CN107631476A - Electric pole type hot-water boiler - Google Patents

Electric pole type hot-water boiler Download PDF

Info

Publication number
CN107631476A
CN107631476A CN201710771314.5A CN201710771314A CN107631476A CN 107631476 A CN107631476 A CN 107631476A CN 201710771314 A CN201710771314 A CN 201710771314A CN 107631476 A CN107631476 A CN 107631476A
Authority
CN
China
Prior art keywords
cylinder
water
adjutage
pipe
electric pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710771314.5A
Other languages
Chinese (zh)
Other versions
CN107631476B (en
Inventor
王通
潘陈星
刘杰
张启山
沈国荣
邓龙强
金乐乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tefu Development Co., Ltd
Original Assignee
Zhejiang Tuff Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tuff Boiler Co Ltd filed Critical Zhejiang Tuff Boiler Co Ltd
Priority to CN201710771314.5A priority Critical patent/CN107631476B/en
Publication of CN107631476A publication Critical patent/CN107631476A/en
Application granted granted Critical
Publication of CN107631476B publication Critical patent/CN107631476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to boiler technology field, more particularly to a kind of electric pole type hot-water boiler, cylinder including vertical and the electrode assembly being arranged on cylinder, inner cylinder is provided with cylinder, electrode assembly is introduced in inner cylinder by cylinder, inner cylinder and cylinder insulation set, inner cylinder bottom is provided with two return pipes and three adjutages, solving the problems, such as that current boiler shell is powered needs integral insulation, and can reach stable in outlet water temperature, the less effect of fluctuating temperature.It is relatively fewer with water during hot water circuit is provided.

Description

Electric pole type hot-water boiler
Technical field
The present invention relates to boiler technology field, and in particular to a kind of electric pole type hot-water boiler.
Background technology
Electrode boiler is the high heat resistance characteristic using water, directly converts electrical energy into heat energy and produces a kind of dress of steam Put.Electric pole type hot-water boiler more and more applies to various fields with energy-saving and environmental protection, the advantage that electricity price is low, thermal power is big Close.
At present, electric pole type hot-water boiler is that the electrode for accessing high-tension electricity is immersed in the water in boiler with certain electrical conductivity In, electrode pair water electric discharge, water is heated.Water after heating enters external heat exchanger, external heat supply through circulating pump.It is but existing The cylinder of boiler directly contacts with water in powered pot, so housing is powered, housing need to integrally do insulation processing.In the presence of insulation into The shortcomings that this height, big potential safety hazard.On the other hand, current regulation of the very long boiler to power mainly using electrode assembly with What the contact area of water was carried out, this mode is not sufficiently stable.
The content of the invention
The invention aims to solve the above problems, there is provided a kind of electric pole type hot-water boiler, the security of the boiler Can be higher.
It is an object of the invention to provide a kind of not all right integral insulation of shell, the extremely low electric pole type hot-water boiler of security risk, It is larger to solve the problems, such as that current power adjusting is not sufficiently stable fluctuation simultaneously.
In order to reach foregoing invention purpose, the present invention uses following technical scheme:
A kind of electric pole type hot-water boiler, including the cylinder of vertical and the electrode assembly that is arranged on cylinder, in cylinder Provided with inner cylinder, electrode assembly is introduced in inner cylinder by cylinder, and inner cylinder and cylinder insulation set, inner cylinder bottom is provided with the first backwater Pipe, the first adjutage, the second adjutage and the 3rd adjutage;First tube opening that discharges water is located at middle and upper part in cylinder, and the 3rd discharges water Bottom of the pipe in cylinder, the second adjutage first lead to outside cylinder, then returned again to cylinder, and its opening is located at cylinder Interior bottom, the second adjutage are provided with regulating valve in cylinder;Cylinder is externally provided with the second return pipe and outlet pipe, and the second return pipe is opened Mouth is located at cylinder inner bottom part positioned at bottom in cylinder, outlet pipe outlet, and the second return pipe is externally provided with regulating valve and second in cylinder Return pipe converges with the first return pipe in outside cylinder, and outlet pipe is externally provided with water circulating pump in cylinder.
Preferably, inner cylinder is located at cylinder internal upper part.
Preferably, cylinder is provided with and water-level gauge.
Preferably, cylinder body bottom is provided with blow-off pipe.
Preferably, cylinder is provided with air pressure adjustment pipe.
Preferably, outlet pipe via heat exchanger with converge after the first return pipe and the second return pipe be connected.
Compared with prior art, beneficial effect is the present invention:Solve that current boiler shell is powered to need integral insulation The problem of, and stable in outlet water temperature can be reached, the less effect of fluctuating temperature.During hot water circuit is provided, use Water is relatively fewer.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
In figure:1 cylinder, 2 electrode assemblies, 3 inner cylinders, 4 first return pipes, 5 first adjutages, 6 second adjutages, 7 the 3rd Adjutage, 8 second return pipes, 9 outlet pipes, 10 regulating valves, 11 water circulating pumps, 12 water-level gauges, 13 blow-off pipes, 14 air pressure adjustments Pipe, 15 heat exchangers, 16 drive mechanisms, 17 insulating boots, 18 electrode bars.
Embodiment
Explanation is further described to technical scheme below by specific embodiment.
If without specified otherwise, the raw material employed in embodiments of the invention is raw material commonly used in the art, is implemented Method employed in example, it is the conventional method of this area.
Embodiment:
A kind of electric pole type hot-water boiler, as shown in figure 1, whole boiler vertical type is arranged, specifically include the cylinder 1 of vertical With the electrode assembly 2 being arranged on cylinder 1, cylinder 1 is outer sleeve,
Inner cylinder 3 is provided with cylinder 1, inner cylinder 3 is located at the internal upper part of cylinder 1, and electrode assembly 2 is introduced in inner cylinder 3 by cylinder 1, Inner cylinder 3 is heated built with a certain amount of water, these water by electrode assembly 2, and the water after heating is first by through excess temperature Regulation, reaches predetermined temperature, then carries out external heat-exchanging;
