CN107587884B - 隧道二衬混凝土拱顶回填注浆装置 - Google Patents

隧道二衬混凝土拱顶回填注浆装置 Download PDF

Info

Publication number
CN107587884B
CN107587884B CN201710942595.6A CN201710942595A CN107587884B CN 107587884 B CN107587884 B CN 107587884B CN 201710942595 A CN201710942595 A CN 201710942595A CN 107587884 B CN107587884 B CN 107587884B
Authority
CN
China
Prior art keywords
flange plate
grouting
secondary lining
fixed flange
lining concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710942595.6A
Other languages
English (en)
Other versions
CN107587884A (zh
Inventor
刘波
冯灿通
罗贤武
李苏
陈江峡
王超
杨洪伟
程东
黄长军
胡寅峰
周斌
刘锦碧
张美飞
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Construction Engineering Co ltd
Original Assignee
China Gezhouba Group Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Construction Engineering Co ltd filed Critical China Gezhouba Group Construction Engineering Co ltd
Priority to CN201710942595.6A priority Critical patent/CN107587884B/zh
Publication of CN107587884A publication Critical patent/CN107587884A/zh
Application granted granted Critical
Publication of CN107587884B publication Critical patent/CN107587884B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

隧道二衬混凝土拱顶回填注浆装置,包括固定法兰盘、移动法兰盘。所述固定法兰盘中部设置第一注浆孔,固定法兰盘底面固定设置多个螺栓,移动法兰盘中部与固定法兰盘的第一注浆孔对应设置第二注浆孔,移动法兰盘上第二注浆孔位置连接一个连接管,移动法兰盘与固定法兰盘设置的多个螺栓对应开孔,固定法兰盘与移动法兰盘之间设置橡胶密封圈,通过螺母将固定法兰盘和移动法兰盘固定,固定法兰盘、移动法兰盘用于固定RPC管。本发明一种隧道二衬混凝土拱顶回填注浆装置,有效的解决了隧道二衬混凝土拱顶部位混凝土脱空问题,保证了隧道二衬混凝土浇筑质量及工程整体施工进度,该发明技术可靠、操作简单、质量保证、能创造良好经济效益。

Description

隧道二衬混凝土拱顶回填注浆装置
技术领域
本发明涉及高速公路工程、水电工程隧道洞内二衬混凝土施工后拱顶回填注浆施工领域,具体是一种隧道二衬混凝土拱顶回填注浆装置。
背景技术
现高速公路工程及水电工程多涉及到隧道施工,隧道施工二衬混凝土均采用钢模台车浇筑,施工中拱顶部位混凝土浇筑存在脱空现象,需进行回填注浆处理。常规设计方式为拱顶预埋注浆管,待二衬混凝土浇筑完成后且混凝土强度达到设计强度75%后方可进行拱顶回填注浆施工,注浆材料通常采用水泥浆,需重复注浆2-3次,施工费用相对增大,且施工质量难以保证;其次,注浆压力过高可能造成二衬混凝土开裂,并且后期多道回填注浆工序作业会影响到工程进度,同时人力及设备资源尚需二次重复投入。因此,隧道二衬混凝土拱顶回填注浆采用常规方式难以保证施工质量,且注浆工序增加相对繁琐,资源重复投入,工程进度受到影响,施工成本投入相对增大。
发明内容
为解决上述技术问题,本发明提供一种隧道二衬混凝土拱顶回填注浆装置,有效的解决了隧道二衬混凝土拱顶部位混凝土脱空问题,保证了隧道二衬混凝土浇筑质量及工程整体施工进度,该发明技术可靠、操作简单、质量保证、能创造良好经济效益。
本发明采取的技术方案为:
一种隧道二衬混凝土拱顶回填注浆装置,包括固定法兰盘、移动法兰盘。所述固定法兰盘中部设置第一注浆孔,固定法兰盘底面固定设置多个螺栓,移动法兰盘中部与固定法兰盘的第一注浆孔对应设置第二注浆孔,移动法兰盘上第二注浆孔位置连接一个连接管,移动法兰盘与固定法兰盘设置的多个螺栓对应开孔,固定法兰盘与移动法兰盘之间设置橡胶密封圈,通过螺母将固定法兰盘和移动法兰盘固定,固定法兰盘、移动法兰盘用于固定RPC管。
所述固定法兰盘、移动法兰盘采用钢板加工成圆盘状;固定法兰盘与衬砌钢模台车孔位周边焊接封闭固定,固定法兰盘底面对称设置四个螺栓;移动法兰盘以固定法兰盘对称设置的四个螺栓一致对应开孔。
所述连接管底端设置外丝,所述连接管下端连接有一道阀门,阀门侧向设置开关手柄,开关手柄作为二衬混凝土拱顶回填注浆施工启动或关闭装置。
所述阀门下端设置有连接套筒,连接套筒侧向设置有压力表,压力表用于回填注浆过程压力控制。
所述连接套筒下端连接有变径连接头,变径连接头上、下两端均设置丝口,变径连接头下端与注浆机管路连接,形成整套灌浆***。
所述RPC管安装后距离初衬面有1-2cm间隙,RPC管管径与固定法兰盘的第一注浆孔对应一致。
本发明一种隧道二衬混凝土拱顶回填注浆装置,技术效果如下:
1)、隧道二衬混凝土拱顶回填注浆在混凝土浇筑完成后即可开始注浆,充分利用二衬间歇时间施工,与常规待二衬混凝土拆模且强度达设计强度75%后开始注浆相比,可节约后期注浆时间及资源的重复投入,降低施工成本,不影响后续其他工序进度。
2)、隧道二衬混凝土拱顶回填注浆可通过较高的压力注浆,解决了常规高压力注浆影响混凝土开裂问题,充分密实二衬混凝土的空洞,修复衬砌缺陷。
3)、整套隧道二衬混凝土拱顶回填注浆装置加工制作简单,注浆技术可靠,质量保证,取得经济效益良好。
附图说明
图1为本发明装置的结构示意图。
其中:1-固定法兰盘,2-螺母,3-螺栓,4-移动法兰盘,5-连接管,6-阀门,7-开关手柄,8-连接套筒,9-压力表,10-变径连接头,11-橡胶密封圈,12-RPC管,13-衬砌台车模板,14-初衬面,15-拱顶脱空部位,16-二衬砌混凝土。
具体实施方式
如图1所示,隧道二衬混凝土拱顶回填注浆装置,包括固定法兰盘1、移动法兰盘4、压力表9、变径连接头10、RPC管12。所述固定法兰盘1与移动法兰盘4采用钢板自行加工,加工大小尺寸一致成圆盘状,主要用于固定RPC管12;所述压力表9主要作为二衬混凝土拱顶回填注浆压力控制装置;所述变径连接头10主要作为注浆机注浆管路连接接头使用。
所述固定法兰盘1采用厚度10mm厚钢板加工作制,根据固定法兰盘1加工尺寸预先在钢模台车拱顶部位开设与之尺寸对应孔位,固定法兰盘1在对应孔位处与衬砌钢模台车孔位周边焊接封闭固定,固定法兰盘1中部设置注浆孔,底面对称设置四个螺栓3,螺栓3与固定法兰盘1焊接固定。
所述移动法兰盘4采用厚度10mm厚钢板加工制作,尺寸与固定法兰盘1对应,移动法兰盘4中部与固定法兰盘1对应设置注浆孔,并在开孔位置底部焊接连接管5,连接管5底端设置外丝,移动法兰盘4以固定法兰盘1对称设置的四个螺栓3一致对应开孔,固定法兰盘1与移动法兰盘4之间设置橡胶密封圈11,采用螺母2将固定法兰盘1和移动法兰盘4固定。
所述连接管5下端连接有一道阀门6,阀门6侧向设置开关手柄7,主要作为二衬混凝土拱顶回填注浆施工启动或关闭装置。
所述阀门6下端设置有连接套管8,连接套筒8侧向设置有一道压力表9,主要作为回填注浆过程压力控制。
所述连接套筒8下端连接有变径连接头10,变径连接头10上下两端均设置丝口,下端与注浆机管路连接形成整套灌浆***。
所述RPC管12在专业生产厂家订购,长度根据固定法兰盘1、移动法兰盘4及二衬混凝土厚度联合确定,控制RPC管12安装后距离初衬面有1-2cm间隙,保证回填注浆用水泥砂浆顺利通过间隙缝,RPC管12管径与固定法兰盘1中央注浆孔对应一致。
隧道二衬混凝土拱顶回填注浆技术,实施步骤:
(1):结合隧道结构尺寸拟定固定法兰盘1、移动法兰盘4的加工尺寸,并采用厚度10mm钢板加工制作。
(2):根据固定法兰盘1尺寸大小在衬砌台车拱顶中央对应开孔,并在孔位处将固定法兰盘1与衬砌台车焊接固定,焊接形式为满焊,确保焊缝不漏浆液,固定法兰盘1表面与衬砌台车模板表面基本齐平。
(3):将移动法兰盘4通过固定法兰盘1上的四个螺栓3,采用螺母2将移动法兰盘4与固定法兰盘1拼装成整体,拼装时在固定法兰盘1与移动法兰盘4之间设置一层橡胶密封圈11,确保注浆过程中浆液不漏浆。
(4):采用钢钎测量移动法兰盘4上设置的连接管5底口至初衬面之间的深度,根据深度(小于测量深度1-2cm)切割RPC管12,并将RPC管12通过连接管5送入二衬混凝土空间内。
(5):通过衬砌台车浇筑隧道二衬混凝土,并随时观测连接管5是否有浆液溢出,若发现浆液溢出,证明二衬混凝土浇筑已至拱顶部位,此时可以停止二衬混凝土的灌注。
(6):以连接管5下口为起点,依次安装阀门6、压力表9、变径连接头10等装置,使整个注浆装置形成一整套注浆***。
(7):注浆机就位,将注浆机自带注浆管路与变径连接头10连接,即可进行二衬混凝土拱顶注浆施工。
(8):注浆结束后待水泥浆液达到初凝后,拆除注浆机管路,拆除固定法兰盘1以下注浆装置,采用铁锤敲断外露RPC管12,移动衬砌台车至下一个衬砌工作面重复上述施工。

Claims (2)

1.隧道二衬混凝土拱顶回填注浆方法,其特征在于包括以下步骤:
步骤1:结合隧道结构尺寸拟定固定法兰盘(1)、移动法兰盘(4)的加工尺寸,采用厚钢板加工制作;
步骤2:根据固定法兰盘(1)尺寸大小在衬砌台车拱顶中央对应开孔,并在孔位处将固定法兰盘(1)与衬砌台车焊接固定,焊接形式为满焊,确保焊缝不漏浆液,固定法兰盘(1)表面与衬砌台车模板表面基本齐平;
步骤3:将移动法兰盘(4)通过固定法兰盘(1)上的四个螺栓(3),采用螺母(2)将移动法兰盘(4)与固定法兰盘(1)拼装成整体,拼装时在固定法兰盘(1)与移动法兰盘(4)之间设置一层橡胶密封圈(11),确保注浆过程中浆液不漏浆;
步骤4:采用钢钎测量移动法兰盘(4)上设置的连接管(5)底口至初衬面之间的深度,根据深度切割RPC管(12),并将RPC管(12)通过连接管(5)送入二衬混凝土空间内;
步骤5:通过衬砌台车浇筑隧道二衬混凝土,并随时观测连接管(5)是否有浆液溢出,若发现浆液溢出,证明二衬混凝土浇筑已至拱顶部位,此时可以停止二衬混凝土的灌注;
步骤6:以连接管(5)下口为起点,依次安装阀门(6)、压力表(9)、变径连接头(10),使整个注浆装置形成一整套注浆***;
步骤7:注浆机就位,将注浆机自带注浆管路与变径连接头(10)连接,即可进行二衬混凝土拱顶注浆施工。
2.根据权利要求1所述隧道二衬混凝土拱顶回填注浆方法,其特征在于:还包括步骤8:注浆结束后待水泥浆液达到初凝后,拆除注浆机管路,拆除固定法兰盘(1)以下注浆装置,采用铁锤敲断外露RPC管(12),移动衬砌台车至下一个衬砌工作面重复上述施工。
CN201710942595.6A 2017-10-11 2017-10-11 隧道二衬混凝土拱顶回填注浆装置 Active CN107587884B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710942595.6A CN107587884B (zh) 2017-10-11 2017-10-11 隧道二衬混凝土拱顶回填注浆装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710942595.6A CN107587884B (zh) 2017-10-11 2017-10-11 隧道二衬混凝土拱顶回填注浆装置

Publications (2)

Publication Number Publication Date
CN107587884A CN107587884A (zh) 2018-01-16
CN107587884B true CN107587884B (zh) 2023-11-03

Family

ID=61052335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710942595.6A Active CN107587884B (zh) 2017-10-11 2017-10-11 隧道二衬混凝土拱顶回填注浆装置

Country Status (1)

