CN107618622A CN201710775360.2A CN201710775360A CN107618622A CN 107618622 A CN107618622 A CN 107618622A CN 201710775360 A CN201710775360 A CN 201710775360A CN 107618622 A CN107618622 A CN 107618622A
Authority
CN
China
Prior art keywords
checking bollard
bushing assembly
slide bushing
traversing
mooring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710775360.2A
Other languages
Chinese (zh)
Other versions
CN107618622B (en
Inventor
戴双全
陈伟彬
张文森
董政
黄文慧
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN201710775360.2A priority Critical patent/CN107618622B/en
Publication of CN107618622A publication Critical patent/CN107618622A/en
Application granted granted Critical
Publication of CN107618622B publication Critical patent/CN107618622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of traversing mooring fairlead of immersed tube.Including leading checking bollard, chock and slide bushing assembly, the slide bushing assembly, which is set in, to be led on checking bollard and can rotate about, and the chock is arranged on slide bushing assembly, and at least a set of open type coaster is also hinged with the slide bushing assembly.The present invention leads checking bollard by setting and rotatable slide bushing assembly is set on checking bollard is led, chock and open type coaster are set on slide bushing assembly simultaneously, the chock and open type coaster can rotate together with slide bushing assembly around 360 ° of checking bollard is led, so that a stake potential energy meets that two hawsers go out more than 180 ° guiding of cable simultaneously, spatially universal it can lead cable, this, which leads checking bollard, simultaneously to be used as bollard, allow the device to meet mooring and to lead cable dual-purpose, mooring can be greatly simplified and lead cable system, reduce basis instrument.

Description

A kind of traversing mooring fairlead of immersed tube
Technical field
The present invention relates to over-water construction mooring arrangement technical field, and in particular to a kind of traversing mooring fairlead of immersed tube.
Background technology
Mooring arrangement is the part for belonging to ship equipment, suitable for aquatic work and offshore construction environment, using offshore vessel It is than better suited selection that oceangoing ship equipment standard, which designs and produces the traversing mooring stranded cable system equipment of immersed tube,.Chock be hawser be oriented to and Protection hawser normally draws the necessary equipment of work.Matching of the chock with stranded cable system and the applicability to environment, its quality Directly affect the whole construction operation of ship or the construction operation of whole scene.Chock used by existing construction ship Be mostly fixed gate seat multi-roller chock, or goat's horn list fairlead with horizontal roller, or hold-down support can bidirectional rotation pulley Chock.
The immersed tube prefabricated dock chamber environment of an activation of certain seabed tunnel is complicated, and immersed tube is traversing to be needed to fill drop above and below draining into dock chamber 15.3m, its activity space change greatly, and scope of activities area is big, it is desirable to the hawser of mooring stranded cable system energy is multi-faceted, wide-angle, The guiding conversion of long range, including more than 180 ° guidance tape cables, traversing immersed tube, mooring can be met in dock chamber, undocked and dock gate The Operations Requirements of opening and closing, while the mooring checking bollard of the Operations Requirements arrangement in dock chamber is more, it is more to lead cable point position, causes mooring to lead cable system Unite huge.
It leads that cable angle is small, and direction is restricted for existing multi-roller chock or single fairlead with horizontal roller, and it is low to lead cable efficiency, Easily injure hawser and chock in itself.Hold-down support can bidirectional rotation rolling chock, although adding guide angle, change Guide direction has been apt to it, has improved and lead cable efficiency, but guide angle and direction also suffers from limitation, can not meet big more than 180 ° Angle, multi-party guide cable spatially need.
The content of the invention
Present invention aims at:It is small because leading cable angle for existing chock, and lead cable direction to be restricted and can not A kind of the problem of satisfaction leads the wide-angle that cable angle is more than 180 °, and multi-party guide cable spatially needs, there is provided traversing system of immersed tube Fairlead is moored, the fairlead, which disclosure satisfy that, leads the guiding that cable angle is more than 180 °, and multi-party guide cable need spatially Will, it can effectively reduce and change cable number, improve efficiency of construction.
To achieve these goals, the technical solution adopted by the present invention is:
A kind of traversing mooring fairlead of immersed tube, including checking bollard, chock and slide bushing assembly are led, the slide bushing assembly set Be located at and lead on checking bollard and can rotate about, the chock be arranged on slide bushing assembly on, be also hinged with the slide bushing assembly to Few a set of open type coaster.
The present invention leads checking bollard by setting and rotatable slide bushing assembly is set on checking bollard is led, while in slide bushing assembly Upper setting chock and open type coaster, the chock and open type coaster can rotate together with slide bushing assembly around 360 ° of checking bollard is led so that One stake potential energy meets that two hawsers go out more than 180 ° guiding of cable simultaneously, universal can spatially lead cable, at the same this lead checking bollard can be with Used as bollard so that the device disclosure satisfy that mooring and to lead cable dual-purpose, can greatly simplify mooring and lead cable system, reduce Basis instrument.
As the preferred scheme of the present invention, the slide bushing assembly includes upper sliding sleeve and low sleeve, the upper sliding sleeve, low sleeve Between be provided with and be fixed on the circular orientation plate led on checking bollard.By setting upper sliding sleeve and low sleeve can be in order to chock and open type Coaster is connected, and both both can be each around checking bollard rotation be led, again can be convenient to adjust guide direction, while the ring with unitary rotation Shape location-plate can avoid upper sliding sleeve and low sleeve edge from leading checking bollard and slide up and down.
As the preferred scheme of the present invention, the low sleeve is formed by connecting by two semicircle sets, can be in order to low sleeve The operation such as installation and subsequent maintenance and replacing.
As the preferred scheme of the present invention, the chock includes gate seat, is vertically provided with the gate seat at least one vertical Roller, two transverse idlers are also correspondingly provided with the gate seat.By setting gate seat, vertical roller and transverse idler, then coordinate sliding sleeve Component is used together, it is possible to achieve 360 ° of hawser guiding, when the drag of traction is from the side yaw of checking bollard is led to leading checking bollard During opposite side, its pull-cord needs, across the top for leading checking bollard, to be laterally moved to opposite side from the side for leading checking bollard, now use The chock do not have to change cable can a sub-band cable complete traction task, that is, realize around stake draw.
As the preferred scheme of the present invention, the vertical roller is two, and the open type coaster is a set of, can give two simultaneously The hawser of platform winch is oriented to.
As the preferred scheme of the present invention, it is described lead that checking bollard includes being connected with each other lead and checking bollard cylinder and lead checking bollard base, Described to lead checking bollard cylinder top installation slide bushing assembly, the checking bollard base of leading is connected on ground.
As the preferred scheme of the present invention, the checking bollard cylinder bottom of leading is provided with for more hawsers to be layered into the rings with cable Shape dividing plate, more hawser layering band cable moorings can be met, cable is conveniently changed and untie the mooring rope.
As the preferred scheme of the present invention, it is described lead be additionally provided with the top of checking bollard cylinder it is vexed for preventing from altering on slide bushing assembly Lid.
In summary, by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1st, the present invention leads checking bollard by setting and rotatable slide bushing assembly is set on checking bollard is led, while in sliding sleeve group Chock and open type coaster, the chock and open type coaster is set to make together with slide bushing assembly around 360 ° of rotations of checking bollard are led on part Stake potential energy meets that two hawsers go out more than 180 ° guiding of cable simultaneously, universal can spatially lead cable, at the same this lead checking bollard can To be used as bollard so that the device disclosure satisfy that mooring and to lead cable dual-purpose, can greatly simplify mooring and lead cable system, subtract Basis instrument is lacked;
2nd, by set slide bushing assembly and open type coaster and both can around lead checking bollard rotate, open type coaster guide cable friction Minimum, efficiency highest, steel wire rope is protected optimal, and hawser steric direction scope is big, and planar guide angle is big, has accomplished to be more than 180 ° of guiding, meet the wide-angle political reform of the traversing cable of immersed tube in place and do not change cable, operating efficiency is high;
3rd, by setting chock at the top of checking bollard it can realize 360 ° of hawser guiding leading, when the drag of traction is from stake Side yaw to stake opposite side when, its pull-cord needs the top across checking bollard, and opposite side is laterally moved to from the side of stake Go, now using the chock do not have to change cable can a sub-band cable complete traction task, that is, realize around stake draw.
Brief description of the drawings
Fig. 1 is the traversing mooring fairlead front view of the first immersed tube in the present invention.
Fig. 2 is Fig. 1 top view.
Fig. 3 is Fig. 1 right view.
Fig. 4 is the traversing mooring fairlead front view of second of immersed tube in the present invention.
Fig. 5 is Fig. 4 top view.
Fig. 6 is Fig. 4 left view.
Fig. 7 is the traversing mooring fairlead front view of the third immersed tube in the present invention.
Fig. 8 is Fig. 7 top view.
Marked in figure:1- pre-embedded bolts;2- concrete foundations;3- leads checking bollard base;4- leads checking bollard cylinder;5- annulars every Plate;6- low sleeves;7- circular orientation plates;8- upper sliding sleeves;9- boring covers;10- gate seats;11- transverse idlers;12- founds roller;13- open types Coaster;14- coaster removable covers;15- latches;The simple gate seat chocks of 17-.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
Embodiment 1
The present embodiment provides a kind of traversing mooring fairlead of immersed tube;
As shown in Figure 1-Figure 3, the traversing mooring fairlead of immersed tube in the present embodiment, including lead checking bollard, chock and Slide bushing assembly, the slide bushing assembly, which is set in, to be led on checking bollard and can rotate about, and the chock is arranged on slide bushing assembly, institute State and open type coaster 13 is also hinged with slide bushing assembly.
In the present embodiment, it is described lead that checking bollard includes being connected with each other lead and checking bollard cylinder 4 and lead checking bollard base 3, it is described to lead cable The stake insertion of cylinder 4 is led in checking bollard base 3 and is welded in one with it, leads checking bollard and provides counter-force for hawser guiding, leads checking bollard base 3 It is to be fixed on by eight sets of pre-embedded bolts 1 in the concrete foundation 2 for leading checking bollard, leads the lower weld toroidal membrane 5 of checking bollard cylinder 4 For more hawser layering band cables, cable is conveniently untied the mooring rope and changed.
In the present embodiment, the slide bushing assembly includes upper sliding sleeve 8 and low sleeve 6, and both, which are inserted in, leads the upper end of checking bollard cylinder 4, The centre of upper sliding sleeve 8 and low sleeve 6 is provided with circular orientation plate 7, and the circular orientation plate 7 is welded on the top for leading checking bollard cylinder 4, on Sliding sleeve 8 is inserted in from stake top leads checking bollard cylinder 4, and is held by circular orientation plate 7, and low sleeve 6 is two semicircle set compositions, passes through spiral shell Tether and be connected into full circle sliding sleeve, lead on checking bollard cylinder 4 mounted in the lower section of circular orientation plate 7 and being placed on, blocked not by circular orientation plate 7 Upward play, upper sliding sleeve and low sleeve both sides are welded with connection eye plate, upper sliding sleeve and low sleeve and connected by eye plate using bearing pin Connect, that is, the slide bushing assembly after connecting is navigated to by circular orientation plate 7 leads the upper end of checking bollard cylinder 4 without sliding up and down.
In the present embodiment, the chock includes the gate seat 10 being weldingly connected with the both sides of upper sliding sleeve 8, is erected on the gate seat 10 To provided with two vertical rollers 12, two transverse idlers 11 are also correspondingly provided with the gate seat 10, it is respectively positioned at vertical roller both sides.Together When the side of upper sliding sleeve 8 is provided with the connecting hole for installing open type coaster 13, the open type coaster is connected with connecting hole by bearing pin Connect, and 120 ° can be rotated around bearing pin.Lead and boring cover 9 is housed at the top of checking bollard, boring cover is to fill in stake top from stake top side, using embedment Formula bolt is connected with stake top to be sealed stake top and prevents from altering on upper sliding sleeve.
Specifically, the fairlead in the present invention can give the hawser of two winches to be oriented to simultaneously, a strand can be also individually for Car hawser is oriented to.When being oriented to work using open type coaster, open type coaster 13 is first gone to that hawser works in checking bollard around stake one Side, the coaster removable cover 14 of open type coaster side is opened, dragging the steel wire rope come to be put into open type coaster 13 from winch, be then shut off Coaster removable cover installs latch 15, and steel wire rope moved to and is dragged with good, then steel wire rope can be carried out in the side of checking bollard 180 ° of guiding.When being oriented to using stake top gate seat chock, two vertical rollers that the steel wire penetrating stake top come is dragged from winch 12 centre, and steel wire rope moved to and is dragged with good, then steel wire rope can be carried out around 360 ° of guiding of stake.When traction is dragged Thing from opposite side of the side of stake around stake when, its pull-cord needs the top across checking bollard, from the side yaw of stake to another Side is gone, now can sub-band cable completion traction task without changing cable using stake top gate seat chock.
In summary, the fairlead in the present embodiment has the following advantages that:
1st, using pile fabricated structure, chock had not only been made but also had made bollard use, one multi-purpose, leads checking bollard and chock Integral design enormously simplify mooring and lead cable system, reduce basis instrument.Make bollard in use, using leading checking bollard stake Bottom, while checking bollard bottom design toroidal membrane is led, meet more hawser layering band cable moorings, conveniently change cable and untie the mooring rope;
2nd, checking bollard top installation slide bushing assembly and open type coaster are led, is revolved using slide bushing assembly and open type coaster around checking bollard is led Turn, the friction of open type coaster guide cable is minimum, efficiency highest, and steel wire rope is protected optimal, and hawser steric direction scope is big, plane Guide angle is big, has accomplished to be more than 180 ° of guiding, meets the wide-angle political reform of the traversing cable of tube coupling in place and does not change cable, work effect Rate is high;
3rd, 360 ° of guiding of hawser of winch can be met by leading the chock on checking bollard top, when the drag of traction is horizontal from the side of stake When swinging to the opposite side of stake, its pull-cord needs, across the top of checking bollard, to be laterally moved to opposite side from the side of stake, now adopt With stake top gate seat chock do not have to change cable can a sub-band cable complete traction task, that is, realize around stake draw;
4th, this fairlead can meet multi-faceted dock chamber Operations Requirements hawser, wide-angle, the conversion of the guiding of long range, adapt to Immersed tube is traversing in dock chamber, mooring, the various activities requirement undocked with dock gate opening and closing.
Embodiment 2
The present embodiment provides another traversing mooring fairlead of immersed tube;
As Figure 4-Figure 6, the traversing mooring fairlead of immersed tube in the present embodiment, including lead checking bollard, chock and Slide bushing assembly, the slide bushing assembly, which is set in, to be led on checking bollard and can rotate about, and the chock is arranged on slide bushing assembly, institute State and open type coaster 13 is also hinged with slide bushing assembly.
In the present embodiment, it is described lead that checking bollard includes being connected with each other lead and checking bollard cylinder 4 and lead checking bollard base 3, it is described to lead cable The stake insertion of cylinder 4 is led in checking bollard base 3 and is welded in one with it, leads checking bollard and provides counter-force for hawser guiding, leads checking bollard base 3 It is to be fixed on by eight sets of pre-embedded bolts 1 in the concrete foundation 2 for leading checking bollard, leads the lower weld toroidal membrane 5 of checking bollard cylinder 4 For more hawser layering band cables, cable is conveniently untied the mooring rope and changed.
In the present embodiment, the slide bushing assembly only includes a sliding sleeve, and the sliding sleeve is to be enclosed on to lead the upper end of checking bollard cylinder 4, together When sliding sleeve side is provided with the connecting hole for installing open type coaster 13, the open type coaster is connected with connecting hole by bearing pin, And 120 ° can be rotated around bearing pin.Chock in the present embodiment is simple gate seat chock 17, and it includes and sliding sleeve stationary phase Simple gate seat even, the simple gate seat are provided with a vertical roller and two transverse idlers.In addition, remaining in the present embodiment is not chatted The part stated is same as Example 1.
Embodiment 3
The present embodiment provides another immersed tube traversing mooring fairlead;
As shown in Figure 7 and Figure 8, the traversing mooring fairlead of immersed tube in the present embodiment, including lead checking bollard, chock and Slide bushing assembly, the slide bushing assembly, which is set in, to be led on checking bollard and can rotate about, and the chock is arranged on slide bushing assembly, institute State and open type coaster 13 is also hinged with slide bushing assembly.
In the present embodiment, it is described lead that checking bollard includes being connected with each other lead and checking bollard cylinder 4 and lead checking bollard base 3, it is described to lead cable The stake insertion of cylinder 4 is led in checking bollard base 3 and is welded in one with it, leads checking bollard and provides counter-force for hawser guiding, leads checking bollard base 3 It is to be fixed on by eight sets of pre-embedded bolts 1 in the concrete foundation 2 for leading checking bollard, leads the lower weld toroidal membrane 5 of checking bollard cylinder 4 For more hawser layering band cables, cable is conveniently untied the mooring rope and changed.
In the present embodiment, the slide bushing assembly includes upper sliding sleeve 8 and low sleeve, is arranged on and leads the upper end of checking bollard cylinder 4, upper cunning Set can rotate around checking bollard is led respectively with low sleeve, while is provided with upper sliding sleeve and low sleeve for installing open type coaster 13 connecting hole, two open type coasters 13 are connected with the connecting hole of upper sliding sleeve and low sleeve by bearing pin respectively, and can be around Bearing pin rotates 120 °.Chock in the present embodiment is simple gate seat chock 17, and it includes the letter being fixedly linked with upper sliding sleeve Easy gate seat, the simple gate seat are provided with a vertical roller and two transverse idlers.In addition, the portion that remaining in the present embodiment does not describe Divide same as Example 1.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all originals in the present invention All any modification, equivalent and improvement made within reason etc., should be included in the scope of the protection.

Claims (8)

1. a kind of traversing mooring fairlead of immersed tube, it is characterised in that described including leading checking bollard, chock and slide bushing assembly Slide bushing assembly, which is set in, to be led on checking bollard and can rotate about, and the chock is arranged on slide bushing assembly, on the slide bushing assembly Also it is hinged with least a set of open type coaster.
2. the traversing mooring fairlead of immersed tube according to claim 1, it is characterised in that the slide bushing assembly includes upper cunning Set and low sleeve, the circular orientation plate for being fixed on and leading on checking bollard is provided between the upper sliding sleeve, low sleeve.
3. the traversing mooring fairlead of immersed tube according to claim 2, it is characterised in that the low sleeve is by two semicircles Set is formed by connecting.
4. the traversing mooring fairlead of immersed tube according to claim 3, it is characterised in that the chock includes gate seat, At least one vertical roller is vertically provided with the gate seat, two transverse idlers are also correspondingly provided with the gate seat.
5. the traversing mooring fairlead of immersed tube according to claim 4, it is characterised in that the vertical roller is two, institute It is a set of to state open type coaster.
6. the traversing mooring fairlead of immersed tube according to one of claim 1-5, it is characterised in that the checking bollard of leading includes What is be connected with each other leads checking bollard cylinder and leads checking bollard base, described to lead checking bollard cylinder top installation slide bushing assembly, described to lead checking bollard bottom Seat is connected on ground.
7. the traversing mooring fairlead of immersed tube according to claim 6, it is characterised in that the checking bollard cylinder bottom of leading is set Have for more hawsers to be layered into the toroidal membrane with cable.
8. the traversing mooring fairlead of immersed tube according to claim 7, it is characterised in that described to lead at the top of checking bollard cylinder also Provided with for preventing the boring cover altered on slide bushing assembly.
CN201710775360.2A 2017-08-31 2017-08-31 Immersed tube transverse movement mooring guide rope device Active CN107618622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710775360.2A CN107618622B (en) 2017-08-31 2017-08-31 Immersed tube transverse movement mooring guide rope device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710775360.2A CN107618622B (en) 2017-08-31 2017-08-31 Immersed tube transverse movement mooring guide rope device

Publications (2)

Publication Number Publication Date
CN107618622A true CN107618622A (en) 2018-01-23
CN107618622B CN107618622B (en) 2020-03-20

Family

ID=61089231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710775360.2A Active CN107618622B (en) 2017-08-31 2017-08-31 Immersed tube transverse movement mooring guide rope device

Country Status (1)

Country Link
CN (1) CN107618622B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241786A (en) * 2019-07-29 2019-09-17 大连理工大学 A kind of string formula anchoring system
CN111254979A (en) * 2020-01-20 2020-06-09 中交第三航务工程局有限公司 Cable anchor system of underwater cable-stayed suspension tunnel
CN114802596A (en) * 2022-04-25 2022-07-29 武汉船用机械有限责任公司 Modular cable guide capable of automatically adjusting position and angle of guide wheel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202966590U (en) * 2012-12-28 2013-06-05 福建省马尾造船股份有限公司 Ocean engineering vessel
CN104229072A (en) * 2013-06-20 2014-12-24 泰州江海船舶设备有限公司 360-degree rotary fairlead
CN104859797A (en) * 2015-05-29 2015-08-26 上海船舶研究设计院 Pedestal roller with height adjusted
NL2015981B1 (en) * 2015-12-17 2017-07-05 Ihc Holland Ie Bv Fairlead for a mooring leg
CN206394818U (en) * 2016-12-15 2017-08-11 沪东中华造船(集团)有限公司 A kind of combination unit of bollard and fairlead

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202966590U (en) * 2012-12-28 2013-06-05 福建省马尾造船股份有限公司 Ocean engineering vessel
CN104229072A (en) * 2013-06-20 2014-12-24 泰州江海船舶设备有限公司 360-degree rotary fairlead
CN104859797A (en) * 2015-05-29 2015-08-26 上海船舶研究设计院 Pedestal roller with height adjusted
NL2015981B1 (en) * 2015-12-17 2017-07-05 Ihc Holland Ie Bv Fairlead for a mooring leg
CN206394818U (en) * 2016-12-15 2017-08-11 沪东中华造船(集团)有限公司 A kind of combination unit of bollard and fairlead

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241786A (en) * 2019-07-29 2019-09-17 大连理工大学 A kind of string formula anchoring system
CN110241786B (en) * 2019-07-29 2023-12-12 大连理工大学 String mooring system
CN111254979A (en) * 2020-01-20 2020-06-09 中交第三航务工程局有限公司 Cable anchor system of underwater cable-stayed suspension tunnel
CN111254979B (en) * 2020-01-20 2021-05-07 中交第三航务工程局有限公司 Cable anchor system of underwater cable-stayed suspension tunnel
CN114802596A (en) * 2022-04-25 2022-07-29 武汉船用机械有限责任公司 Modular cable guide capable of automatically adjusting position and angle of guide wheel

Also Published As

Publication number Publication date
CN107618622B (en) 2020-03-20

Similar Documents

Publication Publication Date Title
CN107618622A (en) A kind of traversing mooring fairlead of immersed tube
US20140346420A1 (en) Fairlead Latch Device
EP2931648B1 (en) Remote heave compensation system
EP2133304A3 (en) Hoisting crane and offshore vessel
CN205150165U (en) Ship's fix anchor system
CN105083471A (en) Ship positioning anchor system
KR20140079815A (en) Method and apparatus for manipulating chain segments
CN104291234A (en) Portable crane used for unloading cargo oil pump
US20220177081A1 (en) Vessel and method for installation of a pile adapted to support an offshore wind turbine
CN204125102U (en) A kind of Portable crane for cargo oil pump deliver from vault
CN109229283B (en) Islands and reefs probe the ROV water surface and lay recovery system and its recovery method
JP4590442B2 (en) Equipment for laying long objects such as cables on the bottom of water
US20160137267A1 (en) Method of supporting a chain stopper on a vessel, a chain stopper assembly for a vessel, and a vessel
CN201971133U (en) Bottom-supported blower installation platform
KR101346225B1 (en) Floating structure
JP2012165708A (en) Method for recovering middle-layer floating fishing bank
CN102587340A (en) Installation platform of bottom-supported fan and method for installing fan equipment
CN200995770Y (en) Sensor-chain distributor based on large buoy
CN205469657U (en) Jack staff winding and unwinding devices
JP6949690B2 (en) Floating body mooring method and floating body
CN206679195U (en) Deep-layer stirring ship processor overturns inspection platform
CN110877660A (en) Cable guiding device for towing winch of manned submersible
JP6006102B2 (en) Mooring method for worktable
EP0058159B1 (en) Rope guiding device
KR101498254B1 (en) Inclined turret and installing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant