tower body snugly links together, and when waist passes through platform 3, waist is embedded in the platform 3
Platform notch in;In the platform indentation, there, the platform 3 under the interior guidance tape 15 of the upper surface and corresponding position of long beam 7a
Surface snugly links together, the interior guidance tape 15 of the outer end face and corresponding position of mistake guidance tape 6 on the platform 3
Interior lateral face snugly links together, the inner circumferential surface of the 3 upper mounting plate plate 4 of platform and the interior road of corresponding position
The outer lateral face of plate 15 snugly links together.
As shown in Figure 1 and Figure 2, immediately below the long beam 7a of one of this m platform 3 difference in height be the place h two pass beam 18 and just on
Square difference in height is the interior guidance tape 15 in interior road between two pass beam 18 at h, the lower surface near both ends respectively with corresponding position
The upper upper surface close to the tower wall 1 of one of this two two pass beam 18 snugly links together.
As shown in Figure 1 and Figure 2, difference in height is the two pass at h immediately below the long beam 7a of bottom platform 3 in this n platform 3
In beam 18 and this n platform 3 between the long beam 7a of the top platform 3 interior road interior guidance tape 15, the lower surface of lower end with
Upper surface on the two pass beam 18 of corresponding position close to the tower wall 1 snugly links together, near the upper end
Lower surface and the upper surface for the long beam 7a being located in the 3 upper mounting plate notch of platform snugly link together;It is flat at this
Platform indentation, there crosses the interior lateral face near the outer end face of guidance tape 6 and interior 15 upper end of guidance tape of corresponding position on the platform 3 with tight
Fit system links together, near the inner circumferential surface of the 3 upper mounting plate plate 4 of platform and interior 15 upper end of guidance tape of corresponding position
Outer lateral face snugly link together.
As shown in figure 4, the inside protective fence 16 is located on the upper surface in the interior guidance tape 15 near lateral face, the road Dan Gainei
When plate 15 passes through platform 3, which has inside protective fence notch 16a in the platform indentation, there of the platform 3.This is interior
The upper surface of the interior guidance tape 15 of the lower end and corresponding position of side protective fence 16 snugly links together.
As shown in figure 4, the lower end of the two interior road end protective fences 9 respectively with the upper table near one of interior 15 both ends of guidance tape
Face snugly links together.
As shown in Figure 1 and Figure 2, this multiple interior road beam 14 is distributed in the interior guidance tape 15 and does not connect two pass beam 18, do not connect
The lower section of the lower surface of long beam 7a, and contacted with the interior guidance tape 15.One of this multiple interior road beam 14, along the same diameter of the tower body
To respectively be inserted into corresponding position the tower wall 1 of the tower body and the borehole wall 2 of the elevator in, and respectively with the tower wall 1 and the borehole wall 2
It snugly links together, inner face is flushed with the inner surface of the borehole wall 2 of corresponding position, outer end face and corresponding
The outer surface of the tower wall 1 of position flushes, close to the lower surface of the interior guidance tape 15 of the upper surface and corresponding position of the tower wall 1
Snugly link together.
As shown in Figure 1 and Figure 2, player can take a lift from ground is raised to one of this multiple platform 3, can also be multiple flat from this
Platform 3, which takes a lift, below in platform 3 is raised to eminence platform 3, and the decline that can take a lift from the eminence platform 3 in this multiple platform 3
To following platform 3, moreover it is possible to take a lift from one of this multiple platform 3 and drop to ground.
As shown in Figure 1 and Figure 2, along the interior guidance tape 15 of the outer guidance tape 11 of outer course and Nei Dao, player can walk to this from ground
One of multiple platforms 3 can also walk to eminence platform 3 by platform 3 below in this multiple platform 3, and can be from this multiple platform 3
In eminence platform 3 walk to following platform 3, moreover it is possible to walk to ground from one of this multiple platform 3.