Country Link
CN (1) CN107587884B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442938A (zh) * 2018-02-01 2018-08-24 中铁十二局集团有限公司 一种全液压台车二衬带模注浆机构及其注浆工艺
CN108301846A (zh) * 2018-03-21 2018-07-20 长安大学 隧道衬砌拱顶带模注浆装置及其施工工法
CN108756941B (zh) * 2018-05-28 2020-12-01 中铁隆工程集团有限公司 一种二衬台车带模注浆结构及带模注浆方法
CN108868822B (zh) * 2018-06-29 2024-03-29 平顶山平煤机煤矿机械装备有限公司 隧道衬砌台车用智能注浆孔装置
CN110242324A (zh) * 2019-05-30 2019-09-17 平顶山平煤机煤矿机械装备有限公司 隧道衬砌台车用二次注浆装置
CN111058864A (zh) * 2019-11-29 2020-04-24 中铁九局集团第四工程有限公司 一种隧道拱顶衬砌后方空洞高压注浆辅助装置
CN113123810B (zh) * 2021-05-12 2023-04-07 中交路桥建设有限公司 提高隧道拱顶带模注浆效果的施工工法
CN114704293B (zh) * 2022-03-10 2023-03-21 中南大学 一种隧道二次衬砌拱顶防脱空多角度注浆装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4496268A (en) * 1983-03-01 1985-01-29 Finic, B.V. Method and apparatus for constructing reinforced concrete walls in the earth
CA2378716A1 (en) * 1999-07-13 2001-01-18 Friedrich Meyer Method and system for encasing a pipe conduit, laid in an endless manner, with backfill concrete
CN104295305A (zh) * 2014-02-12 2015-01-21 齐洪军 实现衬砌拱顶充填注浆与隧道衬砌同步实施的工艺和设备
CN104895585A (zh) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 隧道拱顶预留注浆管的施工方法
CN106014454A (zh) * 2016-07-11 2016-10-12 北京鸿锐嘉科技发展有限公司 隧道衬砌拱顶带模注浆装置及注浆工艺
CN106643365A (zh) * 2016-12-13 2017-05-10 中铁十九局集团第二工程有限公司 隧道废弃二衬***拆除及修复施工方法
CN207297034U (zh) * 2017-10-11 2018-05-01 中国葛洲坝集团第六工程有限公司 隧道二衬混凝土拱顶回填注浆装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4496268A (en) * 1983-03-01 1985-01-29 Finic, B.V. Method and apparatus for constructing reinforced concrete walls in the earth
CA2378716A1 (en) * 1999-07-13 2001-01-18 Friedrich Meyer Method and system for encasing a pipe conduit, laid in an endless manner, with backfill concrete
CN104295305A (zh) * 2014-02-12 2015-01-21 齐洪军 实现衬砌拱顶充填注浆与隧道衬砌同步实施的工艺和设备
CN104895585A (zh) * 2015-04-30 2015-09-09 中铁二十一局集团第四工程有限公司 隧道拱顶预留注浆管的施工方法
CN106014454A (zh) * 2016-07-11 2016-10-12 北京鸿锐嘉科技发展有限公司 隧道衬砌拱顶带模注浆装置及注浆工艺
CN106643365A (zh) * 2016-12-13 2017-05-10 中铁十九局集团第二工程有限公司 隧道废弃二衬***拆除及修复施工方法
CN207297034U (zh) * 2017-10-11 2018-05-01 中国葛洲坝集团第六工程有限公司 隧道二衬混凝土拱顶回填注浆装置

Also Published As

Publication number Publication date
CN107587884A (zh) 2018-01-16

Similar Documents

Publication Publication Date Title
CN107587884B (zh) 隧道二衬混凝土拱顶回填注浆装置
CN106988750B (zh) 一种大跨度区间隧道超近距离下穿既有站的实施方式
CN207297034U (zh) 隧道二衬混凝土拱顶回填注浆装置
CN105421222B (zh) 桥梁预制桥墩立柱与承台承插式连接结构及其拼装方法
CN102425159A (zh) 一种灌注桩的截桩施工方法
CN204326248U (zh) 一种带有螺旋形凹凸肋的钢筋对接连接灌浆套筒
CN103422674A (zh) 装配式混凝土结构现浇段混凝土施工方法
CN106150523A (zh) 一种高速铁路隧道水沟电缆槽整体模板施工工法
CN205557302U (zh) 一种短线法拼装节段预制箱梁的接缝连接结构
CN112524335A (zh) 一种非开挖顶进外接支管施工方法
CN104047423B (zh) 一种穿楼地面板精确预留洞口的模具与施工方法
CN108808594B (zh) 注浆密封的电缆穿墙套管结构及其施工方法
CN104060590A (zh) 一种压力引水隧洞的补强防渗结构及其施工方法
CN103981909B (zh) 地脚螺栓断裂后的快速修复方法及结构
CN108755394A (zh) 一种预应力筋加固桥梁异形墩柱的方法
CN107724427A (zh) 一种沉管隧道节段接头的连接方法
CN107762053A (zh) 预制地下室管道模块及其制作方法
CN104481553B (zh) 盾构管片与现浇混凝土接触部位的止水方法
CN113356897B (zh) 一种盾构出入口洞门环梁装配式结构及施工方法
CN110777860A (zh) 一种地铁车站侧墙渗漏水背后注浆封堵方法
CN206889866U (zh) 一种避免渗漏的管道穿池壁装置
CN105510559A (zh) 弱胶结岩体定向劈裂注浆试验***
CN111502238B (zh) 一种多功能模板及其制作与使用方法
CN209924089U (zh) 一种用于管道施工的骑马井装置
CN102051888B (zh) 设备基础直埋地脚螺栓调整孔的施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province

Applicant after: China Gezhouba Group Construction Engineering Co.,Ltd.

Address before: 650206 building 19, business office area, Xingdu international headquarters base, New Asia Sports City, Guandu District, Kunming City, Yunnan Province

Applicant before: CHINA GEZHOUBA GROUP NO.6 ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant