CN107559020A - A kind of separate type tunneling bilayer subway station - Google Patents

A kind of separate type tunneling bilayer subway station Download PDF

Info

Publication number
CN107559020A
CN107559020A CN201710714398.9A CN201710714398A CN107559020A CN 107559020 A CN107559020 A CN 107559020A CN 201710714398 A CN201710714398 A CN 201710714398A CN 107559020 A CN107559020 A CN 107559020A
Authority
CN
China
Prior art keywords
tunneling
double layer
space
tunnels
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710714398.9A
Other languages
Chinese (zh)
Inventor
丁建隆
孙成伟
姜宝臣
朱世友
严东
李现森
唐上明
朱育宏
李阶智
谭佳
徐韬
卢全辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Guangzhou Metro Group Co Ltd
Original Assignee
Guangzhou Metro Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical Guangzhou Metro Group Co Ltd
Priority to CN201710714398.9A priority Critical patent/CN107559020A/en
Publication of CN107559020A publication Critical patent/CN107559020A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of separate type tunneling bilayer subway station, the present invention relates to subway station technical field;The both ends of No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels are equipped with battery limits;Connected between described No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels by communication channel, and the upper outside of No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels is equipped with exit and entrance;Two layer of space is divided into by median septum inside described No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels, subway concourse, platform and staircase are provided with the upper space of two layer of space;It is provided with heat extraction air channel in the lower space of two layer of space, the side in the heat extraction air channel wherein in No.1 tunneling double layer tunnel is provided with No.1 circuit, and the side in the heat extraction air channel in No. two tunneling double layer tunnels is provided with No. two circuits.It can effectively meet station technique kit function, while reduce tunneling section, reduce construction risk, additionally it is possible to reduce pipeline and move and change, optimize traffic data process, its practicality is stronger.