As shown in Figure 1 and Figure 2, player can take a lift reach one of this multiple platform 3 after be changed to walking, can also walk to
It is changed to take a lift after up to one of this multiple platform 3.
As shown in Figure 1 and Figure 2, no matter walking is got on or walking is got off, total principle is: the outer guidance tape 11 along outer course is walked
It is at the end, passes through the interior guidance tape 15 in the road pyller 1a Gai Zounei of corresponding position.Interior guidance tape 15 along interior road is walked to be at the end, and passes through phase
The pyller 1a of position is answered to change the outer guidance tape 11 for walking outer course.
As shown in Figure 1 and Figure 2, when the platform 3 that the upward walking of interior guidance tape 15 along interior road passes through by the interior guidance tape 15: if
Expect the platform 3 up, is then arrived by the pyller 1a of corresponding position.It takes a lift if wanting to change, goes to the borehole wall of corresponding position
Door 2a waits elevator.If neither wanting to go to the platform 3, and it is not intended to change and takes a lift, that continues to advance, and it is anti-really to encounter interior road end
When guardrail 9 can not move on, it can only turn back.
There are two preferred embodiments for the shape of the tower body.
As shown in Figure 1, first preferred embodiment of the shape of the tower body is such that the shape of the tower body is rotary table.
First preferred embodiment of the tower body shape, sound construction, appearance is beautiful, can build higher, but structure is complicated, makes
Valence is higher.First preferred embodiment can be used preferentially.
As shown in Fig. 2, second preferred embodiment of the shape of the tower body is such that the shape of the tower body is cylinder.
Second preferred embodiment of the tower body shape, structure is simple, and cost is lower, but pattern is dull, height-limited.This
Two preferred embodiments are with reference to use.
Why not does the Sky Tower cancel interior road, and outer course is gone directly tower top from ground?
As shown in Figure 1 and Figure 2, this scheme is ramed, on one of this multiple platform 3 in order to prevent although structure is simple
Must windowing, the short beam 7b at window cannot install.One of this multiple platform 3 uplifting window mouth, certainly will reduce ornamental number.Window
At mouthful short beam 7b is not installed, the firmness of structure certainly will be influenced.Therefore the present invention does not use this structure.
Why not does the Sky Tower cancel outer course, and the road Er Jiangnei goes directly tower top from ground?
As shown in Figure 1 and Figure 2, this scheme, although structure is simple, people walks for a long time in tower body inner cavity, Bu Nengguan
The scenery of outside is appreciated, uninteresting, air is not again pure and fresh.Therefore the present invention does not use this structure.
The organization plan that the present invention, outer course and interior road are cross-linked may be more excellent scheme.
Overlook outer guidance tape 11, in the counterclockwise direction gradually upward spiral surrounding in the periphery of the tower body of corresponding position.
Overlook in guidance tape 15, in the counterclockwise direction gradually upward spiral surrounding around the tower body inner cavity of corresponding position." along inverse
What does is clockwise gradually upward spiral surrounding " intended that?
As shown in Figure 1 and Figure 2, sportsman run on runway all be in the counterclockwise direction, this be have physiologic theory make according to
According to.People consumes great physical strength, runs similar on runway along 15 uplink of outer guidance tape 11 or interior guidance tape." in the counterclockwise direction by
The intention of gradually upward spiral surrounding " is that the physiological function of protection people.As for downlink, although along clockwise direction, gravity
Potential energy is kinetic energy and interior energy, and physical demands very little does not influence the physiological function of people.
Why does is the s greater than 2 times of human body width?
The s is greater than 2 times of human body width, is provided to allow along the people of 15 uplink of outer guidance tape 11 or interior guidance tape and the people of downlink
It can smoothly pass through.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing.The present invention is not limited to above-mentioned embodiment party
Formula, technical field those of ordinary skill within the scope of knowledge, can also be before not departing from present inventive concept
Put that various changes can be made.The various change made without departing from the purpose of the present invention, still falls within the scope of the present invention.