CN107654109A - sky tower - Google Patents

sky tower Download PDF

Info

Publication number
CN107654109A
CN107654109A CN201710991241.0A CN201710991241A CN107654109A CN 107654109 A CN107654109 A CN 107654109A CN 201710991241 A CN201710991241 A CN 201710991241A CN 107654109 A CN107654109 A CN 107654109A
Authority
CN
China
Prior art keywords
platform
tower
guidance tape
relevant position
interior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710991241.0A
Other languages
Chinese (zh)
Other versions
CN107654109B (en
Inventor
李新亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhilue Intellectual Property Operation Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710991241.0A priority Critical patent/CN107654109B/en
Publication of CN107654109A publication Critical patent/CN107654109A/en
Application granted granted Critical
Publication of CN107654109B publication Critical patent/CN107654109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H2012/006Structures with truss-like sections combined with tubular-like sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of Sky Tower, and it is made up of tower body, elevator, multiple platforms (3), multiple outer courses, multiple interior roads, multiple two pass beams (18).Elevator is installed, outer course and Nei Dao supply people's walking in elevator.Take a lift or walking can reach one of this multiple platform (3), taken a lift from one of this multiple platform (3) or walking can reach ground, the residence time on one of this multiple platform (3) is unrestricted.It is to take a lift up to ascend a height and enjoy a distant view or walking is viewed and admired simultaneous and taken exercises, rises at the top of tower body or to waist, be to view and admire or stop in short-term for a long time, player freely determines according to oneself physical qualification and psychological condition, has a role to play, to the satisfaction of all.Sky Tower provides a variety of unrestricted choice power to player, it is shown that the human oriented design thought of the invention.

