CN107598332A CN201710962431.XA CN201710962431A CN107598332A CN 107598332 A CN107598332 A CN 107598332A CN 201710962431 A CN201710962431 A CN 201710962431A CN 107598332 A CN107598332 A CN 107598332A
Authority
CN
China
Prior art keywords
welding
novel
resisting steel
heat resisting
diameter pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710962431.XA
Other languages
Chinese (zh)
Other versions
CN107598332B (en
Inventor
吴富强
张君发
王于亭
苗慧霞
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201710962431.XA priority Critical patent/CN107598332B/en
Publication of CN107598332A publication Critical patent/CN107598332A/en
Priority to PCT/CN2018/109395 priority patent/WO2019076208A1/en
Application granted granted Critical
Publication of CN107598332B publication Critical patent/CN107598332B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/02Seam welding; Backing means; Inserts
    • B23K9/028Seam welding; Backing means; Inserts for curved planar seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/167Arc welding or cutting making use of shielding gas and of a non-consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/50Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for welded joints
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/22Ferrous alloys, e.g. steel alloys containing chromium with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/30Ferrous alloys, e.g. steel alloys containing chromium with cobalt
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Plasma & Fusion (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses the welding of large-diameter pipe road and Technology for Heating Processing in a kind of novel C B2 heat resisting steel, wlding is chosen;Polish and clear up around welding groove debris in the range of 50mm;100%PT detections are carried out to welding groove, in group to preceding, argon filling heating and thermal insulation integration frock is set in novel C B2 heat resisting steel at large-diameter pipe road inner distance welding groove 200mm as sealed gas chamber, argon filling heating and thermal insulation integration frock one end be incubated baffle plate centre bore in insert argon gas pipeline, by argon gas pipeline into sealed gas chamber argon filling;The inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel is preheated simultaneously by argon filling heating and thermal insulation integration frock;Bottoming is welded, and is welded using GTAW and is carried out two layers of welding;Cover welding is filled, is welded using SMAW and carries out two channel welds;After being cooled to 80 DEG C by weldment after the completion of welding and be incubated 1h, post weld heat treatment is carried out using argon filling heating and thermal insulation integration frock.Present invention reduces the labor intensity of welder, welding quality ensure that.