Inner cylinder 3 and the insulation set of cylinder 1, the bottom of inner cylinder 3 are provided with the first return pipe 4, the first adjutage 5, the second adjutage 6 With the 3rd adjutage 7, that is, amount to and three adjutages are housed, and 1 return pipe is provided with inner cylinder 3.
First adjutage 5 opening is located at the bottom in cylinder 1 positioned at middle and upper part in cylinder 1, the 3rd adjutage 7, and second puts Water pipe 6 is first led to outside cylinder 1, is then returned again to cylinder 1, its bottom in the cylinder 1 that is open, the second adjutage 6 in Cylinder 1 is provided with regulating valve 10;
First return pipe 4 is mainly used for the backflow of recirculated water, and the first adjutage 5 and the 3rd adjutage 7 are respectively by inner cylinder 3 Hot water is passed through the inner cylinder bottom diverse location in boiler after the interior heating via electrode assembly 2, consequently facilitating the mixing of water, second puts Part i.e. cylinder 1 outside of the water pipe 6 outside boiler, is provided with regulating valve 10, by the opening degree of regulating valve 10, adjusts inner cylinder 3 water flows into the speed or flow of lower portion thereof, and the first adjutage 5 and the 3rd adjutage 7 are similarly used to hot water being passed through pot Stove bottom, the i.e. bottom of cylinder 1.The part that second adjutage 6 is located at outside cylinder 1 is additionally provided with device for detecting temperature 19, for implementing The water flow temperature flowed out to inner cylinder 3 is monitored.
Certainly, cylinder 1 is externally provided with the second return pipe 8 and outlet pipe 9, and outlet pipe 9 is essential part, outlet pipe 9 The water that water in boiler is the bottom of cylinder 1 is flowed out into water circulating pump 11, circulated by water circulating pump 11.Second return pipe 8 Opening is located at the inner bottom part of cylinder 1 positioned at bottom in cylinder 1, the outlet of outlet pipe 9, and the second return pipe 8 is externally provided with regulating valve in cylinder 1 10 and second return pipe 8 and the first return pipe 4 converge in outside cylinder 1, outlet pipe 9 is externally provided with water circulating pump 11 in cylinder 1.
Second return pipe 8, it is to be shunted the water of circulating reflux, a part of water is introduced directly into through the first return pipe 4 Into inner cylinder 3, another part water is imported in the cylinder 1 of the lower section of inner cylinder 3 by the second return pipe 8, and in the second return pipe 8 It is upper to be provided with regulating valve 10, by the regulation of regulating valve 10, the flow of two-way current can be controlled, so as to adjust entrance The water of inner cylinder 3, so as to reach the purpose of water level and indirect control boiler thermal power in control inner cylinder 3.
The one side of second adjutage 6 adjusts the water level in inner cylinder 3 to adjust the power in inner cylinder indirectly by regulating valve 10, On the other hand the water temperature in cylinder 1 is controlled by coordinating with the second return pipe 8.
By the second return pipe 8, it is implemented in combination with reference to the second adjutage 6 to the temperature adjustment of water outlet and in inner cylinder 3 Power regulation, integrally-regulated intellectuality and precision are realized, so that whole control of the boiler to water temperature more refinement It is greasy accurate.
In addition, cylinder 1 is provided with is provided with blow-off pipe 13 with water-level gauge 12, the bottom of cylinder 1, cylinder 1 is provided with air pressure adjustment Pipe 14, outlet pipe 9 via heat exchanger 15 with converge after the first return pipe 4 and the second return pipe 8 be connected.
In whole heating process, because temperature adjustment is reasonable, water and the bottom sheet of cylinder 1 of specific second return pipe 8 The water mixing of body, carries out temperature adjustment to the hot water of three adjutages together, default recirculated water is obtained, then again from cylinder 1 The outlet pipe 13 of bottom flows out to water circulating pump 11, and the pressure in cylinder 1 is adjusted by air pressure adjustment pipe 14, in whole mistake Cheng Zhong, even water temperature and the less effect of fluctuation can be reached by the regulation to the second return pipe 8 and the second adjutage 6, and And entirety water is less.
Boiler is that the entirely different and current boiler of situation of full water is during this operation with current electrode homogeneous solution-type reactor Pass through regulation
The boiler of the application due to there is provided cylinder 1 and inner cylinder 3, solve current housing it is powered result in the need for it is overall absolutely The problem of edge.And accurate control is reached, waterflow stabilization, has fluctuated less effect.
The electrode assembly of current electrode boiler is completely submerged in water, and electrode assembly is covered with moveable insulating boot, Insulating boot connects the drive mechanism of boiler exterior, and realization moves freely.By the movement of insulating boot, regulation electrode is connected with water Area, that is, the depth that electrode assembly immerses water is adjusted, so as to realize power adjusting.
And the regulative mode of the application and current regulative mode are entirely different, so as to exquisiter stabilization.

Claims (6)

1. a kind of electric pole type hot-water boiler, it is characterised in that cylinder (1) including vertical and be arranged on cylinder (1) Electrode assembly (2), cylinder (1) is interior to be provided with inner cylinder (3), and electrode assembly (2) is introduced in inner cylinder (3) by cylinder (1), inner cylinder (3) With cylinder (1) insulation set, inner cylinder (3) bottom be provided with the first return pipe (4), the first adjutage (5), the second adjutage (6) and 3rd adjutage (7);First adjutage (5) opening is located at cylinder (1) interior middle and upper part, and the 3rd adjutage (7) is located in cylinder (1) Bottom, the second adjutage (6) first leads to cylinder (1) outside, then returns again to cylinder (1), its opening is located at cylinder (1) Interior bottom, the second adjutage (6) are provided with regulating valve (10) in cylinder (1);Cylinder (1) is externally provided with the second return pipe (8) and gone out Water pipe (9), the second return pipe (8) opening are located at cylinder (1) interior bottom, and outlet pipe (9) outlet is located at cylinder (1) inner bottom part, the Two return pipes (8) are externally provided with regulating valve (10) and the second return pipe (8) and the first return pipe (4) in cylinder (1) outside in cylinder (1) Converge, outlet pipe (9) is externally provided with water circulating pump (11) in cylinder (1).
2. electric pole type hot-water boiler according to claim 1, it is characterised in that inner cylinder (3) is located at cylinder (1) internal upper part.
3. electric pole type hot-water boiler according to claim 1, it is characterised in that cylinder (1) is provided with and water-level gauge (12).
4. electric pole type hot-water boiler according to claim 1, it is characterised in that cylinder (1) bottom is provided with blow-off pipe (13).
5. electric pole type hot-water boiler according to claim 1, it is characterised in that cylinder (1) is provided with air pressure adjustment pipe (14)。
6. electric pole type hot-water boiler according to claim 1, it is characterised in that outlet pipe (9) via heat exchanger (15) with The first return pipe (4) after converging is connected with the second return pipe (8).
CN201710771314.5A 2017-08-31 2017-08-31 Electric pole type hot-water boiler Active CN107631476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710771314.5A CN107631476B (en) 2017-08-31 2017-08-31 Electric pole type hot-water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710771314.5A CN107631476B (en) 2017-08-31 2017-08-31 Electric pole type hot-water boiler

Publications (2)

Publication Number Publication Date
CN107631476A true CN107631476A (en) 2018-01-26
CN107631476B CN107631476B (en) 2019-09-06

Family

ID=61100085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710771314.5A Active CN107631476B (en) 2017-08-31 2017-08-31 Electric pole type hot-water boiler

Country Status (1)

Country Link
CN (1) CN107631476B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109186085A (en) * 2018-11-06 2019-01-11 北京瑞特爱能源科技股份有限公司 A kind of electric pole type hot-water boiler module
CN109269091A (en) * 2018-10-30 2019-01-25 浙江盛达铁塔有限公司 Inner cylinder heating mechanism and immersion electrode water boiler
CN110068002A (en) * 2019-05-09 2019-07-30 浙江上能锅炉有限公司 Full immersion electrode steam boiler
CN110145731A (en) * 2019-05-30 2019-08-20 浙江特富锅炉有限公司 A kind of adjusting supporting device of boiler inner cylinder
CN110906487A (en) * 2019-11-22 2020-03-24 东台市高科技术创业园有限公司 Electrode humidifier's electrode pot
CN114623593A (en) * 2022-04-12 2022-06-14 浙江上能锅炉有限公司 Full-immersion electrode hot water boiler

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110762835A (en) * 2019-10-08 2020-02-07 江苏双良锅炉有限公司 Immersed high-voltage electrode type hot water boiler

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0250889A1 (en) * 1986-06-18 1988-01-07 GebràœDer Sulzer Aktiengesellschaft Electrode boiler for the production of steam or hot water
JPH10281853A (en) * 1997-04-08 1998-10-23 Miura Co Ltd Container for detecting water level of boiler
CN201396740Y (en) * 2009-04-14 2010-02-03 杭州华源前线能源设备有限公司 Electrode type steam boiler
CN202082904U (en) * 2011-05-18 2011-12-21 大连船舶重工集团装备制造有限公司 Electrode steam boiler
KR20120066992A (en) * 2010-12-15 2012-06-25 김원영 Electric boiler
JP2012193917A (en) * 2011-03-17 2012-10-11 Tiger Vacuum Bottle Co Ltd Water heater and vacuum jacket
CN204756868U (en) * 2015-06-30 2015-11-11 太平洋电力能源有限公司 High voltage electrode boiler
CN207268542U (en) * 2017-09-26 2018-04-24 浙江特富锅炉有限公司 Electric pole type hot-water boiler

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0250889A1 (en) * 1986-06-18 1988-01-07 GebràœDer Sulzer Aktiengesellschaft Electrode boiler for the production of steam or hot water
JPH10281853A (en) * 1997-04-08 1998-10-23 Miura Co Ltd Container for detecting water level of boiler
CN201396740Y (en) * 2009-04-14 2010-02-03 杭州华源前线能源设备有限公司 Electrode type steam boiler
KR20120066992A (en) * 2010-12-15 2012-06-25 김원영 Electric boiler
JP2012193917A (en) * 2011-03-17 2012-10-11 Tiger Vacuum Bottle Co Ltd Water heater and vacuum jacket
CN202082904U (en) * 2011-05-18 2011-12-21 大连船舶重工集团装备制造有限公司 Electrode steam boiler
CN204756868U (en) * 2015-06-30 2015-11-11 太平洋电力能源有限公司 High voltage electrode boiler
CN207268542U (en) * 2017-09-26 2018-04-24 浙江特富锅炉有限公司 Electric pole type hot-water boiler

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109269091A (en) * 2018-10-30 2019-01-25 浙江盛达铁塔有限公司 Inner cylinder heating mechanism and immersion electrode water boiler
CN109186085A (en) * 2018-11-06 2019-01-11 北京瑞特爱能源科技股份有限公司 A kind of electric pole type hot-water boiler module
CN110068002A (en) * 2019-05-09 2019-07-30 浙江上能锅炉有限公司 Full immersion electrode steam boiler
CN110145731A (en) * 2019-05-30 2019-08-20 浙江特富锅炉有限公司 A kind of adjusting supporting device of boiler inner cylinder
CN110145731B (en) * 2019-05-30 2024-04-19 浙江特富发展股份有限公司 Adjusting and supporting device of boiler inner cylinder
CN110906487A (en) * 2019-11-22 2020-03-24 东台市高科技术创业园有限公司 Electrode humidifier's electrode pot
CN110906487B (en) * 2019-11-22 2021-07-20 东台市高科技术创业园有限公司 Electrode humidifier's electrode pot
CN114623593A (en) * 2022-04-12 2022-06-14 浙江上能锅炉有限公司 Full-immersion electrode hot water boiler

Also Published As

Publication number Publication date
CN107631476B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
CN107631476A (en) Electric pole type hot-water boiler
CN105890152B (en) A kind of liquid level PCU Power Conditioning Unit for high-power grill pan stove heat electrode
CN207268542U (en) Electric pole type hot-water boiler
CN109186085A (en) A kind of electric pole type hot-water boiler module
CN107655210A (en) Phase-change type steam generator system
CN104019561A (en) Solar energy water heater with instantaneous heating function and self-stabilized output temperature
CN105725794A (en) Instant-heating water dispenser
CN106822927A (en) One kind is based on the electrically heated sterilization furnace apparatus of solar energy
CN205199543U (en) High -efficient electric heating constant temperature water -bath for pharmacy
CN209085042U (en) A kind of electric pole type hot-water boiler module
CN104100731A (en) Constant-temperature water outlet valve
CN204730465U (en) A kind of hot-water boiler anticorrosion adjusting device
CN104783703B (en) Instantaneous foot bath achieving steam indirect heating function
CN104930710A (en) Anti-corrosion adjustment device for water boiler
CN206018972U (en) Thermostatic heater under integrated platform
CN204561939U (en) Instant heating type steam indirect Pediluvium apparatus
CN205321151U (en) Feed fermenting device
CN204841742U (en) Automatic fluid infusion constant temperature cistern
CN203115173U (en) Constant-temperature water outlet valve
CN204593331U (en) A kind of steam generator
CN108168088A (en) A kind of Thermostatic water heaters
CN201940221U (en) Special reaction device for essence
CN205690658U (en) A kind of liquid level PCU Power Conditioning Unit adding thermode for high-power electric boiler
CN206695223U (en) The significant residential quarters heating heat exchange station system of energy-saving effect
CN205897502U (en) Electric heating boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Changan city Jiaxing town Zhejiang city of Haining province (314400 agricultural areas) and tide Road No. 36

Patentee after: Zhejiang Tefu Development Co., Ltd

Address before: Changan city Jiaxing town Zhejiang city of Haining province (314000 agricultural areas) and tide Road No. 36

Patentee before: ZHEJIANG TUFF BOILER Co.,Ltd.