CN208073481U - Mountainous City Underground Subway Station vented construction - Google Patents

Mountainous City Underground Subway Station vented construction Download PDF

Info

Publication number
CN208073481U
CN208073481U CN201820226975.XU CN201820226975U CN208073481U CN 208073481 U CN208073481 U CN 208073481U CN 201820226975 U CN201820226975 U CN 201820226975U CN 208073481 U CN208073481 U CN 208073481U
Authority
CN
China
Prior art keywords
air
subway station
piston
station
exhaust passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820226975.XU
Other languages
Chinese (zh)
Inventor
刘向远
付守洪
雷勇
方钱宝
赵柏文
甘文
郭麟
廖连烨
曹师铭
安荣�
庞健民
陈浩
曹书铭
胡朝程
唐勇
吴世凯
王天良
王奥博
戴明江
张江
李军
吴其全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201820226975.XU priority Critical patent/CN208073481U/en
Application granted granted Critical
Publication of CN208073481U publication Critical patent/CN208073481U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Mountainous City Underground Subway Station vented construction reduces the engineering risk because of agent structure trepanning to effectively reduce construction removal area and cost of investment.Uplink interval tunnel, downlink interval tunnel including subway station and longitudinally through subway station.Air exhaust passage is set on station one end subway concourse headwall of the subway station, and the outer end of air exhaust passage and the air shaft transverse passage-way of centralized arrangement are connected to form fresh air, air exhaust passage.The air shaft transverse passage-way arranges that fresh air, air draft, Piston Action Wind go out ground by air shaft transverse passage-way, the air shaft of centralized arrangement with uplink interval tunnel, downlink interval tunnel and air exhaust passage in isosceles triangle.

Description

Mountainous City Underground Subway Station vented construction
Technical field
The utility model is related to subway station, more particularly to a kind of Mountainous City Underground Subway Station vented construction.
Background technology
The typical Mountainous City in China, road is narrow, traffic congestion, and both sides building is intensive, does not often construct suitably Place, accessory structure laying in station is difficult, especially underground space of mountain city inadequate resource, and the attached knot of existing ventilation pavilion The conventional method for arranging of structure, faced engineering amount of demolition is big when less solution accessory structure excavates, surface subsidence is difficult to control, and endangers And structure and neighboring buildings security problems, this brings certain difficulty to the smooth construction of Tunnel Engineering.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of Mountainous City Underground Subway Station vented construction, with Construction removal area and cost of investment are effectively reduced, the engineering risk because of agent structure trepanning is reduced.
Technical solution is as follows used by the utility model solves its technical problem:
Mountainous City Underground Subway Station vented construction, including subway station and the uplink interval longitudinally through subway station Tunnel, downlink interval tunnel, it is characterized in that:Air exhaust passage, air draft are set on station one end subway concourse headwall of the subway station The outer end in channel and the air shaft transverse passage-way of centralized arrangement are connected to form fresh air, air exhaust passage;The air shaft transverse passage-way It is arranged in isosceles triangle with uplink interval tunnel, downlink interval tunnel and air exhaust passage, fresh air, air draft, Piston Action Wind are by concentrating cloth Air shaft transverse passage-way, the air shaft set go out ground.
The utility model has the beneficial effects that the limitation for scheme of breaking the normal procedure, makes station ventilation accessory structure build more Mountainous City complex environment is adapted to well;Agent structure trepanning number is reduced, reduces engineering risk, it is ensured that construction safety;It is attached Structure, which is concentrated, draws ground, reduces a large amount of removals, and substantially reduce construction risk, social and economic benefits are notable.
Description of the drawings
This specification includes following seven width attached drawing:
Fig. 1 is the plan view of the utility model Mountainous City Underground Subway Station vented construction;
Fig. 2 is the laying schematic diagram of the utility model Mountainous City Underground Subway Station vented construction apoplexy pavilion group;
Fig. 3 is the cross-section diagram of the utility model Mountainous City Underground Subway Station vented construction;
Fig. 4 is the cross-section diagram of subway station in the Underground Subway Station vented construction of the utility model Mountainous City;
Fig. 5 is the cross-section diagram of lateral air exhaust passage in the Underground Subway Station vented construction of the utility model Mountainous City;
Fig. 6 is the Underground Subway Station floor map that embodiment uses traditional ventilation configuration;
Fig. 7 is the Underground Subway Station floor map of example The utility model vented construction;
Component and corresponding label are shown in figure:Subway station 10, subway concourse headwall 11, uplink interval tunnel 12, descender Between tunnel 13, air shaft transverse passage-way 20, first piston air duct 21, exhausting duct 22, fresh flue 23, second piston air duct 24, Three piston air ducts 25, air shaft 30, passageway for fire apparatus 31, fresh air wind pavilion 32, air draft wind pavilion 33, first piston wind pavilion 34, second Piston Action Wind pavilion 35, air exhaust passage 40.
Specific implementation mode
The utility model is further illustrated with reference to the accompanying drawings and examples.
Referring to Fig.1, Fig. 3 and Fig. 4, the Mountainous City Underground Subway Station vented construction of the utility model, including subway It stands 10 and the uplink interval tunnel 12 longitudinally through subway station 10, downlink interval tunnel 13.The station of the subway station 10 Air exhaust passage 40, the outer end of air exhaust passage 40 and 20 phase of air shaft transverse passage-way of centralized arrangement are set on one end subway concourse headwall 11 Company forms fresh air, air exhaust passage.The air shaft transverse passage-way 20 and uplink interval tunnel 12, downlink interval tunnel 13 and air draft Channel 40 is in isosceles triangle arrangement, air shaft transverse passage-way 20, the air shaft 30 of fresh air, air draft, Piston Action Wind by centralized arrangement Go out ground.I.e. by subway accessory structure centralized arrangement, isosceles triangle tunnel is arranged by section near the end of station in air duct centralized arrangement Road connection air shaft transverse passage-way 20 goes out ground.
Referring to Figures 1 and 2, the upper end of the air shaft 30 is arranged by passageway for fire apparatus 31, fresh air wind pavilion 32, air draft wind pavilion 33, the wind pavilion group that first piston wind pavilion 34 and second piston wind pavilion 35 are constituted, i.e., remove main body tunnel by wind pavilion group, concentrates from end Air exhaust passage 40 draws ground between Head Section, greatly reduces 10 agent structure trepanning number of subway station, reduces engineering risk, it is ensured that Construction safety.
With reference to Fig. 5, the section of the transversal ventilation vertical shaft transverse passage-way 20 is double-layer structure, and first piston wind is arranged in upper layer Road 21, exhausting duct 22 and fresh flue 23, second piston air duct 24 and third piston air duct 25 is arranged in lower layer, while meeting air duct cloth Set the placement with ventilation equipment.
Referring to figs. 1 to Fig. 5, the utility model Mountainous City Underground Subway Station vented construction is applied as follows Work:
(1) 30 well head of air shaft and fore shaft construction, preparation of construction;
(2) fore shaft foundation excavation and locked concrete is poured;
(3) it is successively aerated the excavation of vertical shaft 30, applies vertical shaft preliminary bracing in time;
(4) when air shaft 30 is excavated to stage excavation face, stops excavating, apply rib column and stull in time;
(5) when being excavated to air shaft 20 top bar of transverse passage-way, stop air shaft 30 and excavate;
(6) ingate reinforcement measure is applied using 30 excavation face of air shaft as workbench;
(7) it uses interval wall approach method to excavate 20 arch of air shaft transverse passage-way, and tunnels 3~5m;
(8) continue the downward preliminary bracing for applying air shaft 30 and concrete support to last excavation face;
(9) interval wall approach is used to excavate 20 top bar of air shaft transverse passage-way;
(10) the 20 end wall preliminary bracing of air shaft transverse passage-way is applied;
(11) benching tunnelling method excavates air exhaust passage 40 and applies preliminary bracing;
(12) 10 big mileage end station hall layer construction of subway station.
Embodiment:
The Station that water route station is No. 2 lines of Kweiyang urban track traffic is seen, is located at Nanming District Golconda South Road and sees Water route intersection, along Golconda South Road in south, north orientation arrangement.Guiyang is to belong to typical Mountainous City, and road is narrow, and traffic is gathered around Stifled, both sides building is intensive, and often without suitable construction site, station accessory structure is laid difficult.
With reference to Fig. 6, K is that subway agent structure is open, such as the traditional vented construction of use, and agent structure trepanning is more, work Journey risk is big, and 2 buildings that need to remove, area 10719m2, investment cost is 1.7 hundred million yuan.
Wind pavilion group is unified by cloth with entrance combination construction site using the vented construction of the utility model with reference to Fig. 7 It sets, removal area reduces, it is only necessary to 1 building of removing, area 6119m2, construction investment reduces 70,000,000 yuan, and economic benefit is very Significantly.
Some of the utility model Mountainous City Underground Subway Station vented construction described above that only explains through diagrams are former Reason, be not intended to by the utility model be confined to shown in and the concrete structure and the scope of application in, therefore every be possible to The corresponding modification being utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (3)

1. Mountainous City Underground Subway Station vented construction, including subway station (10) and longitudinally through the upper of subway station (10) Row running tunnel (12), downlink interval tunnel (13), it is characterized in that:Station one end subway concourse headwall of the subway station (10) (11) air exhaust passage (40) is set on, and the outer end of air exhaust passage (40) is connected shape with the air shaft transverse passage-way (20) of centralized arrangement At fresh air, air exhaust passage;The air shaft transverse passage-way (20) and uplink interval tunnel (12), downlink interval tunnel (13) and row Wind channel (40) arranges that fresh air, air draft, Piston Action Wind pass through the air shaft transverse passage-way (20) of centralized arrangement, ventilation in isosceles triangle Vertical shaft (30) goes out ground.
2. Underground Subway Station vented construction in Mountainous City as described in claim 1, it is characterized in that:The air shaft is horizontal logical The section in road (20) is double-layer structure, and first piston air duct (21), exhausting duct (22) and fresh flue (23), lower layer is arranged in upper layer Second piston air duct (24) and third piston air duct (25) are set.
3. Underground Subway Station vented construction in Mountainous City as claimed in claim 2, it is characterized in that:The air shaft (30) Upper end be arranged by passageway for fire apparatus (31), fresh air wind pavilion (32), air draft wind pavilion (33), first piston wind pavilion (34) and second piston The wind pavilion group that wind pavilion (35) is constituted.
CN201820226975.XU 2018-02-08 2018-02-08 Mountainous City Underground Subway Station vented construction Expired - Fee Related CN208073481U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820226975.XU CN208073481U (en) 2018-02-08 2018-02-08 Mountainous City Underground Subway Station vented construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820226975.XU CN208073481U (en) 2018-02-08 2018-02-08 Mountainous City Underground Subway Station vented construction

Publications (1)

Publication Number Publication Date
CN208073481U true CN208073481U (en) 2018-11-09

Family

ID=64037642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820226975.XU Expired - Fee Related CN208073481U (en) 2018-02-08 2018-02-08 Mountainous City Underground Subway Station vented construction

Country Status (1)

Country Link
CN (1) CN208073481U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412500A (en) * 2018-02-08 2018-08-17 中铁二院工程集团有限责任公司 Mountainous City Underground Subway Station vented construction and its construction method
CN110566212A (en) * 2019-09-19 2019-12-13 中铁六局集团石家庄铁路建设有限公司 Construction method for tunnel-first and well-second underground excavation air duct
CN112523773A (en) * 2020-12-11 2021-03-19 广州地铁设计研究院股份有限公司 Subway station environmental control system with wind pavilions arranged at single end
CN112761181A (en) * 2021-01-12 2021-05-07 上海市政交通设计研究院有限公司 Utility tunnel's node structure
CN117948149A (en) * 2024-03-27 2024-04-30 北京城建道桥建设集团有限公司 Multi-starting-point combined excavation construction method for subway station ventilation system with limited ground

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412500A (en) * 2018-02-08 2018-08-17 中铁二院工程集团有限责任公司 Mountainous City Underground Subway Station vented construction and its construction method
CN110566212A (en) * 2019-09-19 2019-12-13 中铁六局集团石家庄铁路建设有限公司 Construction method for tunnel-first and well-second underground excavation air duct
CN110566212B (en) * 2019-09-19 2021-08-06 中铁六局集团石家庄铁路建设有限公司 Construction method for tunnel-first and well-second underground excavation air duct
CN112523773A (en) * 2020-12-11 2021-03-19 广州地铁设计研究院股份有限公司 Subway station environmental control system with wind pavilions arranged at single end
CN112761181A (en) * 2021-01-12 2021-05-07 上海市政交通设计研究院有限公司 Utility tunnel's node structure
CN117948149A (en) * 2024-03-27 2024-04-30 北京城建道桥建设集团有限公司 Multi-starting-point combined excavation construction method for subway station ventilation system with limited ground

Similar Documents

Publication Publication Date Title
CN208073481U (en) Mountainous City Underground Subway Station vented construction
CN108412500A (en) Mountainous City Underground Subway Station vented construction and its construction method
CN106907159B (en) Shallow-buried underground excavation subway station separated open type structure and construction method thereof
CN101440708B (en) PBA shallow buried underground excavating close range large section three-hole separated island type structure construction method
CN111594181B (en) Construction method for communicating and connecting newly-added underground excavation channel and existing station hall layer
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN103452561B (en) Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
US12025008B2 (en) Vertical orthogonal top exhausting air duct structure of deeply-buried subway station and construction method therefor
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
CN110486036B (en) Construction method for expanding arch foot primary support arch cover method
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN203948108U (en) A kind of concreting moulding form of the tunnel with withe and dividing plate
CN108361036B (en) A kind of construction method that subway station accessory structure is plug-in
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN104712342A (en) Method of providing working plane for station expanding excavation construction in large-diameter shield tunnel
CN206888990U (en) A kind of Shallow Covered Metro Station separates open type structure
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN106930318A (en) A kind of buried Room platform channel design in interface water condition subway station and its construction method
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN111794757B (en) Underground water treatment method for composite stratum subsurface excavation construction under existing building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109