Description

The welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel
Technical field
The present invention relates to pipeline welding Technology for Heating Processing, large-diameter pipe road welds in a kind of novel C B2 heat resisting steel of specific design And Technology for Heating Processing.
Background technology
Novel C B2 heat resisting steel has good intensity, toughness, creep resistance, excellent high-temperature oxidation resistance and corrosion-resistant Performance, gradually it is applied to the heat-resisting steels of the equipment such as firepower plant heating system.The specific trade mark of novel C B2 heat resisting steel is ZG12Cr9Mo1Co1NiVNbNB, it is a kind of novel C B2 ferritic heat-resistant steels, therefore the excellent spy with ferritic heat-resistant steel Property, such as excellent thermal conductivity, low thermal coefficient of expansion, good anti intercrystalline corrosion and anti-stress corrosion performance and relatively low Production cost, the thermal efficiency of generating set can be improved.The multiple elements design that CB2 heat resisting steel is high Cr strengthens heat resisting steel, mainly adopts With add alloying elements cr, Mo, Co, Ni, V, Nb and micro N, B element Alloying Design and reasonably combined improve its high temperature Performance.Its main alloying element species and content are all more similar to T91 heat resisting steel.
Efficient extra-supercritical unit construction and development become current international hot issue, unit operation parameter Constantly improve and higher requirement is proposed to the material of critical component, after novel C B2 heat resisting steel is researched and developed successfully, by the fortune of unit Trip temperature is from 600 DEG C of liftings to 620 DEG C, therefore the welding in large-diameter pipe road and Technology for Heating Processing will be into novel C B2 heat resisting steel For the emphasis of firepower construction project welding research.
Because such a new material is in service stage at initial stage at present, both at home and abroad for this novel C B2 heat resisting steel Research on Weldability it is considerably less, to meet the longtime running of unit, give full play to the potential of new type steel, the application passes through collection The mechanical property of CB2 steel chemical compositions and material, select suitable welding material to carry out welding procedure qualification test, summarize simultaneously Before weldering, the welding hints on operation of welding process and postwelding, have studied in a kind of novel C B2 heat resisting steel at the welding of large-diameter pipe road and heat Science and engineering skill, widely used for the popularization of novel C B2 heat resisting steel from now on and welding technique support is provided, for carrying again for unit operation parameter Height lays the foundation.
The content of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the invention provides large-diameter pipe road in a kind of novel C B2 heat resisting steel to weld Connect and Technology for Heating Processing, the welding and Technology for Heating Processing large-diameter pipe road welding quality stable can in novel C B2 heat resisting steel is handled Lean on.
The technical solution adopted in the present invention is:
The welding of large-diameter pipe road and Technology for Heating Processing, comprise the following steps in a kind of novel C B2 heat resisting steel:
(1) required according to the chemical composition, mechanical property and its welding technological properties of novel C B2 heat resisting steel, choose wlding;
(2) polish the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, and clear up large-diameter pipe in novel C B2 heat resisting steel Debris in the range of 50mm around the welding groove in road;
(3) 100%PT detections are carried out to the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, in novel C B2 heat resisting steel The welding groove surface flawless in large-diameter pipe road is qualified;
(4) before large-diameter pipe road is grouped in the two novel C B2 heat resisting steel for welding needs, in novel C B2 heat resisting steel Argon filling heating and thermal insulation integration frock is set to be filled as sealed gas chamber at middle large-diameter pipe road inner distance welding groove 200mm Insertion argon gas pipeline in the centre bore of one end insulation baffle plate of argon heating and thermal insulation integration frock, by argon gas pipeline to closed gas Indoor argon filling;
(5) it is same to the inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel by argon filling heating and thermal insulation integration frock Shi Jinhang is preheated;