Description

A kind of separate type tunneling bilayer subway station
Technical field
The present invention relates to subway station technical field, and in particular to a kind of separate type tunneling bilayer subway station.
Background technology
In urban compact built-up areas, ground underground building thing, pipeline are numerous, and road traffic is busy, and conventional subway is built If as difficult using cut and cover method, light and shade combination station implementation condition, it is uncontrollable the duration to be present, the construction such as preliminary engineering high cost Problem;Matter condition requires high over the ground at the whole dark digging bilayer station of big cross section simultaneously, and construction risk is big.Therefore it is, it is necessary to a kind of new Station pattern and method of construction, to adapt to the subway construction of urban compact built-up areas.
The content of the invention
It is reasonable in design, make in view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of simple in construction With formula tunneling bilayer subway station is conveniently separated, it can effectively meet station technique kit function, while reduce tunneling section, Reduce construction risk, additionally it is possible to reduce pipeline and move and change, optimize traffic data process, its practicality is stronger.
To achieve the above object, the technical solution adopted by the present invention is:It is double that it includes two symmetrically arranged No.1 tunnelings Floor tunnel and No. two tunneling double layer tunnels;The both ends of No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels are equipped with equipment Area;Connected between described No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels by communication channel, and No.1 tunneling is double-deck The upper outside of tunnel and No. two tunneling double layer tunnels is equipped with exit and entrance;Described No.1 tunneling double layer tunnel and No. two Two layer of space is divided into by median septum inside tunneling double layer tunnel, subway concourse, platform are provided with the upper space of two layer of space And staircase;Heat extraction air channel is provided with the lower space of two layer of space, one of the heat extraction air channel wherein in No.1 tunneling double layer tunnel Side is provided with No.1 circuit, and the side in the heat extraction air channel in No. two tunneling double layer tunnels is provided with No. two circuits.
Further, two subway concourses and a pair of staircases, two subway concourse difference are provided with described No.1 tunneling double layer tunnel It is arranged on the both sides of a pair of staircases;Described No.1 circuit and No. two circuits are arranged in No. two tunneling double layer tunnels, wherein No.1 circuit is arranged in the upper space of two layer of space, and No. two circuits are arranged in the lower space of two layer of space, and No.1 The top of the platform of circuit side is provided with furred ceiling, and area under control is walked in the bottom of the platform of No.1 circuit side provided with pipeline.
The construction procedure of the present invention is as follows:
(1) the tunneling engineering methods such as CRD methods, CD methods or benching tunnelling method are first passed through and build two double layer tunnels, be i.e. No.1 tunneling is double-deck Tunnel and No. two tunneling double layer tunnels, two tunneling two layer of space of combination are as station main part;
(2) arrangement of station equipment room and public area, and technological design are carried out in two tunneling two layer of space;
(3) platform, subway concourse, battery limits UNICOM road are built by tunneling, push pipe or pipe shed method;
(4) build gateway finally by cut and cover method and Feng Ting, public area, battery limits with station are combined, so as to Form complete station.
After said structure, the present invention has the beneficial effect that:A kind of separate type tunneling bilayer subway of the present invention Stand, it can effectively meet station technique kit function, while reduce tunneling section, reduce construction risk, additionally it is possible to reduce pipeline Move and change, optimize traffic data process, its practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, the advantages that low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the schematic cross section of embodiment.
Fig. 2 is the schematic diagram of embodiment upper space.
Fig. 3 is the schematic diagram of embodiment lower space.
Fig. 4 is the schematic cross section of embodiment one.
Fig. 5 is the schematic diagram of the upper space of embodiment one.
Fig. 6 is the schematic diagram of the lower space of embodiment one.
Fig. 7 is the schematic cross section of embodiment two.
Fig. 8 is the schematic diagram of the upper space of embodiment two.
Fig. 9 is the schematic diagram of the lower space of embodiment two.
Description of reference numerals:
1, No. two tunneling double layer tunnel 2 of No.1 tunneling double layer tunnel, exit and entrance 3, communication channel 4, subway concourse 5, platform 6, Staircase 7, pipeline walk area under control 8, heat extraction air channel 9, furred ceiling 10, No.1 circuit 11, No. two circuits 12, battery limits 13.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to as shown in Figure 1-Figure 3, the technical scheme that present embodiment uses is:It is symmetrically arranged comprising two No.1 tunneling double layer tunnel 1 and No. two tunneling double layer tunnels 2;The two of No.1 tunneling double layer tunnel 1 and No. two tunneling double layer tunnels 2 End is equipped with battery limits 13;Connected between described No.1 tunneling double layer tunnel 1 and No. two tunneling double layer tunnels 2 by communication channel 4 It is logical, and the upper outside of No.1 tunneling double layer tunnel 1 and No. two tunneling double layer tunnels 2 is equipped with exit and entrance 3;Described one Two layer of space is divided into by median septum inside number tunneling double layer tunnel 1 and No. two tunneling double layer tunnels 2, two layer of space it is upper Subway concourse 5, platform 6 and staircase 7 are provided with portion space, the wherein neighbour of staircase 7 is located at the both ends of communication channel 4;The bottom of two layer of space is empty In be provided with heat extraction air channel 9, the side in the heat extraction air channel 9 wherein in No.1 tunneling double layer tunnel 1 is provided with No.1 circuit 11, No. two The side in the heat extraction air channel 9 in tunneling double layer tunnel 2 is provided with No. two circuits 12.
The construction procedure of present embodiment is as follows:(1) the tunneling engineering methods such as CRD methods, CD methods or benching tunnelling method are first passed through to build Two high 13.6 meters × 12.0 meters No.1 tunneling double layer tunnels 1 and No. two tunneling double layer tunnels 2 are made, are separated tunnel with median septum For upper and lower two regions, subway concourse, platform passenger use and left and right line driving region, levels are set simultaneously to set up-downgoing staircase respectively Connection, while platform is locally being set, subway concourse UNICOM road, realize subway station function out of the station.It is double-deck empty by two tunnelings Between be combined into station main part;(2) arrangement of station equipment room and public area is carried out in two tunneling two layer of space, and Technological design;(3) platform, subway concourse, battery limits UNICOM road are built by tunneling, push pipe or pipe shed method;(4) finally by cut and cover method Build gateway and Feng Ting, public area, battery limits with station are combined, so as to form complete station.
After said structure, present embodiment has the beneficial effect that:A kind of separation described in present embodiment Formula tunneling bilayer subway station, it can effectively meet station technique kit function, while reduce tunneling section, reduce construction wind Danger, additionally it is possible to reduce pipeline and move and change, optimize traffic data process, its practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, The advantages that low manufacture cost.
Embodiment one:
Referring to Fig. 4-Fig. 6, the present embodiment separate type tunneling bilayer subway station is side formula station, the wherein He of No.1 circuit 11 No. two circuits 12 adjacent both ends for being located at communication channel 4 respectively.
Embodiment two:
Referring to Fig. 7-Fig. 9, the present embodiment separate type tunneling bilayer subway station is superimposing thread station, wherein, described No.1 Two subway concourses 5 are provided with tunneling double layer tunnel 1 and a pair of staircases 7, two subway concourses 5 are separately positioned on the both sides of a pair of staircases 7;Institute The No.1 circuit 11 stated and No. two circuits 12 are arranged in No. two tunneling double layer tunnels 2, and wherein No.1 circuit 11 is arranged on double In the upper space of sheaf space, No. two circuits 12 are arranged in the lower space of two layer of space, and the station of the side of No.1 circuit 11 The top of platform 6 is provided with furred ceiling 10, and area under control 8 is walked in the bottom of the platform 6 of the side of No.1 circuit 11 provided with pipeline.
It is described above, it is merely illustrative of the technical solution of the present invention and unrestricted, those of ordinary skill in the art are to this hair The other modifications or equivalent substitution that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, It all should cover among scope of the presently claimed invention.

Claims (3)

  1. A kind of 1. separate type tunneling bilayer subway station, it is characterised in that:It is double-deck that it includes two symmetrically arranged No.1 tunnelings Tunnel and No. two tunneling double layer tunnels;The both ends of No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels are equipped with battery limits; Connected between described No.1 tunneling double layer tunnel and No. two tunneling double layer tunnels by communication channel, and No.1 tunneling double layer tunnel Exit and entrance is equipped with the upper outside of No. two tunneling double layer tunnels;Described No.1 tunneling double layer tunnel and No. two tunnelings Two layer of space is divided into by median septum inside double layer tunnel, subway concourse, platform are provided with the upper space of two layer of space and is helped Ladder;Heat extraction air channel is provided with the lower space of two layer of space, the side in the heat extraction air channel wherein in No.1 tunneling double layer tunnel is set There is a No.1 circuit, the side in the heat extraction air channel in No. two tunneling double layer tunnels is provided with No. two circuits.
  2. A kind of 2. separate type tunneling bilayer subway station according to claim 1, it is characterised in that:Described No.1 tunneling Two subway concourses and a pair of staircases are provided with double layer tunnel, two subway concourses are separately positioned on the both sides of a pair of staircases;Described No.1 Circuit and No. two circuits are arranged in No. two tunneling double layer tunnels, and wherein No.1 circuit is arranged on the upper space of two layer of space Interior, No. two circuits are arranged in the lower space of two layer of space, and the top of the platform of No.1 circuit side is provided with furred ceiling, No.1 Area under control is walked provided with pipeline in the bottom of the platform of circuit side.
  3. A kind of 3. separate type tunneling bilayer subway station, it is characterised in that:Its construction procedure is as follows:
    (1) the tunneling engineering methods such as CRD methods, CD methods or benching tunnelling method are first passed through and build two double layer tunnels, i.e. No.1 tunneling double layer tunnel With No. two tunneling double layer tunnels, two tunneling two layer of space of combination are as station main part;
    (2) arrangement of station equipment room and public area, and technological design are carried out in two tunneling two layer of space;
    (3) platform, subway concourse, battery limits UNICOM road are built by tunneling, push pipe or pipe shed method;
    (4) gateway and Feng Ting are built finally by cut and cover method, public area, battery limits with station are combined, so as to be formed Complete station.
CN201710714398.9A 2017-08-18 2017-08-18 A kind of separate type tunneling bilayer subway station Pending CN107559020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710714398.9A CN107559020A (en) 2017-08-18 2017-08-18 A kind of separate type tunneling bilayer subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710714398.9A CN107559020A (en) 2017-08-18 2017-08-18 A kind of separate type tunneling bilayer subway station

Publications (1)

Publication Number Publication Date
CN107559020A true CN107559020A (en) 2018-01-09

Family

ID=60976365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710714398.9A Pending CN107559020A (en) 2017-08-18 2017-08-18 A kind of separate type tunneling bilayer subway station

Country Status (1)

Country Link
CN (1) CN107559020A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119151A (en) * 2018-01-24 2018-06-05 中铁工程装备集团有限公司 A kind of Metro Station Structure built using push bench process and its construction method
CN110486062A (en) * 2019-08-15 2019-11-22 中交铁道设计研究总院有限公司 A kind of method of mechanical tunneling multilayer multispan underground engineering in weak soil
CN113847069A (en) * 2021-10-09 2021-12-28 北京城建设计发展集团股份有限公司 Underground excavation subway station of suspension type station hall layer and independent rail traveling area and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2613590Y (en) * 2003-04-28 2004-04-28 上海市隧道工程轨道交通设计研究院 Structure setting for escape way of tunnel
JP2005023765A (en) * 2003-07-01 2005-01-27 Shusaku Hara Underground railway of shield tunnel having four-tracks with cross-shaped cross-section
JP2007284895A (en) * 2006-04-13 2007-11-01 Toda Constr Co Ltd Underground railway construction method
CN201412160Y (en) * 2009-06-02 2010-02-24 中铁第四勘察设计院集团有限公司 Single-cave and double-line subway tunnel
CN102644467A (en) * 2012-04-27 2012-08-22 上海隧道工程股份有限公司 Tunnel connecting passage construction method for directly cutting segment rings through pipe jacking machine
CN105089669A (en) * 2015-09-07 2015-11-25 济南轨道交通集团有限公司 Underground station constructed by prefabricated parts and construction method thereof
CN105240028A (en) * 2015-11-18 2016-01-13 上海市城市建设设计研究总院 Design method of subway station by adopting undercutting method in soft soil area
CN106437724A (en) * 2016-08-31 2017-02-22 济南轨道交通集团有限公司 Subway station constructed by adopting rectangular jacking pipes combined with interval shields and construction method
CN207161092U (en) * 2017-08-18 2018-03-30 中铁隧道勘测设计院有限公司 A kind of separate type tunneling bilayer subway station

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2613590Y (en) * 2003-04-28 2004-04-28 上海市隧道工程轨道交通设计研究院 Structure setting for escape way of tunnel
JP2005023765A (en) * 2003-07-01 2005-01-27 Shusaku Hara Underground railway of shield tunnel having four-tracks with cross-shaped cross-section
JP2007284895A (en) * 2006-04-13 2007-11-01 Toda Constr Co Ltd Underground railway construction method
CN201412160Y (en) * 2009-06-02 2010-02-24 中铁第四勘察设计院集团有限公司 Single-cave and double-line subway tunnel
CN102644467A (en) * 2012-04-27 2012-08-22 上海隧道工程股份有限公司 Tunnel connecting passage construction method for directly cutting segment rings through pipe jacking machine
CN105089669A (en) * 2015-09-07 2015-11-25 济南轨道交通集团有限公司 Underground station constructed by prefabricated parts and construction method thereof
CN105240028A (en) * 2015-11-18 2016-01-13 上海市城市建设设计研究总院 Design method of subway station by adopting undercutting method in soft soil area
CN106437724A (en) * 2016-08-31 2017-02-22 济南轨道交通集团有限公司 Subway station constructed by adopting rectangular jacking pipes combined with interval shields and construction method
CN207161092U (en) * 2017-08-18 2018-03-30 中铁隧道勘测设计院有限公司 A kind of separate type tunneling bilayer subway station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119151A (en) * 2018-01-24 2018-06-05 中铁工程装备集团有限公司 A kind of Metro Station Structure built using push bench process and its construction method
CN110486062A (en) * 2019-08-15 2019-11-22 中交铁道设计研究总院有限公司 A kind of method of mechanical tunneling multilayer multispan underground engineering in weak soil
CN113847069A (en) * 2021-10-09 2021-12-28 北京城建设计发展集团股份有限公司 Underground excavation subway station of suspension type station hall layer and independent rail traveling area and construction method thereof

Similar Documents

Publication Publication Date Title
CN107559020A (en) A kind of separate type tunneling bilayer subway station
CN107460887A (en) A kind of subway station of shield two layer of space combination
CN207161092U (en) A kind of separate type tunneling bilayer subway station
CN106930772B (en) One kind being based on the lateral separate launching construction method of mining sectbn shield and equipment
WO2019218546A1 (en) Mining method for inclined medium-thick ore body
CN110905516B (en) High-sublevel cut-and-fill mining method with downward layered horizontal access
CN108412500A (en) Mountainous City Underground Subway Station vented construction and its construction method
CN205382741U (en) Automatic change six to removing stereo garage
CN106013223B (en) Elliptical section Urban Underground Complex
CN207161123U (en) A kind of subway station of double hole bilayer push pipe Spatial Couplings
KR20150105949A (en) Municipal crossroads structure
CN208073481U (en) Mountainous City Underground Subway Station vented construction
CN105971009A (en) Five-layer circular urban underground complex
WO2019007070A1 (en) Combined road module, unit and system
CN108374432A (en) Pipe gallery integration exploitation is total to the open-cut station of structure with subway
CN214273648U (en) Three-circle shield constructs construction subway station structure
CN106013222B (en) Three circular cross section Urban Underground Complexes
CN105568803A (en) Traffic aisle with no traffic lamp at intersection and capable of achieving any point-to-point barrier-free function
CN107559026A (en) A kind of subway station of double hole bilayer push pipe Spatial Couplings
CN105350577B (en) A kind of combined type traffic tunnel under water
CN110905579A (en) Ventilation structure and ventilation method for downward layered cemented filling stope
CN208121811U (en) Pipe gallery integration exploitation and subway are total to the open-cut station of structure
CN107387112B (en) Urban transportation culvert or tunnel entrance anti-flooding masking device and method
CN207161091U (en) A kind of subway distribution of the threaded list road of single hole shield space four combination
CN208088898U (en) A kind of upper and lower folded bilateral formula station structure based on shield method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190211

Address after: Room 2-3116, 88 Huanhan Road, Tianjin Free Trade Zone (Airport Economic Zone), Tianjin 300000

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Applicant after: GUANGZHOU METRO GROUP Co.,Ltd.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Applicant before: GUANGZHOU METRO GROUP Co.,Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180109

WD01 Invention patent application deemed withdrawn after publication