Description

Sky Tower
Technical field
Can be according to the physical qualification and psychological condition of oneself, freely the present invention relates to a kind of Sky Tower, especially player Selection ascend a height mode, unrestricted choice ascend a height height, freely determine the residence time, ascend a height view and admire and take exercises take into account, the old and the young all Suitable Sky Tower.
Background technology
Ferris wheel is popular.To find out its cause, one is to ascend a height and enjoy a distant view, beautiful scenery has a panoramic view;Second, it is very thrilling, there is frightened nothing Danger.
But ferris wheel has the following disadvantages.
First, ferris wheel has been gone up, what player can not ascend a height according to the physical qualification and psychological condition unrestricted choice of oneself Highly, the peak of thrill will be passed through involuntarily.For those it is probably high and it is by mistake upper those of, without the thrilling beginner experienced and Timid children, their screens breathing, closed eyes tightly, both viewed and admired without pleasure, also without relaxing enjoyment, incomparable nervous Very much in fear, ferris wheel is given life, is left it to chance.Ferris wheel is left, is in a trance, it appears that has got a life back.Always Year people hangs back, and sighs with feeling that oneself is born at the wrong time, and does not have condition object for appreciation when young, and old object for appreciation of having ready conditions, which is but played, does not know clearly, Zhi Nengzhan Send from ferris wheel terrified is listened on ground to scream.
Second, ferris wheel is very of short duration by the time most beneficial for the peak viewed and admired, those bold players, Have little time to press the shutter of camera, car crosses peak, leave ferris wheel leave unavoidably it is unfulfilling sorry.
Third, ferris wheel does not take into account the function of taking exercises.
If being improved upgrading to ferris wheel for disadvantages mentioned above, it will be more favourable.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of player can according to the physical qualification and psychological condition of oneself, Unrestricted choice ascend a height mode, unrestricted choice ascend a height height, freely determine the residence time, ascend a height to view and admire and take exercises and take into account, always Few all suitable Sky Tower.
In order to solve the above technical problems, the technical scheme is that:
A kind of Sky Tower, containing tower body, elevator, multiple platforms, multiple outer courses, multiple interior roads, multiple two pass beams.
The tower body of the Sky Tower, it towers on level ground, its axis vertical, has multiple pyllers in its tower wall;This is more In individual pyller, the axis of n+m-1 pyller on the same line, the straight line on the longitudinal profile by the tower body axis, its Remaining pyller is scattered in the bottom periphery of the tower wall.
The elevator of the Sky Tower, it is surrounded by the borehole wall, and it is located in the inner chamber of the tower body, the axle of its axis and the tower body Line overlaps, and its cross section be rectangle, between the inner surface of the tower wall of the corner of its borehole wall outer surface and the tower body recently Distance is equal to s and the s is more than 2 times of human body width, installation elevator in it, has n+m+1 borehole wall door on its borehole wall;This n+m+1 Individual borehole wall door, for its axis on same vertical curve, it is located at the same of the tower body axis with n+m-1 pyller in the tower wall Side, straight line where the axis of straight line and this n+m-1 pyller where its axis cut open by the same longitudinal direction of the tower body axis On face;The borehole wall door of bottom one in this n+m+1 borehole wall door is stood on ground.
In multiple platforms of the Sky Tower, n platform is continuously installed on the top of the tower body, the scattered peace of m platform successively Waist loaded on the tower body;In this n platform, uppermost platform is located at the top of the tower body, between two neighboring platform Difference in height is h;One of this multiple platform are prevented by guard rail, one piece of guidance tape, two passageway excessively outside a landing slab, a landing slab Guardrail, a long beam, multiple short beams composition;Long beam on this multiple platform is located at the same side of the tower body axis, and this is multiple The axis of long beam on platform is located on same perpendicular;One of this multiple platform are upper to erect a borehole wall door;This is multiple flat In platform, in addition to uppermost platform, one of remaining platform erects a pyller thereon, and long beam thereon is positioned at erectting thereon The underface of borehole wall door and pyller;It is located at uppermost platform in this multiple platform, long beam thereon is positioned at the well erect thereon The underface of wall door, guard rail in mounting platform plate is gone back thereon.
The landing slab, it is horizontal circle annular slab, the axis of its inner circumferential surface or external peripheral surface and the axle of the tower body Line overlaps, and its inner circumferential surface flushes with the inner surface of the tower wall of the tower body of relevant position;Except topmost in this multiple platform Platform outside one of remaining platform, the tower wall of the upper surface near landing slab inner circumferential surface and relevant position is with tight thereon Fit system links together.
The outer guard rail of the landing slab, it is looped around on the upper surface near the landing slab external peripheral surface, its lower end and phase The upper surface of the landing slab of position is answered snugly to link together.
A long beam and multiple short beams on one of this multiple platform, respectively along the difference of the tower body in same level Radially uniform radiation profiles contact in the lower section of the landing slab, and with the landing slab;The long beam, it is same through the tower body axis The tower wall of side and the borehole wall of the elevator, its inner face flush with the inner surface of the borehole wall of relevant position, its outer face and phase Answer the external peripheral surface of the landing slab of position to flush, one of two lateral faces near its inner face and lower surface respectively with accordingly The borehole wall of position snugly links together, and it passes through one of two lateral faces of part in the tower wall and lower surface The tower wall with relevant position snugly links together respectively, its be located at upper surface below the landing slab with it is corresponding The lower surface of the landing slab of position snugly links together;One of this multiple short beam, its inner pass through the tower wall, Its inner face flushes with the inner surface of the tower wall, one of two lateral faces near its inner face and lower surface respectively with relevant position The tower wall snugly link together, the lower surface of the landing slab of its upper surface and relevant position is with tight fit side Formula links together.
The guidance tape of crossing is horizontal rectangular plate, but it is in arc surface that its outer face is outstanding, and its transverse width is more than the borehole wall The transverse width of door or pyller, the upper surface near the lateral middle of its lower surface and the long beam inner face of relevant position is with tight Fit system links together, and its inner face flushes with the inner face of the long beam, the middle part of upper surface and phase near its inner face The lower surface of the borehole wall door of position is answered snugly to link together, the upper surface near one of its inner face both sides is with Surface snugly links together with the borehole wall of relevant position respectively, and its outer face is interior with the opposed landing slab There is the circular arc platform breach that radial distance is s above the long beam between circumferential surface.
The upper surface that the lower end of the two passageway guard rails is crossed near one of guidance tape both sides with this respectively is snugly Link together.
Guard rail in the landing slab, the landing slab inner circumferential surface that it is looped around in this multiple platform on the platform of the top are attached On near upper surface, but it has guard rail breach in landing slab in the platform indentation, there, the platform of its lower end and relevant position The upper surface of plate snugly links together.
The distribution of multiple two pass beams of the Sky Tower is such:In this n platform immediately below the long beam of bottom platform Difference in height is to have a two pass beam at h;The surface difference in height of the long beam of one of this m platform is to have a two pass beam at h;This The underface difference in height of the long beam of one of m platform is has a two pass beam at h.
One of these two pass beams, its same radial direction along the tower body are inserted the tower wall of the tower body of relevant position and are somebody's turn to do respectively In the borehole wall of elevator, it snugly links together with the tower wall and the borehole wall respectively, its inner face and corresponding positions The inner surface for the borehole wall put flushes, and its outer end is protruding from the tower wall, and the length stretched out is equal to s.
The distribution of multiple outer courses of the Sky Tower is such:It is high immediately below the long beam of bottom platform in this n platform Degree difference is that the long beam surface difference in height of the top platform in two pass beam and this m platform at h is to have between the two pass beam at h One outer course;There is an outer course between two two pass beams in this m platform between two neighboring platform;In this m platform most Difference in height is to have an outer course between two pass beam and ground at h immediately below the long beam of platform below.
One of this multiple outer course containing guidance tape outside the helical form for people's walking, support multiple outer course beams of the outer guidance tape, prevent Outer guard column that people falls on the outside of the outer guidance tape, two outer course end guard rails for preventing people from falling from the outer guidance tape both ends.
Overlook the outer guidance tape, its in the counterclockwise direction gradually upwards spiral surrounding in the periphery of the tower body of relevant position, The pitch of the spiral is equal to h, and its radial width is equal to s, the outer surface of the tower body tower wall of its interior lateral face and relevant position with Tight fit mode links together, and the lower surface near its both ends is upper with one of two two pass beams of relevant position external part respectively Surface snugly links together, but difference in height is double at h immediately below the long beam of bottom platform in this m platform The lower surface of the outer guidance tape lower end of outer course between road beam and ground, snugly it is connected to the ground of relevant position On.
The outer guard column, it is located on the outside of the outer guidance tape on the upper surface near face, its lower end and relevant position The upper surface of the outer guidance tape snugly links together.
The lower end of the two outer course end guard rails is respectively with the upper surface near one of the outer guidance tape both ends with tight fit side Formula links together, but difference in height is between two pass beam and ground at h immediately below the long beam of bottom platform in this m platform Save outer course end guard rail in the lower end of the outer guidance tape of outer course.
This multiple outer course beam, it is evenly distributed on the lower section except the outer guidance tape both ends, and is contacted with the outer guidance tape;This is more One of individual outer course beam, its same radial direction along the tower body insert the tower wall of the tower body of relevant position and the well of the elevator respectively In wall, it snugly links together with the tower wall and the borehole wall respectively, the borehole wall of its inner face and relevant position Inner surface flush, it is from the upper surface at the protruding end of the tower wall and the lower surface of the outer guidance tape of relevant position with tight fit Mode links together, and its outer face flushes with the outer lateral face of the outer guidance tape of relevant position.
The distribution in multiple interior roads of the Sky Tower is such:Difference in height is at h immediately below the long beam of one of this m platform Two pass beam and surface difference in height be h at two pass beam between You Yigenei roads;The long beam of bottom platform in this n platform Underface difference in height You Yigenei roads between the long beam of the top platform in the two pass beam and this n platform at h.
One of this multiple interior road containing guidance tape in the helical form for people's walking, support multiple interior road beams of the interior guidance tape, prevent Inner side guard rail that people falls on the inside of the interior guidance tape, the Liang Genei roads end guard rail for preventing people from falling from the interior guidance tape both ends.
Overlook the interior guidance tape, its in the counterclockwise direction gradually upwards spiral surrounding the tower body inner chamber of relevant position week Enclose, the pitch of the spiral is equal to h, and its radial width is equal to s, the interior table of the tower wall of the tower body of its outer lateral face and relevant position Face snugly links together, and when its waist passes through platform, its waist is in the platform breach of the platform;It is flat at this Platform indentation, there, the lower surface of the interior guidance tape of the upper surface of long beam and relevant position is snugly connected to one on the platform Rise, the interior lateral face that the outer face of guidance tape and the interior guidance tape of relevant position are crossed on the platform is snugly connected to one Rise, the outer lateral face of the inner circumferential surface of the platform upper mounting plate plate and the interior guidance tape of relevant position is snugly connected to Together.
Difference in height is two pass beam h at immediately below the long beam of one of this m platform and surface difference in height is two pass at h The interior guidance tape in interior road between beam, the lower surface near its both ends are upper close to the tower with one of this two two pass beam of relevant position respectively The upper surface of wall snugly links together.
Difference in height is most upper in n platform of two pass beam and this at h immediately below the long beam of bottom platform in this n platform Close to the tower on the interior guidance tape in interior road between the long beam of face platform, the lower surface of its lower end and the two pass beam of relevant position The upper surface of wall snugly links together, and the lower surface near its upper end is with being located in the platform upper mounting plate breach The upper surface of long beam snugly links together;Outer face and the phase of guidance tape are crossed in the platform indentation, there, the platform The interior lateral face near the interior guidance tape upper end of position is answered snugly to link together, the inner circle of the platform upper mounting plate plate Outer lateral face near the interior guidance tape upper end of this of perimeter surface and relevant position snugly links together.
The inner side guard rail is located on the upper surface in the interior guidance tape near lateral face, but when the interior guidance tape passes through platform, The inner side guard rail has inner side guard rail breach in the platform indentation, there of the platform;The lower end and relevant position of the inner side guard rail The upper surface of the interior guidance tape snugly link together.
The lower end of the two interior road end guard rails is respectively with the upper surface near one of the interior guidance tape both ends with tight fit side Formula links together.
This multiple interior road beam be distributed in the interior guidance tape do not connect two pass beam, do not connect lengthening bar lower surface lower section, And contacted with the interior guidance tape;One of this multiple interior road beam, its same radial direction along the tower body inserts the tower of relevant position respectively In the tower wall of body and the borehole wall of the elevator, and snugly linked together with the tower wall and the borehole wall respectively, in it End face flushes with the inner surface of the borehole wall of relevant position, and its outer face flushes with the outer surface of the tower wall of relevant position, its Snugly linked together close to the lower surface of the upper surface of the tower wall and the interior guidance tape of relevant position.
Player can take a lift from ground and be raised to one of this multiple platform, also can from this multiple platform below platform multiply Elevator is raised to eminence platform, and and can takes a lift from the eminence platform in this multiple platform drops to following platform, moreover it is possible to from this One of multiple platforms, which take a lift, drops to ground.
Along the interior guidance tape of the outer guidance tape and Nei Dao of outer course, player can walk to one of this multiple platform from ground, also may be used Platform walks to eminence platform below from this multiple platform, and and can walks to following from the eminence platform in this multiple platform Platform, moreover it is possible to walk to ground from one of this multiple platform.
Player can take a lift reach one of this multiple platform after be changed to walking, can also walk to up to one of this multiple platform After be changed to take a lift.
No matter walking is up or walking is got off, total principle is:The end is gone to along the outer guidance tape of outer course, passes through corresponding positions The interior guidance tape in the pyller Gai Zounei roads put;Walk to be at the end along the interior guidance tape in interior road, changed by the pyller of relevant position and walk outer course Outer guidance tape.
When passing through the platform that the interior guidance tape passes through along the upward walking of interior guidance tape in interior road:If expecting the platform up, lead to The pyller for crossing relevant position is arrived;Taken a lift if wanting to change, the borehole wall door for going to relevant position waits elevator;If neither want to go to this Platform, it is not intended to change again to take a lift, that continues to advance, and when really running into interior road end guard rail can not move on, can only roll over Turn.
The shape of the tower body has two preferred schemes.
First preferred scheme of the shape of the tower body is such:The tower body is shaped as round platform.
Second preferred scheme of the shape of the tower body is such:The tower body is shaped as cylinder.
After such structure, due to being provided with elevator and outer course, the interior road for people's walking on the Sky Tower.It is to multiply electricity Ladder or walking, player is according to the physical qualification and psychological condition unrestricted choice of oneself.The elderly, disabled person, pregnant woman, youngster Virgin, milquetoast can take a lift, and bold young people can walking.The mode of ascending a height being capable of unrestricted choice, it is shown that the people of the invention Property design philosophy.
After such structure, due to taking a lift or walking can reach one of this multiple platform, the height ascended a height, trip Happy person freely determines according to oneself physical qualification and psychological condition.It is more high more dangerous thus more high more stimulate.Height ascend a height freely Selection, that is, stimulate degree oneself to select.Sky Tower is different from ferris wheel, and the height and corresponding stimulation degree ascended a height are trips Happy person measures one's own ability what is fixed, will not feel frightened on platform, will not shield breathing, close eyes tightly, but happy laughters and cheerful voices, the spacious god of the heart It is happy;It will not be in a trance on platform, it is desirable to go down soon, but it is clearheaded, so enchanted by the scenery as to forget to return.Height of ascending a height and corresponding stimulation Degree being capable of unrestricted choice, it is shown that the human oriented design thought of the invention.
After such structure, Sky Tower is different from ferris wheel, and player is pinnacled, which to view and admire the time, slightly to indulge i.e. Die, and can feast one's eyes;It will not have little time according to camera shutter, and fine memory can be left on cameras.
After such structure, it can both take a lift and ascend a height and enjoy a distant view, and can view and admire to take into account with walking again and take exercises, each get Its institute, it is to the satisfaction of all.
After such structure, Sky Tower, which remains ferris wheel, ascends a height and views and admires and stimulatory function, and the shortcomings that ferris wheel Overcome, Sky Tower may be more welcomed by the people compared with ferris wheel.
Brief description of the drawings
The embodiment of the present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the sectional elevation schematic diagram along the tower body axis of the first embodiment of Sky Tower tower body of the present invention, n Value is that 3, m values are 3.
Fig. 2 is the sectional elevation schematic diagram along the tower body axis of second of embodiment of Sky Tower tower body of the present invention, n Value is that 3, m values are 3.
Fig. 3 is the schematic diagram that line A-A takes section along Fig. 1.
Fig. 4 is the schematic diagram that line B-B takes section along Fig. 2.
Embodiment
As shown in Figure 1 to Figure 4 shown in each figure, a kind of Sky Tower, containing tower body, elevator, multiple platforms 3, multiple outer courses, it is multiple in Road, multiple two pass beams 18.
As shown in Figure 1 and Figure 2, the tower body of the Sky Tower, it towers on level ground, its axis vertical, in its tower wall 1 There are multiple pyller 1a.In this multiple pyller 1a, on the same line, the straight line is passing through the tower to n+m-1 pyller 1a axis On the longitudinal profile of body axis, remaining pyller 1a is scattered in the bottom periphery of the tower wall 1.
As shown in Figure 1 and Figure 2, the elevator of the Sky Tower, it is surrounded by the borehole wall 2, and it is located in the inner chamber of the tower body, its Axis overlaps with the axis of the tower body, and its cross section is rectangle, the corner of its outer surface of borehole wall 2 and the tower of the nearest tower body The distance between inner surface of wall 1 is equal to s and the s is more than 2 times of human body width, installation elevator in it, has n+m+ on its borehole wall 2 1 borehole wall door 2a.This n+m+1 borehole wall door 2a, its axis is on same vertical curve, itself and n+m-1 pyller in the tower wall 1 1a is located at the same side of the tower body axis, and straight line is logical where straight line and this n+m-1 pyller 1a axis where its axis Cross on the same longitudinal profile of the tower body axis.The borehole wall door 2a of bottom one in this n+m+1 borehole wall door 2a stands on ground On.
As shown in Figure 1, Figure 2, Figure 3 shows, in multiple platforms 3 of the Sky Tower, n platform 3 is continuously installed on the tower body successively Top, the scattered waist for being installed on the tower body of m platform 3.In this n platform 3, uppermost platform 3 is located at the tower body Top, the difference in height between two neighboring platform 3 is h.One of this multiple platform 3 are by anti-outside 4, landing slabs of a landing slab 5, one pieces of guardrail crosses the long beam 7a of the passageway guard rail 13, one of guidance tape 6, two, multiple short beam 7b composition.On this multiple platform 3 Long beam 7a is located at the same side of the tower body axis, and the axis of the long beam 7a on this multiple platform 3 is located on same perpendicular. One of this multiple platform 3 are upper to erect a borehole wall door 2a.In this multiple platform 3, in addition to uppermost platform 3, remaining platform 3 it One, a pyller 1a is erect thereon, and long beam 7a thereon is positioned at the underface for erectting borehole wall door 2a and pyller 1a thereon.This is more It is located at uppermost platform 3 in individual platform 3, long beam 7a thereon is gone back thereon positioned at the underface for erectting borehole wall door 2a thereon Guard rail 8 in mounting platform plate.
As shown in Figure 1 and Figure 2, the landing slab 4, it is the axle of horizontal circle annular slab, its inner circumferential surface or external peripheral surface Line overlaps with the axis of the tower body, and its inner circumferential surface flushes with the inner surface of the tower wall 1 of the tower body of relevant position.This is multiple One of remaining platform 3 in platform 3 in addition to uppermost platform 3, the thereon upper surface near the inner circumferential surface of landing slab 4 and phase The tower wall 1 of position is answered snugly to link together.
As shown in figure 3, the outer guard rail 5 of the landing slab, it is looped around the upper surface near the external peripheral surface of landing slab 4 On, the upper surface of the landing slab 4 of its lower end and relevant position snugly links together.
As shown in Figure 1 and Figure 2, beam 7a one long and multiple short beam 7b on one of this multiple platform 3, in same level It is upper to be contacted respectively along the different radially uniform radiation profiles of the tower body in the lower section of the landing slab 4, and with the landing slab 4.The length Beam 7a, it passes through the well of the tower wall 1 of the tower body axis the same side and the borehole wall 2 of the elevator, its inner face and relevant position The inner surface of wall 2 flushes, and its outer face flushes with the external peripheral surface of the landing slab 4 of relevant position, near its inner face The borehole wall 2 of one of two lateral faces and lower surface respectively with relevant position snugly links together, and it passes through the tower The tower wall 1 of one of two lateral faces of part in wall 1 and lower surface respectively with relevant position is snugly connected to one Rise, it is located at the lower surface of the landing slab 4 of the upper surface of the lower section of landing slab 4 and relevant position and is snugly connected to Together.One of this multiple short beam 7b, its inner pass through the tower wall 1, and its inner face flushes with the inner surface of the tower wall 1, and it is inner The tower wall 1 of one of two lateral faces near face and lower surface respectively with relevant position snugly links together, its The lower surface of this of upper surface and relevant position landing slab 4 snugly links together.
As shown in Figure 1, Figure 2, Figure 3 shows, the guidance tape 6 of crossing is horizontal rectangular plate, but it is in arc surface that its outer face is outstanding, Its transverse width is more than borehole wall door 2a or pyller 1a transverse width, the lateral middle of its lower surface and the long beam of relevant position Upper surface near 7a inner faces snugly links together, and its inner face flushes with the inner face of the long beam 7a, its Nearby the middle part of upper surface and the borehole wall door 2a lower surface of relevant position snugly link together inner face, in it The borehole wall 2 of upper and lower surface respectively with relevant position near one of end face both sides is snugly connected to one Rise, there is the circle that radial distance is s above the long beam 7a between its outer face and the inner circumferential surface of the opposed landing slab 4 Arc platform breach.
As shown in figure 3, the upper surface that the lower end of the two passageway guard rails 13 is crossed near one of both sides of guidance tape 6 with this respectively Snugly link together.
As shown in figure 3, guard rail 8 in the landing slab, it is looped around in this multiple platform 3 flat on uppermost platform 3 On upper surface near the inner circumferential surface of platen 4, but it has guard rail breach 8a in landing slab, its lower end in the platform indentation, there Snugly linked together with the upper surface of the landing slab 4 of relevant position.
As shown in Figure 1 and Figure 2, the distribution of multiple two pass beams 18 of the Sky Tower is such:It is bottom in this n platform 3 Difference in height is to have a two pass beam 18 at h immediately below the long beam 7a of platform 3.The long beam 7a of one of this m platform 3 surface is high Degree difference is to have a two pass beam 18 at h.The long beam 7a of one of this m platform 3 underface difference in height is to have a two pass beam at h 18。
As shown in Figure 1 and Figure 2, one of these two pass beams 18, it inserts relevant position respectively along the same radial direction of the tower body In the tower wall 1 of the tower body and the borehole wall 2 of the elevator, it is snugly connected to one with the tower wall 1 and the borehole wall 2 respectively Rising, its inner face flushes with the inner surface of the borehole wall 2 of relevant position, and its outer end is protruding from the tower wall 1, and stretch out Length is equal to s.
As shown in Figure 1 and Figure 2, the distribution of multiple outer courses of the Sky Tower is such:Bottom platform in this n platform 3 Difference in height is high directly over the two pass beam 18 and long beam 7a of the top platform 3 in this m platform 3 at h immediately below 3 long beam 7a Degree difference has an outer course between the two pass beam 18 at h.Two two pass beams 18 in this m platform 3 between two neighboring platform 3 Between have an outer course.Difference in height is the two pass beam 18 and ground at h immediately below the long beam 7a of bottom platform 3 in this m platform 3 There is an outer course between face.
As shown in Figure 1, Figure 2, Figure 4 shows, one of this multiple outer course containing for people walking helical form outside guidance tape 11, support the outer course Multiple outer course beams 10 of plate 11, prevent outer guard column 12 that people falls from the outside of outer guidance tape 11, prevent people from the outer guidance tape Two outer course end guard rails 17 that 11 both ends are fallen.
As shown in Figure 1 and Figure 2, overlook the outer guidance tape 11, its in the counterclockwise direction gradually upwards spiral surrounding in relevant position The tower body periphery, the pitch of the spiral is equal to h, and its radial width is equal to s, the tower body of its interior lateral face and relevant position The outer surface of tower wall 1 snugly links together, two two pass with relevant position respectively of the lower surface near its both ends The upper surface of one of beam 18 external part snugly links together, but in this m platform 3 bottom platform 3 long beam The lower surface of difference in height lower end of outer guidance tape 11 of outer course between the two pass beam 18 at h and ground immediately below 7a, with close-fitting Conjunction mode is connected on the ground of relevant position.
As shown in figure 4, the outer guard column 12, it is located on the upper surface near the outer 11 outer lateral face of guidance tape, under it The upper surface with the outer guidance tape 11 of relevant position is held snugly to link together.
As shown in figure 4, the lower end of the two outer course end guard rails 17 respectively with it is upper near one of the outer both ends of guidance tape 11 Surface snugly links together, but difference in height is at h immediately below the long beam 7a of bottom platform 3 in this m platform 3 Two pass beam 18 and ground between the lower end of outer guidance tape 11 of outer course save outer course end guard rail 17.
As shown in Figure 1 and Figure 2, this multiple outer course beam 10, it is evenly distributed on the lower section except the outer both ends of guidance tape 11, and Contacted with the outer guidance tape 11.One of this multiple outer course beam 10, its same radial direction along the tower body insert being somebody's turn to do for relevant position respectively In the tower wall 1 of tower body and the borehole wall 2 of the elevator, it is snugly connected to one with the tower wall 1 and the borehole wall 2 respectively Rise, its inner face flushes with the inner surface of the borehole wall 2 of relevant position, and it is from the upper surface at the 1 protruding end of tower wall and phase The lower surface of the outer guidance tape 11 of position is answered snugly to link together, the outer guidance tape of its outer face and relevant position 11 outer lateral face flushes.
As shown in Figure 1 and Figure 2, the distribution in multiple interior roads of the Sky Tower is such:The long beam 7a of one of this m platform 3 Underface difference in height is two pass beam 18 at h and surface difference in height is You Yigenei roads between two pass beam 18 at h.This n Difference in height is the two pass beam 18 at h and the top platform in this n platform 3 immediately below the long beam 7a of bottom platform 3 in platform 3 You Yigenei roads between 3 long beam 7a.
As shown in Figure 1, Figure 2, Figure 4 shows, one of this multiple interior road containing for people walking helical form in guidance tape 15, support the interior road Multiple interior road beams 14 of plate 15, prevent inner side guard rail 16 that people falls from the inner side of interior guidance tape 15, prevent people from the interior guidance tape The Liang Genei roads end guard rail 9 that 15 both ends are fallen.
As shown in Figure 1 and Figure 2, overlook the interior guidance tape 15, its in the counterclockwise direction gradually upwards spiral surrounding in relevant position The tower body inner chamber around, the pitch of the spiral is equal to h, and its radial width is equal to s, its outer lateral face and relevant position should The inner surface of the tower wall 1 of tower body snugly links together, and when its waist is by platform 3, its waist is embedded in the platform 3 Platform breach in;In the platform indentation, there, the platform 3 under the interior guidance tape 15 of this of long beam 7a upper surface and relevant position Surface snugly links together, and the interior guidance tape 15 of the outer face of mistake guidance tape 6 and relevant position is interior on the platform 3 Lateral face snugly links together, the inner circumferential surface of the upper mounting plate plate 4 of platform 3 and the interior guidance tape of relevant position 15 outer lateral face snugly links together.
As shown in Figure 1 and Figure 2, immediately below the long beam 7a of one of this m platform 3 difference in height be h places two pass beam 18 and just on Square difference in height is the interior guidance tape 15 in interior road between two pass beam 18 at h, the lower surface near its both ends respectively with relevant position The upper upper surface close to the tower wall 1 of one of this two two pass beam 18 snugly links together.
As shown in Figure 1 and Figure 2, difference in height is the two pass at h immediately below the long beam 7a of bottom platform 3 in this n platform 3 In beam 18 and this n platform 3 between the long beam 7a of the top platform 3 interior road interior guidance tape 15, the lower surface of its lower end with Upper surface on the two pass beam 18 of relevant position close to the tower wall 1 snugly links together, near its upper end Lower surface and the upper surface of the long beam 7a in the upper mounting plate breach of platform 3 snugly link together;It is flat at this Platform indentation, there, the interior lateral face crossed on the platform 3 near the outer face of guidance tape 6 and the interior upper end of guidance tape 15 of relevant position is with tight Fit system links together, near the inner circumferential surface of the upper mounting plate plate 4 of platform 3 and the interior upper end of guidance tape 15 of relevant position Outer lateral face snugly link together.
As shown in figure 4, the inner side guard rail 16 is located on the upper surface in the interior guidance tape 15 near lateral face, Dan Gainei roads When plate 15 is by platform 3, the inner side guard rail 16 has inner side guard rail breach 16a in the platform indentation, there of the platform 3.The inner side The lower end of guard rail 16 and the upper surface of the interior guidance tape 15 of relevant position snugly link together.
As shown in figure 4, the lower end of the two interior road end guard rails 9 respectively with the upper table near one of the interior both ends of guidance tape 15 Face snugly links together.
As shown in Figure 1 and Figure 2, this multiple interior road beam 14 is distributed in the no connection two pass beam 18 of the interior guidance tape 15, not connected The lower section of long beam 7a lower surface, and contacted with the interior guidance tape 15.One of this multiple interior road beam 14, its same footpath along the tower body To respectively insert relevant position the tower wall 1 of the tower body and the borehole wall 2 of the elevator in, and respectively with the tower wall 1 and the borehole wall 2 Snugly link together, its inner face flushes with the inner surface of the borehole wall 2 of relevant position, its outer face with it is corresponding The outer surface of the tower wall 1 of position flushes, and it is close to the lower surface of the interior guidance tape 15 of this of the upper surface of the tower wall 1 and relevant position Snugly link together.
As shown in Figure 1 and Figure 2, player can take a lift from ground is raised to one of this multiple platform 3, also can be multiple flat from this Platform 3, which takes a lift, below in platform 3 is raised to eminence platform 3, and and can takes a lift decline from the eminence platform 3 in this multiple platform 3 To following platform 3, moreover it is possible to taken a lift from one of this multiple platform 3 and drop to ground.
As shown in Figure 1 and Figure 2, this can be walked to from ground along the outer guidance tape 11 of outer course and Nei Dao interior guidance tape 15, player One of multiple platforms 3, also can from this multiple platform 3 below platform 3 walk to eminence platform 3, and can is from this multiple platform 3 Eminence platform 3 walk to following platform 3, moreover it is possible to walk to ground from one of this multiple platform 3.
As shown in Figure 1 and Figure 2, player can take a lift reach one of this multiple platform 3 after be changed to walking, can also walk to It is changed to take a lift after up to one of this multiple platform 3.
As shown in Figure 1 and Figure 2, no matter walking is got on or walking is got off, total principle is:Walked along the outer guidance tape 11 of outer course It is at the end, passes through the interior guidance tape 15 in the pyller 1a Gai Zounei roads of relevant position.Walk to be at the end along the interior guidance tape 15 in interior road, pass through phase The pyller 1a of position is answered to change the outer guidance tape 11 for walking outer course.
As shown in Figure 1 and Figure 2, when passing through the platform 3 that the interior guidance tape 15 passes through along the 15 upward walking of interior guidance tape in interior road:If Expect the platform 3 up, then arrived by the pyller 1a of relevant position.Taken a lift if wanting to change, go to the borehole wall of relevant position Door 2a waits elevator.If neither wanting to go to the platform 3, it is not intended to change again to take a lift, that continues to advance, and really runs into interior road end and prevents When guardrail 9 can not move on, it can only turn back.
The shape of the tower body has two preferred schemes.
As shown in figure 1, first preferred scheme of the shape of the tower body is such:The tower body is shaped as round platform.
First preferred scheme of the tower body shape, sound construction, outward appearance is beautiful, can build higher, but it is complicated, make Valency is higher.First preferred scheme can be used preferentially.
As shown in Fig. 2 second preferred scheme of the shape of the tower body is such:The tower body is shaped as cylinder.
Second preferred scheme of the tower body shape, simple in construction, cost is relatively low, but pattern is dull, height-limited.This Two preferred schemes are with reference to use.
Why not the Sky Tower cancels interior road, and outer course is gone directly tower top from ground
As shown in Figure 1 and Figure 2, this scheme, although structure is simple, in order to prevent raming, on one of this multiple platform 3 Must windowing, the short beam 7b at window can not install.One of this multiple platform 3 uplifting window mouth, certainly will reduce the number viewed and admired.Window At mouthful short beam 7b is not installed, the firmness of structure certainly will be influenceed.Therefore the present invention does not use this structure.
Why not the Sky Tower cancels outer course, and Er Jiangnei roads go directly tower top from ground
As shown in Figure 1 and Figure 2, this scheme, although structure is simple, people walks for a long time in tower body inner chamber, it is impossible to sees The scenery of outside is appreciated, uninteresting, air is not again pure and fresh.Therefore the present invention does not use this structure.
The present invention, the organization plan that outer course is cross-linked with interior road is probably more excellent scheme.
Overlook outer guidance tape 11, its in the counterclockwise direction gradually upward spiral surrounding in the periphery of the tower body of relevant position. Guidance tape 15 in vertical view, its in the counterclockwise direction gradually upwards spiral surrounding around the tower body inner chamber of relevant position." along inverse The gradual upward spiral surrounding of clockwise " is intended that anything
As shown in Figure 1 and Figure 2, sportsman run on runway be all in the counterclockwise direction, this be have physiologic theory make according to According to.People is up along outer guidance tape 11 or interior guidance tape 15, consumes one's strength big, is run similar on runway." in the counterclockwise direction by The intention of gradually upward spiral surrounding " is that the physiological function of protection people.As for descending, although along clockwise direction, gravity Potential energy is kinetic energy and interior energy, physical demands very little, the physiological function of people is not influenceed.
Why the s is greater than 2 times of human body width
The s is more than 2 times of human body width, is provided to allow along outer guidance tape 11 or the up people of interior guidance tape 15 and descending people Can smoothly it pass through.
Embodiments of the present invention are explained in detail above in conjunction with accompanying drawing.The present invention is not limited to above-mentioned embodiment party Formula, can also be before present inventive concept not be departed from art those of ordinary skill's possessed knowledge Put that various changes can be made.The various change made on the premise of present inventive concept is not departed from, still falls within the scope of the present invention.

Claims (3)

1. a kind of Sky Tower, it contains tower body;The tower body, it towers on level ground, its axis vertical, in its tower wall (1) There are multiple pyllers (1a);
It is characterized in that:
In this multiple pyller (1a), on the same line, the straight line is passing through the tower body axle to the axis of n+m-1 pyller (1a) On the longitudinal profile of line, remaining pyller (1a) is scattered in the bottom periphery of the tower wall (1);
The Sky Tower is also containing an elevator, multiple platforms (3), multiple outer courses, multiple interior roads, multiple two pass beams (18);
The elevator of the Sky Tower, it is surrounded by the borehole wall (2), and it is located in the inner chamber of the tower body, its axis and the tower The axis of body overlaps, and its cross section is rectangle, the corner of its borehole wall (2) outer surface and the tower wall (1) of the nearest tower body The distance between inner surface be equal to s and the s is more than 2 times of human body width, elevator is installed in it, has n+m+1 on its borehole wall (2) Individual borehole wall door (2a);This n+m+1 borehole wall door (2a), its axis is on same vertical curve, itself and the n+m- in the tower wall (1) 1 pyller (1a) is located at the same side of the tower body axis, the axis institute of straight line and this n+m-1 pyller (1a) where its axis In straight line on the same longitudinal profile by the tower body axis;Bottom one in this n+m+1 borehole wall door (2a) Borehole wall door (2a) is stood on ground;
In multiple platforms (3) of the Sky Tower, n platform (3) is continuously installed on the top of the tower body, m platform successively (3) waist for being installed on the tower body is disperseed;In this n platform (3), uppermost platform (3) is located at the top of the tower body, Difference in height between two neighboring platform (3) is h;One of this multiple platform (3) by a landing slab (4), a landing slab outside Guard rail (5), one piece of guidance tape (6), two passageway guard rails (13), one long beam (7a), multiple short beam (7b) excessively form;This is more Long beam (7a) on individual platform (3) is located at the same side of the tower body axis, and the axle of the long beam (7a) on this multiple platform (3) Line is located on same perpendicular;One of this multiple platform (3) are upper to erect a borehole wall door (2a);In this multiple platform (3), remove Uppermost platform (3) outside, one of remaining platform (3), erects a pyller (1a) thereon, and long beam (7a) thereon is positioned at setting Borehole wall door (2a) thereon and the underface of pyller (1a);It is located at uppermost platform (3) in this multiple platform (3), thereon Long beam (7a) goes back guard rail (8) in mounting platform plate thereon positioned at the underface for erectting borehole wall door (2a) thereon;
The landing slab (4), it is horizontal circle annular slab, the axis and the tower body of its inner circumferential surface or external peripheral surface Axis overlaps, and its inner circumferential surface flushes with the inner surface of the tower wall (1) of the tower body of relevant position;This multiple platform (3) In one of remaining platform (3) in addition to uppermost platform (3), thereon the upper surface near landing slab (4) inner circumferential surface with The tower wall (1) of relevant position snugly links together;
The outer guard rail (5) of the landing slab, it is looped around on the upper surface near the landing slab (4) external peripheral surface, under it The upper surface with the landing slab (4) of relevant position is held snugly to link together;
One long beam (7a) and multiple short beams (7b) on one of this multiple platform (3), respectively along described in same level The different radially uniform radiation profiles of tower body contact in the lower section of the landing slab (4), and with the landing slab (4);The length Beam (7a), its through described tower body axis the same side tower wall (1) and the elevator the borehole wall (2), its inner face with accordingly The inner surface of the borehole wall (2) of position flushes, and the external peripheral surface of the landing slab (4) of its outer face and relevant position is neat It is flat, one of two lateral faces near its inner face and lower surface respectively with the borehole wall (2) of relevant position snugly Link together, it passes through one of two lateral faces of part in the tower wall (1) and the lower surface institute with relevant position respectively State tower wall (1) snugly to link together, it is located at the institute of the upper surface and relevant position below the landing slab (4) The lower surface for stating landing slab (4) snugly links together;One of this multiple short beam (7b), its inner pass through the tower Wall (1), its inner face flush with the inner surface of the tower wall (1), one of two lateral faces near its inner face and lower surface point The tower wall (1) not with relevant position snugly links together, the platform of its upper surface and relevant position The lower surface of plate (4) snugly links together;
The guidance tape (6) of crossing is horizontal rectangular plate, but it is in arc surface that its outer face is outstanding, and its transverse width is more than borehole wall door Near (2a) or pyller (1a) transverse width, the lateral middle of its lower surface and long beam (7a) inner face of relevant position Upper surface snugly link together, its inner face flushes with the inner face of the long beam (7a), and its inner face is attached The middle part and the lower surface of relevant position borehole wall door (2a) of nearly upper surface snugly link together, its inner face both sides One of near the borehole wall (2) of the upper and lower surface respectively with relevant position snugly link together, its It is s to have radial distance above the long beam (7a) between outer face and the inner circumferential surface of the opposed landing slab (4) Circular arc platform breach;
The lower end of the two passageway guard rails (13) is respectively with the upper surface crossed near one of guidance tape (6) both sides with tight fit Mode links together;
Guard rail (8) in the landing slab, it is looped around the landing slab (4) in this multiple platform (3) on the top platform (3) Nei On upper surface near circumferential surface, but it has guard rail breach (8a) in landing slab in the platform indentation, there, its lower end with The upper surface of the landing slab (4) of relevant position snugly links together;
The distribution of multiple two pass beams (18) of the Sky Tower is such:The length of bottom platform (3) in this n platform (3) Difference in height is to have a two pass beam (18) at h immediately below beam (7a);The surface of the long beam (7a) of one of this m platform (3) is high Degree difference is to have a two pass beam (18) at h;The underface difference in height of the long beam (7a) of one of this m platform (3) is to have one at h Two pass beam (18);
One of these two pass beams (18), its same radial direction along the tower body insert the tower wall of the tower body of relevant position respectively (1) and in the borehole wall (2) of the elevator, it is snugly connected to the tower wall (1) and the borehole wall (2) respectively Together, its inner face flushes with the inner surface of the borehole wall (2) of relevant position, and its outer end is protruding from the tower wall (1), And the length stretched out is equal to s;
The distribution of multiple outer courses of the Sky Tower is such:The long beam (7a) of bottom platform (3) in this n platform (3) Underface difference in height is the two pass beam (18) at h and height directly over the long beam (7a) of the top platform (3) in this m platform (3) Degree difference has an outer course between the two pass beam (18) at h;Two in this m platform (3) between two neighboring platform (3) are double There is an outer course between road beam (18);Difference in height is at h immediately below the long beam (7a) of bottom platform (3) in this m platform (3) Two pass beam (18) have an outer course between ground;
Guidance tape (11), multiple outer course beams of the support outer guidance tape (11) outside the helical form of one of this multiple outer course people containing confession walking (10), prevent outer guard column (12) that people falls on the outside of the outer guidance tape (11), prevent people from the outer guidance tape (11) two Hold the two outer course end guard rails (17) fallen;
Overlook the outer guidance tape (11), its in the counterclockwise direction gradually upwards spiral surrounding relevant position the tower body it is outer Enclose, the pitch of the spiral is equal to h, and its radial width is equal to s, the tower body tower wall (1) of its interior lateral face and relevant position Outer surface snugly links together, the lower surface near its both ends respectively with two two pass beams (18) of relevant position it The upper surface of one external part snugly links together, but in this m platform (3) bottom platform (3) long beam Difference in height is the lower surface of outer guidance tape (11) lower end of two pass beam (18) outer course between ground at h immediately below (7a), Snugly it is connected on the ground of relevant position;
The outer guard column (12), it is located on the upper surface near the outer lateral face of the outer guidance tape (11), its lower end and phase The upper surface of the outer guidance tape (11) of position is answered snugly to link together;
The lower end of the two outer course end guard rails (17) is respectively with the upper surface near one of outer guidance tape (11) both ends with tight Fit system links together, but difference in height is at h immediately below the long beam (7a) of bottom platform (3) in this m platform (3) Save outer course end guard rail (17) in the lower end of the outer guidance tape (11) of two pass beam (18) outer course between ground;
This multiple outer course beam (10), it is evenly distributed on the lower section except outer guidance tape (11) both ends, and with the outer guidance tape (11) contact;One of this multiple outer course beam (10), its same radial direction along the tower body inserts the tower of relevant position respectively In the tower wall (1) of body and the borehole wall (2) of the elevator, it is respectively with the tower wall (1) and the borehole wall (2) with tight fit side Formula links together, and its inner face flushes with the inner surface of the borehole wall (2) of relevant position, and it is outside from the tower wall (1) The upper surface of external part and the lower surface of the outer guidance tape (11) of relevant position snugly link together, its outer end Face flushes with the outer lateral face of the outer guidance tape (11) of relevant position;
The distribution in multiple interior roads of the Sky Tower is such:Difference in height immediately below the long beam (7a) of one of this m platform (3) It is You Yigenei roads between two pass beam (18) at h for the two pass beam (18) at h and surface difference in height;In this n platform (3) Difference in height is that the two pass beam (18) at h and the top in this n platform (3) are flat immediately below the long beam (7a) of bottom platform (3) You Yigenei roads between the long beam (7a) of platform (3);
Guidance tape (15), multiple interior road beams of the support interior guidance tape (15) in the helical form of one of this multiple interior road people containing confession walking (14), prevent inner side guard rail (16) that people falls on the inside of the interior guidance tape (15), prevent people from the interior guidance tape (15) two Hold the Liang Genei roads end guard rail (9) fallen;
Overlook the interior guidance tape (15), its in the counterclockwise direction gradually upwards spiral surrounding in the tower body inner chamber of relevant position Around, the pitch of the spiral is equal to h, and its radial width is equal to s, the tower wall of the tower body of its outer lateral face and relevant position (1) inner surface snugly links together, and when its waist is by platform (3), its waist is embedded in the platform (3) In platform breach;In the platform indentation, there, the upper surface of platform (3) Shang Changliang (7a) and the interior guidance tape of relevant position (15) lower surface snugly links together, on the platform (3) guidance tape (6) outer face and relevant position The interior lateral face of the interior guidance tape (15) snugly links together, the inner periphery of platform (3) the upper mounting plate plate (4) The outer lateral face of the interior guidance tape (15) of surface and relevant position snugly links together;
Difference in height be two pass beam (18) at h immediately below the long beam (7a) of one of this m platform (3) and surface difference in height is h The interior guidance tape (15) in interior road between the two pass beam (18) at place, lower surface near its both ends this two two pass with relevant position respectively The upper upper surface close to the tower wall (1) of one of beam (18) snugly links together;
Difference in height is the two pass beam (18) at h and this n immediately below the long beam (7a) of bottom platform (3) in this n platform (3) In platform (3) between the long beam (7a) of the top platform (3) interior road interior guidance tape (15), the lower surface of its lower end with it is corresponding Upper surface on the two pass beam (18) of position close to the tower wall (1) snugly links together, near its upper end Lower surface and the upper surface of the long beam (7a) in platform (3) the upper mounting plate breach be snugly connected to one Rise;In the platform indentation, there, the platform (3) on the outer face of guidance tape (6) and the interior guidance tape (15) of relevant position Interior lateral face near end snugly links together, the inner circumferential surface and phase of platform (3) the upper mounting plate plate (4) The outer lateral face near interior guidance tape (15) upper end of position is answered snugly to link together;
The inner side guard rail (16) is located on the upper surface near the interior lateral face of the interior guidance tape (15), but the interior guidance tape (15) when by platform (3), the inner side guard rail (16) has inner side guard rail breach in the platform indentation, there of the platform (3) (16a);The lower end of the inner side guard rail (16) and the upper surface of the interior guidance tape (15) of relevant position are snugly Link together;
The lower end of the two interior road end guard rails (9) is respectively with the upper surface near one of interior guidance tape (15) both ends with close-fitting Conjunction mode links together;
This multiple interior road beam (14) is distributed in the no connection two pass beam (18) of the interior guidance tape (15), does not connect lengthening bar (7a) The lower section of lower surface, and contacted with the interior guidance tape (15);One of this multiple interior road beam (14), its same footpath along the tower body To respectively insert relevant position the tower wall (1) of the tower body and the borehole wall (2) of the elevator in, and respectively with the tower wall (1) snugly linked together with the borehole wall (2), the interior table of the borehole wall (2) of its inner face and relevant position Face flushes, and its outer face flushes with the outer surface of the tower wall (1) of relevant position, and it is close to the upper surface of the tower wall (1) Snugly linked together with the lower surface of the interior guidance tape (15) of relevant position;
Player can take a lift from ground is raised to one of this multiple platform (3), also can from this multiple platform (3) below platform (3) take a lift and be raised to eminence platform (3), and can taken a lift from the eminence platform (3) in this multiple platform (3) drop to it is following Platform (3), moreover it is possible to taken a lift from one of this multiple platform (3) and drop to ground;
Along the outer guidance tape (11) of outer course and the interior guidance tape (15) in interior road, player can be walked to from ground this multiple platform (3) it One, also can from this multiple platform (3) below platform (3) walk to eminence platform (3), and can is from this multiple platform (3) Eminence platform (3) walks to following platform (3), moreover it is possible to walks to ground from one of this multiple platform (3);
Player can take a lift reach one of this multiple platform (3) after be changed to walking, can also walk to up to this multiple platform (3) it It is changed to take a lift after one;
No matter walking is up or walking is got off, total principle is:Walk to be at the end along the outer guidance tape (11) of outer course, pass through corresponding positions The interior guidance tape (15) in pyller (1a) the Gai Zounei roads put;Walk to be at the end along the interior guidance tape (15) in interior road, pass through the tower of relevant position Door (1a) changes the outer guidance tape (11) for walking outer course;
During platform (3) that the upward walking of interior guidance tape (15) along interior road passes through by the interior guidance tape (15):If expect the platform (3) Up, then arrived by the pyller (1a) of relevant position;Taken a lift if wanting to change, the borehole wall door (2a) for going to relevant position waits Elevator;If neither wanting to go to the platform (3), it is not intended to change again to take a lift, that continues to advance, and really runs into interior road end guard rail (9) when can not move on, can only turn back.
2. according to Sky Tower described in claim 1, it is characterised in that:
The tower body is shaped as round platform.
3. according to Sky Tower described in claim 1, it is characterised in that:
The tower body is shaped as cylinder.
CN201710991241.0A 2017-10-18 2017-10-18 Sky Tower Active CN107654109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710991241.0A CN107654109B (en) 2017-10-18 2017-10-18 Sky Tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710991241.0A CN107654109B (en) 2017-10-18 2017-10-18 Sky Tower

Publications (2)

Publication Number Publication Date
CN107654109A true CN107654109A (en) 2018-02-02
CN107654109B CN107654109B (en) 2019-03-26

Family

ID=61118887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710991241.0A Active CN107654109B (en) 2017-10-18 2017-10-18 Sky Tower

Country Status (1)

Country Link
CN (1) CN107654109B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3842026A1 (en) * 1988-10-15 1990-07-19 Dietrich F W Schiffer Tower of a highly stable, to the greatest extent vibration-free design, inter alia for wind-driven power plants, of a laminar or sandwich construction using glass-fibre-reinforced plastic or carbon-fibre-reinforced plastic, for extremely heavy loadings at great heights
CN102061826A (en) * 2009-11-16 2011-05-18 姚鹏云 Quakeproof pyramid skyscraper
CN202090677U (en) * 2011-01-25 2011-12-28 罗维 Elevator tombstone tower
CN104520521A (en) * 2012-05-21 2015-04-15 因徳吉特·辛格·迪隆 High rise building elevation concept
CN105064750A (en) * 2015-09-01 2015-11-18 黄河科技学院 Tower-type parking building with elevator with two-side exits
CN206299196U (en) * 2016-11-02 2017-07-04 河北凯源钢结构有限公司 A kind of pipe tower of combined type three

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3842026A1 (en) * 1988-10-15 1990-07-19 Dietrich F W Schiffer Tower of a highly stable, to the greatest extent vibration-free design, inter alia for wind-driven power plants, of a laminar or sandwich construction using glass-fibre-reinforced plastic or carbon-fibre-reinforced plastic, for extremely heavy loadings at great heights
CN102061826A (en) * 2009-11-16 2011-05-18 姚鹏云 Quakeproof pyramid skyscraper
CN202090677U (en) * 2011-01-25 2011-12-28 罗维 Elevator tombstone tower
CN104520521A (en) * 2012-05-21 2015-04-15 因徳吉特·辛格·迪隆 High rise building elevation concept
CN105064750A (en) * 2015-09-01 2015-11-18 黄河科技学院 Tower-type parking building with elevator with two-side exits
CN206299196U (en) * 2016-11-02 2017-07-04 河北凯源钢结构有限公司 A kind of pipe tower of combined type three

Also Published As

Publication number Publication date
CN107654109B (en) 2019-03-26

Similar Documents

Publication Publication Date Title
US6569023B1 (en) Chutes and ladders water ride
KR101687264B1 (en) Indoor kids cafe themed playroom facility
US3572698A (en) Playground shelter
US10702729B2 (en) Multi-level play equipment
CN107654109B (en) Sky Tower
CN213667888U (en) Multilayer structure amusement facility
US4251069A (en) Child recreation structure
WO2016193805A1 (en) Adventure park
CN108271710A (en) The venture recreational multifunctional cat that ascends a height plays frame
CN211328131U (en) Double-tower recreation facility
CN211676262U (en) Children climbing amusement facility
CN211635208U (en) Recreation body-building net tower
CN103669476B (en) Water intake facility without electric energy consumption
US8647213B2 (en) Apparatus for a playground bouldering slide
US4068842A (en) Child recreation structure
CN211215397U (en) Ant-shaped entertainment device
CN206414668U (en) One kind surrounds telescopic children's Interactive Experience device entirely
KR200429261Y1 (en) sport apparatus of ethnic customs for a rope play
CN212166504U (en) Composite entertainment facility
CN216222901U (en) Robot amusement facility
KR200429892Y1 (en) a safe playing system equiped a slide
CN212187775U (en) Large-scale entertainment facility
CN108261768B (en) amusement slide
CN211215398U (en) Launching tower paradise
CN211752146U (en) Recreation facility

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191122

Address after: 215400 South Ring Road small and medium sized enterprise business park, Fuqiao Town, Taicang City, Suzhou City, Jiangsu Province

Patentee after: East seal technology (Jiangsu) Co., Ltd.

Address before: Seven road 528437 in Guangdong Province, Zhongshan Torch Development Zone No. 113 fraternity homes 1 building 1407 room Lily

Patentee before: Li Xinya

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201110

Address after: Room 308, No.6 office building, No.1, Lugong Road, Port Development Zone, Fuqiao Town, Taicang City, Jiangsu Province, 215400

Patentee after: Suzhou Zhilue Intellectual Property Operation Co., Ltd

Address before: 215400 South Ring Road small and medium sized enterprise business park, Fuqiao Town, Taicang City, Suzhou City, Jiangsu Province

Patentee before: EAST SEAL TECHNOLOGY (JIANGSU) Co.,Ltd.