(6) bottoming is welded, and is welded using GTAW and is carried out two layers of welding;Cover welding is filled, is gone forward side by side using SMAW welding The channel welds of row two, control the diameter for being no more than welding rod per thickness degree, and width is no more than 4 times of core diameter;
(7) after the completion of welding, weldment is cooled to 80 DEG C, and after being incubated 1h, using argon filling heating and thermal insulation integration frock, Mode based on multi-region temperature control, multi-point temperature measurement carries out post weld heat treatment.
Further, in the step (1), the chemical composition ranges of novel C B2 heat resisting steel are (%):Cr:=9.11, Mo:=1.59, Co:=1.27;Mechanical property requirements are:Tensile strength:>=690Mpa, surrender are slight:≥490Mpa.
Further, in the step (1), from the welding wires of Φ 2.4 and the welding rods of Φ 3.2.
Further, in the step (4), the argon filling heating and thermal insulation integration frock includes two heating frocks and two The individual insulation baffle plate being separately positioned on the outside of two heating frocks, two are heated frocks and two insulation baffle combinations into closed gas Room.
Further, in the step (4), the welding slope in air tube large-diameter pipe road from novel C B2 heat resisting steel can also be used Insertion sealed gas chamber in mouth gap carries out nitrogen charging.
Further, in the step (5), preheating temperature is 200-250 DEG C, makes large-diameter pipe road in novel C B2 heat resisting steel Inner and outer wall reach preheating temperature requirement.
Further, in the step (6), the welding condition of GTAW welding is:Welding current 90-100A, interlayer 200-250 DEG C of temperature.
Further, in the step (6), the welding condition of SMAW welding is:Welding current 80-120A, interlayer 200-300 DEG C of temperature.
Further, in the step (7), the detailed process of post weld heat treatment is:The large-diameter pipe in novel C B2 heat resisting steel The position while welding arrangement temperature-control heat couple in road, the weld seam both sides heat affected area in large-diameter pipe road respectively sets one in novel C B2 heat resisting steel Individual temperature thermocouple, monitor the temperature of heat affected area, heated using flexible ceramic heater, arrangement scope should using weld seam as Center, it is ensured that samming scope meets the requirements;It is incubated using alumina silicate insulation blanket, is along the circumferential direction wrapped up on the heaters, Insulation width is counted from Weld pipe mill, should be than heater width increase at least 2 times of wall thickness per side;Argon filling built in being used inside pipeline Heating and thermal insulation integration frock is heated so that the inner and outer walls of pipeline temperature difference reaches or less than standard requirement.
Further, in the step (7), in PWHT procedures, post weld heat treatment temperature is 730-750 DEG C, weldering Programming rate≤80 DEG C, cooling rate≤60 DEG C are heat-treated afterwards.
Compared with prior art, the beneficial effects of the invention are as follows:
(1) present invention realizes the welding and heat treatment to large-diameter pipe road in novel C B2 heat resisting steel, reduces the work of welder Intensity, welding quality is ensure that, and by reasonably controlling welding and heat treatment process parameter, obtained welding point is once Qualification rate is high, welding point combination property is more excellent;
(2) present invention argon filling, heating, heat insulation integrated frock built in large-diameter pipe road in novel C B2 heat resisting steel, both can be with Ensure argon-filled protection effect, and can reduces pipeline preheating, the inside and outside wall temperature difference of post weld heat treatment, improves the matter of welding and heat treatment Amount;
(3) weldment is cooled to after 80 DEG C of insulation 1h by the present invention after the completion of welding carries out post weld heat treatment, at postwelding heat Reason uses built-in argon filling heating and thermal insulation frock so that the inner and outer walls of pipeline temperature difference reaches standard requirement and is even less than standard requirement.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not form the improper restriction to the application.
Fig. 1 is the welding of large-diameter pipe road and Technology for Heating Processing flow chart in novel C B2 heat resisting steel disclosed in the embodiment of the present invention.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, presence in the prior art can not realize that large-diameter pipe road welds in novel C B2 heat resisting steel The deficiency for connecing and being heat-treated, in order to solve technical problem as above, present applicant proposes large-diameter pipe in a kind of novel C B2 heat resisting steel Road welds and Technology for Heating Processing.
In a kind of typical embodiment of the application, as shown in Figure 1, there is provided big footpath in a kind of novel C B2 heat resisting steel Pipeline welding and Technology for Heating Processing, the technique comprise the following steps:
(1) wlding is chosen, and is required according to the chemical composition, mechanical property and its welding technological properties of novel C B2 heat resisting steel, The welding wires of 616 Φ of MTS 2.4 and the welding rods of MTS 5Co1 Φ 3.2 from Bole company;
(2) polish the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, and clear up large-diameter pipe in novel C B2 heat resisting steel The debris such as oil, paint, dirt and iron rust in the range of 50mm around the welding groove in road;
(3) 100%PT detections are carried out to the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, in novel C B2 heat resisting steel The welding groove surface flawless in large-diameter pipe road is qualified, it is ensured that the welding groove surface in large-diameter pipe road in novel C B2 heat resisting steel The defects of flawless;
(4) before large-diameter pipe road is grouped in the two novel C B2 heat resisting steel for welding needs, in novel C B2 heat resisting steel Argon filling heating and thermal insulation integration frock is set to be filled as sealed gas chamber at middle large-diameter pipe road inner distance welding groove 200mm Insertion argon gas pipeline in the centre bore of one end insulation baffle plate of argon heating and thermal insulation integration frock, by argon gas pipeline to closed gas Indoor argon filling;
(5) it is same to the inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel by argon filling heating and thermal insulation integration frock Shi Jinhang is preheated, and preheating temperature is 200-250 DEG C, the inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel is reached pre- Hot temperature requirement;
(6) bottoming is welded, and is welded using GTAW and is carried out two layers of welding, welding condition is:Welding current 90- 100A, 200-250 DEG C of interlayer temperature;Cover welding is filled, is welded using SMAW and carries out two channel welds, controls heat input, Avoid interlayer temperature too high, welding condition is:Welding current 80-120A, 200-300 DEG C of interlayer temperature;Control is per thickness Degree is no more than the diameter of welding rod, and width is no more than 4 times of core diameter,;
(7) after the completion of welding, weldment is cooled to 80 DEG C, and after being incubated 1h, using argon filling heating and thermal insulation integration frock Carry out post weld heat treatment so that the inner and outer walls of pipeline temperature difference reaches standard requirement and is even less than standard requirement, PWHT procedures In, post weld heat treatment temperature is 730-750 DEG C, post weld heat treatment programming rate≤80 DEG C, cooling rate≤60 DEG C, at postwelding heat Width of heating and insulation width are managed according to pipeline specifications, is strictly performed by technique, it is ensured that samming scope meets the requirements.
In the present embodiment, in the step (1), novel C B2 heat resisting steel is that 1.27% is added on the basis of P91 steel Co, while a small amount of Nb and B are added, what the appropriate content for increasing Mo obtained, in order to improve the high-temperature mechanics of steel Energy;The chemical composition ranges and mechanical property of novel C B2 heat resisting steel are as shown in Table 1 and Table 2:
The chemical composition list (%) of the novel C B2 heat resisting steel of table 1
C Cr Ni Co Mo V Nb B N
0.13 9.11 0.14 1.27 1.59 0.21 0.054 0.01 0.015
The novel C B2 heat resisting steel of table 2 mechanical property at room temperature
According to the chemical composition, mechanical property and its welding technological properties of novel C B2 heat resisting steel, from the weldering of Bole company The silk Φ 2.4 of MTS 616 and welding rod MTS 5Co1 Φ 3.2.Welding wire MTS 616 and welding rod the MTS 5Co1 of Bole company chemistry into Point, mechanical property it is suitable with novel C B2 heat resisting steel, and using welding wire MTS 616 and welding rod MTS the 5Co1 welderings of Bole company It is functional to connect CB2 steel welding technologies.
In the present embodiment, the argon filling heating and thermal insulation integration frock includes two heating frocks and two are set respectively In the insulation baffle plate that two are heated on the outside of frock, two are heated frocks and two insulation baffle combinations into sealed gas chamber;It is described to add Thermal technology, which fills, includes large-diameter pipe frame, tracklayer heater and high temperature resistant load-bearing pulley, along the circumferential direction uniform on the large-diameter pipe frame The symmetrical square hole of two row is disposed with, the insulation closure plate is provided with the outside of the large-diameter pipe frame, wherein on an insulation closure plate It is provided with centre bore;It is provided with alumina silicate heat-preservation cotton on the inwall of the large-diameter pipe frame, uniform cloth on the outer wall of the large-diameter pipe frame Multiple tracklayer heaters are equipped with, multiple high temperature resistant load-bearing have also been evenly arranged on the outer wall of the large-diameter pipe frame and have been slided Wheel, the high temperature resistant load-bearing pulley is between two adjacent tracklayer heaters;Middle part in the large-diameter pipe frame is set There is cross support frame, the cross support frame includes vertically disposed support tube and is horizontally set on the support tube hub Hollow steel pipe, through there is a rigid drawstring in the hollow steel pipe, one end of the rigid drawstring is incubated closure plate with one and fixed Connection, the other end extend the big footpath thick-walled pipe of 9%~12%Cr martensite heat-resistant steels by the centre bore on another insulation closure plate Road.
On the basis of above-described embodiment, in step described in one embodiment of the invention (4), air tube can be also used from new The welding groove gap insertion sealed gas chamber in large-diameter pipe road carries out nitrogen charging in type CB2 heat resisting steel.
The welding of large-diameter pipe road and Technology for Heating Processing, its institute in the novel C B2 heat resisting steel that one embodiment of the invention is provided State in step (7), use multi-region temperature control, the mode of multi-point temperature measurement carry out the detailed process of post weld heat treatment for:In novel C B2 The position while welding arrangement temperature-control heat couple in large-diameter pipe road in heat resisting steel, the weld seam both sides heat in large-diameter pipe road in novel C B2 heat resisting steel The zone of influence respectively sets a temperature thermocouple, monitors the temperature of heat affected area, is heated using flexible ceramic heater, arranges Scope should be centered on weld seam, and post weld heat treatment width of heating is strictly performed according to pipeline specifications by designation of heat treatment, it is ensured that Warm scope meets the requirements;It is incubated, thickness at least 50mm, is along the circumferential direction wrapped on the heaters using alumina silicate insulation blanket Wrap up in, insulation width is counted from Weld pipe mill, should be than heater width increase at least 2 times of wall thickness per side;Built in being used inside pipeline Heating and thermal insulation frock so that the inner and outer walls of pipeline temperature difference reaches standard requirement and is even less than standard requirement.
As can be seen from the above description, the application the above embodiments realize following technique effect:
(1) present invention realizes the welding and heat treatment to large-diameter pipe road in novel C B2 heat resisting steel, reduces the work of welder Intensity, welding quality is ensure that, and by reasonably controlling welding and heat treatment process parameter, obtained welding point is once Qualification rate is high, welding point combination property is more excellent;
(2) present invention argon filling, heating, heat insulation integrated frock built in large-diameter pipe road in novel C B2 heat resisting steel, both can be with Ensure argon-filled protection effect, and can reduces pipeline preheating, the inside and outside wall temperature difference of post weld heat treatment, improves the matter of welding and heat treatment Amount;
(3) weldment is cooled to after 80 DEG C of insulation 1h by the present invention after the completion of welding carries out post weld heat treatment, at postwelding heat Reason uses built-in argon filling heating and thermal insulation frock so that the inner and outer walls of pipeline temperature difference reaches standard requirement and is even less than standard requirement.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, model not is protected to the present invention The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deformation that creative work can make still within protection scope of the present invention.

Claims (10)

1. the welding of large-diameter pipe road and Technology for Heating Processing in a kind of novel C B2 heat resisting steel, it is characterized in that, comprise the following steps:
(1) required according to the chemical composition, mechanical property and its welding technological properties of novel C B2 heat resisting steel, choose wlding;
(2) polish the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, and clear up large-diameter pipe road in novel C B2 heat resisting steel Debris in the range of 50mm around welding groove;
(3) 100%PT detections are carried out to the welding groove in large-diameter pipe road in novel C B2 heat resisting steel, big footpath in novel C B2 heat resisting steel The welding groove surface flawless of pipeline is qualified;
(4) it is big in novel C B2 heat resisting steel before large-diameter pipe road is grouped in the two novel C B2 heat resisting steel for welding needs Argon filling heating and thermal insulation integration frock is set at the pipeline inner distance welding groove 200mm of footpath as sealed gas chamber, in argon filling plus Insertion argon gas pipeline in the centre bore of one end insulation baffle plate of the heat insulation integrated frock of heat, by argon gas pipeline into sealed gas chamber Argon filling;
(5) inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel is entered simultaneously by argon filling heating and thermal insulation integration frock Row preheating;
(6) bottoming is welded, and is welded using GTAW and is carried out two layers of welding;Cover welding is filled, is welded using SMAW and carries out two Channel welds, control the diameter for being no more than welding rod per thickness degree, and width is no more than 4 times of core diameter;
(7) after the completion of welding, weldment is cooled to 80 DEG C, and after being incubated 1h, using argon filling heating and thermal insulation integration frock, is based on Multi-region temperature control, the mode of multi-point temperature measurement carry out post weld heat treatment.
2. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (1), the chemical composition ranges of novel C B2 heat resisting steel are (%):Cr:=9.11, Mo:=1.59, Co:=1.27; Mechanical property requirements are:Tensile strength:>=690Mpa, surrender are slight:≥490Mpa.
3. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (1), from the welding wires of Φ 2.4 and the welding rods of Φ 3.2.
4. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (4), the argon filling heating and thermal insulation integration frock includes two heating frocks and two are separately positioned on two and add Thermal technology fills the insulation baffle plate in outside, two heating frocks and two insulation baffle combinations into sealed gas chamber.
5. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (4), can also use the welding groove gap insertion sealed gas chamber in air tube large-diameter pipe road from novel C B2 heat resisting steel to enter Row nitrogen charging.
6. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (5), preheating temperature is 200-250 DEG C, the inner and outer wall in large-diameter pipe road in novel C B2 heat resisting steel is reached pre- Hot temperature requirement.
7. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (6), the welding condition of GTAW welding is:Welding current 90-100A, 200-250 DEG C of interlayer temperature.
8. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (6), the welding condition of SMAW welding is:Welding current 80-120A, 200-300 DEG C of interlayer temperature.
9. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (7), the detailed process of post weld heat treatment is:The position while welding arrangement control in large-diameter pipe road in novel C B2 heat resisting steel Galvanic couple is warmed, the weld seam both sides heat affected area in large-diameter pipe road respectively sets a temperature thermocouple, monitoring heat in novel C B2 heat resisting steel The temperature of the zone of influence;Heated using flexible ceramic heater, arrangement scope should be centered on weld seam, it is ensured that samming scope accords with Close and require;It is incubated using alumina silicate insulation blanket, is along the circumferential direction wrapped up on the heaters, insulation width is calculated from Weld pipe mill Rise, should be than heater width increase at least 2 times of wall thickness per side;Argon filling heating and thermal insulation integration frock built in being used inside pipeline is entered Row heating so that the inner and outer walls of pipeline temperature difference reaches or less than standard requirement.
10. the welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel according to claim 1, it is characterized in that, institute State in step (7), in PWHT procedures, post weld heat treatment temperature is 730-750 DEG C, post weld heat treatment programming rate≤80 DEG C, cooling rate≤60 DEG C.
CN201710962431.XA 2017-10-16 2017-10-16 Novel CB2 heat-resistant steel medium-large diameter pipeline welding and heat treatment process Active CN107598332B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710962431.XA CN107598332B (en) 2017-10-16 2017-10-16 Novel CB2 heat-resistant steel medium-large diameter pipeline welding and heat treatment process
PCT/CN2018/109395 WO2019076208A1 (en) 2017-10-16 2018-10-09 Welding and heat treatment process for medium-to-large diameter pipeline of novel cb2 heat-resistant steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710962431.XA CN107598332B (en) 2017-10-16 2017-10-16 Novel CB2 heat-resistant steel medium-large diameter pipeline welding and heat treatment process

Publications (2)

Publication Number Publication Date
CN107598332A true CN107598332A (en) 2018-01-19
CN107598332B CN107598332B (en) 2020-05-08

Family

ID=61077489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710962431.XA Active CN107598332B (en) 2017-10-16 2017-10-16 Novel CB2 heat-resistant steel medium-large diameter pipeline welding and heat treatment process

Country Status (2)

Country Link
CN (1) CN107598332B (en)
WO (1) WO2019076208A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019076208A1 (en) * 2017-10-16 2019-04-25 中国电建集团山东电力建设第一工程有限公司 Welding and heat treatment process for medium-to-large diameter pipeline of novel cb2 heat-resistant steel
CN111215731A (en) * 2019-11-06 2020-06-02 中国化学工程第六建设有限公司 Welding and heat treatment method of high-temperature and high-pressure TP347 pipe
CN111304520A (en) * 2020-03-30 2020-06-19 共享铸钢有限公司 Method for smelting CB2 material by electric arc furnace
CN112191986A (en) * 2020-09-25 2021-01-08 中国化学工程第六建设有限公司 Method for controlling cracks and air holes in welding process of 800HT pipeline

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000516148A (en) * 1996-08-12 2000-12-05 ティーアールアイ・トゥール・インコーポレーテッド Welding method
CN102615380A (en) * 2012-03-10 2012-08-01 广东省韶关粤江发电有限责任公司 Welding process of ultra-supercritical fossil power unit for welding SA335-P91/P92 steel
CN102848048A (en) * 2012-09-07 2013-01-02 龙口中集来福士海洋工程有限公司 Pipeline welding method
WO2013024344A1 (en) * 2011-08-17 2013-02-21 Lincoln Global, Inc. Method and system to start and use combination filler wire feed and high intensity energy source for welding
CN104858555A (en) * 2015-06-10 2015-08-26 江苏力沛电力工程技术服务有限公司 Pressure pipeline welding process
CN105234598A (en) * 2015-10-19 2016-01-13 东方电气集团东方汽轮机有限公司 Material repair welding method of CB2 casting of ultra-supercritical turbine unit
CN105983792A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Furnace carbon steel large-diameter pipeline welding joint thermal treatment process
CN205967773U (en) * 2016-08-29 2017-02-22 四川空分设备(集团)有限责任公司 Stainless steel pipe welding back of body gas protection device
CN106624279A (en) * 2016-12-26 2017-05-10 中国核工业第二二建设有限公司 Automatic welding method for large-diameter pipe
CN107150161A (en) * 2017-05-26 2017-09-12 中国能源建设集团湖南火电建设有限公司 A kind of T91 steel welding technologies

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3712797B2 (en) * 1996-09-03 2005-11-02 バブコック日立株式会社 Welded structure of ferritic heat resistant steel pipe
JP4015780B2 (en) * 1999-06-18 2007-11-28 バブコック日立株式会社 Heat-resistant steel welding method and post-heat treatment method
CN101850460A (en) * 2010-05-21 2010-10-06 中国石化集团第五建设公司 Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN102230066B (en) * 2011-06-22 2013-02-13 中石化第十建设有限公司 Local heat treatment process for welding seam of 12CrlMoV pipe
CN107598332B (en) * 2017-10-16 2020-05-08 山东电力建设第一工程公司 Novel CB2 heat-resistant steel medium-large diameter pipeline welding and heat treatment process

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000516148A (en) * 1996-08-12 2000-12-05 ティーアールアイ・トゥール・インコーポレーテッド Welding method
WO2013024344A1 (en) * 2011-08-17 2013-02-21 Lincoln Global, Inc. Method and system to start and use combination filler wire feed and high intensity energy source for welding
CN102615380A (en) * 2012-03-10 2012-08-01 广东省韶关粤江发电有限责任公司 Welding process of ultra-supercritical fossil power unit for welding SA335-P91/P92 steel
CN102848048A (en) * 2012-09-07 2013-01-02 龙口中集来福士海洋工程有限公司 Pipeline welding method
CN105983792A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Furnace carbon steel large-diameter pipeline welding joint thermal treatment process
CN104858555A (en) * 2015-06-10 2015-08-26 江苏力沛电力工程技术服务有限公司 Pressure pipeline welding process
CN105234598A (en) * 2015-10-19 2016-01-13 东方电气集团东方汽轮机有限公司 Material repair welding method of CB2 casting of ultra-supercritical turbine unit
CN205967773U (en) * 2016-08-29 2017-02-22 四川空分设备(集团)有限责任公司 Stainless steel pipe welding back of body gas protection device
CN106624279A (en) * 2016-12-26 2017-05-10 中国核工业第二二建设有限公司 Automatic welding method for large-diameter pipe
CN107150161A (en) * 2017-05-26 2017-09-12 中国能源建设集团湖南火电建设有限公司 A kind of T91 steel welding technologies

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019076208A1 (en) * 2017-10-16 2019-04-25 中国电建集团山东电力建设第一工程有限公司 Welding and heat treatment process for medium-to-large diameter pipeline of novel cb2 heat-resistant steel
CN111215731A (en) * 2019-11-06 2020-06-02 中国化学工程第六建设有限公司 Welding and heat treatment method of high-temperature and high-pressure TP347 pipe
CN111304520A (en) * 2020-03-30 2020-06-19 共享铸钢有限公司 Method for smelting CB2 material by electric arc furnace
CN111304520B (en) * 2020-03-30 2021-10-26 共享铸钢有限公司 Method for smelting CB2 material by electric arc furnace
CN112191986A (en) * 2020-09-25 2021-01-08 中国化学工程第六建设有限公司 Method for controlling cracks and air holes in welding process of 800HT pipeline

Also Published As

Publication number Publication date
CN107598332B (en) 2020-05-08
WO2019076208A1 (en) 2019-04-25

Similar Documents

Publication Publication Date Title
CN107598332A (en) The welding of large-diameter pipe road and Technology for Heating Processing in novel C B2 heat resisting steel
CN104220624B (en) The excellent low yield ratio, high strength steel plate of resistance to distortion aging property and its manufacture method and the high strength welded steelpipe using the steel plate
US8709174B2 (en) Seamless steel pipe for line pipe and method for manufacturing the same
CN101844281B (en) Stainless steel welding material
JPS6254022A (en) Production of welded steel pipe usable in transport of acidic gas and/or oil
CN108866314B (en) Method for ensuring heat treatment uniformity of large-diameter thick-wall pipe weld joint
JP2012524661A (en) Low carbon welded steel pipe, system and manufacturing method thereof
CN103614594B (en) A kind of method eliminating refractory alloy hot-work surface folding
CN104894485A (en) Production method of nuclear power plant used high-temperature-resisting brittleness-resisting seamless steel tube with outer diameter of more than 508mm
CN105127237A (en) Production method of double-metal abrasion-resistant composite pipe
CN102581250A (en) Centrifugally cast TP310Cb/T11 bimetal composite tube blank and method for producing same
CN110280923B (en) Fe-Ni-based alloy welding wire for 800H alloy welding, preparation method of Fe-Ni-based alloy welding wire and welding method of 800H alloy
CN102383057A (en) Low temperature-resistant K60 pipe line steel, bent pipe made by same and manufacturing method of bent pipe
CN103103455A (en) Steel plate for 600MPa-level hydroelectric pressure steel tube and preparation method thereof
CN209162147U (en) A kind of cold rolled reinforcing bar annealing device
CN102021499B (en) Method for manufacturing high-strength pipe steel
CN107775280B (en) A kind of manufacturing method of N08825 nickel-base alloy composite-curve
US20180128546A1 (en) Extended leg return elbow for use with a steel making furnace and method thereof
CN105345252B (en) A kind of welding method of high nitrogen steel
CN107557541A (en) The big footpath posted sides pipeline argon filling heating and thermal insulation frock of 9% ~ 12%Cr martensite heat-resistant steels and method
CN106011442A (en) Quenching induction heating device for support roller path part of oversized excavator
CN102127698A (en) Production method of X100 steel grade elbow pipes and pipe fittings
JP3711959B2 (en) Heat resistant low alloy steel pipe and method for producing the same
JP4051042B2 (en) ERW steel pipe containing Cr and method for producing the same
CN202547393U (en) Heat-resistant metal collar for CSP (compact strip production) heating furnace roller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant